BALASORE ALLOYS LTD. 
Dust Generation 
Mapping 
Elimination & 
Control Plan 
Sustain 
Dust 
Mapping 
& 
Control Plan. 
Prepared By : 
Deepak Kumar Sahoo 
Under the guidance of 
Mr. S V Bhavani Varma 
& Mr. J S Verma 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Cover Page
Dust Generation 
Mapping 
Control Plan 
Sustain 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -i 
Objective 
Achieving 
Dust Free Environment 
in Plant Premises 
through 
Dust Mapping &Control Plan 
[DMCP] Initiative.
Dust Generation 
Mapping 
Control Plan 
Sustain 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page –ii 
Table of Contents 
S/N 
Contents 
Pg. No. 
1 
Introduction 
-: 01:- 
2 
DustGeneration [Source] 
-: 03 :- 
2.1 
1. Material Flow 
-: 04:- 
2.2 
2.Transportation 
-: 06:- 
2.3 
3.Environment 
-: 08:- 
3 
Dust Mapping 
-: 09:- 
4 
Elimination & Control Plan 
-: 12:- 
4.1 
1. Material Flow 
-: 13:- 
4.2 
2.Transportation 
-: 14:- 
4.3 
3.Environment 
-: 15:- 
5 
ROI for DMCP Initiative 
-: 16:- 
6 
Sustain 
-: 17:-
Authority 
Measured as: 24 hrmean 
Relevance 
UK Air Quality Standard 
50 μg/m3 
Air quality in relation to public health 
SPCB, Orissa 
100 μg/m3 
Industrial 
190.6 -238.2 μg/m3 
Dust Generation 
Mapping 
Control Plan 
Sustain 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -01 
Introduction 
Dust:Itconsistsofparticlesintheatmospherethatcomefromvarioussourcessuchassolidparticlesfromrawmaterials,soildustliftedbyweather/Windflow,FlueGases,vehiclemovementetc. 
DustLevelStandard
Dust Generation 
Mapping 
Control Plan 
Sustain 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -02 
Time Line for DMCP Initiatives 
Initial 
Assessment 
Dust 
Mapping 
Elimination, 
Control Plan 
& Implementation 
Sustain & 
Improvement 
2 Month 
3 Month 
9 Months 
Kick off 
Completion of Initial Assessment 
Receiving the Dust Measuring Instrument. 
Completion of Dust Mapping. 
Finalization of Elimination & Control Plan 
Will reach final stage of execution – 
Control Plan 
Sustain & Scope for improvement
Dust Generation 
Mapping 
Control Plan 
Sustain 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -03 
Source of Dust generation 
Therearevarioussourcesofdustgeneration;butinBALPlant,weidentifiedmainlythedustcamefrom3majorSources. 
Material flow 
Transportation 
Environmental
Dust Generation 
Mapping 
Control Plan 
Sustain 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -04 
Material Flow : Flow Diagram 
RM Storage 
UG Bunker 
Day bin Bunker 
Weigh Hoppers 
F/C Chutes 
Material Charging 
Smelting 
Tapping 
Casting 
Loading 
Breaking yard 
Slag Yard 
Sales 
Cooling 
Loading truck 
MRP plant 
Loading truck 
Return Dust 
Weigh mint 
Storage area 
Recycle 
UG Bunker 
Screen House 
Detailed Process Map for Material Flow
Dust Generation 
Mapping 
Control Plan 
Sustain 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -05 
Dust Generation : Material Flow
Gate Entry 
Dust Generation 
Mapping 
Control Plan 
Sustain 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -06 
Transportation: Flow Diagram 
RM Store Area / Br.plant 
Weigh bridge 
UG Bunker 
Weigh bridge 
Storage Area 
Casting Metal/Slag loading 
Slag Yard 
MRP plant 
Weighing 
Break yard 
Weighing 
Sales yard 
Weighing 
Material loading & Weighment 
Raw material feeding 
Product handling movement 
Raw Material Entry 
Weighment 
RM yard at unloading point 
Weighment 
Exit 
Exit
Dust Generation 
Mapping 
Control Plan 
Sustain 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -07 
Dust Generation : Transportation
Dust Generation 
Mapping 
Control Plan 
Sustain 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -08 
Dust Generation : Environment 
Open Raw Material Stock Yard 
Chimney ( BAL Plant & Br. Plant ) 
Under Construction 
Open Conveyer System 
More Fines Generation 
Internal Road Conditions
Dust Generation 
Mapping 
Control Plan 
Sustain 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -09 
Dust Mapping : Why ? 
IfyoucanMEASUREit, 
youcanCONTROLit. 
We can reduce 30% of the current dust generation, if we are able to measure the dust level continuously.
Dust Generation 
Mapping 
Control Plan 
Sustain 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -10 
Dust Mapping : Measuring Device 
HAZ-DUST Real-time Area Dust Monitor 
P311 
DT-9881 
P611 
$ 1763 
£1.764,00 
£847 
£2425 
SKC Inc. 
PCE Instruments UK Ltd. 
PCE Instruments UK Ltd. 
PCE Instruments UK Ltd. 
The Avg. Cost of Dust Measuring Device is costing around 2 LacsINR and the lead time Maximum 15 days. [Date of Payment to Equipment received @ BAL Plant.]
Dust Generation 
Mapping 
Control Plan 
Sustain 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -11 
Dust Map : Area Wise 
AfterreceivingthetheDustMeasuringdevicewewillmeasurethedustlevelwitheachindividualareaandmonitorthedustlevelonweeklybasis. 
1.InitialAccessthedustlevelinsidetheplant 
2.PreparetheDustMAPinthewholePlant. 
3.WeeklyDustTracking–Areawise. 
4.TrendAnalysisforDustlevel.
Dust Generation 
Mapping 
Control Plan 
Sustain 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -12 
Elimination & Control Plan 
EliminationandControlPlanmaybeoutsourceordevelopinhouse. 
In House Develop 
Consultant or Expert
Dust Generation 
Mapping 
Control Plan 
Sustain 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -13 
Control Plan : Material Flow 
Dustisgeneratingduringmaterialflowdueto 
1.Leakage. 
2.Spillage. 
3.WrongDesign. 
4.PoorMaintenance. 
5.OpenconveyorSystem 
Suggestion and possible cause : Material Flow
Doc. No : BAL/DS/DMCP/A11-02Dec’ 13 | Page -01 
Dust Mapping And Control PlanControl Plan Material Flow. 
INDEX 
Dust Generation 
Mapping 
Elimination & 
Control Plan 
Sustain 
Dust 
Mapping 
& 
Control Plan. 
Control Plan 
Material Flow
Doc. No : BAL/DS/DMCP/A11-02Dec’ 13 | Page -02 
Suggestion 
During material unloading some of the materials drops to the platform; that material went to UG Bunker 
S1: Platform Can be checker plate. 
S2 : Increase the height of side wall so no material will fall in the platform 
S N Padhi 
15.01.14 
Discussion with Engineering team. 
KAM 
Target Date 
Support Required 
Dust Mapping And Control PlanControl Plan Material Flow.
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -03 
Suggestion 
KAM 
Target Date 
Support Required 
Dust Mapping And Control PlanControl Plan Material Flow.
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -04 
Suggestion 
If we can arrange the uniform water spray near bunker the dust level can be reduce; also at the same time we need to take care the moisture level in the raw materials. 
KAM 
Target Date 
Support Required 
Dust Mapping And Control PlanControl Plan Material Flow.
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -05 
Suggestion 
Some of the materials are came through conveyor. 
KAM 
Target Date 
Support Required 
Dust Mapping And Control PlanControl Plan Material Flow.
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -06 
Suggestion 
Raw Materials falling one corner of the conveyor. 
KAM 
Target Date 
Support Required 
Dust Mapping And Control PlanControl Plan Material Flow.
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -07 
Suggestion 
KAM 
Target Date 
Support Required 
Dust Mapping And Control PlanControl Plan Material Flow.
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -08 
Suggestion 
GAP between Conveyor and bunker can be reduce so that dust particle will go to the bunker. 
KAM 
Target Date 
Support Required 
Dust Mapping And Control PlanControl Plan Material Flow.
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -09 
Suggestion 
GAP can be reduce so that dust particle will go to the bunker. 
KAM 
Target Date 
Support Required 
Dust Mapping And Control PlanControl Plan Material Flow.
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -10 
Suggestion 
Conveyor can make close type by using PVC screen arrangement just like airport luggage x-ray machine entrance. 
KAM 
Target Date 
Support Required 
Dust Mapping And Control PlanControl Plan Material Flow.
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -11 
Suggestion 
Conveyor brush required during return so that raw material can’t transform. 
KAM 
Target Date 
Support Required 
Dust Mapping And Control PlanControl Plan Material Flow.
Dust Generation 
Mapping 
Control Plan 
Sustain 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -14 
Control Plan : Transportation 
Dustisgeneratingduringmaterialflowdueto 
1.HighVehiclesmovement(MotionStudyrequired) 
2.InternalRoadconditionsarenotuptothemark. 
3.LeakageinTrucks 
4.SpeedyMovement. 
Suggestion and possible cause : Transportation
Doc. No : BAL/DS/DMCP/A11-02Dec’ 13 | Page -1 
Dust Mapping and Control PlanControl Plan Transportation. 
Dust Generation 
Mapping 
Elimination & 
Control Plan 
Sustain 
Dust 
Mapping 
& 
Control Plan. 
Control Plan 
Transportation
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 
Suggestion 
KAM 
Target Date 
Support Required 
Dust Mapping and Control PlanControl Plan Transportation.
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 
Suggestion 
KAM 
Target Date 
Support Required 
Dust Mapping and Control PlanControl Plan Transportation.
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 
Suggestion 
KAM 
Target Date 
Support Required 
Dust Mapping and Control PlanControl Plan Transportation.
Dust Generation 
Mapping 
Control Plan 
Sustain 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -15 
Control Plan : Environment 
Dustisgeneratingduringmaterialflowdueto 
1.OpenRawMaterialStockYard 
2.Chimney(BALPlant&Br.Plant) 
3.UnderConstruction 
4.OpenConveyerSystem 
5.MoreFinesGenerationduringprocess. 
6.OpenLandSpace–bothinsideandoutsidetheplantpremises. 
Suggestion and possible cause : Transportation
Doc. No : BAL/DS/DMCP/A11-02Dec’ 13 | Page -1 
Dust Mapping and Control PlanControl Plan Environment. 
Dust Generation 
Mapping 
Elimination & 
Control Plan 
Sustain 
Dust 
Mapping 
& 
Control Plan. 
Control Plan 
Environment
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 
Suggestion 
KAM 
Target Date 
Support Required 
Dust Mapping and Control PlanControl Plan Environment.
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 
Suggestion 
KAM 
Target Date 
Support Required 
Dust Mapping and Control PlanControl Plan Environment.
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 
Suggestion 
KAM 
Target Date 
Support Required 
Dust Mapping and Control PlanControl Plan Environment.
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 
Suggestion 
KAM 
Target Date 
Support Required 
Dust Mapping and Control PlanControl Plan Environment.
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 
Suggestion 
KAM 
Target Date 
Support Required 
Dust Mapping and Control PlanControl Plan Environment.
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 
Suggestion 
KAM 
Target Date 
Support Required 
Dust Mapping and Control PlanControl Plan Environment.
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 
Suggestion 
KAM 
Target Date 
Support Required 
Dust Mapping and Control PlanControl Plan Environment.
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 
Suggestion 
KAM 
Target Date 
Support Required 
Dust Mapping and Control PlanControl Plan Environment.
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 
Suggestion 
KAM 
Target Date 
Support Required 
Dust Mapping and Control PlanControl Plan Environment.
Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 
Suggestion 
KAM 
Target Date 
Support Required 
Dust Mapping and Control PlanControl Plan Environment.
Dust Generation 
Mapping 
Control Plan 
Sustain 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -16 
Control Plan : ROI of DMCP 
Duringthepre-assessmenttheROIofDMCPwillbecalculated. 
1.Directfinancialbenefits 
1.Yield–RawMaterials. 
2.Productivityimprovement. 
2.Furnaceprocessstabilizationforlessdustgeneration. 
3.Man-hoursinvolve. 
4.Brandimpactinsocioeconomylife. 
5.Employeeshealthimpact. 
6.Intangiblebenefits.
Dust Generation 
Mapping 
Control Plan 
Sustain 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -17 
Sustain 
1.DustMappingAudit:AreaWise 
2.DustMappingScoreinterlinkwithPMS. 
3.Reward&RecognitionSchemeforDustMappingandControlPlan. 
4.RawMaterial(FromBrqt.ToFurnace) Yieldtobemonitoredandanalyzedperiodically. 
5.ExternalConsultantforperiodicalassessment. 
6.PeriodicallyvisitforgoodmanufacturingpracticeFerroalloysplant.
Dust Generation 
Mapping 
Control Plan 
Sustain 
Doc. No : BAL/DS/DMCP/A11Dec’ 13 | END 
BALASORE ALLOYS LIMITED. 
Contact me 
QR Code 
Download this presentation at : http://goo.gl/Zs9Ej4 
DEEPAK KUMAR SAHOO 
Email : dksahoo2@gmail.com

Mais conteúdo relacionado

Mais procurados

Check interval escalation
Check interval escalationCheck interval escalation
Check interval escalationMohammed Hadi
 
The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)
The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)
The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)PMI-Montréal
 
Check interval escalation
Check interval escalation Check interval escalation
Check interval escalation Mohammed Awad
 
PDM IMPLIMENTATION
PDM IMPLIMENTATIONPDM IMPLIMENTATION
PDM IMPLIMENTATIONUttam Misra
 
Development of instructions for continuing airworthiness and aircraft logisti...
Development of instructions for continuing airworthiness and aircraft logisti...Development of instructions for continuing airworthiness and aircraft logisti...
Development of instructions for continuing airworthiness and aircraft logisti...Andrey Petrov
 
Slides from 2003 structures conference
Slides from 2003 structures conference Slides from 2003 structures conference
Slides from 2003 structures conference Hifon Wong
 
Human factors - Maintenance and inspection
Human factors - Maintenance and inspectionHuman factors - Maintenance and inspection
Human factors - Maintenance and inspectionLahiru Dilshan
 
airsight - UAV airport pavement inspections
airsight - UAV airport pavement inspectionsairsight - UAV airport pavement inspections
airsight - UAV airport pavement inspectionsairsight GmbH
 
2003 structures
2003 structures2003 structures
2003 structuresHifon Wong
 
Case Study Of The Implementation Of Advanced Maintenance Techniques At Baa He...
Case Study Of The Implementation Of Advanced Maintenance Techniques At Baa He...Case Study Of The Implementation Of Advanced Maintenance Techniques At Baa He...
Case Study Of The Implementation Of Advanced Maintenance Techniques At Baa He...Andy_Watson_Sim
 
Retrocommissioning Works
Retrocommissioning WorksRetrocommissioning Works
Retrocommissioning WorksCx Associates
 
M&E Key Performance Indicators 2016
M&E Key Performance Indicators 2016M&E Key Performance Indicators 2016
M&E Key Performance Indicators 2016Nerissa Delos Santos
 
Measure Tollgate
Measure TollgateMeasure Tollgate
Measure Tollgatedonhhenry
 

Mais procurados (20)

Cmr
CmrCmr
Cmr
 
Check interval escalation
Check interval escalationCheck interval escalation
Check interval escalation
 
The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)
The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)
The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)
 
Check interval escalation
Check interval escalation Check interval escalation
Check interval escalation
 
Part145 Slides
Part145 SlidesPart145 Slides
Part145 Slides
 
PDM IMPLIMENTATION
PDM IMPLIMENTATIONPDM IMPLIMENTATION
PDM IMPLIMENTATION
 
Development of instructions for continuing airworthiness and aircraft logisti...
Development of instructions for continuing airworthiness and aircraft logisti...Development of instructions for continuing airworthiness and aircraft logisti...
Development of instructions for continuing airworthiness and aircraft logisti...
 
Slides from 2003 structures conference
Slides from 2003 structures conference Slides from 2003 structures conference
Slides from 2003 structures conference
 
Airworthiness: Failure to follow procedures
Airworthiness:  Failure to follow proceduresAirworthiness:  Failure to follow procedures
Airworthiness: Failure to follow procedures
 
Producción inspeccionada de aeronaves
Producción inspeccionada de aeronavesProducción inspeccionada de aeronaves
Producción inspeccionada de aeronaves
 
c-130 CV Attique
c-130 CV Attiquec-130 CV Attique
c-130 CV Attique
 
Human factors - Maintenance and inspection
Human factors - Maintenance and inspectionHuman factors - Maintenance and inspection
Human factors - Maintenance and inspection
 
WG13
WG13WG13
WG13
 
airsight - UAV airport pavement inspections
airsight - UAV airport pavement inspectionsairsight - UAV airport pavement inspections
airsight - UAV airport pavement inspections
 
2003 structures
2003 structures2003 structures
2003 structures
 
Case Study Of The Implementation Of Advanced Maintenance Techniques At Baa He...
Case Study Of The Implementation Of Advanced Maintenance Techniques At Baa He...Case Study Of The Implementation Of Advanced Maintenance Techniques At Baa He...
Case Study Of The Implementation Of Advanced Maintenance Techniques At Baa He...
 
Retrocommissioning Works
Retrocommissioning WorksRetrocommissioning Works
Retrocommissioning Works
 
M&E Key Performance Indicators 2016
M&E Key Performance Indicators 2016M&E Key Performance Indicators 2016
M&E Key Performance Indicators 2016
 
Measure Tollgate
Measure TollgateMeasure Tollgate
Measure Tollgate
 
Car m
Car mCar m
Car m
 

Destaque

2013 ASPRS Track, Modeling Asset Condition Using LIDAR and GIS Data by Colin ...
2013 ASPRS Track, Modeling Asset Condition Using LIDAR and GIS Data by Colin ...2013 ASPRS Track, Modeling Asset Condition Using LIDAR and GIS Data by Colin ...
2013 ASPRS Track, Modeling Asset Condition Using LIDAR and GIS Data by Colin ...GIS in the Rockies
 
Business strategy for FM Professionals_2
Business strategy for FM Professionals_2Business strategy for FM Professionals_2
Business strategy for FM Professionals_2DEEPAK SAHOO
 
What Every First Time Homebuyer Should Know
What Every First Time Homebuyer Should KnowWhat Every First Time Homebuyer Should Know
What Every First Time Homebuyer Should KnowKatchen Company
 
Baseline Condition Assessment
Baseline Condition AssessmentBaseline Condition Assessment
Baseline Condition AssessmentGrantWhittle
 
A Professional Approach to Property Maintenance
A Professional Approach to Property MaintenanceA Professional Approach to Property Maintenance
A Professional Approach to Property MaintenanceKatchen Company
 
5S Training materials From Deepak Sahoo
5S   Training materials From Deepak Sahoo5S   Training materials From Deepak Sahoo
5S Training materials From Deepak SahooDEEPAK SAHOO
 
14 Things Every Investor Should Know About Commercial Real Estate
14 Things Every Investor Should Know About Commercial Real Estate14 Things Every Investor Should Know About Commercial Real Estate
14 Things Every Investor Should Know About Commercial Real EstateKatchen Company
 
Case Studies On Gis Fm Integration
Case Studies On Gis Fm IntegrationCase Studies On Gis Fm Integration
Case Studies On Gis Fm IntegrationJohn Przybyla
 
Facility Condition Assessment And Asset Management With GIS
Facility Condition Assessment And Asset Management With GISFacility Condition Assessment And Asset Management With GIS
Facility Condition Assessment And Asset Management With GISJohn Przybyla
 

Destaque (10)

2013 ASPRS Track, Modeling Asset Condition Using LIDAR and GIS Data by Colin ...
2013 ASPRS Track, Modeling Asset Condition Using LIDAR and GIS Data by Colin ...2013 ASPRS Track, Modeling Asset Condition Using LIDAR and GIS Data by Colin ...
2013 ASPRS Track, Modeling Asset Condition Using LIDAR and GIS Data by Colin ...
 
Business strategy for FM Professionals_2
Business strategy for FM Professionals_2Business strategy for FM Professionals_2
Business strategy for FM Professionals_2
 
What Every First Time Homebuyer Should Know
What Every First Time Homebuyer Should KnowWhat Every First Time Homebuyer Should Know
What Every First Time Homebuyer Should Know
 
Baseline Condition Assessment
Baseline Condition AssessmentBaseline Condition Assessment
Baseline Condition Assessment
 
A Professional Approach to Property Maintenance
A Professional Approach to Property MaintenanceA Professional Approach to Property Maintenance
A Professional Approach to Property Maintenance
 
5S Training materials From Deepak Sahoo
5S   Training materials From Deepak Sahoo5S   Training materials From Deepak Sahoo
5S Training materials From Deepak Sahoo
 
card
cardcard
card
 
14 Things Every Investor Should Know About Commercial Real Estate
14 Things Every Investor Should Know About Commercial Real Estate14 Things Every Investor Should Know About Commercial Real Estate
14 Things Every Investor Should Know About Commercial Real Estate
 
Case Studies On Gis Fm Integration
Case Studies On Gis Fm IntegrationCase Studies On Gis Fm Integration
Case Studies On Gis Fm Integration
 
Facility Condition Assessment And Asset Management With GIS
Facility Condition Assessment And Asset Management With GISFacility Condition Assessment And Asset Management With GIS
Facility Condition Assessment And Asset Management With GIS
 

Semelhante a Dust Mapping and Control Plan - DMCP by_Deepak Kumar Sahoo

Construction and Demolition Waste Management Rules, 2016 - Impacts on ULB’s
Construction and Demolition Waste Management Rules, 2016  -  Impacts on ULB’sConstruction and Demolition Waste Management Rules, 2016  -  Impacts on ULB’s
Construction and Demolition Waste Management Rules, 2016 - Impacts on ULB’sDevelopment Alternatives
 
15. Addressing challeneges in wastewater netwroks - Michael Goss - Water Even...
15. Addressing challeneges in wastewater netwroks - Michael Goss - Water Even...15. Addressing challeneges in wastewater netwroks - Michael Goss - Water Even...
15. Addressing challeneges in wastewater netwroks - Michael Goss - Water Even...Environmental Protection Agency, Ireland
 
KISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIAKISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIAMNIT,JAIPUR
 
Nyk and weather routing
Nyk and weather routingNyk and weather routing
Nyk and weather routingydmisra
 
Design of 3 piles pile cap
Design of 3 piles pile capDesign of 3 piles pile cap
Design of 3 piles pile cap321nilesh
 
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE Julian Kalac P.Eng
 
CV - Drilling Logistics Coordinator with 8 years Experience
CV - Drilling  Logistics Coordinator with 8 years ExperienceCV - Drilling  Logistics Coordinator with 8 years Experience
CV - Drilling Logistics Coordinator with 8 years ExperiencePrince David K
 
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...LOWaterkeeper
 
2004 May - Demystifying the Air Permitting Process
2004 May - Demystifying the Air Permitting Process2004 May - Demystifying the Air Permitting Process
2004 May - Demystifying the Air Permitting ProcessShirley Rivera
 
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...City of Salina
 
Presentation_BWT_2013.pdf
Presentation_BWT_2013.pdfPresentation_BWT_2013.pdf
Presentation_BWT_2013.pdfpal_malay
 
Operating a compost facility to maximize carbon credits
Operating a compost facility to maximize carbon creditsOperating a compost facility to maximize carbon credits
Operating a compost facility to maximize carbon creditsSWANA Northern Lights Chapter
 
6 bowling green ksa presentation
6 bowling green ksa presentation6 bowling green ksa presentation
6 bowling green ksa presentationguest7dbf4
 
WEAO Influents Spring2015, Offsets
WEAO Influents Spring2015, OffsetsWEAO Influents Spring2015, Offsets
WEAO Influents Spring2015, OffsetsEdgar Tovilla
 
Actividad de aprendizaje 2
Actividad de aprendizaje 2Actividad de aprendizaje 2
Actividad de aprendizaje 2ieugilberto2010
 

Semelhante a Dust Mapping and Control Plan - DMCP by_Deepak Kumar Sahoo (20)

Construction and Demolition Waste Management Rules, 2016 - Impacts on ULB’s
Construction and Demolition Waste Management Rules, 2016  -  Impacts on ULB’sConstruction and Demolition Waste Management Rules, 2016  -  Impacts on ULB’s
Construction and Demolition Waste Management Rules, 2016 - Impacts on ULB’s
 
15. Addressing challeneges in wastewater netwroks - Michael Goss - Water Even...
15. Addressing challeneges in wastewater netwroks - Michael Goss - Water Even...15. Addressing challeneges in wastewater netwroks - Michael Goss - Water Even...
15. Addressing challeneges in wastewater netwroks - Michael Goss - Water Even...
 
KISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIAKISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIA
 
Caltrans view on recycling of in-place asphalt pavements
Caltrans view on recycling of in-place asphalt pavementsCaltrans view on recycling of in-place asphalt pavements
Caltrans view on recycling of in-place asphalt pavements
 
Nyk and weather routing
Nyk and weather routingNyk and weather routing
Nyk and weather routing
 
Design of 3 piles pile cap
Design of 3 piles pile capDesign of 3 piles pile cap
Design of 3 piles pile cap
 
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
 
CV - Drilling Logistics Coordinator with 8 years Experience
CV - Drilling  Logistics Coordinator with 8 years ExperienceCV - Drilling  Logistics Coordinator with 8 years Experience
CV - Drilling Logistics Coordinator with 8 years Experience
 
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
 
Onr nr-ar-17-021
Onr nr-ar-17-021Onr nr-ar-17-021
Onr nr-ar-17-021
 
2004 May - Demystifying the Air Permitting Process
2004 May - Demystifying the Air Permitting Process2004 May - Demystifying the Air Permitting Process
2004 May - Demystifying the Air Permitting Process
 
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
 
Presentation_BWT_2013.pdf
Presentation_BWT_2013.pdfPresentation_BWT_2013.pdf
Presentation_BWT_2013.pdf
 
Enhancing performance using a programme dashboard
Enhancing performance using a programme dashboard Enhancing performance using a programme dashboard
Enhancing performance using a programme dashboard
 
Operating a compost facility to maximize carbon credits
Operating a compost facility to maximize carbon creditsOperating a compost facility to maximize carbon credits
Operating a compost facility to maximize carbon credits
 
6 bowling green ksa presentation
6 bowling green ksa presentation6 bowling green ksa presentation
6 bowling green ksa presentation
 
WEAO Influents Spring2015, Offsets
WEAO Influents Spring2015, OffsetsWEAO Influents Spring2015, Offsets
WEAO Influents Spring2015, Offsets
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Actividad de aprendizaje 2
Actividad de aprendizaje 2Actividad de aprendizaje 2
Actividad de aprendizaje 2
 
Report
ReportReport
Report
 

Mais de DEEPAK SAHOO

Arrelic-Careers-EN
Arrelic-Careers-ENArrelic-Careers-EN
Arrelic-Careers-ENDEEPAK SAHOO
 
Arrelic_Overview_2016
Arrelic_Overview_2016Arrelic_Overview_2016
Arrelic_Overview_2016DEEPAK SAHOO
 
GSMP_ SMRP_BOK_Training_Catalog_march 2016
GSMP_ SMRP_BOK_Training_Catalog_march 2016GSMP_ SMRP_BOK_Training_Catalog_march 2016
GSMP_ SMRP_BOK_Training_Catalog_march 2016DEEPAK SAHOO
 
Why-Why Analysis in Arabic Language.
Why-Why Analysis in Arabic Language.Why-Why Analysis in Arabic Language.
Why-Why Analysis in Arabic Language.DEEPAK SAHOO
 
FMEA_BAL_Deepak_Sahoo
FMEA_BAL_Deepak_SahooFMEA_BAL_Deepak_Sahoo
FMEA_BAL_Deepak_SahooDEEPAK SAHOO
 
Asset Performance Management_Deepak Sahoo_v0.2
Asset Performance Management_Deepak Sahoo_v0.2Asset Performance Management_Deepak Sahoo_v0.2
Asset Performance Management_Deepak Sahoo_v0.2DEEPAK SAHOO
 
4.5 g Maintenance Strategy by Deepak Sahoo
4.5 g Maintenance Strategy by Deepak Sahoo4.5 g Maintenance Strategy by Deepak Sahoo
4.5 g Maintenance Strategy by Deepak SahooDEEPAK SAHOO
 
Inverted u model training Catalog.
Inverted u model training Catalog.Inverted u model training Catalog.
Inverted u model training Catalog.DEEPAK SAHOO
 
Business strategy for FM Professional_1
Business strategy for FM Professional_1Business strategy for FM Professional_1
Business strategy for FM Professional_1DEEPAK SAHOO
 
Root Cause Analysis By Deepak
Root Cause Analysis By DeepakRoot Cause Analysis By Deepak
Root Cause Analysis By DeepakDEEPAK SAHOO
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive MaintenanceDEEPAK SAHOO
 
Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance DEEPAK SAHOO
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)DEEPAK SAHOO
 
Kaizen & Small Group Activities
Kaizen & Small Group ActivitiesKaizen & Small Group Activities
Kaizen & Small Group ActivitiesDEEPAK SAHOO
 
5S AWARNESS TRAINING PROGRAM
5S AWARNESS  TRAINING  PROGRAM5S AWARNESS  TRAINING  PROGRAM
5S AWARNESS TRAINING PROGRAMDEEPAK SAHOO
 

Mais de DEEPAK SAHOO (15)

Arrelic-Careers-EN
Arrelic-Careers-ENArrelic-Careers-EN
Arrelic-Careers-EN
 
Arrelic_Overview_2016
Arrelic_Overview_2016Arrelic_Overview_2016
Arrelic_Overview_2016
 
GSMP_ SMRP_BOK_Training_Catalog_march 2016
GSMP_ SMRP_BOK_Training_Catalog_march 2016GSMP_ SMRP_BOK_Training_Catalog_march 2016
GSMP_ SMRP_BOK_Training_Catalog_march 2016
 
Why-Why Analysis in Arabic Language.
Why-Why Analysis in Arabic Language.Why-Why Analysis in Arabic Language.
Why-Why Analysis in Arabic Language.
 
FMEA_BAL_Deepak_Sahoo
FMEA_BAL_Deepak_SahooFMEA_BAL_Deepak_Sahoo
FMEA_BAL_Deepak_Sahoo
 
Asset Performance Management_Deepak Sahoo_v0.2
Asset Performance Management_Deepak Sahoo_v0.2Asset Performance Management_Deepak Sahoo_v0.2
Asset Performance Management_Deepak Sahoo_v0.2
 
4.5 g Maintenance Strategy by Deepak Sahoo
4.5 g Maintenance Strategy by Deepak Sahoo4.5 g Maintenance Strategy by Deepak Sahoo
4.5 g Maintenance Strategy by Deepak Sahoo
 
Inverted u model training Catalog.
Inverted u model training Catalog.Inverted u model training Catalog.
Inverted u model training Catalog.
 
Business strategy for FM Professional_1
Business strategy for FM Professional_1Business strategy for FM Professional_1
Business strategy for FM Professional_1
 
Root Cause Analysis By Deepak
Root Cause Analysis By DeepakRoot Cause Analysis By Deepak
Root Cause Analysis By Deepak
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)
 
Kaizen & Small Group Activities
Kaizen & Small Group ActivitiesKaizen & Small Group Activities
Kaizen & Small Group Activities
 
5S AWARNESS TRAINING PROGRAM
5S AWARNESS  TRAINING  PROGRAM5S AWARNESS  TRAINING  PROGRAM
5S AWARNESS TRAINING PROGRAM
 

Último

Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 

Último (20)

Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 

Dust Mapping and Control Plan - DMCP by_Deepak Kumar Sahoo

  • 1. BALASORE ALLOYS LTD. Dust Generation Mapping Elimination & Control Plan Sustain Dust Mapping & Control Plan. Prepared By : Deepak Kumar Sahoo Under the guidance of Mr. S V Bhavani Varma & Mr. J S Verma Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Cover Page
  • 2. Dust Generation Mapping Control Plan Sustain Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -i Objective Achieving Dust Free Environment in Plant Premises through Dust Mapping &Control Plan [DMCP] Initiative.
  • 3. Dust Generation Mapping Control Plan Sustain Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page –ii Table of Contents S/N Contents Pg. No. 1 Introduction -: 01:- 2 DustGeneration [Source] -: 03 :- 2.1 1. Material Flow -: 04:- 2.2 2.Transportation -: 06:- 2.3 3.Environment -: 08:- 3 Dust Mapping -: 09:- 4 Elimination & Control Plan -: 12:- 4.1 1. Material Flow -: 13:- 4.2 2.Transportation -: 14:- 4.3 3.Environment -: 15:- 5 ROI for DMCP Initiative -: 16:- 6 Sustain -: 17:-
  • 4. Authority Measured as: 24 hrmean Relevance UK Air Quality Standard 50 μg/m3 Air quality in relation to public health SPCB, Orissa 100 μg/m3 Industrial 190.6 -238.2 μg/m3 Dust Generation Mapping Control Plan Sustain Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -01 Introduction Dust:Itconsistsofparticlesintheatmospherethatcomefromvarioussourcessuchassolidparticlesfromrawmaterials,soildustliftedbyweather/Windflow,FlueGases,vehiclemovementetc. DustLevelStandard
  • 5. Dust Generation Mapping Control Plan Sustain Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -02 Time Line for DMCP Initiatives Initial Assessment Dust Mapping Elimination, Control Plan & Implementation Sustain & Improvement 2 Month 3 Month 9 Months Kick off Completion of Initial Assessment Receiving the Dust Measuring Instrument. Completion of Dust Mapping. Finalization of Elimination & Control Plan Will reach final stage of execution – Control Plan Sustain & Scope for improvement
  • 6. Dust Generation Mapping Control Plan Sustain Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -03 Source of Dust generation Therearevarioussourcesofdustgeneration;butinBALPlant,weidentifiedmainlythedustcamefrom3majorSources. Material flow Transportation Environmental
  • 7. Dust Generation Mapping Control Plan Sustain Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -04 Material Flow : Flow Diagram RM Storage UG Bunker Day bin Bunker Weigh Hoppers F/C Chutes Material Charging Smelting Tapping Casting Loading Breaking yard Slag Yard Sales Cooling Loading truck MRP plant Loading truck Return Dust Weigh mint Storage area Recycle UG Bunker Screen House Detailed Process Map for Material Flow
  • 8. Dust Generation Mapping Control Plan Sustain Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -05 Dust Generation : Material Flow
  • 9. Gate Entry Dust Generation Mapping Control Plan Sustain Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -06 Transportation: Flow Diagram RM Store Area / Br.plant Weigh bridge UG Bunker Weigh bridge Storage Area Casting Metal/Slag loading Slag Yard MRP plant Weighing Break yard Weighing Sales yard Weighing Material loading & Weighment Raw material feeding Product handling movement Raw Material Entry Weighment RM yard at unloading point Weighment Exit Exit
  • 10. Dust Generation Mapping Control Plan Sustain Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -07 Dust Generation : Transportation
  • 11. Dust Generation Mapping Control Plan Sustain Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -08 Dust Generation : Environment Open Raw Material Stock Yard Chimney ( BAL Plant & Br. Plant ) Under Construction Open Conveyer System More Fines Generation Internal Road Conditions
  • 12. Dust Generation Mapping Control Plan Sustain Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -09 Dust Mapping : Why ? IfyoucanMEASUREit, youcanCONTROLit. We can reduce 30% of the current dust generation, if we are able to measure the dust level continuously.
  • 13. Dust Generation Mapping Control Plan Sustain Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -10 Dust Mapping : Measuring Device HAZ-DUST Real-time Area Dust Monitor P311 DT-9881 P611 $ 1763 £1.764,00 £847 £2425 SKC Inc. PCE Instruments UK Ltd. PCE Instruments UK Ltd. PCE Instruments UK Ltd. The Avg. Cost of Dust Measuring Device is costing around 2 LacsINR and the lead time Maximum 15 days. [Date of Payment to Equipment received @ BAL Plant.]
  • 14. Dust Generation Mapping Control Plan Sustain Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -11 Dust Map : Area Wise AfterreceivingthetheDustMeasuringdevicewewillmeasurethedustlevelwitheachindividualareaandmonitorthedustlevelonweeklybasis. 1.InitialAccessthedustlevelinsidetheplant 2.PreparetheDustMAPinthewholePlant. 3.WeeklyDustTracking–Areawise. 4.TrendAnalysisforDustlevel.
  • 15. Dust Generation Mapping Control Plan Sustain Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -12 Elimination & Control Plan EliminationandControlPlanmaybeoutsourceordevelopinhouse. In House Develop Consultant or Expert
  • 16. Dust Generation Mapping Control Plan Sustain Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -13 Control Plan : Material Flow Dustisgeneratingduringmaterialflowdueto 1.Leakage. 2.Spillage. 3.WrongDesign. 4.PoorMaintenance. 5.OpenconveyorSystem Suggestion and possible cause : Material Flow
  • 17. Doc. No : BAL/DS/DMCP/A11-02Dec’ 13 | Page -01 Dust Mapping And Control PlanControl Plan Material Flow. INDEX Dust Generation Mapping Elimination & Control Plan Sustain Dust Mapping & Control Plan. Control Plan Material Flow
  • 18. Doc. No : BAL/DS/DMCP/A11-02Dec’ 13 | Page -02 Suggestion During material unloading some of the materials drops to the platform; that material went to UG Bunker S1: Platform Can be checker plate. S2 : Increase the height of side wall so no material will fall in the platform S N Padhi 15.01.14 Discussion with Engineering team. KAM Target Date Support Required Dust Mapping And Control PlanControl Plan Material Flow.
  • 19. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -03 Suggestion KAM Target Date Support Required Dust Mapping And Control PlanControl Plan Material Flow.
  • 20. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -04 Suggestion If we can arrange the uniform water spray near bunker the dust level can be reduce; also at the same time we need to take care the moisture level in the raw materials. KAM Target Date Support Required Dust Mapping And Control PlanControl Plan Material Flow.
  • 21. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -05 Suggestion Some of the materials are came through conveyor. KAM Target Date Support Required Dust Mapping And Control PlanControl Plan Material Flow.
  • 22. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -06 Suggestion Raw Materials falling one corner of the conveyor. KAM Target Date Support Required Dust Mapping And Control PlanControl Plan Material Flow.
  • 23. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -07 Suggestion KAM Target Date Support Required Dust Mapping And Control PlanControl Plan Material Flow.
  • 24. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -08 Suggestion GAP between Conveyor and bunker can be reduce so that dust particle will go to the bunker. KAM Target Date Support Required Dust Mapping And Control PlanControl Plan Material Flow.
  • 25. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -09 Suggestion GAP can be reduce so that dust particle will go to the bunker. KAM Target Date Support Required Dust Mapping And Control PlanControl Plan Material Flow.
  • 26. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -10 Suggestion Conveyor can make close type by using PVC screen arrangement just like airport luggage x-ray machine entrance. KAM Target Date Support Required Dust Mapping And Control PlanControl Plan Material Flow.
  • 27. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -11 Suggestion Conveyor brush required during return so that raw material can’t transform. KAM Target Date Support Required Dust Mapping And Control PlanControl Plan Material Flow.
  • 28. Dust Generation Mapping Control Plan Sustain Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -14 Control Plan : Transportation Dustisgeneratingduringmaterialflowdueto 1.HighVehiclesmovement(MotionStudyrequired) 2.InternalRoadconditionsarenotuptothemark. 3.LeakageinTrucks 4.SpeedyMovement. Suggestion and possible cause : Transportation
  • 29. Doc. No : BAL/DS/DMCP/A11-02Dec’ 13 | Page -1 Dust Mapping and Control PlanControl Plan Transportation. Dust Generation Mapping Elimination & Control Plan Sustain Dust Mapping & Control Plan. Control Plan Transportation
  • 30. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 Suggestion KAM Target Date Support Required Dust Mapping and Control PlanControl Plan Transportation.
  • 31. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 Suggestion KAM Target Date Support Required Dust Mapping and Control PlanControl Plan Transportation.
  • 32. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 Suggestion KAM Target Date Support Required Dust Mapping and Control PlanControl Plan Transportation.
  • 33. Dust Generation Mapping Control Plan Sustain Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -15 Control Plan : Environment Dustisgeneratingduringmaterialflowdueto 1.OpenRawMaterialStockYard 2.Chimney(BALPlant&Br.Plant) 3.UnderConstruction 4.OpenConveyerSystem 5.MoreFinesGenerationduringprocess. 6.OpenLandSpace–bothinsideandoutsidetheplantpremises. Suggestion and possible cause : Transportation
  • 34. Doc. No : BAL/DS/DMCP/A11-02Dec’ 13 | Page -1 Dust Mapping and Control PlanControl Plan Environment. Dust Generation Mapping Elimination & Control Plan Sustain Dust Mapping & Control Plan. Control Plan Environment
  • 35. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 Suggestion KAM Target Date Support Required Dust Mapping and Control PlanControl Plan Environment.
  • 36. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 Suggestion KAM Target Date Support Required Dust Mapping and Control PlanControl Plan Environment.
  • 37. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 Suggestion KAM Target Date Support Required Dust Mapping and Control PlanControl Plan Environment.
  • 38. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 Suggestion KAM Target Date Support Required Dust Mapping and Control PlanControl Plan Environment.
  • 39. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 Suggestion KAM Target Date Support Required Dust Mapping and Control PlanControl Plan Environment.
  • 40. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 Suggestion KAM Target Date Support Required Dust Mapping and Control PlanControl Plan Environment.
  • 41. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 Suggestion KAM Target Date Support Required Dust Mapping and Control PlanControl Plan Environment.
  • 42. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 Suggestion KAM Target Date Support Required Dust Mapping and Control PlanControl Plan Environment.
  • 43. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 Suggestion KAM Target Date Support Required Dust Mapping and Control PlanControl Plan Environment.
  • 44. Doc. No : BAL/DS/DMCP/A11-05Dec’ 13 | Page -3 Suggestion KAM Target Date Support Required Dust Mapping and Control PlanControl Plan Environment.
  • 45. Dust Generation Mapping Control Plan Sustain Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -16 Control Plan : ROI of DMCP Duringthepre-assessmenttheROIofDMCPwillbecalculated. 1.Directfinancialbenefits 1.Yield–RawMaterials. 2.Productivityimprovement. 2.Furnaceprocessstabilizationforlessdustgeneration. 3.Man-hoursinvolve. 4.Brandimpactinsocioeconomylife. 5.Employeeshealthimpact. 6.Intangiblebenefits.
  • 46. Dust Generation Mapping Control Plan Sustain Doc. No : BAL/DS/DMCP/A11Dec’ 13 | Page -17 Sustain 1.DustMappingAudit:AreaWise 2.DustMappingScoreinterlinkwithPMS. 3.Reward&RecognitionSchemeforDustMappingandControlPlan. 4.RawMaterial(FromBrqt.ToFurnace) Yieldtobemonitoredandanalyzedperiodically. 5.ExternalConsultantforperiodicalassessment. 6.PeriodicallyvisitforgoodmanufacturingpracticeFerroalloysplant.
  • 47. Dust Generation Mapping Control Plan Sustain Doc. No : BAL/DS/DMCP/A11Dec’ 13 | END BALASORE ALLOYS LIMITED. Contact me QR Code Download this presentation at : http://goo.gl/Zs9Ej4 DEEPAK KUMAR SAHOO Email : dksahoo2@gmail.com