SlideShare uma empresa Scribd logo
1 de 59
Baixar para ler offline
Neon Energy
Thinks Green
1/11/2011
Agenda
 About us
 Our Company
 Our Philosophy
 Our Strategy
 Our Services
 Value-add Services
The Opportunity
 The Greek Environment
 Our Network
 Our Projects
 Our Partners
2
About Us
Our Company
 A new entrant in the field of solar power exploitation and EPC solutions, the firm
already enjoys a formidable advantage in clean energy technologies in Greece due
to the collective experience of its’ team. Neon Energy was founded in 2009 but
the core team’s experience spans across 25+yrs in the fields of economics, energy
efficient technology and specialized technological development/ construction.
 The firm’s credibility as a PV provider is supported by the excellent quality of the
equipment deployed and the connection topology design of the multi component
systems, all of which is accompanied by the necessary certifications and written
guarantees.
 Neon Energy offers the broadest service network of certified agents and
installation Greece-wide- this shall be further outlined during the presentation.
 Due to the firm’s continual investment in its’ expert staff and technological know-
how, Neon Energy offers a level of professionalism and credibility that few firms in
the field of Photovoltaic Systems offer today in Greece.
4
Our mission is to provide an integrated and holistic service
to clients, taking the headache out of what can be a
complex process in Greece – TURN-KEY SOLUTIONS.
 Νeon Energy undertakes every step of the project’s
procedures, from the initial surveillance of the proposed
area, to the provision of the required permits and
associated financial loans through to the final construction,
implementation and maintenance of both small & large
scale, accredited PV units.
 360 «Turn-key» PV solutions
Our Mission
5
RESIDENTIAL
rooftops / terraces
Our Photovoltaic Solutions
COMMERCIAL
rooftops / terraces
PV PARKs
ground installations
6
■ At Neon Energy we continually harvest and grow our corporate values through our approach to
each and every project, which emphasizes sincerity, professionalism, consistency, the continuous
enhancement and development of our offering, as well as both functional and business
excellence.
■ Neon Energy constantly seeks and procures PV products that will maximize our client’s
satisfaction. The company focuses on innovative to the market service offerings that will
differentiate us from our competitors and also ensures that the products the company adopts are
of the latest technological advancements.
■ Neon Energy thinks globally by leveraging off its exceptional human resources and through its
innovative philosophy for the foundation of new business opportunities world-wide. It is this
sense of “GLOBAL THINKING” that has laid the foundations for a long-term, dynamic and
promising potential for global reach.
7
Our Strategy
Green / technical
know how
Global thinking
Cooperation / CollaborationInnovation / First movers
Credibility
Solutions/Results driven=
Product/Service Guarantee
Our Values
8
 Neon Energy Thinks Green
 Enhanced by its’ solid technical expertise, Neon Energy
embraces the R.E.S. philosophy and contributes to the
benefits of R.E.S. by fully exploiting (via solar panel
arrays) the immense power of the sun.
 In this way the firm contributes to a more viable and
sustainable environment for every citizen of the world.
 This philosophy is an essential component driving the
firm’s growth as it inspires Neon Energy to “think”
globally, as a company of the world.
 As such, the company displays a strong desire and
promising potential for global reach.
Our Philosophy
9
 Our expansion into the Balkan region and into countries within South-East Europe
 Sofia, Bulgaria (July 2011)
 Dusseldorf, Germany (November 2011)
 Turkey (2012 due to the
regulatory environment)
Ambitions for Expansion
10
Our Vision
 NEON ENERGY’s corporate vision:
 To be the pioneer company in Greece, South-
East Europe and Turkey operating in the field
of PV Systems and offering an integrated,
holistic service. This includes the surveyance,
construction, implementation & maintenance
of high quality, technologically advanced PV
systems for parks, commercial and residential
properties.
11
Our Services
12
Our Services
13
Our Services
14
 It is the only company in Greece that issues a written guarantee concerning the
output performance and functionality of the PV system, throughout the entire lifespan
of the investment, including the financial return on investment.
 Complete technical specifications and efficiency analysis, which includes all detailed
system characteristics, guarantees, and relevant system certifications.
 A complete insurance scheme against exogenous dangers (extreme weather
conditions, mechanical dysfunctions, vandal actions, income loss).
 A 24hr close surveillance of the investment, via closed circuit electronic equipment,
and detailed data reception in relation to production efficiency, through telemetry
systems, in order to secure the designated power output as thoroughly described in the
technical/financial analysis.
Neon Energy offers a guaranteed output performance of the PV system collaborating
with German companies of the highest quality of the photovoltaic panels and inverters.
Value-add Services
15
 Neon Energy is the only company that boasts a nation wide service network: 9 branches
(Thessaloniki, Patra, Hrakleio, Chania, Rethymno, Halkida, Rhodes, Ko, Corfu) and more
than 60 representatives and agents across Greece, and a highly specialized, certified and
well trained, specialized personnel.
 Neon Energy is the only company that adopts a model for participatory investments
that gives potential investors the opportunity to join the strategic expansion plan of our
company in Europe and worldwide.
 Neon Energy has zero debt or credit dependence of any kind, and all its’ investment
activities and operational expenditures, are financed through the company’s own net cash
reserves.
 Neon Energy owns 300.000m2 landscape in Lakonia and Messinia for constructing
photovoltaic parks (areas in Greece that display the highest output performance due to
their local climate and high solar production capacity).
 Thus, Neon Energy proves its power through the companies own contribution to
investment plans for photovoltaic systems.
Value-add Services
16
The Opportunity
National Strategy for R.E.S – Why Greece?
Government policy (a powerful ally and a force of guarantee)
Among all the international players in the R.E.S industry, Greece stands out as one
of the most promising nations, in terms of creating business opportunities, and a
fertile terrain for the appropriate development of R.E.S industry activities, operating
within a rock solid market framework and setting the foundations for a strong and
long enduring profitable investment environment.
Greece, due to its unique geographical position and sunlight dispersion, occupies
one of the highest “ideal” solar energy dynamics ratios within the European and
EMEA region. (*see the following table – next page)
18
Sun Production Capacity by Area in Greece
Area Sun Production Capacity (Kwh) Specifications
Athens 1500 at 310
Evia 1460 at 280
Viotia 1410 at 300
Arkadia 1460 at 280
Lakonia 1410 at 280
Korinthia 1420 at 280
Andros 1490 at 300
Tinos 1480 at 300
Lefkada 1370 at 280
Kithira 1450 at 280
Kefalonia 1350 at 270
Chania 1500 at 270
Rethimno 1460 at 270
Iraklio 1470 at 270
19
Government policy (a powerful ally and a force of guarantee)
In addition, the Greek Government within the National strategic development
program and its strong will to promote R.E.S technology as one of the leading
sectors of the Country’s economic growth, is strongly supporting R.E.S business
activity, by setting particularly high and lucrative tariffs for R.E.S energy production,
and at the same time, via the state owned Power and Electricity Company (DEH), is
guaranteeing (via a fixed contract provision) these tariffs for a straight period of
20-25 years.
National Strategy for R.E.S – Why Greece?
20
In particular the national targets for R.E.S based on the directive 2009/28/EK
(EEL,140/2009) are set until the year 2020 as follows:
• Contribution of R.E.S producible energy as a proportion of the Gross Energy
Consumption = 20%
• Contribution of R.E.S electrical producible energy as a proportion of the Gross
Energy Contribution = 40% minimum
• Contribution of R.E.S producible energy as a proportion of the Gross Energy
Contribution for heating/cooling = 20% minimum
• Contribution of R.E.S producible energy as a proportion of the Gross Energy
consumption for transportation = 10% minimum
National Strategy for R.E.S – Why Greece?
21
National Electricity Company tariff table
For residential installations (up to 10Kwp): 0,55€/kwh (5% annual reduction starting from 1/1/2012)
22
Our Network
 Today, Neon Energy
boasts a nation wide
service network
(9)Headquarters
-Athens
8 BUSINESS UNIT DIRECTORS
50+ BUSINESS UNIT TEAM MEMBERS
15+ SALESFORCE + CALL CENTRE
Our Network
Branches Reps & Agents
Thessaloniki
Patra
Hrakleio
Chania
Kerkyra (Corfu)
Rhodes
Chalkida
Kos
60+ reps and
agents across
Greece
220+ GF members
24
Rethimno
 Furthermore, Neon Energy has a nation wide network consisting of a highly specialized,
certified and well trained scientific personnel known as the Ground Force (GF).
 The GF consists of 220+ experienced staff and professionals including civil engineers,
electrical engineers, electrical network designers as well as construction teams that are
able to service and secure the written guarantees pertaining to the production output of
each system across Greece.
Our Team - The Ground Force
25
Greece-wide map of our Network
26
NEON ENERGY’s network is
Greece-wide, with 100%
national coverage:
 Sales
 Installation
Our Projects
Photovoltaic Parks
80+Mwp
That’s 160+ projects
in the pipeline
PV systems for
Commercial Properties
11,9Mwp
That’s 35 projects
underway
PV systems for
Residential Properties
1,2Mwp
That’s 150+ projects
underway
Our Projects: Quick View
28
Our projects
• Commercial Properties
• PV Parks
29
Our projects - Commercial Property
■“EUROPA PROFIL ALUMINIUM S.A.” - OINOFYTA, VIOTIA: 1,5MW
Neon Energy and Europa Profil Aluminium S.A. collaborated for the construction of one of Greece’s
largest industrial rooftop PV projects at the Europe premises, which has a total capacity of 1,5MWp in
the region Oinofyta, Attica, Greece.
30
 “Energiaki Κoropiou M.Ε.P.Ε.” - KOROPI, ATTICA: 500 KWp
31
Our projects – PV Park
• 31/10/2011 – 279,87 KWp grid connected PV Park project in Megara, Attica
«Energiaki Megaron Tria E.E. - location “Tsoulieri Rema”.
• 26/10/2011 – New Assignment: 199,88 KWp PV Park project in Keratea, Attica
“Kiberlitis Energiaki E.E.” - location “Dardeza Kalogiri”.
• 24/10/2011 – New Assignment: 219,83 KWp PV Park project in Megara, Attica
“Energiaki Megaron Dio E.E.” - location “Toutouli”.
• 21/10/2011 – New Assignment: 199,88 KWp PV Park project in Markopoulo, Attica
“Melia Energiaki E.E.” - location “Patitiria Lexana”.
• 18/10/2011 – New Assignment: 249,85 KWp PV Park project in Markopoulo, Attica
“Prasini Ischis Ena E.E.” - location “Stravo Melissi”.
• 14/10/2011 – New Assignment: 199,88 KWp PV Park project in Markopoulo, Attica
“Galinitis Energiaki E.E.” - location “Poleme”.
32
Our projects - Commercial Properties & PV Parks
• 11/10/2011 – New Assignment: 499,89 KWp PV Park project in Keratea, Attica
“Karmi Energiaki E.E.” - location “Mylos Panou”.
• 7/10/2011 – 499,68 KWp grid connected PV Park project in Megara, Attica
«Melissia Energiaki M.E.P.E.» - location “Artitsies Kalogerou Melissia”.
• 3/10/2011 – 99,84 KWp grid connected PV Park project in Achaia
«Androulaki Aristea & SIA E.E.» - location “Ambelia”, Skiada, M. Tritaia.
• 3/10/2011 – New Assignment: 449,68 KWp PV Park project in Thiva, Viotia
“Melanippos M.E.P.E.” - location “Elaionas”.
• 27/09/2011 – New Assignment: 249,60 KWp PV Park project in Thiva, Viotia
“Evagori M.E.P.E.” - location “Koumazi”.
• 23/09/2011 – New Assignment: 99,94KWp PV Park project in Chalkidiki
“Tzikas Apostolos & Sia O.E” - location “Nea Kallikratia”.
33
Our projects - Commercial Properties & PV Parks
• 20/09/2011 – New Assignment: 99,82 KWp PV Park project in Arkadia
“Konstantinidis & Aivaliotis O.E.” - location “Profili”, Pigadakia.
• 20/09/2011 – New Assignment: 99,82 KWp PV Park project in Arkadia
“Konstantinidis & Aivaliotis O.E.” - location “Profili”, Pigadakia.
• 19/09/2011 – New Assignment: 999,97 KWp PV Park project in Oropo, Attica
“Kadmilos Energiaki E.E.” - location “Loutsa Tria”.
• 19/09/2011 – New Assignment: 399,95 KWp PV Park project in Oropo, Attica
“Menitios Energiaki E.E.” - location “Loutsa”.
• 16/09/2011 – New Assignment: 399,95 KWp PV Park project in Oropo, Attica
“Evrifaessa Energiaki E.E.” - location “Loutsa”.
• 16/09/2011 – New Assignment: 249,85 KWp PV Park project in Keratea, Attica
“Grafitis Energiaki E.E.” - location “Tourkou Elies”.
34
Our projects - Commercial Properties & PV Parks
• 14/09/2011 – New Assignment: 299,82 KWp PV Park project in Keratea, Attica
“Apatitis Energiaki E.E.” - location “Kontri Gourilia”.
• 14/09/2011 – New Assignment: 299,82 KWp PV Park project in Keratea, Attica
“Aplitis Energiaki E.E.” - location “Mokriza”.
• 14/09/2011 – 79,99KWp grid connected PV Park in Iraklio, Crete
«Kokkinidis Emmanuel & Sia O.E» - location “Lofos Leivadas Vouton”.
• 13/09/2011 – New Assignment: 199,88KWp PV Park project in Markopoulo, Attica
“Prasini Isxis Exi E.E” - location “Dimitsiri”.
• 12/09/2011 – 1,5MWp grid connected Commercial PV Project in Viotia
Europa Profil Aluminium S.A. – Inofyta.
• 12/09/2011 – New Assignment: 1MWp PV Park project in Megara, Attica
“Energiaki Megaron Ena E.E” - location “Kolata”.
35
Our projects - Commercial Properties & PV Parks
• 9/09/2011 – New Assignment: 100KWp PV Park project in Tripoli, Arcadia
“Nick Priovolos & Sia O.E” - location “Kalogritsa”.
• 9/09/2011 – New Assignment: 100KWp PV Park project in Neochori, Arcadia
“Nick Priovolos & Sia O.E” - location “Leuko- D.D. Neochoriou – D. Korythiou.
• 9/09/2011 – New Assignment: 100KWp PV Park project in Tripoli, Arcadia
“Nick Priovolos & Sia O.E” - location “Loutsa”.
• 9/09/2011 – New Assignment: 100KWp PV Park project in Neochori, Arcadia
“Nick Priovolos & Sia O.E” - location “Leuko- D.D. Neochoriou”.
• 9/09/2011 – New Assignment: 499,80KWp PV Park project in Avlona, Attica
“Ilektra MEPE” - location “Vresteza”.
• 8/09/2011 – New Assignment: 499,89 KWp PV Park project in Megara, Attica
“Diasporos Energiaki E.E.” - location “Almires”.
36
Our projects - Commercial Properties & PV Parks
• 8/09/2011 – New Assignment: 299,82 KWp PV Park project in Keratea, Attica
“Granodioritis Energiaki E.E.” - location “Fovoles”.
• 7/09/2011 – New Assignment: 299,82 KWp PV Park project in Megara, Attica
“Adamantas Energiaki E.E.” - location “Paliabela Priskidon”.
• 5/09/2011 – New Assignment: 299,82 KWp PV Park project in Keratea, Attica
“Fotodynamiki Kerateas E.E.” - location “Daskalio”.
• 5/09/2011 – 99,94KWp grid connected PV Park in Pyrgos, Ilias.
«Karagounis» - location “Paliochori”.
• 2/09/2011 – New Assignment: 499,89 KWp PV Park project in Keratea, Attica
“Syinitis Energiaki E.E.” - in location “Noka Loubarda”.
• 31/08/2011 – New Assignment: 249,85 KWp PV Park project in Keratea, Attica
“Dakitis Energiaki E.E.” - location “Loubarda”.
37
Our projects - Commercial Properties & PV Parks
• 30/08/2011 – 499,98KWp grid connected PV Park in Koropi, Attica.
«Energiaki Koropiou Μ.Ε.P.E.» - location “Kontra Lepouri Bourboutsana”.
• 29/08/2011 – New Assignment: 149,72 KWp PV Park project in Keratea, Attica
“Energiaki Kerateas Ena E.E.” - location “Lahori”.
•
• 25/08/2011 – New Assignment: 349,98 KWp PV Park project in Keratea, Attica
“Zagreus Energiaki E.E.” - location “Mamai”.
• 23/08/2011 – New Assignment: 499,89 KWp PV Park project in Koropi, Attica
“Talkis Energiaki E.E.” - location “Prari”.
• 22/08/2011 – New Assignment: 150KWp PV Park project in Oropo, Attica
“Kabanou Anna O.E.” - location “Louberdi”.
• 30/07/2011 – 161,12KWp grid connected Commercial Rooftop PV Project in Avlona, Attica.
«Alpha Energy O.E.» - location “Tsakali-Melissia Pappa”.
38
Our projects - Commercial Properties & PV Parks
• 27/07/2011 – New Assignment: 500KWp PV Park project in Markopoulo, Attica
“Prasini Isxis Tria E.E” - location “Dimitsiri”.
• 27/07/2011 – New Assignment: 149,91KWp PV Park project in Markopoulo, Attica
“Prasini Isxis Pente E.E” - location “Dimitsiri”.
• 25/07/2011 – New Assignment: 499,89KWp PV Park project in Koropi, Attica
“Astrea Energiaki & Sia E.E” - location “Stamala”.
• 20/07/2011 – New Assignment: 300KWp PV Park project in Keratea, Attica
“Ios Energiaki E.E” - location “Rizomatou Thorikou”.
• 14/07/2011 – New Assignment: 200KWp PV Park project in Oropo, Attica
“Tithus Energiaki & Sia E.E” - location “Louberdi”.
• 7/07/2011 – New Assignment: 39,84KWp PV Park project in Keratea, Attica
“Energiaki Afon Kelaiditi O.E” - location “Kato Dardeza”.
39
Our projects - Commercial Properties & PV Parks
• 7/07/2011 – 25,44 KWp grid connected Commercial Rooftop PV Project in Elliniko, Attica.
«Energiaki Afon Kelaiditi O.E.».
• 5/07/2011 – New Assignment: 500KWp PV Park project in Megara, Attica
“Melissia Energiaki M.E.P.E” - location “Artitsies Kalogerou Melissia”.
• 29/06/2011 – New Assignment: 99,94KWp PV Park project in Agrinio
“Gadzoudis Stefanos & Sia O.E” - location “Mirmigaki Stamnas”.
• 22/06/2011 – New Assignment: 249,99KWp PV Park project in Markopoulo, Attica
“Palaioledia Energiaki A.E” - location “Paleoledia Vraona”.
• 20/06/2011 – New Assignment: 500KWp PV Park project in Markopoulo, Attica
“Nikolakis Vlahthi Ena M.E.P.E” - location “Vlahthi”.
• 20/06/2011 – New Assignment: 500KWp PV Park project in Markopoulo, Attica
“Nikolakis Vlahthi Duo M.E.P.E” - location “Vlahthi”.
40
Our projects - Commercial Properties & PV Parks
• 15/06/2011 – New Assignment: 299,82KWp PV Park project in Keratea, Attica
“Energia Kerateas Duo E.E” - location “Thoriko”.
• 25/05/2011 – New Assignment: 99,94KWp PV Park project in Markopoulo, Attica
“Koniakos Efthimios & SIA E.E” - location “Solomesa”.
• 19/05/2011 – New Assignment: 279,87KWp PV Park project in Megara, Attica
“Energiaki Megaron Tria E.E” - in location “Tsouliari Rema”.
• 11/05/2011 – New Assignment: 499,68KWp PV Park project in Markopoulo, Attica
“Iliodinamiki Markopoulou A.E” - location “Patira Markopoulou”.
• 9/05/2011 – New Assignment: 999,97KWp PV Park project in Koropi, Attica
“Aksieros Energiaki E.E” - location “Ag. Nikolaos”.
• 4/05/2011 – New Assignment: 199,88KWp PV Park project in Markopoulo, Attica
“Prasini Isxis Duo E.E” - location “Dimitsiri”.
41
Our projects - Commercial Properties & PV Parks
• 30/04/2011 – New Assignment: 99,94KWp PV Park project in Pirgos, Ilias
“Evag. Karagounis & Sia O.E” - location “Paliochori”.
•
• 28/04/2011 – New Assignment: 99,94KWp PV Park project in Patra
“Androulaki Aristea & Sia E.E” - location “Abelia”.
• 14/04/2011 – New Assignment: 88,335KWp Commercial Rooftop PV Project in Ilion, Attica
“Theodoropoulos I & D O.E”.
• 4/04/2011 – New Assignment: 61,94KWp Commercial Rooftop PV Project in Vari, Attica
“Metro AEBE”.
• 22/03/2011 – New Assignment: 100KWp PV Park project in Tripoli
“Rush Net M.E.P.E” - location “Gremos”.
• 22/03/2011 – New Assignment: 100KWp PV Park project in Tripoli
“Rush Net M.E.P.E” - location “Megabeli”.
42
Our projects - Commercial Properties & PV Parks
• 4/03/2011 – New Assignment: 79,99KWp PV Park project in Iraklio, Crete
“Kokkinidis Emmanouel & Sia O..E” - location “Lofos Livadas Vouton”.
• 3/03/2011 – New Assignment: 161,12KWp Commercial Rooftop PV Project in Avlona,
Attica
“Alpha Energy O.E” - location “Tsakali- Melissia Pappa”.
• 24/02/2011 – New Assignment: 100KWp PV Park project in Agrinio
“Sarmadzaki M.E.P.E.” - location “Sarmadzaki- Ag. Andreas Makrinias”.
• 10/02/2011 – New Assignment: 199,68KWp PV Park project in Inofyta, Viotia Crete
“Europa ABE” - location “Kamina Draseza”.
• 5/02/2011 – New Assignment: 1,5MWp Commercial Rooftop PV Project in Viotia
“Europa Profil Alumium A.B.E” - location Inofyta.
• 10/01/2011 – New Assignment: 499,98KWp PV Park project in Koropi, Attica
“Energiakis Koropiou M.E.P.E.” - location “Kontra Lepouri Bourboutsana”.
•
43
Our projects - Commercial Properties & PV Parks
• 5/01/2011 – New Assignment: 99KWp PV Park project in Megara, Attica
“Saragas Nikitas & Con/nos O.E” - location “Ag. Barbara - Migiari”.
• 5/01/2011 – New Assignment: 99KWp PV Park project in Megara, Attica
“Saragas Nikitas & Con/nos O.E” – location “Ag. Ierotheos”.
• 5/01/2011 – New Assignment: 45,60KWp Commercial Rooftop PV Project in Moschato,
Attica
“Emm. Andreadis A.E” .
• 4/01/2011 – New Assignment: 25,44 KWp Commercial Rooftop PV Project in Elliniko, Attica
“Energiaki Afon Kelaiditi O.E.” .
44
Our projects - Commercial Properties & PV Parks
45
Our projects
• Residential Properties
■ PEREA, THESSALONIKI: 9,69 KW WITH STABLE MOUNTING SYSTEM
46
Our projects – Residential Properties
■ OINOFYTA, ATTICA: 9,84 KW WITH STABLE MOUNTING SYSTEM
47
Our projects – Residential Properties
48
■ GLYKOVRISI, LACONIA: 9,84KW WITH STABLE MOUNTING SYSTEM
Our projects – Residential Properties
49
Our projects – Residential Properties
■ MOLAI, LACONIA: 9,84 KW WITH STABLE MOUNTING SYSTEM
• 8/11/2011 – 7,60 KWp grid connected residential terrace PV system in Arta (Grammenitsa)
• 8/11/2011 – 9,84 KWp grid connected residential terrace PV system in Chania, Crete (Vourkias
Daratso N. Kydonias)
• 8/11/2011 – 6,24 KWp grid connected residential rooftop PV system in Chiliomodi, Korinthia
• 7/11/2011 – 7,60 KWp grid connected residential terrace PV system in Markopoulo Oropou,
Attica
• 4/11/2011 – 6,84 KWp grid connected residential terrace PV system in Oropo, Attica (position
Skoumbi Sykamino)
• 3/11/2011 – 9,94 KWp grid connected residential terrace PV system in Ν. Iraklio, Attica
• 2/11/2011 – 9,94 KWp grid connected residential rooftop PV system in Amaliada, Ilia
• 2/11/2011 – 7,98 KWp grid connected residential terrace PV system in Salamina, Attica
50
Our projects – Residential Properties
• 1/11/2011 – 6,08 KWp grid connected residential terrace PV system in Agio Konstantino, Lavrio
- Attica
• 31/10/2011 – 9,88 KWp grid connected residential terrace PV system in Aigina, Attica (Souvala)
• 27/10/2011 – 9,94 KWp grid connected residential terrace PV system in Karpenisi, Evritania
• 27/10/2011 – 6,24 KWp grid connected residential terrace PV system in Thessaloniki
• 21/10/2011 – 9,84 KWp grid connected residential terrace PV system in Oropo, Attica (position
“Anemomylos”)
• 21/10/2011 – 2,53 KWp grid connected residential rooftop PV system in Vrahati, Korinthia
• 7/10/2011 – 9,84 KWp grid connected residential terrace PV system in Kalamo, Attica
• 6/10/2011 – 9,94 KWp grid connected residential terrace PV system in Aigina, Attica
51
Our projects – Residential Properties
• 4/10/2011 – 7,60 KWp grid connected residential rooftop PV system in Kalivia Thorikou, Attica
• 3/10/2011 – 6,84 KWp grid connected residential terrace PV system in Loutraki, Korinthos
(Paradeisos Loutrakiou)
• 26/09/2011 – 8,36 KWp grid connected residential terrace PV system in Rio, Achaia
• 22/09/2011 – 4,94 KWp grid connected residential rooftop PV system in Rhodes (Ialisos)
• 22/09/2011 – 6,84 KWp grid connected residential terrace PV system in Keratea, Attica
• 21/09/2011 – 9,50 KWp grid connected residential rooftop PV system in Agioi Anargyroi, Attica
• 18/09/2011 – 4,94 KWp grid connected residential rooftop PV system in Rhodes (Ialisos)
• 17/09/2011 – 9,88 KWp grid connected residential rooftop PV system in Nafpakto,
Etoloakarnania (Eleostasio)
52
Our projects – Residential Properties
• 16/09/2011 – 6,08 KWp grid connected residential terrace PV system in Fhiotida (Livanates)
• 16/09/2011 – 9,88 KWp grid connected residential terrace PV system in Thessaloniki (Adam)
• 16/09/2011 – 4,94 KWp grid connected residential rooftop PV system in Glyfada, Attica
• 15/09/2011 – 4,94 KWp grid connected residential rooftop PV system in Koropi, Attica
• 5/09/2011 – 4,80 KWp grid connected residential terrace PV system in Ahaia (Logos Aigio)
• 9/09/2011 – 9,88 KWp grid connected residential rooftop PV system in Serres (Scoutari)
• 9/09/2011 – 6,46 KWp grid connected residential rooftop PV system in Artemida, Attica
• 8/09/2011 – 7,60 KWp grid connected residential terrace PV system in Keratea, Attica
• 7/09/2011 – 8,74 KWp grid connected residential terrace PV system in Heraclion, Crete (Agia
Varvara)
53
Our projects – Residential Properties
• 7/09/2011 – 6,84 KWp grid connected residential terrace PV system in Heraclion, Crete (Agia
Varvara)
• 5/09/2011 – 4,94 KWp grid connected residential terrace PV system in Ko (Agios Nektarios)
• 31/08/2011 – 9,88 KWp grid connected residential terrace PV system in Thiva, Voiotia (Eleon,
M. Thiveon)
• 29/08/2011 – 6,08 KWp grid connected residential rooftop PV system in Kilkis (Agios Petros,
M. Peonias)
• 19/08/2011 – 4,94 KWp grid connected residential terrace PV system in Ko (Tsiggoura
Kefalou)
• and many more….
54
Our projects – Residential Properties
Our Partners
 NEON ENERGY collaborates with international and reliable manufacturers of photovoltaic
panels, inverters and mounting systems for the construction of the photovoltaic systems for it’s
clients.
 NEON ENERGY aims to secure the photovoltaic systems’ maximum performance output by
selecting the highest quality technical parts for the installation thus selecting reliable
manufacturers giving guarantees for the parts as well as for the performance output.
Our partners
56
57
Services: Enhanced by Global Partners
57
Our partners
58
«Invest in a partnership that is credible, stable and
profitable; and take part in the effort to achieve our
planet’s sustainability»
ΝΕΟΝ ENERGY S.A., 12th km on Ethniki Highway,
Athinon-Lamias, Bakogiannis 80, P.C. 144 52
Τel.: 2102837000 - Fax: 2102838889
e-mail: info@neonenergy.gr, www.neonenergy.gr

Mais conteúdo relacionado

Mais procurados

Abengoa Solar Annual Report 2013
Abengoa Solar Annual Report 2013Abengoa Solar Annual Report 2013
Abengoa Solar Annual Report 2013Abengoa
 
TRINA SOLAR Company PPT
TRINA SOLAR Company PPTTRINA SOLAR Company PPT
TRINA SOLAR Company PPTrjimd
 
Orion projects company profile v4
Orion projects   company profile v4Orion projects   company profile v4
Orion projects company profile v4Orionprojects
 
Megajoule Corporate Presentation 2014
Megajoule Corporate Presentation 2014Megajoule Corporate Presentation 2014
Megajoule Corporate Presentation 2014Miguel Ferreira
 
White certificate at Germany G7 meeting
White certificate at Germany G7 meetingWhite certificate at Germany G7 meeting
White certificate at Germany G7 meetingDario Di Santo
 
Measurement and verification in the Italian white certificate scheme
Measurement and verification in the Italian white certificate schemeMeasurement and verification in the Italian white certificate scheme
Measurement and verification in the Italian white certificate schemeDario Di Santo
 
Energy manager: the Italian experience
Energy manager: the Italian experienceEnergy manager: the Italian experience
Energy manager: the Italian experienceDario Di Santo
 
Measuring energy efficiency savings
Measuring energy efficiency savingsMeasuring energy efficiency savings
Measuring energy efficiency savingsDario Di Santo
 
The white certificates scheme in Italy: how it works
The white certificates scheme in Italy: how it worksThe white certificates scheme in Italy: how it works
The white certificates scheme in Italy: how it worksDario Di Santo
 
White certificates in industry at ECEEE conference
White certificates in industry at ECEEE conferenceWhite certificates in industry at ECEEE conference
White certificates in industry at ECEEE conferenceDario Di Santo
 
Grace Solar-Company Profile
Grace Solar-Company ProfileGrace Solar-Company Profile
Grace Solar-Company ProfileSara Malik
 
ESCOs and white certificates in Italy
ESCOs and white certificates in ItalyESCOs and white certificates in Italy
ESCOs and white certificates in ItalyDario Di Santo
 
Developing A Successful Strategy To Attract Venture Capital Financing
Developing A Successful Strategy To Attract Venture Capital FinancingDeveloping A Successful Strategy To Attract Venture Capital Financing
Developing A Successful Strategy To Attract Venture Capital FinancingCharged2020
 
Session4 the role of successful pilot projects for re business development au...
Session4 the role of successful pilot projects for re business development au...Session4 the role of successful pilot projects for re business development au...
Session4 the role of successful pilot projects for re business development au...RCREEE
 
Going green with renewable energy and energy efficiency
Going green with renewable energy and energy efficiencyGoing green with renewable energy and energy efficiency
Going green with renewable energy and energy efficiencyGreen Constitutes Sdn Bhd
 

Mais procurados (16)

Abengoa Solar Annual Report 2013
Abengoa Solar Annual Report 2013Abengoa Solar Annual Report 2013
Abengoa Solar Annual Report 2013
 
TRINA SOLAR Company PPT
TRINA SOLAR Company PPTTRINA SOLAR Company PPT
TRINA SOLAR Company PPT
 
Orion projects company profile v4
Orion projects   company profile v4Orion projects   company profile v4
Orion projects company profile v4
 
Megajoule Corporate Presentation 2014
Megajoule Corporate Presentation 2014Megajoule Corporate Presentation 2014
Megajoule Corporate Presentation 2014
 
White certificate at Germany G7 meeting
White certificate at Germany G7 meetingWhite certificate at Germany G7 meeting
White certificate at Germany G7 meeting
 
Measurement and verification in the Italian white certificate scheme
Measurement and verification in the Italian white certificate schemeMeasurement and verification in the Italian white certificate scheme
Measurement and verification in the Italian white certificate scheme
 
Energy manager: the Italian experience
Energy manager: the Italian experienceEnergy manager: the Italian experience
Energy manager: the Italian experience
 
Measuring energy efficiency savings
Measuring energy efficiency savingsMeasuring energy efficiency savings
Measuring energy efficiency savings
 
The white certificates scheme in Italy: how it works
The white certificates scheme in Italy: how it worksThe white certificates scheme in Italy: how it works
The white certificates scheme in Italy: how it works
 
White certificates in industry at ECEEE conference
White certificates in industry at ECEEE conferenceWhite certificates in industry at ECEEE conference
White certificates in industry at ECEEE conference
 
Grace Solar-Company Profile
Grace Solar-Company ProfileGrace Solar-Company Profile
Grace Solar-Company Profile
 
ESCOs and white certificates in Italy
ESCOs and white certificates in ItalyESCOs and white certificates in Italy
ESCOs and white certificates in Italy
 
Hyperion Solar Profile(1)
Hyperion Solar Profile(1)Hyperion Solar Profile(1)
Hyperion Solar Profile(1)
 
Developing A Successful Strategy To Attract Venture Capital Financing
Developing A Successful Strategy To Attract Venture Capital FinancingDeveloping A Successful Strategy To Attract Venture Capital Financing
Developing A Successful Strategy To Attract Venture Capital Financing
 
Session4 the role of successful pilot projects for re business development au...
Session4 the role of successful pilot projects for re business development au...Session4 the role of successful pilot projects for re business development au...
Session4 the role of successful pilot projects for re business development au...
 
Going green with renewable energy and energy efficiency
Going green with renewable energy and energy efficiencyGoing green with renewable energy and energy efficiency
Going green with renewable energy and energy efficiency
 

Semelhante a Neon Energy Corporate Presentation

The meeco Group Corporate Brochure
The meeco Group Corporate BrochureThe meeco Group Corporate Brochure
The meeco Group Corporate BrochureThe meeco Group
 
PES Wind Magazine - Interview Jesus Mayor Ingeteam Wind Energy
PES Wind Magazine - Interview Jesus Mayor Ingeteam Wind EnergyPES Wind Magazine - Interview Jesus Mayor Ingeteam Wind Energy
PES Wind Magazine - Interview Jesus Mayor Ingeteam Wind EnergyIngeteam Wind Energy
 
The role of technology and innovation in facilitating the transition towards ...
The role of technology and innovation in facilitating the transition towards ...The role of technology and innovation in facilitating the transition towards ...
The role of technology and innovation in facilitating the transition towards ...RCREEE
 
Pietro Colucci - Presentazione Kinexia - Lugano Small & Mid Cap Investor Day
Pietro Colucci - Presentazione Kinexia - Lugano Small & Mid Cap Investor Day Pietro Colucci - Presentazione Kinexia - Lugano Small & Mid Cap Investor Day
Pietro Colucci - Presentazione Kinexia - Lugano Small & Mid Cap Investor Day Pietro Colucci
 
Financing Energy Efficiency - Green Mortgages Workshop
Financing Energy Efficiency - Green Mortgages WorkshopFinancing Energy Efficiency - Green Mortgages Workshop
Financing Energy Efficiency - Green Mortgages WorkshopIrish Green Building Council
 
Solving the finance conundrum affecting innovative renewable energy technologies
Solving the finance conundrum affecting innovative renewable energy technologiesSolving the finance conundrum affecting innovative renewable energy technologies
Solving the finance conundrum affecting innovative renewable energy technologiesNuno Quental
 
Friost & Sullivan - Eltek (dc power systems) award write up
Friost & Sullivan  - Eltek (dc power systems) award write upFriost & Sullivan  - Eltek (dc power systems) award write up
Friost & Sullivan - Eltek (dc power systems) award write upEltek
 
St solar holdings_pitch_deck
St solar holdings_pitch_deckSt solar holdings_pitch_deck
St solar holdings_pitch_decksolaritaly
 
BOE 2015 Brochure_email
BOE 2015 Brochure_emailBOE 2015 Brochure_email
BOE 2015 Brochure_emailTobin Booth
 
Blue Oak Energy - Commercial and Utility Solar Construction
Blue Oak Energy - Commercial and Utility Solar ConstructionBlue Oak Energy - Commercial and Utility Solar Construction
Blue Oak Energy - Commercial and Utility Solar ConstructionTobin Booth
 
Energia innovation company profile 2019
Energia innovation company profile 2019Energia innovation company profile 2019
Energia innovation company profile 2019ENERGIA INNOVATION Ltd
 
Energy efficiency implementation program for state level in Malaysia
Energy efficiency implementation program for state level in MalaysiaEnergy efficiency implementation program for state level in Malaysia
Energy efficiency implementation program for state level in MalaysiaZAINI ABDUL WAHAB
 
Renewable energy program particularly the solar pv in buildings in Malaysia (...
Renewable energy program particularly the solar pv in buildings in Malaysia (...Renewable energy program particularly the solar pv in buildings in Malaysia (...
Renewable energy program particularly the solar pv in buildings in Malaysia (...Steve Lojuntin
 
EC Company Profile 15
EC Company Profile 15EC Company Profile 15
EC Company Profile 15Craig Warwick
 

Semelhante a Neon Energy Corporate Presentation (20)

EUROSOL_Brochure_2015.02
EUROSOL_Brochure_2015.02EUROSOL_Brochure_2015.02
EUROSOL_Brochure_2015.02
 
RSL Brochure lores
RSL Brochure loresRSL Brochure lores
RSL Brochure lores
 
The meeco Group Corporate Brochure
The meeco Group Corporate BrochureThe meeco Group Corporate Brochure
The meeco Group Corporate Brochure
 
PES Wind Magazine - Interview Jesus Mayor Ingeteam Wind Energy
PES Wind Magazine - Interview Jesus Mayor Ingeteam Wind EnergyPES Wind Magazine - Interview Jesus Mayor Ingeteam Wind Energy
PES Wind Magazine - Interview Jesus Mayor Ingeteam Wind Energy
 
The role of technology and innovation in facilitating the transition towards ...
The role of technology and innovation in facilitating the transition towards ...The role of technology and innovation in facilitating the transition towards ...
The role of technology and innovation in facilitating the transition towards ...
 
Proef Presentation
Proef Presentation Proef Presentation
Proef Presentation
 
REI_Brochure
REI_BrochureREI_Brochure
REI_Brochure
 
Pietro Colucci - Presentazione Kinexia - Lugano Small & Mid Cap Investor Day
Pietro Colucci - Presentazione Kinexia - Lugano Small & Mid Cap Investor Day Pietro Colucci - Presentazione Kinexia - Lugano Small & Mid Cap Investor Day
Pietro Colucci - Presentazione Kinexia - Lugano Small & Mid Cap Investor Day
 
Financing Energy Efficiency - Green Mortgages Workshop
Financing Energy Efficiency - Green Mortgages WorkshopFinancing Energy Efficiency - Green Mortgages Workshop
Financing Energy Efficiency - Green Mortgages Workshop
 
Solving the finance conundrum affecting innovative renewable energy technologies
Solving the finance conundrum affecting innovative renewable energy technologiesSolving the finance conundrum affecting innovative renewable energy technologies
Solving the finance conundrum affecting innovative renewable energy technologies
 
EPS expertise
EPS  expertiseEPS  expertise
EPS expertise
 
Why Choose REC
Why Choose RECWhy Choose REC
Why Choose REC
 
Friost & Sullivan - Eltek (dc power systems) award write up
Friost & Sullivan  - Eltek (dc power systems) award write upFriost & Sullivan  - Eltek (dc power systems) award write up
Friost & Sullivan - Eltek (dc power systems) award write up
 
St solar holdings_pitch_deck
St solar holdings_pitch_deckSt solar holdings_pitch_deck
St solar holdings_pitch_deck
 
BOE 2015 Brochure_email
BOE 2015 Brochure_emailBOE 2015 Brochure_email
BOE 2015 Brochure_email
 
Blue Oak Energy - Commercial and Utility Solar Construction
Blue Oak Energy - Commercial and Utility Solar ConstructionBlue Oak Energy - Commercial and Utility Solar Construction
Blue Oak Energy - Commercial and Utility Solar Construction
 
Energia innovation company profile 2019
Energia innovation company profile 2019Energia innovation company profile 2019
Energia innovation company profile 2019
 
Energy efficiency implementation program for state level in Malaysia
Energy efficiency implementation program for state level in MalaysiaEnergy efficiency implementation program for state level in Malaysia
Energy efficiency implementation program for state level in Malaysia
 
Renewable energy program particularly the solar pv in buildings in Malaysia (...
Renewable energy program particularly the solar pv in buildings in Malaysia (...Renewable energy program particularly the solar pv in buildings in Malaysia (...
Renewable energy program particularly the solar pv in buildings in Malaysia (...
 
EC Company Profile 15
EC Company Profile 15EC Company Profile 15
EC Company Profile 15
 

Neon Energy Corporate Presentation

  • 2. Agenda  About us  Our Company  Our Philosophy  Our Strategy  Our Services  Value-add Services The Opportunity  The Greek Environment  Our Network  Our Projects  Our Partners 2
  • 4. Our Company  A new entrant in the field of solar power exploitation and EPC solutions, the firm already enjoys a formidable advantage in clean energy technologies in Greece due to the collective experience of its’ team. Neon Energy was founded in 2009 but the core team’s experience spans across 25+yrs in the fields of economics, energy efficient technology and specialized technological development/ construction.  The firm’s credibility as a PV provider is supported by the excellent quality of the equipment deployed and the connection topology design of the multi component systems, all of which is accompanied by the necessary certifications and written guarantees.  Neon Energy offers the broadest service network of certified agents and installation Greece-wide- this shall be further outlined during the presentation.  Due to the firm’s continual investment in its’ expert staff and technological know- how, Neon Energy offers a level of professionalism and credibility that few firms in the field of Photovoltaic Systems offer today in Greece. 4
  • 5. Our mission is to provide an integrated and holistic service to clients, taking the headache out of what can be a complex process in Greece – TURN-KEY SOLUTIONS.  Νeon Energy undertakes every step of the project’s procedures, from the initial surveillance of the proposed area, to the provision of the required permits and associated financial loans through to the final construction, implementation and maintenance of both small & large scale, accredited PV units.  360 «Turn-key» PV solutions Our Mission 5
  • 6. RESIDENTIAL rooftops / terraces Our Photovoltaic Solutions COMMERCIAL rooftops / terraces PV PARKs ground installations 6
  • 7. ■ At Neon Energy we continually harvest and grow our corporate values through our approach to each and every project, which emphasizes sincerity, professionalism, consistency, the continuous enhancement and development of our offering, as well as both functional and business excellence. ■ Neon Energy constantly seeks and procures PV products that will maximize our client’s satisfaction. The company focuses on innovative to the market service offerings that will differentiate us from our competitors and also ensures that the products the company adopts are of the latest technological advancements. ■ Neon Energy thinks globally by leveraging off its exceptional human resources and through its innovative philosophy for the foundation of new business opportunities world-wide. It is this sense of “GLOBAL THINKING” that has laid the foundations for a long-term, dynamic and promising potential for global reach. 7 Our Strategy
  • 8. Green / technical know how Global thinking Cooperation / CollaborationInnovation / First movers Credibility Solutions/Results driven= Product/Service Guarantee Our Values 8
  • 9.  Neon Energy Thinks Green  Enhanced by its’ solid technical expertise, Neon Energy embraces the R.E.S. philosophy and contributes to the benefits of R.E.S. by fully exploiting (via solar panel arrays) the immense power of the sun.  In this way the firm contributes to a more viable and sustainable environment for every citizen of the world.  This philosophy is an essential component driving the firm’s growth as it inspires Neon Energy to “think” globally, as a company of the world.  As such, the company displays a strong desire and promising potential for global reach. Our Philosophy 9
  • 10.  Our expansion into the Balkan region and into countries within South-East Europe  Sofia, Bulgaria (July 2011)  Dusseldorf, Germany (November 2011)  Turkey (2012 due to the regulatory environment) Ambitions for Expansion 10
  • 11. Our Vision  NEON ENERGY’s corporate vision:  To be the pioneer company in Greece, South- East Europe and Turkey operating in the field of PV Systems and offering an integrated, holistic service. This includes the surveyance, construction, implementation & maintenance of high quality, technologically advanced PV systems for parks, commercial and residential properties. 11
  • 15.  It is the only company in Greece that issues a written guarantee concerning the output performance and functionality of the PV system, throughout the entire lifespan of the investment, including the financial return on investment.  Complete technical specifications and efficiency analysis, which includes all detailed system characteristics, guarantees, and relevant system certifications.  A complete insurance scheme against exogenous dangers (extreme weather conditions, mechanical dysfunctions, vandal actions, income loss).  A 24hr close surveillance of the investment, via closed circuit electronic equipment, and detailed data reception in relation to production efficiency, through telemetry systems, in order to secure the designated power output as thoroughly described in the technical/financial analysis. Neon Energy offers a guaranteed output performance of the PV system collaborating with German companies of the highest quality of the photovoltaic panels and inverters. Value-add Services 15
  • 16.  Neon Energy is the only company that boasts a nation wide service network: 9 branches (Thessaloniki, Patra, Hrakleio, Chania, Rethymno, Halkida, Rhodes, Ko, Corfu) and more than 60 representatives and agents across Greece, and a highly specialized, certified and well trained, specialized personnel.  Neon Energy is the only company that adopts a model for participatory investments that gives potential investors the opportunity to join the strategic expansion plan of our company in Europe and worldwide.  Neon Energy has zero debt or credit dependence of any kind, and all its’ investment activities and operational expenditures, are financed through the company’s own net cash reserves.  Neon Energy owns 300.000m2 landscape in Lakonia and Messinia for constructing photovoltaic parks (areas in Greece that display the highest output performance due to their local climate and high solar production capacity).  Thus, Neon Energy proves its power through the companies own contribution to investment plans for photovoltaic systems. Value-add Services 16
  • 18. National Strategy for R.E.S – Why Greece? Government policy (a powerful ally and a force of guarantee) Among all the international players in the R.E.S industry, Greece stands out as one of the most promising nations, in terms of creating business opportunities, and a fertile terrain for the appropriate development of R.E.S industry activities, operating within a rock solid market framework and setting the foundations for a strong and long enduring profitable investment environment. Greece, due to its unique geographical position and sunlight dispersion, occupies one of the highest “ideal” solar energy dynamics ratios within the European and EMEA region. (*see the following table – next page) 18
  • 19. Sun Production Capacity by Area in Greece Area Sun Production Capacity (Kwh) Specifications Athens 1500 at 310 Evia 1460 at 280 Viotia 1410 at 300 Arkadia 1460 at 280 Lakonia 1410 at 280 Korinthia 1420 at 280 Andros 1490 at 300 Tinos 1480 at 300 Lefkada 1370 at 280 Kithira 1450 at 280 Kefalonia 1350 at 270 Chania 1500 at 270 Rethimno 1460 at 270 Iraklio 1470 at 270 19
  • 20. Government policy (a powerful ally and a force of guarantee) In addition, the Greek Government within the National strategic development program and its strong will to promote R.E.S technology as one of the leading sectors of the Country’s economic growth, is strongly supporting R.E.S business activity, by setting particularly high and lucrative tariffs for R.E.S energy production, and at the same time, via the state owned Power and Electricity Company (DEH), is guaranteeing (via a fixed contract provision) these tariffs for a straight period of 20-25 years. National Strategy for R.E.S – Why Greece? 20
  • 21. In particular the national targets for R.E.S based on the directive 2009/28/EK (EEL,140/2009) are set until the year 2020 as follows: • Contribution of R.E.S producible energy as a proportion of the Gross Energy Consumption = 20% • Contribution of R.E.S electrical producible energy as a proportion of the Gross Energy Contribution = 40% minimum • Contribution of R.E.S producible energy as a proportion of the Gross Energy Contribution for heating/cooling = 20% minimum • Contribution of R.E.S producible energy as a proportion of the Gross Energy consumption for transportation = 10% minimum National Strategy for R.E.S – Why Greece? 21
  • 22. National Electricity Company tariff table For residential installations (up to 10Kwp): 0,55€/kwh (5% annual reduction starting from 1/1/2012) 22
  • 23. Our Network  Today, Neon Energy boasts a nation wide service network
  • 24. (9)Headquarters -Athens 8 BUSINESS UNIT DIRECTORS 50+ BUSINESS UNIT TEAM MEMBERS 15+ SALESFORCE + CALL CENTRE Our Network Branches Reps & Agents Thessaloniki Patra Hrakleio Chania Kerkyra (Corfu) Rhodes Chalkida Kos 60+ reps and agents across Greece 220+ GF members 24 Rethimno
  • 25.  Furthermore, Neon Energy has a nation wide network consisting of a highly specialized, certified and well trained scientific personnel known as the Ground Force (GF).  The GF consists of 220+ experienced staff and professionals including civil engineers, electrical engineers, electrical network designers as well as construction teams that are able to service and secure the written guarantees pertaining to the production output of each system across Greece. Our Team - The Ground Force 25
  • 26. Greece-wide map of our Network 26 NEON ENERGY’s network is Greece-wide, with 100% national coverage:  Sales  Installation
  • 28. Photovoltaic Parks 80+Mwp That’s 160+ projects in the pipeline PV systems for Commercial Properties 11,9Mwp That’s 35 projects underway PV systems for Residential Properties 1,2Mwp That’s 150+ projects underway Our Projects: Quick View 28
  • 29. Our projects • Commercial Properties • PV Parks 29
  • 30. Our projects - Commercial Property ■“EUROPA PROFIL ALUMINIUM S.A.” - OINOFYTA, VIOTIA: 1,5MW Neon Energy and Europa Profil Aluminium S.A. collaborated for the construction of one of Greece’s largest industrial rooftop PV projects at the Europe premises, which has a total capacity of 1,5MWp in the region Oinofyta, Attica, Greece. 30
  • 31.  “Energiaki Κoropiou M.Ε.P.Ε.” - KOROPI, ATTICA: 500 KWp 31 Our projects – PV Park
  • 32. • 31/10/2011 – 279,87 KWp grid connected PV Park project in Megara, Attica «Energiaki Megaron Tria E.E. - location “Tsoulieri Rema”. • 26/10/2011 – New Assignment: 199,88 KWp PV Park project in Keratea, Attica “Kiberlitis Energiaki E.E.” - location “Dardeza Kalogiri”. • 24/10/2011 – New Assignment: 219,83 KWp PV Park project in Megara, Attica “Energiaki Megaron Dio E.E.” - location “Toutouli”. • 21/10/2011 – New Assignment: 199,88 KWp PV Park project in Markopoulo, Attica “Melia Energiaki E.E.” - location “Patitiria Lexana”. • 18/10/2011 – New Assignment: 249,85 KWp PV Park project in Markopoulo, Attica “Prasini Ischis Ena E.E.” - location “Stravo Melissi”. • 14/10/2011 – New Assignment: 199,88 KWp PV Park project in Markopoulo, Attica “Galinitis Energiaki E.E.” - location “Poleme”. 32 Our projects - Commercial Properties & PV Parks
  • 33. • 11/10/2011 – New Assignment: 499,89 KWp PV Park project in Keratea, Attica “Karmi Energiaki E.E.” - location “Mylos Panou”. • 7/10/2011 – 499,68 KWp grid connected PV Park project in Megara, Attica «Melissia Energiaki M.E.P.E.» - location “Artitsies Kalogerou Melissia”. • 3/10/2011 – 99,84 KWp grid connected PV Park project in Achaia «Androulaki Aristea & SIA E.E.» - location “Ambelia”, Skiada, M. Tritaia. • 3/10/2011 – New Assignment: 449,68 KWp PV Park project in Thiva, Viotia “Melanippos M.E.P.E.” - location “Elaionas”. • 27/09/2011 – New Assignment: 249,60 KWp PV Park project in Thiva, Viotia “Evagori M.E.P.E.” - location “Koumazi”. • 23/09/2011 – New Assignment: 99,94KWp PV Park project in Chalkidiki “Tzikas Apostolos & Sia O.E” - location “Nea Kallikratia”. 33 Our projects - Commercial Properties & PV Parks
  • 34. • 20/09/2011 – New Assignment: 99,82 KWp PV Park project in Arkadia “Konstantinidis & Aivaliotis O.E.” - location “Profili”, Pigadakia. • 20/09/2011 – New Assignment: 99,82 KWp PV Park project in Arkadia “Konstantinidis & Aivaliotis O.E.” - location “Profili”, Pigadakia. • 19/09/2011 – New Assignment: 999,97 KWp PV Park project in Oropo, Attica “Kadmilos Energiaki E.E.” - location “Loutsa Tria”. • 19/09/2011 – New Assignment: 399,95 KWp PV Park project in Oropo, Attica “Menitios Energiaki E.E.” - location “Loutsa”. • 16/09/2011 – New Assignment: 399,95 KWp PV Park project in Oropo, Attica “Evrifaessa Energiaki E.E.” - location “Loutsa”. • 16/09/2011 – New Assignment: 249,85 KWp PV Park project in Keratea, Attica “Grafitis Energiaki E.E.” - location “Tourkou Elies”. 34 Our projects - Commercial Properties & PV Parks
  • 35. • 14/09/2011 – New Assignment: 299,82 KWp PV Park project in Keratea, Attica “Apatitis Energiaki E.E.” - location “Kontri Gourilia”. • 14/09/2011 – New Assignment: 299,82 KWp PV Park project in Keratea, Attica “Aplitis Energiaki E.E.” - location “Mokriza”. • 14/09/2011 – 79,99KWp grid connected PV Park in Iraklio, Crete «Kokkinidis Emmanuel & Sia O.E» - location “Lofos Leivadas Vouton”. • 13/09/2011 – New Assignment: 199,88KWp PV Park project in Markopoulo, Attica “Prasini Isxis Exi E.E” - location “Dimitsiri”. • 12/09/2011 – 1,5MWp grid connected Commercial PV Project in Viotia Europa Profil Aluminium S.A. – Inofyta. • 12/09/2011 – New Assignment: 1MWp PV Park project in Megara, Attica “Energiaki Megaron Ena E.E” - location “Kolata”. 35 Our projects - Commercial Properties & PV Parks
  • 36. • 9/09/2011 – New Assignment: 100KWp PV Park project in Tripoli, Arcadia “Nick Priovolos & Sia O.E” - location “Kalogritsa”. • 9/09/2011 – New Assignment: 100KWp PV Park project in Neochori, Arcadia “Nick Priovolos & Sia O.E” - location “Leuko- D.D. Neochoriou – D. Korythiou. • 9/09/2011 – New Assignment: 100KWp PV Park project in Tripoli, Arcadia “Nick Priovolos & Sia O.E” - location “Loutsa”. • 9/09/2011 – New Assignment: 100KWp PV Park project in Neochori, Arcadia “Nick Priovolos & Sia O.E” - location “Leuko- D.D. Neochoriou”. • 9/09/2011 – New Assignment: 499,80KWp PV Park project in Avlona, Attica “Ilektra MEPE” - location “Vresteza”. • 8/09/2011 – New Assignment: 499,89 KWp PV Park project in Megara, Attica “Diasporos Energiaki E.E.” - location “Almires”. 36 Our projects - Commercial Properties & PV Parks
  • 37. • 8/09/2011 – New Assignment: 299,82 KWp PV Park project in Keratea, Attica “Granodioritis Energiaki E.E.” - location “Fovoles”. • 7/09/2011 – New Assignment: 299,82 KWp PV Park project in Megara, Attica “Adamantas Energiaki E.E.” - location “Paliabela Priskidon”. • 5/09/2011 – New Assignment: 299,82 KWp PV Park project in Keratea, Attica “Fotodynamiki Kerateas E.E.” - location “Daskalio”. • 5/09/2011 – 99,94KWp grid connected PV Park in Pyrgos, Ilias. «Karagounis» - location “Paliochori”. • 2/09/2011 – New Assignment: 499,89 KWp PV Park project in Keratea, Attica “Syinitis Energiaki E.E.” - in location “Noka Loubarda”. • 31/08/2011 – New Assignment: 249,85 KWp PV Park project in Keratea, Attica “Dakitis Energiaki E.E.” - location “Loubarda”. 37 Our projects - Commercial Properties & PV Parks
  • 38. • 30/08/2011 – 499,98KWp grid connected PV Park in Koropi, Attica. «Energiaki Koropiou Μ.Ε.P.E.» - location “Kontra Lepouri Bourboutsana”. • 29/08/2011 – New Assignment: 149,72 KWp PV Park project in Keratea, Attica “Energiaki Kerateas Ena E.E.” - location “Lahori”. • • 25/08/2011 – New Assignment: 349,98 KWp PV Park project in Keratea, Attica “Zagreus Energiaki E.E.” - location “Mamai”. • 23/08/2011 – New Assignment: 499,89 KWp PV Park project in Koropi, Attica “Talkis Energiaki E.E.” - location “Prari”. • 22/08/2011 – New Assignment: 150KWp PV Park project in Oropo, Attica “Kabanou Anna O.E.” - location “Louberdi”. • 30/07/2011 – 161,12KWp grid connected Commercial Rooftop PV Project in Avlona, Attica. «Alpha Energy O.E.» - location “Tsakali-Melissia Pappa”. 38 Our projects - Commercial Properties & PV Parks
  • 39. • 27/07/2011 – New Assignment: 500KWp PV Park project in Markopoulo, Attica “Prasini Isxis Tria E.E” - location “Dimitsiri”. • 27/07/2011 – New Assignment: 149,91KWp PV Park project in Markopoulo, Attica “Prasini Isxis Pente E.E” - location “Dimitsiri”. • 25/07/2011 – New Assignment: 499,89KWp PV Park project in Koropi, Attica “Astrea Energiaki & Sia E.E” - location “Stamala”. • 20/07/2011 – New Assignment: 300KWp PV Park project in Keratea, Attica “Ios Energiaki E.E” - location “Rizomatou Thorikou”. • 14/07/2011 – New Assignment: 200KWp PV Park project in Oropo, Attica “Tithus Energiaki & Sia E.E” - location “Louberdi”. • 7/07/2011 – New Assignment: 39,84KWp PV Park project in Keratea, Attica “Energiaki Afon Kelaiditi O.E” - location “Kato Dardeza”. 39 Our projects - Commercial Properties & PV Parks
  • 40. • 7/07/2011 – 25,44 KWp grid connected Commercial Rooftop PV Project in Elliniko, Attica. «Energiaki Afon Kelaiditi O.E.». • 5/07/2011 – New Assignment: 500KWp PV Park project in Megara, Attica “Melissia Energiaki M.E.P.E” - location “Artitsies Kalogerou Melissia”. • 29/06/2011 – New Assignment: 99,94KWp PV Park project in Agrinio “Gadzoudis Stefanos & Sia O.E” - location “Mirmigaki Stamnas”. • 22/06/2011 – New Assignment: 249,99KWp PV Park project in Markopoulo, Attica “Palaioledia Energiaki A.E” - location “Paleoledia Vraona”. • 20/06/2011 – New Assignment: 500KWp PV Park project in Markopoulo, Attica “Nikolakis Vlahthi Ena M.E.P.E” - location “Vlahthi”. • 20/06/2011 – New Assignment: 500KWp PV Park project in Markopoulo, Attica “Nikolakis Vlahthi Duo M.E.P.E” - location “Vlahthi”. 40 Our projects - Commercial Properties & PV Parks
  • 41. • 15/06/2011 – New Assignment: 299,82KWp PV Park project in Keratea, Attica “Energia Kerateas Duo E.E” - location “Thoriko”. • 25/05/2011 – New Assignment: 99,94KWp PV Park project in Markopoulo, Attica “Koniakos Efthimios & SIA E.E” - location “Solomesa”. • 19/05/2011 – New Assignment: 279,87KWp PV Park project in Megara, Attica “Energiaki Megaron Tria E.E” - in location “Tsouliari Rema”. • 11/05/2011 – New Assignment: 499,68KWp PV Park project in Markopoulo, Attica “Iliodinamiki Markopoulou A.E” - location “Patira Markopoulou”. • 9/05/2011 – New Assignment: 999,97KWp PV Park project in Koropi, Attica “Aksieros Energiaki E.E” - location “Ag. Nikolaos”. • 4/05/2011 – New Assignment: 199,88KWp PV Park project in Markopoulo, Attica “Prasini Isxis Duo E.E” - location “Dimitsiri”. 41 Our projects - Commercial Properties & PV Parks
  • 42. • 30/04/2011 – New Assignment: 99,94KWp PV Park project in Pirgos, Ilias “Evag. Karagounis & Sia O.E” - location “Paliochori”. • • 28/04/2011 – New Assignment: 99,94KWp PV Park project in Patra “Androulaki Aristea & Sia E.E” - location “Abelia”. • 14/04/2011 – New Assignment: 88,335KWp Commercial Rooftop PV Project in Ilion, Attica “Theodoropoulos I & D O.E”. • 4/04/2011 – New Assignment: 61,94KWp Commercial Rooftop PV Project in Vari, Attica “Metro AEBE”. • 22/03/2011 – New Assignment: 100KWp PV Park project in Tripoli “Rush Net M.E.P.E” - location “Gremos”. • 22/03/2011 – New Assignment: 100KWp PV Park project in Tripoli “Rush Net M.E.P.E” - location “Megabeli”. 42 Our projects - Commercial Properties & PV Parks
  • 43. • 4/03/2011 – New Assignment: 79,99KWp PV Park project in Iraklio, Crete “Kokkinidis Emmanouel & Sia O..E” - location “Lofos Livadas Vouton”. • 3/03/2011 – New Assignment: 161,12KWp Commercial Rooftop PV Project in Avlona, Attica “Alpha Energy O.E” - location “Tsakali- Melissia Pappa”. • 24/02/2011 – New Assignment: 100KWp PV Park project in Agrinio “Sarmadzaki M.E.P.E.” - location “Sarmadzaki- Ag. Andreas Makrinias”. • 10/02/2011 – New Assignment: 199,68KWp PV Park project in Inofyta, Viotia Crete “Europa ABE” - location “Kamina Draseza”. • 5/02/2011 – New Assignment: 1,5MWp Commercial Rooftop PV Project in Viotia “Europa Profil Alumium A.B.E” - location Inofyta. • 10/01/2011 – New Assignment: 499,98KWp PV Park project in Koropi, Attica “Energiakis Koropiou M.E.P.E.” - location “Kontra Lepouri Bourboutsana”. • 43 Our projects - Commercial Properties & PV Parks
  • 44. • 5/01/2011 – New Assignment: 99KWp PV Park project in Megara, Attica “Saragas Nikitas & Con/nos O.E” - location “Ag. Barbara - Migiari”. • 5/01/2011 – New Assignment: 99KWp PV Park project in Megara, Attica “Saragas Nikitas & Con/nos O.E” – location “Ag. Ierotheos”. • 5/01/2011 – New Assignment: 45,60KWp Commercial Rooftop PV Project in Moschato, Attica “Emm. Andreadis A.E” . • 4/01/2011 – New Assignment: 25,44 KWp Commercial Rooftop PV Project in Elliniko, Attica “Energiaki Afon Kelaiditi O.E.” . 44 Our projects - Commercial Properties & PV Parks
  • 46. ■ PEREA, THESSALONIKI: 9,69 KW WITH STABLE MOUNTING SYSTEM 46 Our projects – Residential Properties
  • 47. ■ OINOFYTA, ATTICA: 9,84 KW WITH STABLE MOUNTING SYSTEM 47 Our projects – Residential Properties
  • 48. 48 ■ GLYKOVRISI, LACONIA: 9,84KW WITH STABLE MOUNTING SYSTEM Our projects – Residential Properties
  • 49. 49 Our projects – Residential Properties ■ MOLAI, LACONIA: 9,84 KW WITH STABLE MOUNTING SYSTEM
  • 50. • 8/11/2011 – 7,60 KWp grid connected residential terrace PV system in Arta (Grammenitsa) • 8/11/2011 – 9,84 KWp grid connected residential terrace PV system in Chania, Crete (Vourkias Daratso N. Kydonias) • 8/11/2011 – 6,24 KWp grid connected residential rooftop PV system in Chiliomodi, Korinthia • 7/11/2011 – 7,60 KWp grid connected residential terrace PV system in Markopoulo Oropou, Attica • 4/11/2011 – 6,84 KWp grid connected residential terrace PV system in Oropo, Attica (position Skoumbi Sykamino) • 3/11/2011 – 9,94 KWp grid connected residential terrace PV system in Ν. Iraklio, Attica • 2/11/2011 – 9,94 KWp grid connected residential rooftop PV system in Amaliada, Ilia • 2/11/2011 – 7,98 KWp grid connected residential terrace PV system in Salamina, Attica 50 Our projects – Residential Properties
  • 51. • 1/11/2011 – 6,08 KWp grid connected residential terrace PV system in Agio Konstantino, Lavrio - Attica • 31/10/2011 – 9,88 KWp grid connected residential terrace PV system in Aigina, Attica (Souvala) • 27/10/2011 – 9,94 KWp grid connected residential terrace PV system in Karpenisi, Evritania • 27/10/2011 – 6,24 KWp grid connected residential terrace PV system in Thessaloniki • 21/10/2011 – 9,84 KWp grid connected residential terrace PV system in Oropo, Attica (position “Anemomylos”) • 21/10/2011 – 2,53 KWp grid connected residential rooftop PV system in Vrahati, Korinthia • 7/10/2011 – 9,84 KWp grid connected residential terrace PV system in Kalamo, Attica • 6/10/2011 – 9,94 KWp grid connected residential terrace PV system in Aigina, Attica 51 Our projects – Residential Properties
  • 52. • 4/10/2011 – 7,60 KWp grid connected residential rooftop PV system in Kalivia Thorikou, Attica • 3/10/2011 – 6,84 KWp grid connected residential terrace PV system in Loutraki, Korinthos (Paradeisos Loutrakiou) • 26/09/2011 – 8,36 KWp grid connected residential terrace PV system in Rio, Achaia • 22/09/2011 – 4,94 KWp grid connected residential rooftop PV system in Rhodes (Ialisos) • 22/09/2011 – 6,84 KWp grid connected residential terrace PV system in Keratea, Attica • 21/09/2011 – 9,50 KWp grid connected residential rooftop PV system in Agioi Anargyroi, Attica • 18/09/2011 – 4,94 KWp grid connected residential rooftop PV system in Rhodes (Ialisos) • 17/09/2011 – 9,88 KWp grid connected residential rooftop PV system in Nafpakto, Etoloakarnania (Eleostasio) 52 Our projects – Residential Properties
  • 53. • 16/09/2011 – 6,08 KWp grid connected residential terrace PV system in Fhiotida (Livanates) • 16/09/2011 – 9,88 KWp grid connected residential terrace PV system in Thessaloniki (Adam) • 16/09/2011 – 4,94 KWp grid connected residential rooftop PV system in Glyfada, Attica • 15/09/2011 – 4,94 KWp grid connected residential rooftop PV system in Koropi, Attica • 5/09/2011 – 4,80 KWp grid connected residential terrace PV system in Ahaia (Logos Aigio) • 9/09/2011 – 9,88 KWp grid connected residential rooftop PV system in Serres (Scoutari) • 9/09/2011 – 6,46 KWp grid connected residential rooftop PV system in Artemida, Attica • 8/09/2011 – 7,60 KWp grid connected residential terrace PV system in Keratea, Attica • 7/09/2011 – 8,74 KWp grid connected residential terrace PV system in Heraclion, Crete (Agia Varvara) 53 Our projects – Residential Properties
  • 54. • 7/09/2011 – 6,84 KWp grid connected residential terrace PV system in Heraclion, Crete (Agia Varvara) • 5/09/2011 – 4,94 KWp grid connected residential terrace PV system in Ko (Agios Nektarios) • 31/08/2011 – 9,88 KWp grid connected residential terrace PV system in Thiva, Voiotia (Eleon, M. Thiveon) • 29/08/2011 – 6,08 KWp grid connected residential rooftop PV system in Kilkis (Agios Petros, M. Peonias) • 19/08/2011 – 4,94 KWp grid connected residential terrace PV system in Ko (Tsiggoura Kefalou) • and many more…. 54 Our projects – Residential Properties
  • 56.  NEON ENERGY collaborates with international and reliable manufacturers of photovoltaic panels, inverters and mounting systems for the construction of the photovoltaic systems for it’s clients.  NEON ENERGY aims to secure the photovoltaic systems’ maximum performance output by selecting the highest quality technical parts for the installation thus selecting reliable manufacturers giving guarantees for the parts as well as for the performance output. Our partners 56
  • 57. 57 Services: Enhanced by Global Partners 57
  • 59. «Invest in a partnership that is credible, stable and profitable; and take part in the effort to achieve our planet’s sustainability» ΝΕΟΝ ENERGY S.A., 12th km on Ethniki Highway, Athinon-Lamias, Bakogiannis 80, P.C. 144 52 Τel.: 2102837000 - Fax: 2102838889 e-mail: info@neonenergy.gr, www.neonenergy.gr