SlideShare uma empresa Scribd logo
1 de 5
David Wilkie

Part-time student – Course 7502 GBS Management and Risk

Griffith University – Southbank Campus

Student Number: 2848709

21/22 April 2012




                            David Wilkie
Logan City Council Risk Matrix
                                                                                                                          CONSEQUENCE EXAMPLES
                                                                                       Catastrophic                                Major                        Moderate                       Minor                  Negligible
 Risk rating     Action required                               Communicati                                                                                                                Localised damage to
                                                                    on &                                                  Restriction or damage of or       Temporary damage to
                                                                              Loss of all major utilities, records, ICT                                                                    property, assets or         Minimal effect on
                                                                Information                                                    prolonged service          property, assets or records.
                 Escalate to CEO and                                            data systems and communication.                                                                          records and restricted    infrastructure, records,
                                                                                                                          disruption to some utilities,      Temporary restricted
   Red =               Council                                 Facilities &     Permanent damage to property or
                                                                                                                          records, ICT data systems        access to ICT systems or
                                                                                                                                                                                         access to ICT systems          ICT systems or
                                                                  Asset        assets where services have ceased.                                                                          or communication            communication.
  extreme        Implement a detailed                          Management                                                      & communication.            communication for days.
                                                                                                                                                                                           during work hours.
  (E: 1- 3)      action plan to reduce                                                                                    Sustained adverse publicity
                      risk rating.                                                                                                                        Increasing and broadening      Periodic, local adverse
                                                                                                                            surrounding or leading to
                                                                                                                                                            adverse publicity, loss of    publicity arising from
                  Escalate to CEO,                                             Intense public, political and media           events such as a Govt.
                                                                                                                                                             customer confidence,          short term adverse
  Orange =       SLPT and Managers                              Community          scrutiny with critical effects.        inquiry, Coroner’s inquiry or
                                                                                                                                                              escalating customer        community concerns,
                                                                                                                                                                                                                      Occasional local


                                         LCC RISK CATEGORIES
    high                                                       Expectations   Total divergence between policy and          other legal proceedings or                                                                    publicity.
                 Implement a detailed                                                                                                                       complaints. Divergence          Some divergence
                                                                                          public opinion.                    a loss of accreditation.
   (H: 1-9)      action plan to reduce
                                                                                                                           Major divergence between
                                                                                                                                                           between policy and public      between policy and
                      risk rating.                                                                                                                                  opinion.                 public opinion.
                                                                                                                            policy and public opinion.
                     Escalate to                               Emergency &                                                                                                                Activity KPI’s not met
                 Managers, Program                               Disaster                                                 Major activity KPIs not met       Activity KPI’s not met in
                                                                                 Major activity KPIs not met for                                                                            in single Branch's
                 Leaders and specify
                                                                Response                                                   for one month. Loss of or      single locations. Loss of or                              Loss of or unplanned
  Yellow =                                                      Finance &         several months. Loss of or
                                                                                                                          unplanned expenditure of >       unplanned expenditure of
                                                                                                                                                                                          loss of or unplanned
                                                                                                                                                                                                                   expenditure of < 1% of
                    management                                    Legal        unplanned expenditure of >20% of                                                                          expenditure of < 5% of
  medium          accountability and                                                                                      10-20% of Budget. Loss of         5-10% of Budget. Loss                                    budget. Loss < 1K.
                                                               Leadership &     Budget. Loss of 500K or more.                                                                            budget. Loss between
  (M: 1-8)          responsibility                             Management                                                        100K to 500K.              between 10K and 100K.
                                                                                                                                                                                               1K and 10K.
                   Monitor trends and                                                                                                                      Serious harm / injury or      Minor harm or injury       Harm, injuries or
                 plan for improvement.                           Health,
                                                                                                                              Extensive and/or            illness requiring ongoing        where medical            ailments that may
                                                                Safety &       Death or life threatening event.
                                                                Security                                                      debilitating injury              treatment and/or          advice or attention        require basic first
                                                                                                                                                              hospital admission             is required.                  aid.
                 Manage by routine
 Green = low                                                                                                               Service delivery severely
                    procedures                                                                                                                                                           Service delivery delays
   (L: 1-5)                                                                   Service delivery severely affected or         affected or significant         Local service delivery
                                                                                                                                                                                               localised to          Minimal effect on
                    Monitor trends                              Workforce         significant workforce issues            workforce issues restricting    delays in multiple locations
                                                                                                                                                                                           Stream/Branch or          service delivery.
                                                                               restricting numbers across LCC.              numbers at some LCC             or community service.
                                                                                                                                                                                                  sites.
                                                                                                                                     sites.

                                                                                                                                         CONSE QUE NCE R ATI NGS
                   Frequency and
 Probability        or exposure
                                                                                       Catastrophic                                Major                        Moderate                       Minor                  Negligible
                                                                Almost
 > 95% to 100%   Several times a week                                                          E1                                     E3                             H6                           H9                        M7
                                                                certain
                   Monthly or several
                                                                 Likely                        E2                                    H4                              H7                          M5                         M8
                                         LIKELIHOOD




 > 70% to 95 %
                     times a year

 > 30% to 70%    Once every 1 -2 years                         Possible                         H1                                   H5                              H8                          M6                         L3
                   Once every 2 – 5
  > 5% to 30%
                         years
                                                               Unlikely                        H2                                    M1                              M3                           L1                        L4
                  Greater than every 5
     < 5%                                                        Rare                           H3                                   M2                              M4                           L2                        L5
                         years
Logan City Council Risk Escalator
• Risk Pyramid
Risk Type Reporting
                                       Logan City Council (LCC)                                Classification

                                   Enterprise-Wide Risk Framework                               Extreme



                                                                                             Extreme ( and
      Legend                                 Logan City Council                              others at CE’s
                                                                                               discretion
Governance
                                           Standing Committees
Operational
                                        Extreme & high risk reviewed.                         Extreme (and
                                     Receive reports and issue directives                   others at SLPT’s
                                                                                               discretion


                                                                              Mayor and
                                                                              Councillors

                                            Senior Leadership                               Extreme, High &
 Health Safety and Risk                                                                         medium
 Management Committee                    Performance Team (SLPT)

   Risk Status monitored                Extreme & high risk reviewed


                 Corporate Risk                  Cost Centre                   Other            All risks
                Management and               Manager / Program              Stakeholders
               Insurance Program
                                               Risks Identified &           Identify risk
       Staff                                       assessed
                                                                                                All risks

   Identify and
  manage risks

Mais conteúdo relacionado

Mais procurados

Operations Foundation Business Brief 2
Operations Foundation Business Brief 2Operations Foundation Business Brief 2
Operations Foundation Business Brief 2wdjohnson1
 
Orange County Container Group Featured in Uptime Magazine
Orange County Container Group Featured in Uptime MagazineOrange County Container Group Featured in Uptime Magazine
Orange County Container Group Featured in Uptime MagazineeMaint Enterprises
 
Managing in the yellow zone philadelphia spin
Managing in the yellow zone   philadelphia spinManaging in the yellow zone   philadelphia spin
Managing in the yellow zone philadelphia spinRobert Benjamin
 
A Game Plan for Making Decisions Before, During, and After a Crisis Hits Your...
A Game Plan for Making Decisions Before, During, and After a Crisis Hits Your...A Game Plan for Making Decisions Before, During, and After a Crisis Hits Your...
A Game Plan for Making Decisions Before, During, and After a Crisis Hits Your...4Good.org
 
Jake Kendall - hot issues session mobile banking
Jake Kendall -  hot issues session mobile banking Jake Kendall -  hot issues session mobile banking
Jake Kendall - hot issues session mobile banking Microfinance Gateway
 
Data Center Qualitative Readiness Sample Post
Data Center Qualitative Readiness Sample PostData Center Qualitative Readiness Sample Post
Data Center Qualitative Readiness Sample Postchroan_soc
 
Rem NetApp Champion Case Study
Rem NetApp Champion Case StudyRem NetApp Champion Case Study
Rem NetApp Champion Case StudyMichael Hudak
 
Camp Dresser Mc Kee #2
Camp Dresser Mc Kee #2Camp Dresser Mc Kee #2
Camp Dresser Mc Kee #2billyhat
 
Service Support Quick Reference
Service Support Quick ReferenceService Support Quick Reference
Service Support Quick Referenceguest5f36a4
 
12th Annual Outage Response & Restoration Management Final Agenda
12th Annual Outage Response & Restoration Management Final Agenda12th Annual Outage Response & Restoration Management Final Agenda
12th Annual Outage Response & Restoration Management Final AgendaSamantha Rice
 
5 IT Trends That Reduce Cost And Improve Web Performance - A Forrester and Go...
5 IT Trends That Reduce Cost And Improve Web Performance - A Forrester and Go...5 IT Trends That Reduce Cost And Improve Web Performance - A Forrester and Go...
5 IT Trends That Reduce Cost And Improve Web Performance - A Forrester and Go...Compuware APM
 
Is0 749 sample business plan of nesans
Is0 749 sample business plan of nesansIs0 749 sample business plan of nesans
Is0 749 sample business plan of nesansBalan Jeevana
 
Task 1ii safety-risk assessment-form_dec09
Task 1ii   safety-risk assessment-form_dec09Task 1ii   safety-risk assessment-form_dec09
Task 1ii safety-risk assessment-form_dec09BenT1990
 
"7th Remote Device Monitoring Summit
"7th Remote Device Monitoring Summit"7th Remote Device Monitoring Summit
"7th Remote Device Monitoring Summitcassie111
 
Walter Ammann - Business Continuity Management within the Concept of Integrat...
Walter Ammann - Business Continuity Management within the Concept of Integrat...Walter Ammann - Business Continuity Management within the Concept of Integrat...
Walter Ammann - Business Continuity Management within the Concept of Integrat...Global Risk Forum GRFDavos
 
11th Annual Outage Management for Power Plants Final Agenda
11th Annual Outage Management for Power Plants Final Agenda11th Annual Outage Management for Power Plants Final Agenda
11th Annual Outage Management for Power Plants Final AgendaSamantha Rice
 

Mais procurados (19)

Operations Foundation Business Brief 2
Operations Foundation Business Brief 2Operations Foundation Business Brief 2
Operations Foundation Business Brief 2
 
Orange County Container Group Featured in Uptime Magazine
Orange County Container Group Featured in Uptime MagazineOrange County Container Group Featured in Uptime Magazine
Orange County Container Group Featured in Uptime Magazine
 
Managing in the yellow zone philadelphia spin
Managing in the yellow zone   philadelphia spinManaging in the yellow zone   philadelphia spin
Managing in the yellow zone philadelphia spin
 
A Game Plan for Making Decisions Before, During, and After a Crisis Hits Your...
A Game Plan for Making Decisions Before, During, and After a Crisis Hits Your...A Game Plan for Making Decisions Before, During, and After a Crisis Hits Your...
A Game Plan for Making Decisions Before, During, and After a Crisis Hits Your...
 
Jake Kendall - hot issues session mobile banking
Jake Kendall -  hot issues session mobile banking Jake Kendall -  hot issues session mobile banking
Jake Kendall - hot issues session mobile banking
 
Data Center Qualitative Readiness Sample Post
Data Center Qualitative Readiness Sample PostData Center Qualitative Readiness Sample Post
Data Center Qualitative Readiness Sample Post
 
Rem NetApp Champion Case Study
Rem NetApp Champion Case StudyRem NetApp Champion Case Study
Rem NetApp Champion Case Study
 
Camp Dresser Mc Kee #2
Camp Dresser Mc Kee #2Camp Dresser Mc Kee #2
Camp Dresser Mc Kee #2
 
Service Support Quick Reference
Service Support Quick ReferenceService Support Quick Reference
Service Support Quick Reference
 
12th Annual Outage Response & Restoration Management Final Agenda
12th Annual Outage Response & Restoration Management Final Agenda12th Annual Outage Response & Restoration Management Final Agenda
12th Annual Outage Response & Restoration Management Final Agenda
 
J-9 FOCAL POINT! NEWSLETTER Volume 3, Issue 8
J-9 FOCAL POINT! NEWSLETTER Volume 3, Issue 8J-9 FOCAL POINT! NEWSLETTER Volume 3, Issue 8
J-9 FOCAL POINT! NEWSLETTER Volume 3, Issue 8
 
5 IT Trends That Reduce Cost And Improve Web Performance - A Forrester and Go...
5 IT Trends That Reduce Cost And Improve Web Performance - A Forrester and Go...5 IT Trends That Reduce Cost And Improve Web Performance - A Forrester and Go...
5 IT Trends That Reduce Cost And Improve Web Performance - A Forrester and Go...
 
Is0 749 sample business plan of nesans
Is0 749 sample business plan of nesansIs0 749 sample business plan of nesans
Is0 749 sample business plan of nesans
 
Task 1ii safety-risk assessment-form_dec09
Task 1ii   safety-risk assessment-form_dec09Task 1ii   safety-risk assessment-form_dec09
Task 1ii safety-risk assessment-form_dec09
 
3 Steps for Reducing Complexity
3 Steps for Reducing Complexity3 Steps for Reducing Complexity
3 Steps for Reducing Complexity
 
"7th Remote Device Monitoring Summit
"7th Remote Device Monitoring Summit"7th Remote Device Monitoring Summit
"7th Remote Device Monitoring Summit
 
Walter Ammann - Business Continuity Management within the Concept of Integrat...
Walter Ammann - Business Continuity Management within the Concept of Integrat...Walter Ammann - Business Continuity Management within the Concept of Integrat...
Walter Ammann - Business Continuity Management within the Concept of Integrat...
 
11th Annual Outage Management for Power Plants Final Agenda
11th Annual Outage Management for Power Plants Final Agenda11th Annual Outage Management for Power Plants Final Agenda
11th Annual Outage Management for Power Plants Final Agenda
 
Change Management Process sample
Change Management Process sampleChange Management Process sample
Change Management Process sample
 

Destaque

Five Year Marketing Plan Presentation
Five Year Marketing Plan PresentationFive Year Marketing Plan Presentation
Five Year Marketing Plan Presentationcqdelrosario
 
Spencer Term 2
Spencer Term 2Spencer Term 2
Spencer Term 2figjam_31
 
Training ppt for efd and apd
Training ppt for efd and apdTraining ppt for efd and apd
Training ppt for efd and apdKaren1insc
 
Ken Davis Products, Inc
Ken Davis Products, Inc Ken Davis Products, Inc
Ken Davis Products, Inc cqdelrosario
 
Emily W Term 2
Emily W Term 2Emily W Term 2
Emily W Term 2figjam_31
 
Momma's House Presentation
Momma's House Presentation Momma's House Presentation
Momma's House Presentation cqdelrosario
 
Law Of Attraction Final
Law Of Attraction FinalLaw Of Attraction Final
Law Of Attraction Finalricbennett
 

Destaque (9)

Five Year Marketing Plan Presentation
Five Year Marketing Plan PresentationFive Year Marketing Plan Presentation
Five Year Marketing Plan Presentation
 
Spencer Term 2
Spencer Term 2Spencer Term 2
Spencer Term 2
 
Training ppt for efd and apd
Training ppt for efd and apdTraining ppt for efd and apd
Training ppt for efd and apd
 
Ken Davis Products, Inc
Ken Davis Products, Inc Ken Davis Products, Inc
Ken Davis Products, Inc
 
Emily W Term 2
Emily W Term 2Emily W Term 2
Emily W Term 2
 
La eutanasia
La eutanasiaLa eutanasia
La eutanasia
 
Fitness
FitnessFitness
Fitness
 
Momma's House Presentation
Momma's House Presentation Momma's House Presentation
Momma's House Presentation
 
Law Of Attraction Final
Law Of Attraction FinalLaw Of Attraction Final
Law Of Attraction Final
 

Semelhante a David wilkie task 1 gbs7502

Tpcs risk table.xls
Tpcs risk table.xlsTpcs risk table.xls
Tpcs risk table.xlseriko51
 
F01 ensure presentation
F01 ensure presentationF01 ensure presentation
F01 ensure presentationcristini75
 
Protecting Utilities through Business Continuity - Scott Roe, Corporate Risk ...
Protecting Utilities through Business Continuity - Scott Roe, Corporate Risk ...Protecting Utilities through Business Continuity - Scott Roe, Corporate Risk ...
Protecting Utilities through Business Continuity - Scott Roe, Corporate Risk ...Energy Network marcus evans
 
Business Driven Security Securing the Smarter Planet pcty_020710_rev
Business Driven Security Securing the Smarter Planet pcty_020710_revBusiness Driven Security Securing the Smarter Planet pcty_020710_rev
Business Driven Security Securing the Smarter Planet pcty_020710_revShanker Sareen
 
Swenson Group Vvma
Swenson Group VvmaSwenson Group Vvma
Swenson Group Vvmamhunter22
 
360-Degree Approach to DR / BC
360-Degree Approach to DR / BC360-Degree Approach to DR / BC
360-Degree Approach to DR / BCAISDC
 
Sivasubramanian Risk Management In The Web 2.0 Environment
Sivasubramanian Risk  Management In The  Web 2.0  EnvironmentSivasubramanian Risk  Management In The  Web 2.0  Environment
Sivasubramanian Risk Management In The Web 2.0 EnvironmentVinoth Sivasubramanan
 
DSS ITSEC Conference 2012 - Lumension Intelligent Application Whitelisting & ...
DSS ITSEC Conference 2012 - Lumension Intelligent Application Whitelisting & ...DSS ITSEC Conference 2012 - Lumension Intelligent Application Whitelisting & ...
DSS ITSEC Conference 2012 - Lumension Intelligent Application Whitelisting & ...Andris Soroka
 
ERCI SSP Backgrounder
ERCI SSP BackgrounderERCI SSP Backgrounder
ERCI SSP Backgrounderjohnrosengard
 
Business Meets IT presentation: Business Continuity
Business Meets IT presentation: Business ContinuityBusiness Meets IT presentation: Business Continuity
Business Meets IT presentation: Business ContinuityWilliam Visterin
 
Open Government, Open Data and Data Management - Coradix
Open Government, Open Data and Data Management - CoradixOpen Government, Open Data and Data Management - Coradix
Open Government, Open Data and Data Management - CoradixCheryl McKinnon
 
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical InfrastructureVarsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructureitnewsafrica
 
Cloud Computing Summit 2011
Cloud Computing Summit 2011 Cloud Computing Summit 2011
Cloud Computing Summit 2011 ONI_PLC
 
2009_NYC_OpRiskUSA_Conf
2009_NYC_OpRiskUSA_Conf2009_NYC_OpRiskUSA_Conf
2009_NYC_OpRiskUSA_ConfPeter Poulos
 

Semelhante a David wilkie task 1 gbs7502 (20)

Tpcs risk table.xls
Tpcs risk table.xlsTpcs risk table.xls
Tpcs risk table.xls
 
F01 ensure presentation
F01 ensure presentationF01 ensure presentation
F01 ensure presentation
 
Protecting Utilities through Business Continuity - Scott Roe, Corporate Risk ...
Protecting Utilities through Business Continuity - Scott Roe, Corporate Risk ...Protecting Utilities through Business Continuity - Scott Roe, Corporate Risk ...
Protecting Utilities through Business Continuity - Scott Roe, Corporate Risk ...
 
Business Driven Security Securing the Smarter Planet pcty_020710_rev
Business Driven Security Securing the Smarter Planet pcty_020710_revBusiness Driven Security Securing the Smarter Planet pcty_020710_rev
Business Driven Security Securing the Smarter Planet pcty_020710_rev
 
Swenson Group Vvma
Swenson Group VvmaSwenson Group Vvma
Swenson Group Vvma
 
360-Degree Approach to DR / BC
360-Degree Approach to DR / BC360-Degree Approach to DR / BC
360-Degree Approach to DR / BC
 
Sivasubramanian Risk Management In The Web 2.0 Environment
Sivasubramanian Risk  Management In The  Web 2.0  EnvironmentSivasubramanian Risk  Management In The  Web 2.0  Environment
Sivasubramanian Risk Management In The Web 2.0 Environment
 
DSS ITSEC Conference 2012 - Lumension Intelligent Application Whitelisting & ...
DSS ITSEC Conference 2012 - Lumension Intelligent Application Whitelisting & ...DSS ITSEC Conference 2012 - Lumension Intelligent Application Whitelisting & ...
DSS ITSEC Conference 2012 - Lumension Intelligent Application Whitelisting & ...
 
Phillipines - first day synthesis
Phillipines - first day synthesisPhillipines - first day synthesis
Phillipines - first day synthesis
 
Stream 2 - Don't Risk IT
Stream 2 - Don't Risk ITStream 2 - Don't Risk IT
Stream 2 - Don't Risk IT
 
ERCI SSP Backgrounder
ERCI SSP BackgrounderERCI SSP Backgrounder
ERCI SSP Backgrounder
 
Business Meets IT presentation: Business Continuity
Business Meets IT presentation: Business ContinuityBusiness Meets IT presentation: Business Continuity
Business Meets IT presentation: Business Continuity
 
Plan-Protect -- Possible Risks
Plan-Protect -- Possible RisksPlan-Protect -- Possible Risks
Plan-Protect -- Possible Risks
 
Open Government, Open Data and Data Management - Coradix
Open Government, Open Data and Data Management - CoradixOpen Government, Open Data and Data Management - Coradix
Open Government, Open Data and Data Management - Coradix
 
M&E Project (Africa) Presentation
M&E Project (Africa) PresentationM&E Project (Africa) Presentation
M&E Project (Africa) Presentation
 
ZENDAL BACKUP
ZENDAL BACKUPZENDAL BACKUP
ZENDAL BACKUP
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical InfrastructureVarsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
 
Cloud Computing Summit 2011
Cloud Computing Summit 2011 Cloud Computing Summit 2011
Cloud Computing Summit 2011
 
2009_NYC_OpRiskUSA_Conf
2009_NYC_OpRiskUSA_Conf2009_NYC_OpRiskUSA_Conf
2009_NYC_OpRiskUSA_Conf
 

Último

Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfSanaAli374401
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.MateoGardella
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 

Último (20)

Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 

David wilkie task 1 gbs7502

  • 1. David Wilkie Part-time student – Course 7502 GBS Management and Risk Griffith University – Southbank Campus Student Number: 2848709 21/22 April 2012 David Wilkie
  • 2. Logan City Council Risk Matrix CONSEQUENCE EXAMPLES Catastrophic Major Moderate Minor Negligible Risk rating Action required Communicati Localised damage to on & Restriction or damage of or Temporary damage to Loss of all major utilities, records, ICT property, assets or Minimal effect on Information prolonged service property, assets or records. Escalate to CEO and data systems and communication. records and restricted infrastructure, records, disruption to some utilities, Temporary restricted Red = Council Facilities & Permanent damage to property or records, ICT data systems access to ICT systems or access to ICT systems ICT systems or Asset assets where services have ceased. or communication communication. extreme Implement a detailed Management & communication. communication for days. during work hours. (E: 1- 3) action plan to reduce Sustained adverse publicity risk rating. Increasing and broadening Periodic, local adverse surrounding or leading to adverse publicity, loss of publicity arising from Escalate to CEO, Intense public, political and media events such as a Govt. customer confidence, short term adverse Orange = SLPT and Managers Community scrutiny with critical effects. inquiry, Coroner’s inquiry or escalating customer community concerns, Occasional local LCC RISK CATEGORIES high Expectations Total divergence between policy and other legal proceedings or publicity. Implement a detailed complaints. Divergence Some divergence public opinion. a loss of accreditation. (H: 1-9) action plan to reduce Major divergence between between policy and public between policy and risk rating. opinion. public opinion. policy and public opinion. Escalate to Emergency & Activity KPI’s not met Managers, Program Disaster Major activity KPIs not met Activity KPI’s not met in Major activity KPIs not met for in single Branch's Leaders and specify Response for one month. Loss of or single locations. Loss of or Loss of or unplanned Yellow = Finance & several months. Loss of or unplanned expenditure of > unplanned expenditure of loss of or unplanned expenditure of < 1% of management Legal unplanned expenditure of >20% of expenditure of < 5% of medium accountability and 10-20% of Budget. Loss of 5-10% of Budget. Loss budget. Loss < 1K. Leadership & Budget. Loss of 500K or more. budget. Loss between (M: 1-8) responsibility Management 100K to 500K. between 10K and 100K. 1K and 10K. Monitor trends and Serious harm / injury or Minor harm or injury Harm, injuries or plan for improvement. Health, Extensive and/or illness requiring ongoing where medical ailments that may Safety & Death or life threatening event. Security debilitating injury treatment and/or advice or attention require basic first hospital admission is required. aid. Manage by routine Green = low Service delivery severely procedures Service delivery delays (L: 1-5) Service delivery severely affected or affected or significant Local service delivery localised to Minimal effect on Monitor trends Workforce significant workforce issues workforce issues restricting delays in multiple locations Stream/Branch or service delivery. restricting numbers across LCC. numbers at some LCC or community service. sites. sites. CONSE QUE NCE R ATI NGS Frequency and Probability or exposure Catastrophic Major Moderate Minor Negligible Almost > 95% to 100% Several times a week E1 E3 H6 H9 M7 certain Monthly or several Likely E2 H4 H7 M5 M8 LIKELIHOOD > 70% to 95 % times a year > 30% to 70% Once every 1 -2 years Possible H1 H5 H8 M6 L3 Once every 2 – 5 > 5% to 30% years Unlikely H2 M1 M3 L1 L4 Greater than every 5 < 5% Rare H3 M2 M4 L2 L5 years
  • 3. Logan City Council Risk Escalator
  • 5. Risk Type Reporting Logan City Council (LCC) Classification Enterprise-Wide Risk Framework Extreme Extreme ( and Legend Logan City Council others at CE’s discretion Governance Standing Committees Operational Extreme & high risk reviewed. Extreme (and Receive reports and issue directives others at SLPT’s discretion Mayor and Councillors Senior Leadership Extreme, High & Health Safety and Risk medium Management Committee Performance Team (SLPT) Risk Status monitored Extreme & high risk reviewed Corporate Risk Cost Centre Other All risks Management and Manager / Program Stakeholders Insurance Program Risks Identified & Identify risk Staff assessed All risks Identify and manage risks