SlideShare uma empresa Scribd logo
1 de 13
SCHOOL OF ARCHITECTURE, BUILDING AND
DESIGN
Bachelor of Quantity Surveying (Honours)
INTEGRATED ASSIGNMENT:
MEASUREMENT I (QSB60104)
CONSTRUCTION TECHNOLOGY I (BLD 60104)
BUILDING MATERIALS (BLD 62003)
SITE VISIT REPORT
STUDENT NAME: NADHIRAH MOHD ZAIN
STUDENT ID NO: 0321366
DATE OF SUBMISSION: 27th NOVEMBER 2015
|TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR |
Page 2
TABLE OF CONTENT
INTRODUCTION………………………………….…………3
CONTENT/TEHNICAL OBSERVATION…………………...5
TYPE OF FOUNDATION……………………………………..7
 METHOD TO CONSTRUCT……………………………9
 MATERIAL USE FOR PAD FOOTING ………………..10
APPENDIX…………………………………………………….11
CONCLUSION………………….……………………………..13
|TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR |
Page 3
INTRODUCTION
A site visit to construction site was organized by the program director on 19th November
2015. The location of the site visit was at Antara Gapi, Hulu Selangor. A total of
approximately 87 students accompany by two lecturers were attended the site visit. All
students were told to gather at university around 8:00 am and need to wear proper attire
like wearing helmet, proper shoes and pant. After arrival to the site and meeting with the
people in charge of guiding us, a short brief about the project was given by En. Sobri.
Before we started our tour around the site, we are reminded of the safety precaution
that we need to follow during our presence in the site by one of the safety officer.
The purpose of this site visit is to give exposure to students about the basic of the
construction process. They will be able to understand, describe and explain the process
of construction and the scientific principles that underpin the design and construction.
Besides, the students are able to witness the usage of construction equipment and
mechanical plants on site. They have the opportunity to explore and identify various
type of building material and technology on site.
|TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR |
Page 4
PROJECT SUMMARY
Below is the summary of the project:
Project title : Cadangan membina dan menyiapkan 96 unit rumah
berkembar (40’ x 60’) serta infrastuktur yang berkaitan di
Sekyen 2A, Antara Gapi, Hulu Selangor, Selangor.
Contract Value : RM 44 Million
Contract Period : 24 months
Commencement Date : 8 July 2014
Completion Date : 4 July 2016
Developer : Perbadanan Kemajuan Negeri Selangor (PKNS)
Architect : Zain Hamzah Architect
C&S Consultant : Wawasan Bersatu Sdn. Bhd.
M&E Consultant : ZNVA & Associated
QS Consultant : MCM Associates Sdn. Bhd.
Contractor : AJ-Corp Sdn. Bhd.
|TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR |
Page 5
CONTENT/TECHNICAL OBSERVATION
During the briefing by En Sobri about the project, we were informed that this project
consist of four different type of house which are Type 1, Type 2A, Type 2B and Type 3.
All houses were constructed by using pile foundation except for Type 2B. For Type 2B,
the foundation used is pad foundation. From our interview with one of the workers, only
one third of Type 2B house is using pad foundation. This is because the type of soils at
site is different. Pad foundation is suitable for area with soft soil where the one third of
Type 2B houses was constructed.
Some of the houses were almost completed.
The houses are the example for every type of
house design.
The plan of construction site. Middle area is Type 2B that using pile foundation and
outer layer area is Type 2B that using pad foundation.
Example for Type 2B house
|TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR |
Page 6
The construction site is located beside a residential area and near to a playground, so
the whole area of the construction site was surrounded by hoarding to prevent
unauthorized person from access to the site. In the site, we also saw a few
accommodations that were reserved for the workers and also used as an office at the
site. Other than that, a lot of formwork is used during the constructing process.
In the site, we saw some of heavy machinery like
lifting crane, excavator and concrete mixer. Besides
that, a lot of materials were placed on the ground of
the site. All the materials were stored safely. For
example the brick and the block were wrapped with
polythene sheet.
Liftingcrane isusedto liftheavyobject
The materials (cement and door frame) are stored to prevent it from damage
|TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR |
Page 7
TYPE OF FOUNDATION.
The foundation used to construct Type 2B house is pad foundation. Pad foundations are
used to support individual or multiple columns and transmit the load to the ground
below. They are generally square or rectangular in plan, with the plan area are
determined by the bearing pressure of the soil allowed.
The thickness of the slab must be sufficient to ensure the distribution of the load. The
top of the slop may be sloping as this is an economic solution for it. From the
conversation that I had with one of the contractor of the project, the shape and size of
the plan will be dictated by the arrangement of the column and the load to be
transferred into the soil. The heavier the load supported, the bigger the size of the pad
footing constructed.
COLUMN
Ground level
Above is the diagram of pad footing and image of the
pad footing from the site.
|TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR |
Page 8
Pad footing can come in many shapes; mass concrete for steel column, reinforce
concrete with sloping upper face, plain reinforced concrete and stepped reinforced
concrete. Below is the diagram of the different type of pad footing.
Mass concrete for steel column Reinforced concrete with
slopping upper face
Plainreinforcedconcrete Steppedreinforcedconcrete
|TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR |
Page 9
METHOD TO CONSTRUCT PAD FOOTING
From what En Hafizi said, to construct pad footing, it all starts with pegging the site with
the correct position of the foundation. After pegging, use excavator to excavate the soil
down to the desire level. Then, build the formwork with the size that is shown in the
detail drawing. After the formwork is done, lay a layer of lean concrete to prepare a
clean and firm base for the footing. Placed the spacer block before reinforcement been
laid. This meant to provide sufficient concrete cover for the rebar. Numbers and size of
the rebars needed must be follow detail drawing. The rebars were bent and tied to form
a basket in advance before the whole thing been lowered and placed inside the
formwork. Then, stump reinforcements are erected. The length of the rebars should be
extended beyond stump level to be a starter bar for the column above. After that,
concrete is poured into the formwork and make sure to compact the concrete during the
process. Wait for the concrete to harden and gain sufficient strength before dismantled
the formwork.
The workers are dismantled the formwork once the concrete is
harden
|TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR |
Page
10
MATERIAL USED IN PAD FOOTING CONSTRUCTIONOF THE
PROJECT.
In this construction project, the materials that are use are:
1. Lean concrete
For lean concrete, the concrete used is Grade 30 with 50mm thick. Lean
concrete is measured in m3.
2. Formwork
TECO plywood is used for building formwork in constructing pad footing. The
size of the formwork is 2meter x 3meter. As it is exceeding 1 meter high, the
formwork is measure in m2.
3. Reinforcement bar
16mm diameter of high tensile steel rod is used. Rebar is measured in M.
4. Reinforced concrete
For pad foundation, they using reinforced concrete Grade 30N. They prepare a
mixture of sand, aggregates, water and cement with certain ratio to form the
concrete. Concrete is also measure in m3.
|TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR |
Page
11
APPENDIX
The workersare bindingthe rebars
withstirrupor link.
Pile foundationforotherhouses.
Bentand tiedrebarsthat are form
into‘basket’shape.
|TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR |
Page
12
The excavatoris usedtoexcavate the
site.
The contractor showingthe cast in-
situRC wall.
The workersare preparingthe formwork.
|TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR |
Page
13
Conclusion
From this site visit activity, I had a chance to experience the real working space
and be in construction environment. Working in construction site is much more
different and more difficult with the hot weather condition and high risk rate. I also
learnt something that I cannot gain during lecturer class. I learnt the importance
of safety which is the basic of construction. Furthermore, I manage to explain,
describe and understand the process of constructing pad footing and what
materials and machinery needed to construct this foundation. It also helps me to
prepare myself to be a future quantity surveyor and helps me in study especially
in taking off list process as I understand the process of construction. In a
conclusion, this is a great experience for me to improving my knowledge.

Mais conteúdo relacionado

Mais procurados

Site visit report.
Site visit report.Site visit report.
Site visit report.Man Yee
 
Building Construction II Report
Building Construction II ReportBuilding Construction II Report
Building Construction II ReportBolin Loong
 
Building Construction 1: Project 1
Building Construction 1: Project 1Building Construction 1: Project 1
Building Construction 1: Project 1KohSungJie
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)Jia Hong Mui
 
Buildng construction report
Buildng construction reportBuildng construction report
Buildng construction reportClara Lee
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)I'mMiss Lily
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1Yap Xin
 
Assignment of Site Report
Assignment of Site Report Assignment of Site Report
Assignment of Site Report I'mMiss Lily
 
One Storey Building Construction (Pre-Construction Process)
One Storey Building Construction (Pre-Construction Process)One Storey Building Construction (Pre-Construction Process)
One Storey Building Construction (Pre-Construction Process)Cirilo Gazzingan III
 
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...Firdaurs Abdullah
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGAmritpal Singh
 
Construction site
Construction siteConstruction site
Construction siteTimun Loh
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training pptSumit Singh
 
Building Construction
Building ConstructionBuilding Construction
Building ConstructionWilden How
 
Innovations in Construction
Innovations in ConstructionInnovations in Construction
Innovations in ConstructionSahil Baviskar
 
Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0Minh Bui Si
 
What is Ground Improvement Techniques?
What is Ground Improvement Techniques?What is Ground Improvement Techniques?
What is Ground Improvement Techniques?roks99
 

Mais procurados (20)

Site visit report.
Site visit report.Site visit report.
Site visit report.
 
Building Construction II Report
Building Construction II ReportBuilding Construction II Report
Building Construction II Report
 
Building Construction 1: Project 1
Building Construction 1: Project 1Building Construction 1: Project 1
Building Construction 1: Project 1
 
Construction Site Report
Construction Site ReportConstruction Site Report
Construction Site Report
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)
 
Buildng construction report
Buildng construction reportBuildng construction report
Buildng construction report
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1
 
Assignment of Site Report
Assignment of Site Report Assignment of Site Report
Assignment of Site Report
 
One Storey Building Construction (Pre-Construction Process)
One Storey Building Construction (Pre-Construction Process)One Storey Building Construction (Pre-Construction Process)
One Storey Building Construction (Pre-Construction Process)
 
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Construction site
Construction siteConstruction site
Construction site
 
Site possession
Site possessionSite possession
Site possession
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training ppt
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 
Innovations in Construction
Innovations in ConstructionInnovations in Construction
Innovations in Construction
 
Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0
 
What is Ground Improvement Techniques?
What is Ground Improvement Techniques?What is Ground Improvement Techniques?
What is Ground Improvement Techniques?
 

Destaque

FINAL REPORT PROJECT 1 LIGHTING AND ACOUSTIC PERFORMANCE.pdf
FINAL REPORT PROJECT 1 LIGHTING AND ACOUSTIC PERFORMANCE.pdfFINAL REPORT PROJECT 1 LIGHTING AND ACOUSTIC PERFORMANCE.pdf
FINAL REPORT PROJECT 1 LIGHTING AND ACOUSTIC PERFORMANCE.pdfOctonio Octonio
 
Daylight providing effective and efficient lighting in industrial facilities
Daylight providing effective and efficient lighting in industrial facilitiesDaylight providing effective and efficient lighting in industrial facilities
Daylight providing effective and efficient lighting in industrial facilitiesZondits
 
Building Materials assignment 1 (Concrete)
Building Materials assignment 1 (Concrete)Building Materials assignment 1 (Concrete)
Building Materials assignment 1 (Concrete)Syafiq Zariful
 
Final report
Final report Final report
Final report Gary Yeow
 
Building Materials - Final assignment 2 brief
Building Materials - Final assignment 2 briefBuilding Materials - Final assignment 2 brief
Building Materials - Final assignment 2 briefSyafiq Zariful
 
Building Material Assignment 2
Building Material Assignment 2Building Material Assignment 2
Building Material Assignment 2Haziq1511
 
Seminar acoustic engineering marineindustries
Seminar acoustic engineering marineindustriesSeminar acoustic engineering marineindustries
Seminar acoustic engineering marineindustriesDeniz Yazgaç
 
DEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDY
DEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDYDEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDY
DEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDYjolynnTJL
 
Daylighting slideshare
Daylighting slideshareDaylighting slideshare
Daylighting slideshareParween Karim
 
Building materials assignment 2 - Skk paint
Building materials assignment 2 - Skk paintBuilding materials assignment 2 - Skk paint
Building materials assignment 2 - Skk paintSyafiq Zariful
 
Building materials
Building materialsBuilding materials
Building materialslol
 
Lighting Analysis Project 1
Lighting Analysis Project 1Lighting Analysis Project 1
Lighting Analysis Project 1J-Sern Phua
 
Let There Be Light! A case study about illumination
Let There Be Light!  A case study about illuminationLet There Be Light!  A case study about illumination
Let There Be Light! A case study about illuminationStephen Studnicka, PMP
 
Construction Technology 1 Assignment 1
Construction Technology 1 Assignment 1Construction Technology 1 Assignment 1
Construction Technology 1 Assignment 1Pang Shuen
 

Destaque (20)

Ct assignment
Ct assignmentCt assignment
Ct assignment
 
FINAL REPORT PROJECT 1 LIGHTING AND ACOUSTIC PERFORMANCE.pdf
FINAL REPORT PROJECT 1 LIGHTING AND ACOUSTIC PERFORMANCE.pdfFINAL REPORT PROJECT 1 LIGHTING AND ACOUSTIC PERFORMANCE.pdf
FINAL REPORT PROJECT 1 LIGHTING AND ACOUSTIC PERFORMANCE.pdf
 
Daylight providing effective and efficient lighting in industrial facilities
Daylight providing effective and efficient lighting in industrial facilitiesDaylight providing effective and efficient lighting in industrial facilities
Daylight providing effective and efficient lighting in industrial facilities
 
btech ibs
btech ibsbtech ibs
btech ibs
 
Building Materials assignment 1 (Concrete)
Building Materials assignment 1 (Concrete)Building Materials assignment 1 (Concrete)
Building Materials assignment 1 (Concrete)
 
Csi journal
Csi journalCsi journal
Csi journal
 
Final report
Final report Final report
Final report
 
Building Materials - Final assignment 2 brief
Building Materials - Final assignment 2 briefBuilding Materials - Final assignment 2 brief
Building Materials - Final assignment 2 brief
 
Building Material Assignment 2
Building Material Assignment 2Building Material Assignment 2
Building Material Assignment 2
 
Seminar acoustic engineering marineindustries
Seminar acoustic engineering marineindustriesSeminar acoustic engineering marineindustries
Seminar acoustic engineering marineindustries
 
Acoustics(atjd)
Acoustics(atjd)Acoustics(atjd)
Acoustics(atjd)
 
DEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDY
DEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDYDEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDY
DEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDY
 
Assignment 2 edited
Assignment 2 editedAssignment 2 edited
Assignment 2 edited
 
Daylighting slideshare
Daylighting slideshareDaylighting slideshare
Daylighting slideshare
 
dBwave.i acoustic engineering presentation
dBwave.i acoustic engineering presentationdBwave.i acoustic engineering presentation
dBwave.i acoustic engineering presentation
 
Building materials assignment 2 - Skk paint
Building materials assignment 2 - Skk paintBuilding materials assignment 2 - Skk paint
Building materials assignment 2 - Skk paint
 
Building materials
Building materialsBuilding materials
Building materials
 
Lighting Analysis Project 1
Lighting Analysis Project 1Lighting Analysis Project 1
Lighting Analysis Project 1
 
Let There Be Light! A case study about illumination
Let There Be Light!  A case study about illuminationLet There Be Light!  A case study about illumination
Let There Be Light! A case study about illumination
 
Construction Technology 1 Assignment 1
Construction Technology 1 Assignment 1Construction Technology 1 Assignment 1
Construction Technology 1 Assignment 1
 

Semelhante a site report

Site visit report
Site visit reportSite visit report
Site visit reportWen Crystal
 
Final Report
Final Report Final Report
Final Report Jack Ng
 
Site visit report
Site visit reportSite visit report
Site visit reportDoreen Yeo
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement reportKailyn Lee
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Chin Tze Wei
 
Site report
Site reportSite report
Site reportHuiYik
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShareYung Kai
 
Svp field training report final
Svp field training report finalSvp field training report final
Svp field training report finalShubham Parab
 
Integrated Assignment - Site Visit Report
Integrated Assignment - Site Visit ReportIntegrated Assignment - Site Visit Report
Integrated Assignment - Site Visit ReportYee Len Wan
 
Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Parham Farhadpoor
 
Chapter 10 structure construction
Chapter 10  structure constructionChapter 10  structure construction
Chapter 10 structure constructionmohdasrimohdhasim
 
Integrated assignment site report
Integrated assignment site reportIntegrated assignment site report
Integrated assignment site reportw ss
 

Semelhante a site report (20)

MCB Final report
MCB Final reportMCB Final report
MCB Final report
 
Site report 1
Site report 1Site report 1
Site report 1
 
Ez
EzEz
Ez
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Final Report
Final Report Final Report
Final Report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Shib
ShibShib
Shib
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement report
 
Site report
Site reportSite report
Site report
 
Site report
Site reportSite report
Site report
 
Site report
Site reportSite report
Site report
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
Site report
Site reportSite report
Site report
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
 
Svp field training report final
Svp field training report finalSvp field training report final
Svp field training report final
 
Integrated Assignment - Site Visit Report
Integrated Assignment - Site Visit ReportIntegrated Assignment - Site Visit Report
Integrated Assignment - Site Visit Report
 
Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1
 
Chapter 10 structure construction
Chapter 10  structure constructionChapter 10  structure construction
Chapter 10 structure construction
 
Integrated assignment site report
Integrated assignment site reportIntegrated assignment site report
Integrated assignment site report
 

Mais de dhirazain

Acc spritzer
Acc spritzerAcc spritzer
Acc spritzerdhirazain
 
Ecomonicshotel 150601074919-lva1-app6891
Ecomonicshotel 150601074919-lva1-app6891Ecomonicshotel 150601074919-lva1-app6891
Ecomonicshotel 150601074919-lva1-app6891dhirazain
 
5 concepts-in-our-story
5 concepts-in-our-story5 concepts-in-our-story
5 concepts-in-our-storydhirazain
 
Socialpschology.doc
Socialpschology.docSocialpschology.doc
Socialpschology.docdhirazain
 
Psychlogy final report
Psychlogy final reportPsychlogy final report
Psychlogy final reportdhirazain
 
Businessfinalreport 150621150651-lva1-app6891
Businessfinalreport 150621150651-lva1-app6891Businessfinalreport 150621150651-lva1-app6891
Businessfinalreport 150621150651-lva1-app6891dhirazain
 
Bus2303 150403103230-conversion-gate01
Bus2303 150403103230-conversion-gate01Bus2303 150403103230-conversion-gate01
Bus2303 150403103230-conversion-gate01dhirazain
 
Investmentscam2 150403104320-conversion-gate01
Investmentscam2 150403104320-conversion-gate01Investmentscam2 150403104320-conversion-gate01
Investmentscam2 150403104320-conversion-gate01dhirazain
 
Epc.pptx (recovered)
Epc.pptx (recovered)Epc.pptx (recovered)
Epc.pptx (recovered)dhirazain
 
English 2 & epc presentation
English 2 & epc presentationEnglish 2 & epc presentation
English 2 & epc presentationdhirazain
 
english presentation
english presentationenglish presentation
english presentationdhirazain
 
Plagiarism class activity
Plagiarism class activityPlagiarism class activity
Plagiarism class activitydhirazain
 
Enbe future town
Enbe future townEnbe future town
Enbe future towndhirazain
 
Ici ben stress
Ici ben stressIci ben stress
Ici ben stressdhirazain
 
National park
National parkNational park
National parkdhirazain
 
Module outline
Module outlineModule outline
Module outlinedhirazain
 
pre writting 2nd project.doc
pre writting 2nd project.docpre writting 2nd project.doc
pre writting 2nd project.docdhirazain
 

Mais de dhirazain (20)

Acc spritzer
Acc spritzerAcc spritzer
Acc spritzer
 
Ecomonicshotel 150601074919-lva1-app6891
Ecomonicshotel 150601074919-lva1-app6891Ecomonicshotel 150601074919-lva1-app6891
Ecomonicshotel 150601074919-lva1-app6891
 
5 concepts-in-our-story
5 concepts-in-our-story5 concepts-in-our-story
5 concepts-in-our-story
 
Comic strio
Comic strioComic strio
Comic strio
 
Socialpschology.doc
Socialpschology.docSocialpschology.doc
Socialpschology.doc
 
Psychlogy final report
Psychlogy final reportPsychlogy final report
Psychlogy final report
 
Businessfinalreport 150621150651-lva1-app6891
Businessfinalreport 150621150651-lva1-app6891Businessfinalreport 150621150651-lva1-app6891
Businessfinalreport 150621150651-lva1-app6891
 
Bus2303 150403103230-conversion-gate01
Bus2303 150403103230-conversion-gate01Bus2303 150403103230-conversion-gate01
Bus2303 150403103230-conversion-gate01
 
Investmentscam2 150403104320-conversion-gate01
Investmentscam2 150403104320-conversion-gate01Investmentscam2 150403104320-conversion-gate01
Investmentscam2 150403104320-conversion-gate01
 
Epc.pptx (recovered)
Epc.pptx (recovered)Epc.pptx (recovered)
Epc.pptx (recovered)
 
English 2 & epc presentation
English 2 & epc presentationEnglish 2 & epc presentation
English 2 & epc presentation
 
english presentation
english presentationenglish presentation
english presentation
 
Plagiarism class activity
Plagiarism class activityPlagiarism class activity
Plagiarism class activity
 
Enbe future town
Enbe future townEnbe future town
Enbe future town
 
Ici
IciIci
Ici
 
Ici
IciIci
Ici
 
Ici ben stress
Ici ben stressIci ben stress
Ici ben stress
 
National park
National parkNational park
National park
 
Module outline
Module outlineModule outline
Module outline
 
pre writting 2nd project.doc
pre writting 2nd project.docpre writting 2nd project.doc
pre writting 2nd project.doc
 

Último

2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdfssuserdda66b
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxcallscotland1987
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 

Último (20)

2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 

site report

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN Bachelor of Quantity Surveying (Honours) INTEGRATED ASSIGNMENT: MEASUREMENT I (QSB60104) CONSTRUCTION TECHNOLOGY I (BLD 60104) BUILDING MATERIALS (BLD 62003) SITE VISIT REPORT STUDENT NAME: NADHIRAH MOHD ZAIN STUDENT ID NO: 0321366 DATE OF SUBMISSION: 27th NOVEMBER 2015
  • 2. |TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR | Page 2 TABLE OF CONTENT INTRODUCTION………………………………….…………3 CONTENT/TEHNICAL OBSERVATION…………………...5 TYPE OF FOUNDATION……………………………………..7  METHOD TO CONSTRUCT……………………………9  MATERIAL USE FOR PAD FOOTING ………………..10 APPENDIX…………………………………………………….11 CONCLUSION………………….……………………………..13
  • 3. |TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR | Page 3 INTRODUCTION A site visit to construction site was organized by the program director on 19th November 2015. The location of the site visit was at Antara Gapi, Hulu Selangor. A total of approximately 87 students accompany by two lecturers were attended the site visit. All students were told to gather at university around 8:00 am and need to wear proper attire like wearing helmet, proper shoes and pant. After arrival to the site and meeting with the people in charge of guiding us, a short brief about the project was given by En. Sobri. Before we started our tour around the site, we are reminded of the safety precaution that we need to follow during our presence in the site by one of the safety officer. The purpose of this site visit is to give exposure to students about the basic of the construction process. They will be able to understand, describe and explain the process of construction and the scientific principles that underpin the design and construction. Besides, the students are able to witness the usage of construction equipment and mechanical plants on site. They have the opportunity to explore and identify various type of building material and technology on site.
  • 4. |TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR | Page 4 PROJECT SUMMARY Below is the summary of the project: Project title : Cadangan membina dan menyiapkan 96 unit rumah berkembar (40’ x 60’) serta infrastuktur yang berkaitan di Sekyen 2A, Antara Gapi, Hulu Selangor, Selangor. Contract Value : RM 44 Million Contract Period : 24 months Commencement Date : 8 July 2014 Completion Date : 4 July 2016 Developer : Perbadanan Kemajuan Negeri Selangor (PKNS) Architect : Zain Hamzah Architect C&S Consultant : Wawasan Bersatu Sdn. Bhd. M&E Consultant : ZNVA & Associated QS Consultant : MCM Associates Sdn. Bhd. Contractor : AJ-Corp Sdn. Bhd.
  • 5. |TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR | Page 5 CONTENT/TECHNICAL OBSERVATION During the briefing by En Sobri about the project, we were informed that this project consist of four different type of house which are Type 1, Type 2A, Type 2B and Type 3. All houses were constructed by using pile foundation except for Type 2B. For Type 2B, the foundation used is pad foundation. From our interview with one of the workers, only one third of Type 2B house is using pad foundation. This is because the type of soils at site is different. Pad foundation is suitable for area with soft soil where the one third of Type 2B houses was constructed. Some of the houses were almost completed. The houses are the example for every type of house design. The plan of construction site. Middle area is Type 2B that using pile foundation and outer layer area is Type 2B that using pad foundation. Example for Type 2B house
  • 6. |TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR | Page 6 The construction site is located beside a residential area and near to a playground, so the whole area of the construction site was surrounded by hoarding to prevent unauthorized person from access to the site. In the site, we also saw a few accommodations that were reserved for the workers and also used as an office at the site. Other than that, a lot of formwork is used during the constructing process. In the site, we saw some of heavy machinery like lifting crane, excavator and concrete mixer. Besides that, a lot of materials were placed on the ground of the site. All the materials were stored safely. For example the brick and the block were wrapped with polythene sheet. Liftingcrane isusedto liftheavyobject The materials (cement and door frame) are stored to prevent it from damage
  • 7. |TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR | Page 7 TYPE OF FOUNDATION. The foundation used to construct Type 2B house is pad foundation. Pad foundations are used to support individual or multiple columns and transmit the load to the ground below. They are generally square or rectangular in plan, with the plan area are determined by the bearing pressure of the soil allowed. The thickness of the slab must be sufficient to ensure the distribution of the load. The top of the slop may be sloping as this is an economic solution for it. From the conversation that I had with one of the contractor of the project, the shape and size of the plan will be dictated by the arrangement of the column and the load to be transferred into the soil. The heavier the load supported, the bigger the size of the pad footing constructed. COLUMN Ground level Above is the diagram of pad footing and image of the pad footing from the site.
  • 8. |TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR | Page 8 Pad footing can come in many shapes; mass concrete for steel column, reinforce concrete with sloping upper face, plain reinforced concrete and stepped reinforced concrete. Below is the diagram of the different type of pad footing. Mass concrete for steel column Reinforced concrete with slopping upper face Plainreinforcedconcrete Steppedreinforcedconcrete
  • 9. |TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR | Page 9 METHOD TO CONSTRUCT PAD FOOTING From what En Hafizi said, to construct pad footing, it all starts with pegging the site with the correct position of the foundation. After pegging, use excavator to excavate the soil down to the desire level. Then, build the formwork with the size that is shown in the detail drawing. After the formwork is done, lay a layer of lean concrete to prepare a clean and firm base for the footing. Placed the spacer block before reinforcement been laid. This meant to provide sufficient concrete cover for the rebar. Numbers and size of the rebars needed must be follow detail drawing. The rebars were bent and tied to form a basket in advance before the whole thing been lowered and placed inside the formwork. Then, stump reinforcements are erected. The length of the rebars should be extended beyond stump level to be a starter bar for the column above. After that, concrete is poured into the formwork and make sure to compact the concrete during the process. Wait for the concrete to harden and gain sufficient strength before dismantled the formwork. The workers are dismantled the formwork once the concrete is harden
  • 10. |TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR | Page 10 MATERIAL USED IN PAD FOOTING CONSTRUCTIONOF THE PROJECT. In this construction project, the materials that are use are: 1. Lean concrete For lean concrete, the concrete used is Grade 30 with 50mm thick. Lean concrete is measured in m3. 2. Formwork TECO plywood is used for building formwork in constructing pad footing. The size of the formwork is 2meter x 3meter. As it is exceeding 1 meter high, the formwork is measure in m2. 3. Reinforcement bar 16mm diameter of high tensile steel rod is used. Rebar is measured in M. 4. Reinforced concrete For pad foundation, they using reinforced concrete Grade 30N. They prepare a mixture of sand, aggregates, water and cement with certain ratio to form the concrete. Concrete is also measure in m3.
  • 11. |TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR | Page 11 APPENDIX The workersare bindingthe rebars withstirrupor link. Pile foundationforotherhouses. Bentand tiedrebarsthat are form into‘basket’shape.
  • 12. |TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR | Page 12 The excavatoris usedtoexcavate the site. The contractor showingthe cast in- situRC wall. The workersare preparingthe formwork.
  • 13. |TAYLOR UNIVERSITY| SABD | BACHELOR OF QUANTITY SURVEYOR | Page 13 Conclusion From this site visit activity, I had a chance to experience the real working space and be in construction environment. Working in construction site is much more different and more difficult with the hot weather condition and high risk rate. I also learnt something that I cannot gain during lecturer class. I learnt the importance of safety which is the basic of construction. Furthermore, I manage to explain, describe and understand the process of constructing pad footing and what materials and machinery needed to construct this foundation. It also helps me to prepare myself to be a future quantity surveyor and helps me in study especially in taking off list process as I understand the process of construction. In a conclusion, this is a great experience for me to improving my knowledge.