INTEGRATING LEAN
SUPPLY WITH
WORK PLAN & VE
helpdesk@construction-productivity.co.uk
htt://www.construction-productivity.co.uk
LEAN CONSTRUCTION
 Lean construction main objective
is to maximizes value and reduces
waste.
 It applies specific techniques in an
innovative project delivery
approach.
 It including:
1. supply chain management,
2. Just-In-Time techniques.
LEAN CONSTRUCTION
LEAN CONSTRUCTION
As well as the open sharing of
information between all the parties
involved in the production process.
Lean manufacturing is an
outgrowth of the Toyota Production
system.
Developed by Taichii Ohno in
Toyota in the 1950s.
LEAN CONSTRUCTION
Ohno identified several
wastes in mass production
systems in car industry such
as:
1. overproducing
2. waiting time
3. transporting
LEAN CONSTRUCTION
also, in other areas such as:
1. processing methods;
2. unnecessary stock on hand;
3. unnecessary motion;
4. defective goods;
5. failure to meet customers’ needs;
6. high waste through out the process.
LEAN CONSTRUCTION
Womack and Jones (1996) suggested that
there are five key principles that need to be
monitored when lean construction systems
are applied in construction. Those are:
Value-clarifying the customer’s needs;
the supply chain involvement in all stages,
from inception to completion;
By clarifying activities or products
that signify value.
LEAN CONSTRUCTION
Value stream: By mapping the
whole value stream
establishing cooperation between
all parties involved;
identifying and eliminating waste;
From taking such steps the
construction process can be
improved.
LEAN CONSTRUCTION
WORK PLAN
 Construction Planning is a
fundamental and challenging activity
in the management and execution of
construction projects
It involves:
1. Managerial
2. Technological
3. Social factors.
WORK PLAN
 A good construction plan is the basis for
developing the budget and the schedule for
work.
 Developing the construction plan is a critical
task in the management of construction.
 In developing a construction plan, it is
common to adopt a primary emphasis on
either cost control or on schedule control.
WORK PLAN
WORK PLAN
A database program called
WorkPlan has been developed to
systematically provide weekly work
plans.
WorkPlan adopts the Last Planner
methodology, which implements a
number of lean construction
techniques.
WORK PLAN
 A week before the actual work starts
WorkPlan guides the management
team step by step through the process
of producing work packages in order to
identify issues such:
 checking constraint
 resolving constraints
 Sending out work packages
 allocating resources
WORK PLAN
Then at the end of the week,
collecting site progress data such
as:
reasons for cost overrun
reason for time overrun
reason for delays
Disruptions
etc
WORK PLAN
This well planned and systematic
approach helps the management
team to create quality work plans.
They learn from any failure
a good WorkPlan is a weekly work
plan
based lean construction
production scheduling
WORK PLAN
 screening
 work package
 Constraint
 percentage of planned completed
(PPC)
 Scheduling of construction work is often
done with the help of computer tools
 It implement the critical-path method
(CPM)
WORK PLAN
 based on activities of given duration
and unit resources allocated to them
 as well as predecessor relationships
between activities
 for different parties involved in a
construction project to communicate
with one another whom should be doing
what work and when.
WORK PLAN
The application of lean production
techniques in construction has
been triggered by its success in
manufacturing (Womack and Jones
1996).
Weekly work plans can be
developed as valuable tools for
production planning and control.
WORK PLAN
This is possible through the
application of lean construction
techniques.
In the application weekly work
plans are generated using a
database (Choo, Tommelein,
Ballard, and Zabelle -1998).
Value Engineering-Constructability
 VALUE ENGINEERING
 Value Engineering (VE) has been defined as:
 the systematic effort directed at analyzing the
functional requirements of:
 systems
 equipment
 facilities
 procedures
 and supplies for the purpose of achieving the
essential function at the lowest total (life-cycle)
cost.
Value Engineering-Constructability
 Also, all the efforts are focused on meeting
needed issues such as:
 Performance;
 Reliability;
 quality, maintainability;
 aesthetics,
 Safety;
 fire resistance;
 while, at the same time, achieving lowest life-
cycle cost.
Value Engineering-Constructability
 Constructability implementation can
act as a predecessor to value
engineering.
 Providing information through
constructor input and lessons
learned from past projects such
that value engineering may be
more effective.
Value Engineering
Implementation of value engineering involves
several steps:
1. Information;
2. functional analysis;
3. creative mind;
4. Evaluation;
5. planning & proposal;
6. Implementation;
7. follow-up.
Value Engineering
The creative step involves a
brainstorming session where life-
cycle cost alternatives, for design
components are considered.
Value engineering may be performed
in two ways:
(1) Proactively
(2) Reactively
Value Engineering(Value Analysis)
What Is Value Engineering?
 Value Engineering (V.E.), also known as Value Analysis,
 is a systematic and function-based approach to
improving the value of products, projects, or processes.
 VE involves a group of people following a structured
process.
 The process helps team members communicate better
across boundaries.
 understand different perspectives,
 innovate, and analyze.
Value Engineering
What does Value Engineering do?
 Value Engineering improves value.
 On a major road development, improvements
to value might include:
 reducing the life cycle cost of an interchange,
enhancing safety in a design;
 or reducing impacts to the public by
shortening the duration of a construction
project.
Value Engineering
 Value Engineering uses a combination of
creative and analytical techniques to identify
alternative ways to achieve objectives.
 The use of Function Analysis differentiates
Value Engineering from other problem solving
approaches.
 VE focuses on delivering the product or service
at the best price.
 This is achieved by incorporating those value
characteristics deemed most important by the
customer.
Value Engineering
How does V.E. work?
 V.E. follows a structured thought process
to evaluate options.
 Every V.E. session goes through a
number of steps:
 Gather information -What is being done
now?
 Measure Performance -How will the
alternatives be measured?
Value Engineering
 Analyse Functions -What must be done?
What does it Cost?
 Generate Ideas (Brainstorming) -What else
will do the job?
 Evaluate and Rank Ideas -Which Ideas are
the best?
 Develop and Expand Ideas -What are the
impacts? What is the cost? What is the
performance?
 Present Ideas Sell Alternatives
This is not helpdesk figure (different source)
Value Engineering
There are four important steps most be taken in
modified VE job plan. They are as follow:
Value Engineering
INTEGRATING LEAN SUPPLY WITH WORK
PLAN & VE

Mais conteúdo relacionado

Mais procurados

COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJCOST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
Tapesh Ajmera
 
Concurrent Engineering
Concurrent EngineeringConcurrent Engineering
Concurrent Engineering
ajithsrc
 
PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost management
ejlp12
 
Implementation of Enterprise Project Controls
Implementation of Enterprise Project ControlsImplementation of Enterprise Project Controls
Implementation of Enterprise Project Controls
Mohamed El-Mehalawi
 
James dimas it infrastructure approach
James dimas it infrastructure approachJames dimas it infrastructure approach
James dimas it infrastructure approach
James (JD) Dimas
 

Mais procurados (19)

Spm chapter 1
Spm chapter 1Spm chapter 1
Spm chapter 1
 
Lean Construction
Lean ConstructionLean Construction
Lean Construction
 
Software Project Management Spm1176
Software Project Management Spm1176Software Project Management Spm1176
Software Project Management Spm1176
 
Project control. Management
Project control. ManagementProject control. Management
Project control. Management
 
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJCOST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
 
Ch 9 project monitoring & control updated
Ch 9 project monitoring & control updatedCh 9 project monitoring & control updated
Ch 9 project monitoring & control updated
 
Monitor and control process group part two
Monitor and control process group part twoMonitor and control process group part two
Monitor and control process group part two
 
Concurrent Engineering
Concurrent EngineeringConcurrent Engineering
Concurrent Engineering
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
 
022 Construction Productivity (PART 1)
022 Construction Productivity (PART 1)022 Construction Productivity (PART 1)
022 Construction Productivity (PART 1)
 
Concurrent Virtual Engineering
Concurrent Virtual EngineeringConcurrent Virtual Engineering
Concurrent Virtual Engineering
 
Dfma as the tool for concurrent engineering
Dfma as the tool for concurrent engineeringDfma as the tool for concurrent engineering
Dfma as the tool for concurrent engineering
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation Tafseer
 
Application of last planner system
Application of last planner systemApplication of last planner system
Application of last planner system
 
Last planner system
Last planner systemLast planner system
Last planner system
 
Project Management
Project ManagementProject Management
Project Management
 
PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost management
 
Implementation of Enterprise Project Controls
Implementation of Enterprise Project ControlsImplementation of Enterprise Project Controls
Implementation of Enterprise Project Controls
 
James dimas it infrastructure approach
James dimas it infrastructure approachJames dimas it infrastructure approach
James dimas it infrastructure approach
 

Semelhante a 041 integrating lean construction (2)

Application of Value Engineering in Commercial Building Projects
Application of Value Engineering in  Commercial Building ProjectsApplication of Value Engineering in  Commercial Building Projects
Application of Value Engineering in Commercial Building Projects
nitinrane33
 
Application of Value Engineering in Construction Projects
Application of Value Engineering in Construction ProjectsApplication of Value Engineering in Construction Projects
Application of Value Engineering in Construction Projects
nitinrane33
 

Semelhante a 041 integrating lean construction (2) (20)

050 intergrating constructability
050 intergrating constructability050 intergrating constructability
050 intergrating constructability
 
050 Intergrating Constructability with Lean Construction
050 Intergrating Constructability with Lean Construction 050 Intergrating Constructability with Lean Construction
050 Intergrating Constructability with Lean Construction
 
concurrent engineering.pdf
concurrent engineering.pdfconcurrent engineering.pdf
concurrent engineering.pdf
 
Value engineering in residential house construction
Value engineering in residential house constructionValue engineering in residential house construction
Value engineering in residential house construction
 
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTIONVALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
 
Application of Value Engineering in Commercial Building Projects
Application of Value Engineering in  Commercial Building ProjectsApplication of Value Engineering in  Commercial Building Projects
Application of Value Engineering in Commercial Building Projects
 
Unit iii-Architecture in the lifecycle
Unit iii-Architecture in the lifecycleUnit iii-Architecture in the lifecycle
Unit iii-Architecture in the lifecycle
 
Application of Value Engineering in Construction Projects
Application of Value Engineering in Construction ProjectsApplication of Value Engineering in Construction Projects
Application of Value Engineering in Construction Projects
 
058 Lean Construction (PART 2) Construction productivity
058 Lean Construction  (PART 2) Construction productivity 058 Lean Construction  (PART 2) Construction productivity
058 Lean Construction (PART 2) Construction productivity
 
058 lean construction (2)
058 lean construction (2)058 lean construction (2)
058 lean construction (2)
 
Software project management
Software project managementSoftware project management
Software project management
 
Software project management 3
Software project management 3Software project management 3
Software project management 3
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project Managment
 
Essay On Stage Scheduling
Essay On Stage SchedulingEssay On Stage Scheduling
Essay On Stage Scheduling
 
122 value engineering
122 value engineering122 value engineering
122 value engineering
 
IRJET- The Application of Value Engineering to Highway Projects and Programs
IRJET- The Application of Value Engineering to Highway Projects and ProgramsIRJET- The Application of Value Engineering to Highway Projects and Programs
IRJET- The Application of Value Engineering to Highway Projects and Programs
 
Design Review Mini
Design Review MiniDesign Review Mini
Design Review Mini
 
Design Review Mini(2)
Design Review Mini(2)Design Review Mini(2)
Design Review Mini(2)
 
IRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate IndustryIRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate Industry
 

Mais de drdej19

Mais de drdej19 (20)

069 managing people
069 managing people069 managing people
069 managing people
 
070 material management
070 material management070 material management
070 material management
 
068 managing fundamentals
068 managing fundamentals068 managing fundamentals
068 managing fundamentals
 
067 management
067 management067 management
067 management
 
066 management structure-the design
066 management structure-the design066 management structure-the design
066 management structure-the design
 
062 logistics and productivity
062 logistics and productivity062 logistics and productivity
062 logistics and productivity
 
065 management information system
065 management information system065 management information system
065 management information system
 
064 management accounting
064 management accounting064 management accounting
064 management accounting
 
063 management theory
063 management theory063 management theory
063 management theory
 
061 logistics and productivity
061 logistics and productivity061 logistics and productivity
061 logistics and productivity
 
059 lean construction
059 lean construction059 lean construction
059 lean construction
 
060 lean supply chain
060 lean supply chain060 lean supply chain
060 lean supply chain
 
055 kpi's-success factor
055 kpi's-success factor055 kpi's-success factor
055 kpi's-success factor
 
057 lean and environment
057 lean and environment057 lean and environment
057 lean and environment
 
056 labour productivity
056 labour productivity056 labour productivity
056 labour productivity
 
054 jit and quality management system
054 jit and quality management system054 jit and quality management system
054 jit and quality management system
 
049 integration of constructability
049 integration of constructability049 integration of constructability
049 integration of constructability
 
048 integrating workers motivation
048 integrating workers motivation048 integrating workers motivation
048 integrating workers motivation
 
047 integrating tqm-cons-ve
047 integrating tqm-cons-ve047 integrating tqm-cons-ve
047 integrating tqm-cons-ve
 
045 integrating scm with jit and tqm
045 integrating scm with jit and tqm045 integrating scm with jit and tqm
045 integrating scm with jit and tqm
 

Último

Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
MateoGardella
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Último (20)

Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 

041 integrating lean construction (2)

  • 1. INTEGRATING LEAN SUPPLY WITH WORK PLAN & VE helpdesk@construction-productivity.co.uk htt://www.construction-productivity.co.uk
  • 2. LEAN CONSTRUCTION  Lean construction main objective is to maximizes value and reduces waste.  It applies specific techniques in an innovative project delivery approach.  It including: 1. supply chain management, 2. Just-In-Time techniques.
  • 4. LEAN CONSTRUCTION As well as the open sharing of information between all the parties involved in the production process. Lean manufacturing is an outgrowth of the Toyota Production system. Developed by Taichii Ohno in Toyota in the 1950s.
  • 5. LEAN CONSTRUCTION Ohno identified several wastes in mass production systems in car industry such as: 1. overproducing 2. waiting time 3. transporting
  • 6. LEAN CONSTRUCTION also, in other areas such as: 1. processing methods; 2. unnecessary stock on hand; 3. unnecessary motion; 4. defective goods; 5. failure to meet customers’ needs; 6. high waste through out the process.
  • 7. LEAN CONSTRUCTION Womack and Jones (1996) suggested that there are five key principles that need to be monitored when lean construction systems are applied in construction. Those are: Value-clarifying the customer’s needs; the supply chain involvement in all stages, from inception to completion; By clarifying activities or products that signify value.
  • 8. LEAN CONSTRUCTION Value stream: By mapping the whole value stream establishing cooperation between all parties involved; identifying and eliminating waste; From taking such steps the construction process can be improved.
  • 10. WORK PLAN  Construction Planning is a fundamental and challenging activity in the management and execution of construction projects It involves: 1. Managerial 2. Technological 3. Social factors.
  • 11. WORK PLAN  A good construction plan is the basis for developing the budget and the schedule for work.  Developing the construction plan is a critical task in the management of construction.  In developing a construction plan, it is common to adopt a primary emphasis on either cost control or on schedule control.
  • 13. WORK PLAN A database program called WorkPlan has been developed to systematically provide weekly work plans. WorkPlan adopts the Last Planner methodology, which implements a number of lean construction techniques.
  • 14. WORK PLAN  A week before the actual work starts WorkPlan guides the management team step by step through the process of producing work packages in order to identify issues such:  checking constraint  resolving constraints  Sending out work packages  allocating resources
  • 15. WORK PLAN Then at the end of the week, collecting site progress data such as: reasons for cost overrun reason for time overrun reason for delays Disruptions etc
  • 16. WORK PLAN This well planned and systematic approach helps the management team to create quality work plans. They learn from any failure a good WorkPlan is a weekly work plan based lean construction production scheduling
  • 17. WORK PLAN  screening  work package  Constraint  percentage of planned completed (PPC)  Scheduling of construction work is often done with the help of computer tools  It implement the critical-path method (CPM)
  • 18. WORK PLAN  based on activities of given duration and unit resources allocated to them  as well as predecessor relationships between activities  for different parties involved in a construction project to communicate with one another whom should be doing what work and when.
  • 19. WORK PLAN The application of lean production techniques in construction has been triggered by its success in manufacturing (Womack and Jones 1996). Weekly work plans can be developed as valuable tools for production planning and control.
  • 20. WORK PLAN This is possible through the application of lean construction techniques. In the application weekly work plans are generated using a database (Choo, Tommelein, Ballard, and Zabelle -1998).
  • 21. Value Engineering-Constructability  VALUE ENGINEERING  Value Engineering (VE) has been defined as:  the systematic effort directed at analyzing the functional requirements of:  systems  equipment  facilities  procedures  and supplies for the purpose of achieving the essential function at the lowest total (life-cycle) cost.
  • 22. Value Engineering-Constructability  Also, all the efforts are focused on meeting needed issues such as:  Performance;  Reliability;  quality, maintainability;  aesthetics,  Safety;  fire resistance;  while, at the same time, achieving lowest life- cycle cost.
  • 23. Value Engineering-Constructability  Constructability implementation can act as a predecessor to value engineering.  Providing information through constructor input and lessons learned from past projects such that value engineering may be more effective.
  • 24. Value Engineering Implementation of value engineering involves several steps: 1. Information; 2. functional analysis; 3. creative mind; 4. Evaluation; 5. planning & proposal; 6. Implementation; 7. follow-up.
  • 25. Value Engineering The creative step involves a brainstorming session where life- cycle cost alternatives, for design components are considered. Value engineering may be performed in two ways: (1) Proactively (2) Reactively
  • 26. Value Engineering(Value Analysis) What Is Value Engineering?  Value Engineering (V.E.), also known as Value Analysis,  is a systematic and function-based approach to improving the value of products, projects, or processes.  VE involves a group of people following a structured process.  The process helps team members communicate better across boundaries.  understand different perspectives,  innovate, and analyze.
  • 27. Value Engineering What does Value Engineering do?  Value Engineering improves value.  On a major road development, improvements to value might include:  reducing the life cycle cost of an interchange, enhancing safety in a design;  or reducing impacts to the public by shortening the duration of a construction project.
  • 28. Value Engineering  Value Engineering uses a combination of creative and analytical techniques to identify alternative ways to achieve objectives.  The use of Function Analysis differentiates Value Engineering from other problem solving approaches.  VE focuses on delivering the product or service at the best price.  This is achieved by incorporating those value characteristics deemed most important by the customer.
  • 29. Value Engineering How does V.E. work?  V.E. follows a structured thought process to evaluate options.  Every V.E. session goes through a number of steps:  Gather information -What is being done now?  Measure Performance -How will the alternatives be measured?
  • 30. Value Engineering  Analyse Functions -What must be done? What does it Cost?  Generate Ideas (Brainstorming) -What else will do the job?  Evaluate and Rank Ideas -Which Ideas are the best?  Develop and Expand Ideas -What are the impacts? What is the cost? What is the performance?  Present Ideas Sell Alternatives
  • 31. This is not helpdesk figure (different source)
  • 33. There are four important steps most be taken in modified VE job plan. They are as follow:
  • 35. INTEGRATING LEAN SUPPLY WITH WORK PLAN & VE

Notas do Editor

  1. Definitions of lead time: the time interval between the initiation and the completion of a production process; "the lead times for many publications can vary tremendously"; "planning is an area where lead time can be reduced