Jamaica Bay Feasibility Study
November 13, 2019
Overview
• Nitrogen Removal At Our Wastewater Resource Recovery Facilities
• Shortlisted Technologies for Further Evaluation
• Treatment Optimization Opportunities
• A Focus on Ecological Health of the Bay
2
Purpose
Jamaica Bay Feasibility Study required pursuant to First Amended Nitrogen Consent
Judgment with NYSDEC
Purpose:
• Evaluate the latest nitrogen-removal technologies, and optimization techniques for
existing infrastructure to identify potential measures to reduce nitrogen discharges
from Jamaica Bay Wastewater Treatment Plants (WWTPs) and improve DO water
quality.
• The City will be able to use results of Feasibility Study to assist in determining which
technologies, if any, may be appropriate for further upgrades or to support other
regulatory decisions.
Timeline
Relevant Dates
June 2011 Effective date for First Amended Nitrogen Consent
Judgment.
July 31, 2016 Jamaica Bay Phase I post-construction monitoring
commenced following completion of BNR upgrades to JA
and 26W WRRFs.
July 31, 2017 Jamaica Bay Feasibility Study commenced - 12-months
after the start of Phase I post-construction monitoring.
July 31, 2019 Draft of the Jamaica Bay Feasibility Study made available
for public comment – 75 day comment period through
October 15, 2019.
January 31, 2020 Final study is to be released to the public; six-months
after draft available.
Jamaica Bay WRRFs - Total Nitrogen
5
• Level 3 BNR with Chemical Addition achieved on average 77% TN
removal compared to 28% TN removal from Pre-BNR Operation
26W Nitrogen Removal Performance
6
• Level 2 BNR with Chemical Addition achieved on average 75% TN
removal compared to 40% TN removal from Pre-BNR Operation
JA Nitrogen Removal Performance
7
• Currently removes on average of 42% of the influent TN load
• Level 1 BNR – Projected Completion Fall 2022
Coney Island WRRF – Recent Performance
8
• Currently remove on average of 40% of the influent TN load
• Level 1 BNR – Projected Completion Summer 2020
Rockaway WRRF – Recent Performance
9
Innovative Technology Evaluations
Focus on Options for
Jamaica WRRF and
26th Ward WRRF
10
Shortlisted Technologies for Further Evaluation
Concepts Applicable to 26th Ward WRRF
• Simultaneous Nitrification/Denitrification with Dynamic Aeration
Control and Add-On Denitrification Process
• Level 2/3/4 BNR and Add-On Denitrification Process
Concepts Applicable to Jamaica WRRF
• Simultaneous Nitrification/Denitrification with Dynamic Aeration
Control and Add-On Denitrification Process
• Level 2/3/4 BNR with Add-On Denitrification Process
Concepts Applicable to Coney Island and Rockaway WRRFs
• Simultaneous Nitrification/Denitrification with Dynamic Aeration
Control
• Level 3 BNR
11
Future Research Projects
• Focus on Adaptation of Processes to NYC Conditions and
Facilities
• Membrane Aerated Bioreactors (MABR)
• gas transfer membrane that delivers oxygen to a biofilm that is
attached to the surface of the membrane
• provides simultaneous nitrification and denitrification and requires
less aeration energy
• Simultaneous Nitrification/Denitrification (SND)
• allows both nitrification and denitrification to occur in the same
tank at low DO levels
• biochemical mechanisms of nitrogen removal are complex and not
completely understood, rendering operational control over an SND
system difficult
• Ammonia Based Aeration Control (ABAC)
• Reduced aeration energy, supplemental carbon consumption
12
Optimization Opportunities – Enhanced Process Control
• Intensive Contingency Sampling Program developed
• Instrumentation to provide plant staff with added control over the
BNR process
DO Probes
• DO control strategy allows for automated
control of process air based on specified DO
setpoints and inputs from DO probes
Nitrate Probes
• NO3 probe based strategy for glycerol dosing
13
Focus on the Ecological Health of the Bay
Category Projects
Ecological Technology • Algal Turf Scrubber Pilot
Ecosystem Restoration • Sea Lettuce Harvesting Pilot
• Eel Grass Study
• Oyster Bed Pilot
• Head of Bay Oyster Project
• Ribbed Mussel Pilot
Wetland Restoration • Paerdegat Basin Restoration
• Marsh Island Wave Attenuator Study
CSO Reduction • Historical CSO Abatement Projects
• Paerdegat CSO Retention Facility
• Bergen Basin Bending Weirs and Parallel Sewer to Jamaica
WWTP
• Environmental Benefit Projects (EBPs)
• Jamaica Bay Tributaries LTCP
• Green Infrastructure
14
Water Quality Monitoring Timeline
Jamaica Bay PCM Phase II will begin after upgrades are complete at Rockaway
WRRF and Coney Island WRRF for an additional three years of enhanced
monitoring.
15
Date
June 30, 2015 DEP submitted Work Plan for Jamaica Bay Post Construction
Monitoring (PCM)
(The Jamaica Bay PCM Work Plan was reviewed by a Technical Panel
comprised of Dr. Linda Allen, Anand Kumaraswamy, and Dr. John Marra)
July 31, 2016 Jamaica Bay PCM Phase I began (based on 26W Construction
Completion)
July 31, 2017 Jamaica Bay Feasibility Study was initiated
July 31, 2019 Jamaica Bay Feasibility Study was released for public review
January 31, 2020 Jamaica Bay Feasibility Study public release
October 31, 2020 Jamaica Bay PCM Phase I End
Water Quality in Jamaica Bay
16
Total Nitrogen
Water Quality in Jamaica Bay
17
Dissolved Oxygen
Water Quality in Jamaica Bay
18
Temperature
Thank You!
19
Jamaica Bay PCM Sampling Program
• Macroalgae and Marsh Grass Sampling
• Macroalgae
• Biomass
• Intertidal
• Subtidal
• Carbon, Nitrogen, Phosphorus
Content
• Intertidal
• Subtidal
• Marsh Grass
• Biomass (Shoots and Roots)
• Carbon, Nitrogen, Phosphorus
Content
• Biological Studies (Benthic Invertebrates)
• Densities
• Diversity
20
• Physical and Hydraulic
Characterization
• Bathymetry
• Tides
• Currents
• Ambient Water Quality Sampling
• Grab Sampling
• Continuous Sondes
• Primary Productivity
• Sediment Flux Measurements
• Sediment Fluxes
• Pore Water Data
• Solid Phase Data
• Benthic Studies
• Benthic Algae
• Sediment Composition
Jamaica Bay PCM Water Quality Stations
21
Jamaica Bay PCM Sediment Survey Stations
22
Jamaica Bay PCM Macroalgae Sampling Stations
23
Jamaica Bay PCM Marsh Grass Sampling Stations
24
Jamaica Bay PCM Benthic Invertebrate Survey Stations
25

Mais conteúdo relacionado

Mais procurados

Ringsend plant extension
Ringsend plant extensionRingsend plant extension
Ringsend plant extensionNaoise
 
09 reynolds 7th salt workshop (trr)
09 reynolds 7th salt workshop (trr)09 reynolds 7th salt workshop (trr)
09 reynolds 7th salt workshop (trr)leann_mays
 
DHI-UK UGM 2013 Draft Agenda
DHI-UK UGM 2013 Draft AgendaDHI-UK UGM 2013 Draft Agenda
DHI-UK UGM 2013 Draft AgendaStephen Flood
 
Williams Slide Presentation for Northeast Supply Enhancement Project
Williams Slide Presentation for Northeast Supply Enhancement ProjectWilliams Slide Presentation for Northeast Supply Enhancement Project
Williams Slide Presentation for Northeast Supply Enhancement ProjectMarcellus Drilling News
 
Creating A Paradigm Shift, Putting the Buffalo River First: Usace
Creating A Paradigm Shift, Putting the Buffalo River First: UsaceCreating A Paradigm Shift, Putting the Buffalo River First: Usace
Creating A Paradigm Shift, Putting the Buffalo River First: UsaceHealthy Lakes, Healthy Lives
 
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...Graeme Donaldson
 
EOR vs. Storage, Ed Steadman, EERC
EOR vs. Storage, Ed Steadman, EERCEOR vs. Storage, Ed Steadman, EERC
EOR vs. Storage, Ed Steadman, EERCGlobal CCS Institute
 
Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...
Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...
Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...LOWaterkeeper
 
Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...
Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...
Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...LOWaterkeeper
 
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Stephen Flood
 
Underground Infastructure and Deep Foundation Conference
Underground Infastructure and Deep Foundation ConferenceUnderground Infastructure and Deep Foundation Conference
Underground Infastructure and Deep Foundation ConferenceStephen Olubunmi Fadeyi
 
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...Youn Sim, Ph.D., P.E.
 
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...Stephen Flood
 
02 orrell international perspectives
02 orrell international perspectives02 orrell international perspectives
02 orrell international perspectivesleann_mays
 

Mais procurados (20)

Mc Quirk Sess1 101509
Mc Quirk Sess1 101509Mc Quirk Sess1 101509
Mc Quirk Sess1 101509
 
Ringsend plant extension
Ringsend plant extensionRingsend plant extension
Ringsend plant extension
 
09 reynolds 7th salt workshop (trr)
09 reynolds 7th salt workshop (trr)09 reynolds 7th salt workshop (trr)
09 reynolds 7th salt workshop (trr)
 
DHI-UK UGM 2013 Draft Agenda
DHI-UK UGM 2013 Draft AgendaDHI-UK UGM 2013 Draft Agenda
DHI-UK UGM 2013 Draft Agenda
 
LaMP: Great Lakes Program Reporting
LaMP: Great Lakes Program ReportingLaMP: Great Lakes Program Reporting
LaMP: Great Lakes Program Reporting
 
Williams Slide Presentation for Northeast Supply Enhancement Project
Williams Slide Presentation for Northeast Supply Enhancement ProjectWilliams Slide Presentation for Northeast Supply Enhancement Project
Williams Slide Presentation for Northeast Supply Enhancement Project
 
Mark Cowin Same 10282009
Mark Cowin Same 10282009Mark Cowin Same 10282009
Mark Cowin Same 10282009
 
JEWELLERY
JEWELLERYJEWELLERY
JEWELLERY
 
Fashion
FashionFashion
Fashion
 
March 22, 2012
March 22, 2012March 22, 2012
March 22, 2012
 
Creating A Paradigm Shift, Putting the Buffalo River First: Usace
Creating A Paradigm Shift, Putting the Buffalo River First: UsaceCreating A Paradigm Shift, Putting the Buffalo River First: Usace
Creating A Paradigm Shift, Putting the Buffalo River First: Usace
 
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
 
EOR vs. Storage, Ed Steadman, EERC
EOR vs. Storage, Ed Steadman, EERCEOR vs. Storage, Ed Steadman, EERC
EOR vs. Storage, Ed Steadman, EERC
 
Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...
Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...
Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...
 
Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...
Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...
Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...
 
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
 
Underground Infastructure and Deep Foundation Conference
Underground Infastructure and Deep Foundation ConferenceUnderground Infastructure and Deep Foundation Conference
Underground Infastructure and Deep Foundation Conference
 
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
 
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
 
02 orrell international perspectives
02 orrell international perspectives02 orrell international perspectives
02 orrell international perspectives
 

Semelhante a 20191113 jbfs presentation final

ACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay CommunitiesACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay Communitiesecowatchers
 
Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...
Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...
Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...LOWaterkeeper
 
Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Greg Gearheart
 
Kansas Water Vision Implementation - A Regional Approach
Kansas Water Vision Implementation - A Regional ApproachKansas Water Vision Implementation - A Regional Approach
Kansas Water Vision Implementation - A Regional ApproachMatt Unruh
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestFairfax County
 
Marengo lid symposium_2011-09-25
Marengo lid symposium_2011-09-25Marengo lid symposium_2011-09-25
Marengo lid symposium_2011-09-25retzcanter
 
Michael Goffin, Environment Canada, and Susan Hedman, US EPA
Michael Goffin, Environment Canada, and Susan Hedman, US EPAMichael Goffin, Environment Canada, and Susan Hedman, US EPA
Michael Goffin, Environment Canada, and Susan Hedman, US EPAAlliance for the Great Lakes
 
FIRST WAVE OF INCENTIVE-DRIVEN CCS PROJECTS PERMITTED IN NORTH DAKOTA, U.S.
FIRST WAVE OF INCENTIVE-DRIVEN CCS PROJECTS PERMITTED IN NORTH DAKOTA, U.S.FIRST WAVE OF INCENTIVE-DRIVEN CCS PROJECTS PERMITTED IN NORTH DAKOTA, U.S.
FIRST WAVE OF INCENTIVE-DRIVEN CCS PROJECTS PERMITTED IN NORTH DAKOTA, U.S.iQHub
 
EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureKANTHARAJAN GANESAN
 
2008 02 Tidal Power: Management & Mechanisms Gary Shanahan, BERR
2008 02 Tidal Power: Management & Mechanisms Gary Shanahan, BERR2008 02 Tidal Power: Management & Mechanisms Gary Shanahan, BERR
2008 02 Tidal Power: Management & Mechanisms Gary Shanahan, BERRSevernEstuary
 
StormCon 2017 - Stormwater Management at Facilities - Draining to Sediment Su...
StormCon 2017 - Stormwater Management at Facilities - Draining to Sediment Su...StormCon 2017 - Stormwater Management at Facilities - Draining to Sediment Su...
StormCon 2017 - Stormwater Management at Facilities - Draining to Sediment Su...Stefano Biondi
 
Media release niagara falls water board - september 1, 2017
Media release   niagara falls water board - september 1, 2017Media release   niagara falls water board - september 1, 2017
Media release niagara falls water board - september 1, 2017Fatima Bangura
 
Mark Kavanagh CV 2016 no dates
Mark Kavanagh CV  2016 no datesMark Kavanagh CV  2016 no dates
Mark Kavanagh CV 2016 no datesMark Kavanagh
 
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...Deltares
 
Part 490 Presentation
Part 490 PresentationPart 490 Presentation
Part 490 PresentationAmanda Post
 

Semelhante a 20191113 jbfs presentation final (20)

ACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay CommunitiesACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay Communities
 
James riverpartnership2003
James riverpartnership2003James riverpartnership2003
James riverpartnership2003
 
Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...
Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...
Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...
 
Sea Water Air Conditioning in the Caribbean
Sea Water Air Conditioning in the CaribbeanSea Water Air Conditioning in the Caribbean
Sea Water Air Conditioning in the Caribbean
 
Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101
 
Act basin priority project
Act basin priority projectAct basin priority project
Act basin priority project
 
Kansas Water Vision Implementation - A Regional Approach
Kansas Water Vision Implementation - A Regional ApproachKansas Water Vision Implementation - A Regional Approach
Kansas Water Vision Implementation - A Regional Approach
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury Forest
 
Marengo lid symposium_2011-09-25
Marengo lid symposium_2011-09-25Marengo lid symposium_2011-09-25
Marengo lid symposium_2011-09-25
 
Marengo lid symposium_2011-09-25
Marengo lid symposium_2011-09-25Marengo lid symposium_2011-09-25
Marengo lid symposium_2011-09-25
 
Michael Goffin, Environment Canada, and Susan Hedman, US EPA
Michael Goffin, Environment Canada, and Susan Hedman, US EPAMichael Goffin, Environment Canada, and Susan Hedman, US EPA
Michael Goffin, Environment Canada, and Susan Hedman, US EPA
 
FIRST WAVE OF INCENTIVE-DRIVEN CCS PROJECTS PERMITTED IN NORTH DAKOTA, U.S.
FIRST WAVE OF INCENTIVE-DRIVEN CCS PROJECTS PERMITTED IN NORTH DAKOTA, U.S.FIRST WAVE OF INCENTIVE-DRIVEN CCS PROJECTS PERMITTED IN NORTH DAKOTA, U.S.
FIRST WAVE OF INCENTIVE-DRIVEN CCS PROJECTS PERMITTED IN NORTH DAKOTA, U.S.
 
EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & Aquaculture
 
New Ballast Technology Regulations
New Ballast Technology RegulationsNew Ballast Technology Regulations
New Ballast Technology Regulations
 
2008 02 Tidal Power: Management & Mechanisms Gary Shanahan, BERR
2008 02 Tidal Power: Management & Mechanisms Gary Shanahan, BERR2008 02 Tidal Power: Management & Mechanisms Gary Shanahan, BERR
2008 02 Tidal Power: Management & Mechanisms Gary Shanahan, BERR
 
StormCon 2017 - Stormwater Management at Facilities - Draining to Sediment Su...
StormCon 2017 - Stormwater Management at Facilities - Draining to Sediment Su...StormCon 2017 - Stormwater Management at Facilities - Draining to Sediment Su...
StormCon 2017 - Stormwater Management at Facilities - Draining to Sediment Su...
 
Media release niagara falls water board - september 1, 2017
Media release   niagara falls water board - september 1, 2017Media release   niagara falls water board - september 1, 2017
Media release niagara falls water board - september 1, 2017
 
Mark Kavanagh CV 2016 no dates
Mark Kavanagh CV  2016 no datesMark Kavanagh CV  2016 no dates
Mark Kavanagh CV 2016 no dates
 
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
 
Part 490 Presentation
Part 490 PresentationPart 490 Presentation
Part 490 Presentation
 

Mais de ecowatchers

JBTF Nov2023 - JBRPC West Pond Living Shoreline.pdf
JBTF Nov2023 - JBRPC West Pond Living Shoreline.pdfJBTF Nov2023 - JBRPC West Pond Living Shoreline.pdf
JBTF Nov2023 - JBRPC West Pond Living Shoreline.pdfecowatchers
 
NYCParks_HookCreekSedimentPlacement_20231130_FINAL.pptx
NYCParks_HookCreekSedimentPlacement_20231130_FINAL.pptxNYCParks_HookCreekSedimentPlacement_20231130_FINAL.pptx
NYCParks_HookCreekSedimentPlacement_20231130_FINAL.pptxecowatchers
 
Baron - Jamaica Bay Task Force Meeting 2 - 30Nov23.pdf
Baron - Jamaica Bay Task Force Meeting 2 - 30Nov23.pdfBaron - Jamaica Bay Task Force Meeting 2 - 30Nov23.pdf
Baron - Jamaica Bay Task Force Meeting 2 - 30Nov23.pdfecowatchers
 
Fall 2023 JBTF presentation on Additional HRE project areas. .pptx
Fall 2023 JBTF presentation on Additional HRE project areas. .pptxFall 2023 JBTF presentation on Additional HRE project areas. .pptx
Fall 2023 JBTF presentation on Additional HRE project areas. .pptxecowatchers
 
NPS presentation Jamaica Bay Task Force Meeting 2022-11-17.pdf
NPS presentation Jamaica Bay Task Force Meeting 2022-11-17.pdfNPS presentation Jamaica Bay Task Force Meeting 2022-11-17.pdf
NPS presentation Jamaica Bay Task Force Meeting 2022-11-17.pdfecowatchers
 
NYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdf
NYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdfNYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdf
NYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdfecowatchers
 
November 17 2022 Jam Bay Task Force.pdf
November 17 2022 Jam Bay Task Force.pdfNovember 17 2022 Jam Bay Task Force.pdf
November 17 2022 Jam Bay Task Force.pdfecowatchers
 
Baron-Jamaica Bay Task force 17Nov22.pdf
Baron-Jamaica Bay Task force 17Nov22.pdfBaron-Jamaica Bay Task force 17Nov22.pdf
Baron-Jamaica Bay Task force 17Nov22.pdfecowatchers
 
Jamaica Bay Task Force_May 2022.pdf
Jamaica Bay Task Force_May 2022.pdfJamaica Bay Task Force_May 2022.pdf
Jamaica Bay Task Force_May 2022.pdfecowatchers
 
Jamaica Bay Task Force2- 10May22.pdf
Jamaica Bay Task Force2- 10May22.pdfJamaica Bay Task Force2- 10May22.pdf
Jamaica Bay Task Force2- 10May22.pdfecowatchers
 
Spring 2022 Task Force Meeting presentation on Adjacent Sediment Slurry Enric...
Spring 2022 Task Force Meeting presentation on Adjacent Sediment Slurry Enric...Spring 2022 Task Force Meeting presentation on Adjacent Sediment Slurry Enric...
Spring 2022 Task Force Meeting presentation on Adjacent Sediment Slurry Enric...ecowatchers
 
Ribbed Mussel Study Status JBTF.pdf
Ribbed Mussel Study Status JBTF.pdfRibbed Mussel Study Status JBTF.pdf
Ribbed Mussel Study Status JBTF.pdfecowatchers
 
Weppler jam bay task force 3 nov 21
Weppler jam bay task force  3 nov 21Weppler jam bay task force  3 nov 21
Weppler jam bay task force 3 nov 21ecowatchers
 
Jb task force 2021 1103
Jb task force 2021 1103Jb task force 2021 1103
Jb task force 2021 1103ecowatchers
 
201130 west pond reduced
201130 west pond reduced201130 west pond reduced
201130 west pond reducedecowatchers
 
Jamaica bay ecowatchers task force presentation 12.9.2020
Jamaica bay ecowatchers task force presentation   12.9.2020Jamaica bay ecowatchers task force presentation   12.9.2020
Jamaica bay ecowatchers task force presentation 12.9.2020ecowatchers
 
Nyc parks marine debris removal
Nyc parks marine debris removalNyc parks marine debris removal
Nyc parks marine debris removalecowatchers
 
Raptor mgmt presentation12 09-2020
Raptor mgmt presentation12 09-2020Raptor mgmt presentation12 09-2020
Raptor mgmt presentation12 09-2020ecowatchers
 
Jamaica Bay Wildlife refuge west pond proposal for protecting the south shore...
Jamaica Bay Wildlife refuge west pond proposal for protecting the south shore...Jamaica Bay Wildlife refuge west pond proposal for protecting the south shore...
Jamaica Bay Wildlife refuge west pond proposal for protecting the south shore...ecowatchers
 
Ribbed Mussel ability to remove Nitrogen from water bodies.
Ribbed Mussel ability to remove Nitrogen from water bodies.Ribbed Mussel ability to remove Nitrogen from water bodies.
Ribbed Mussel ability to remove Nitrogen from water bodies.ecowatchers
 

Mais de ecowatchers (20)

JBTF Nov2023 - JBRPC West Pond Living Shoreline.pdf
JBTF Nov2023 - JBRPC West Pond Living Shoreline.pdfJBTF Nov2023 - JBRPC West Pond Living Shoreline.pdf
JBTF Nov2023 - JBRPC West Pond Living Shoreline.pdf
 
NYCParks_HookCreekSedimentPlacement_20231130_FINAL.pptx
NYCParks_HookCreekSedimentPlacement_20231130_FINAL.pptxNYCParks_HookCreekSedimentPlacement_20231130_FINAL.pptx
NYCParks_HookCreekSedimentPlacement_20231130_FINAL.pptx
 
Baron - Jamaica Bay Task Force Meeting 2 - 30Nov23.pdf
Baron - Jamaica Bay Task Force Meeting 2 - 30Nov23.pdfBaron - Jamaica Bay Task Force Meeting 2 - 30Nov23.pdf
Baron - Jamaica Bay Task Force Meeting 2 - 30Nov23.pdf
 
Fall 2023 JBTF presentation on Additional HRE project areas. .pptx
Fall 2023 JBTF presentation on Additional HRE project areas. .pptxFall 2023 JBTF presentation on Additional HRE project areas. .pptx
Fall 2023 JBTF presentation on Additional HRE project areas. .pptx
 
NPS presentation Jamaica Bay Task Force Meeting 2022-11-17.pdf
NPS presentation Jamaica Bay Task Force Meeting 2022-11-17.pdfNPS presentation Jamaica Bay Task Force Meeting 2022-11-17.pdf
NPS presentation Jamaica Bay Task Force Meeting 2022-11-17.pdf
 
NYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdf
NYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdfNYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdf
NYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdf
 
November 17 2022 Jam Bay Task Force.pdf
November 17 2022 Jam Bay Task Force.pdfNovember 17 2022 Jam Bay Task Force.pdf
November 17 2022 Jam Bay Task Force.pdf
 
Baron-Jamaica Bay Task force 17Nov22.pdf
Baron-Jamaica Bay Task force 17Nov22.pdfBaron-Jamaica Bay Task force 17Nov22.pdf
Baron-Jamaica Bay Task force 17Nov22.pdf
 
Jamaica Bay Task Force_May 2022.pdf
Jamaica Bay Task Force_May 2022.pdfJamaica Bay Task Force_May 2022.pdf
Jamaica Bay Task Force_May 2022.pdf
 
Jamaica Bay Task Force2- 10May22.pdf
Jamaica Bay Task Force2- 10May22.pdfJamaica Bay Task Force2- 10May22.pdf
Jamaica Bay Task Force2- 10May22.pdf
 
Spring 2022 Task Force Meeting presentation on Adjacent Sediment Slurry Enric...
Spring 2022 Task Force Meeting presentation on Adjacent Sediment Slurry Enric...Spring 2022 Task Force Meeting presentation on Adjacent Sediment Slurry Enric...
Spring 2022 Task Force Meeting presentation on Adjacent Sediment Slurry Enric...
 
Ribbed Mussel Study Status JBTF.pdf
Ribbed Mussel Study Status JBTF.pdfRibbed Mussel Study Status JBTF.pdf
Ribbed Mussel Study Status JBTF.pdf
 
Weppler jam bay task force 3 nov 21
Weppler jam bay task force  3 nov 21Weppler jam bay task force  3 nov 21
Weppler jam bay task force 3 nov 21
 
Jb task force 2021 1103
Jb task force 2021 1103Jb task force 2021 1103
Jb task force 2021 1103
 
201130 west pond reduced
201130 west pond reduced201130 west pond reduced
201130 west pond reduced
 
Jamaica bay ecowatchers task force presentation 12.9.2020
Jamaica bay ecowatchers task force presentation   12.9.2020Jamaica bay ecowatchers task force presentation   12.9.2020
Jamaica bay ecowatchers task force presentation 12.9.2020
 
Nyc parks marine debris removal
Nyc parks marine debris removalNyc parks marine debris removal
Nyc parks marine debris removal
 
Raptor mgmt presentation12 09-2020
Raptor mgmt presentation12 09-2020Raptor mgmt presentation12 09-2020
Raptor mgmt presentation12 09-2020
 
Jamaica Bay Wildlife refuge west pond proposal for protecting the south shore...
Jamaica Bay Wildlife refuge west pond proposal for protecting the south shore...Jamaica Bay Wildlife refuge west pond proposal for protecting the south shore...
Jamaica Bay Wildlife refuge west pond proposal for protecting the south shore...
 
Ribbed Mussel ability to remove Nitrogen from water bodies.
Ribbed Mussel ability to remove Nitrogen from water bodies.Ribbed Mussel ability to remove Nitrogen from water bodies.
Ribbed Mussel ability to remove Nitrogen from water bodies.
 

Último

Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...robinsonayot
 
case-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfcase-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfgarthraymundo123
 
Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...Open Access Research Paper
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxNazmusSakibNS
 
2,6-Dichlorophenol - Material Safety Data Sheet.pptx
2,6-Dichlorophenol - Material Safety Data Sheet.pptx2,6-Dichlorophenol - Material Safety Data Sheet.pptx
2,6-Dichlorophenol - Material Safety Data Sheet.pptxMunamMeher
 
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsMonica Sydney
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...Sareena Khatun
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterNisqually River Council
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
 
Role of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease ManagementRole of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease ManagementRavikumar Vaniya
 
Russian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsRussian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsMonica Sydney
 
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your AreaVip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Areameghakumariji156
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...BrixsonLajara
 
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Hyderabad Escorts Agency
 
Russian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsRussian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsMonica Sydney
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...kumargunjan9515
 
Fuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionFuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionGlenn Rambach
 

Último (20)

Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
 
case-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfcase-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdf
 
Water Pollution
Water Pollution Water Pollution
Water Pollution
 
Deforestation
DeforestationDeforestation
Deforestation
 
Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptx
 
2,6-Dichlorophenol - Material Safety Data Sheet.pptx
2,6-Dichlorophenol - Material Safety Data Sheet.pptx2,6-Dichlorophenol - Material Safety Data Sheet.pptx
2,6-Dichlorophenol - Material Safety Data Sheet.pptx
 
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Role of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease ManagementRole of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease Management
 
Russian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsRussian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai Escorts
 
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your AreaVip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
 
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
 
Russian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsRussian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girls
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
 
Fuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionFuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An Introduction
 

20191113 jbfs presentation final

  • 1. Jamaica Bay Feasibility Study November 13, 2019
  • 2. Overview • Nitrogen Removal At Our Wastewater Resource Recovery Facilities • Shortlisted Technologies for Further Evaluation • Treatment Optimization Opportunities • A Focus on Ecological Health of the Bay 2
  • 3. Purpose Jamaica Bay Feasibility Study required pursuant to First Amended Nitrogen Consent Judgment with NYSDEC Purpose: • Evaluate the latest nitrogen-removal technologies, and optimization techniques for existing infrastructure to identify potential measures to reduce nitrogen discharges from Jamaica Bay Wastewater Treatment Plants (WWTPs) and improve DO water quality. • The City will be able to use results of Feasibility Study to assist in determining which technologies, if any, may be appropriate for further upgrades or to support other regulatory decisions.
  • 4. Timeline Relevant Dates June 2011 Effective date for First Amended Nitrogen Consent Judgment. July 31, 2016 Jamaica Bay Phase I post-construction monitoring commenced following completion of BNR upgrades to JA and 26W WRRFs. July 31, 2017 Jamaica Bay Feasibility Study commenced - 12-months after the start of Phase I post-construction monitoring. July 31, 2019 Draft of the Jamaica Bay Feasibility Study made available for public comment – 75 day comment period through October 15, 2019. January 31, 2020 Final study is to be released to the public; six-months after draft available.
  • 5. Jamaica Bay WRRFs - Total Nitrogen 5
  • 6. • Level 3 BNR with Chemical Addition achieved on average 77% TN removal compared to 28% TN removal from Pre-BNR Operation 26W Nitrogen Removal Performance 6
  • 7. • Level 2 BNR with Chemical Addition achieved on average 75% TN removal compared to 40% TN removal from Pre-BNR Operation JA Nitrogen Removal Performance 7
  • 8. • Currently removes on average of 42% of the influent TN load • Level 1 BNR – Projected Completion Fall 2022 Coney Island WRRF – Recent Performance 8
  • 9. • Currently remove on average of 40% of the influent TN load • Level 1 BNR – Projected Completion Summer 2020 Rockaway WRRF – Recent Performance 9
  • 10. Innovative Technology Evaluations Focus on Options for Jamaica WRRF and 26th Ward WRRF 10
  • 11. Shortlisted Technologies for Further Evaluation Concepts Applicable to 26th Ward WRRF • Simultaneous Nitrification/Denitrification with Dynamic Aeration Control and Add-On Denitrification Process • Level 2/3/4 BNR and Add-On Denitrification Process Concepts Applicable to Jamaica WRRF • Simultaneous Nitrification/Denitrification with Dynamic Aeration Control and Add-On Denitrification Process • Level 2/3/4 BNR with Add-On Denitrification Process Concepts Applicable to Coney Island and Rockaway WRRFs • Simultaneous Nitrification/Denitrification with Dynamic Aeration Control • Level 3 BNR 11
  • 12. Future Research Projects • Focus on Adaptation of Processes to NYC Conditions and Facilities • Membrane Aerated Bioreactors (MABR) • gas transfer membrane that delivers oxygen to a biofilm that is attached to the surface of the membrane • provides simultaneous nitrification and denitrification and requires less aeration energy • Simultaneous Nitrification/Denitrification (SND) • allows both nitrification and denitrification to occur in the same tank at low DO levels • biochemical mechanisms of nitrogen removal are complex and not completely understood, rendering operational control over an SND system difficult • Ammonia Based Aeration Control (ABAC) • Reduced aeration energy, supplemental carbon consumption 12
  • 13. Optimization Opportunities – Enhanced Process Control • Intensive Contingency Sampling Program developed • Instrumentation to provide plant staff with added control over the BNR process DO Probes • DO control strategy allows for automated control of process air based on specified DO setpoints and inputs from DO probes Nitrate Probes • NO3 probe based strategy for glycerol dosing 13
  • 14. Focus on the Ecological Health of the Bay Category Projects Ecological Technology • Algal Turf Scrubber Pilot Ecosystem Restoration • Sea Lettuce Harvesting Pilot • Eel Grass Study • Oyster Bed Pilot • Head of Bay Oyster Project • Ribbed Mussel Pilot Wetland Restoration • Paerdegat Basin Restoration • Marsh Island Wave Attenuator Study CSO Reduction • Historical CSO Abatement Projects • Paerdegat CSO Retention Facility • Bergen Basin Bending Weirs and Parallel Sewer to Jamaica WWTP • Environmental Benefit Projects (EBPs) • Jamaica Bay Tributaries LTCP • Green Infrastructure 14
  • 15. Water Quality Monitoring Timeline Jamaica Bay PCM Phase II will begin after upgrades are complete at Rockaway WRRF and Coney Island WRRF for an additional three years of enhanced monitoring. 15 Date June 30, 2015 DEP submitted Work Plan for Jamaica Bay Post Construction Monitoring (PCM) (The Jamaica Bay PCM Work Plan was reviewed by a Technical Panel comprised of Dr. Linda Allen, Anand Kumaraswamy, and Dr. John Marra) July 31, 2016 Jamaica Bay PCM Phase I began (based on 26W Construction Completion) July 31, 2017 Jamaica Bay Feasibility Study was initiated July 31, 2019 Jamaica Bay Feasibility Study was released for public review January 31, 2020 Jamaica Bay Feasibility Study public release October 31, 2020 Jamaica Bay PCM Phase I End
  • 16. Water Quality in Jamaica Bay 16 Total Nitrogen
  • 17. Water Quality in Jamaica Bay 17 Dissolved Oxygen
  • 18. Water Quality in Jamaica Bay 18 Temperature
  • 20. Jamaica Bay PCM Sampling Program • Macroalgae and Marsh Grass Sampling • Macroalgae • Biomass • Intertidal • Subtidal • Carbon, Nitrogen, Phosphorus Content • Intertidal • Subtidal • Marsh Grass • Biomass (Shoots and Roots) • Carbon, Nitrogen, Phosphorus Content • Biological Studies (Benthic Invertebrates) • Densities • Diversity 20 • Physical and Hydraulic Characterization • Bathymetry • Tides • Currents • Ambient Water Quality Sampling • Grab Sampling • Continuous Sondes • Primary Productivity • Sediment Flux Measurements • Sediment Fluxes • Pore Water Data • Solid Phase Data • Benthic Studies • Benthic Algae • Sediment Composition
  • 21. Jamaica Bay PCM Water Quality Stations 21
  • 22. Jamaica Bay PCM Sediment Survey Stations 22
  • 23. Jamaica Bay PCM Macroalgae Sampling Stations 23
  • 24. Jamaica Bay PCM Marsh Grass Sampling Stations 24
  • 25. Jamaica Bay PCM Benthic Invertebrate Survey Stations 25