Offshore Production Technology
FPSO Layout and Turret
Marine & Offshore Technology
Learning Outcomes
1. Explain the key considerations in the FPSO layout and
design
2. Explain the features of an internal and external turret for
a FPSO
3. Explain the considerations for deciding whether to use
internal turret or external turret for a FPSO
4. Explain how the internal turret may be placed along the
length of a FPSO
1. Explain the key considerations in the
FPSO layout and design
FPSO Layout / General Arrangement
FPSO Layout and GA
Key Issues
 Deadweight
 Cargo (storage) capacity
 Equipment (payload) capacity
 Hull structure - Global and local strength
 Main vessel layout - Deck space - Location of accommodation (NB)
 Location of turret % LBP
Need to be considered
 Hull form, fineness and sea-keeping considerations (NB)
 Bow shape, free board (forecastle & ship side) (NB)
 Green water protection
NB = Issues where scope
for choice exists with new-
builds
FPSO layout-aft accommodation
UtilitiesBlast wall Fwd
AccommodationHelideck Process Turret
FPSO layout -fwd accommodation
TurretProcess HelideckUtilities
Accommodation
Blast wall
Fwd
FPSO Layout - Hull systems and utilities
 Layout of major features (NB)
 Accommodation and Turret
 Main marine systems & utilities
• Cargo & ballast & Pump room
• Main Power, emergency power,
• Fire pumps.
• Heating, Ventilation and Air-Con (HVAC)
• Inert Gas (IG)
 Other spaces and services required for auxiliary equipment and shared systems
 Vessel upper deck piping arrangements (pipe rack integration)
 Integration of hull marine and topsides systems
 Power/fuel
 Control and safety systems
 Emergency power
NB = Issues where scope
for choice exists with new-
builds
Interface with Topsides equipment and systems
 There are a number of key issues that need to be considered by the hull design process
 Structural integration of topsides support stools & module support structure into hull structure layout
 Hydrostatics considerations of required maximum topsides weight and Centres of Gravity
 Layout and space considerations in the area of the vessel upper deck
 Systems integration of hull and topsides systems
Examples of Layout Considerations
1. Vessel Motions
Minimise the effects of vessel motions
– The process equipment located as close to midship
2. Helicopter Operations
– Accommodation block with the helicopter platform must be located clear of
hazardous zones
– Ideally upwind of the flare stack
3. Metering arrangements
– Export (esp. North Sea) is always likely to be by tandem moored tanker and so
the offloading facilities as well as the metering arrangements will be at the
stern if the turret is near the bow.
BUMI ARMARDA CLAIRE
• Layout Considerations
2. Explain the features of an internal and
external turret for a FPSO
Turret Technology
 Turret and swivel systems (allow n x 360 degrees rotation) has been the key technology for
the deployment of FPSOs in all met-ocean environments
 Turret allows vessel to weathervane – that is, to take up a position that aligns her heading
towards the dominant forces of wave, wind and current.
 Weathervaning has the effect of minimising environmental loads on the station keeping
system, and minimises the most sensitive vessel motions – generally for a mono-hull – roll.
 This has the effect of minimising disturbance to process equipment and personnel and
maximising the facility uptime.
Different Turret Types
 Internal turrets
 External turrets (forward of bow - normally)
 Permanent or disconnectable
 Yoke moored
Internal Turret
• An internal turret is convenient when a large number of
risers are to be installed, and therefore a large turret and
swivel assembly are required.
• An internal position also reduces the risk of slamming due to
the reduction of the effect of pitch.
• Internal turrets can be used in deep waters and the most
severe environments
– up to 18 m significant wave height
Internal Turret
Internal Turret
Internal Turrets
Images courtesy of APL
Internal Turrets
Images courtesy of APL
Internal Turrets
Images courtesy of Bluewater
Turntable Access Structure
(alternative: Deckhouse)
Swivel Stack
Turntable
Turret
Casing / Moonpool
Spider
(bottom ship)
(upper deck)
Internal Turrets
Images courtesy of Bluewater
Casing/Moonpool
Mooring Legs
Spider
Lower Radial Bearing
Turret (with riser pipes)
Main Roller Bearing
Entry of risers and chains
at bottom of Internal Turret
External Turret
• An external turret eliminates the CALM buoy and allows the
turntable and swivels to be directly attached to the vessel
bow or stern.
• Suitable for deep waters and large wave heights
– 12 m significant wave heights
• Can be used up to the point where the combined heave and
pitch motions may cause slamming on the bottom of the
turret (depending on vessel size and length, up to
approximately wave height).
External Turret
External turrets - Baobab Ivoirien FPSO,
Baobab Oilfield (Ivory Coast)
Images courtesy of Modec/Sofec
 970 m water depth
 8-leg polyester
mooring
 357,000 dwt tanker
conversion
 2.0 million bbls storage
External turrets- FPSO Fluminense Brazil
Images courtesy of Modec/Sofec
 800 m water depth
 357,000 dwt tanker conversion
 1.2 million bbls storage
External turrets - Cuulong MV9 FPSO,
Su Tu Den Field (Vietnam)
Images courtesy of Modec/Sofec
Turntable- Typical Lay-out
Includes for example:
 Subsea Control Skids
 Pipe headers
 Control valves
 Pig receivers
 Pig launchers
 Installation Winch

Images courtesy of Bluewater
Yoke Mooring
CNOOC Bohai Bay QHD32-6 FPSO (China)
Kome Kribi FSO
w/ Tower Yoke Mooring System
Images courtesy of Modec/Sofec
 66 ft water depth
 New-build vessel
 1.0 million bbls storage
Disconnectable systems
SBM’s External and Internal solutions
External or Riser Turret Mooring Internal turret with disconnectable buoy
Images courtesy of SBM
The Riser Turret Mooring (RTM)
 Cossack Pioneer
 Location NW Shelf
Australia
 Vessel size: 152,000 Dwt
 Topsides
 115,000 bopd
Images courtesy of SBM
Disconnectable internal turret system
APL’s STP system (Submerged Turret Point)
Images courtesy of APL
Disconnectable systems –Terra Nova
Images courtesy of Modec/Sofec
Turret Access
Structure
Upper Turret
Lower Turret
Spider Buoy
Fluid Swivel
Manifold System
Upper Bearing
Connector System
Quick Connect/Disconnect
(QC/DC) Connectors
Lower Bearing
Swivel systems
Swivel systems
 Swivel systems allow the transfer of:
 Production fluids from the subsea equipment to the vessel
 Export fluids from the vessel to the sub-sea infrastructure
 Well/subsea management/control fluids e.g. methanol
 Electrical signals for control and monitoring
 Electrical power for driving subsea/down-hole equipment
 Swivel systems allow n x 360 degrees rotation
 Swivel manufacturers are pushing back the boundaries of pressure and temperature to:
 ~400+ bar
 ~120 ⁰C
Various Deck Levels of Turret
Swivel stack located on top of the turret
Swivel stack (Anasuria)
Swivel stack modules
Images courtesy of Bluewater
P37 Swivel stack
Images courtesy of Bluewater
Leadon FPSO stack
Images courtesy of Framo
Leadon power slip ring to be
installed later when required
(4 x 1 MW)
Fluid paths
Utilities
Swivel stack located
on top of the turret
What is going on inside a swivel?
Images courtesy of Bluewater
What is going on inside a swivel?
Images courtesy of Framo
45
What is going on inside a swivel?
Stator Rotor
Roller Bearing
(3-race)
Wiper Seal
Dust/Grease Seal
Outer Seal
Backup
Sliding
Bearings
Stator Rotor
Roller Bearing
(3-race)
Wiper Seal
Dust/Grease Seal
Outer Seal
Backup
Sliding
Bearings
Images courtesy of Bluewater
3. Explain the considerations for deciding
whether to use internal turret or external
turret for a FPSO
Internal Turret
• An internal turret is convenient when a
large number of risers are to be installed,
and therefore a large turret and swivel
assembly are required.
• Internal turrets can be used in deep
waters and the most severe environments
– up to 18 m significant wave height
• An internal position also reduces the risk
of slamming due to the reduction of the
effect of pitch.
External Turret
• An external turret eliminates the CALM
buoy and allows the turntable and
swivels to be directly attached to the
vessel bow or stern.
• Suitable for deep waters and large
wave heights
– 12 m significant wave heights
• Can be used up to the point where the
combined heave and pitch motions may
cause slamming on the bottom of the
turret (depending on vessel size and
length, up to approximately wave
height).
4. Explain how the internal turret may be
placed along the length of a FPSO
4. Explain how the internal turret may be placed
along the length of a FPSO
Pg 5-10:
• if the vessel is passive i.e. no Dynamic-Position (DP) thrusters or has
a minimum thruster capacity, the internal turret is positioned within
the first 25% of the vessel length from the bow in severe
environments
• if the vessel is active i.e. sufficient Dynamic-Position (DP) thruster
capacity, the internal turret is positioned just forward of midships
Key Questions
1. Explain the key considerations in the FPSO layout and design
2. Explain the features of an internal and external turret for a FPSO
3. Explain the considerations for deciding whether to use internal turret or
external turret for a FPSO
4. Explain how the internal turret may be placed along the length of a FPSO

Mais conteúdo relacionado

Mais procurados

Oil Production Facilities
Oil Production FacilitiesOil Production Facilities
Oil Production FacilitiesInGu Lee
 
Ship Construction (Structure Part)
Ship Construction (Structure Part)Ship Construction (Structure Part)
Ship Construction (Structure Part)Marine Study
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Engineers Australia
 
FPSO SYSTEMS-1.pdf
FPSO SYSTEMS-1.pdfFPSO SYSTEMS-1.pdf
FPSO SYSTEMS-1.pdfBnBn25
 
FPSO Redeployment
FPSO RedeploymentFPSO Redeployment
FPSO RedeploymentDan Benson
 
Offshore Structure
Offshore StructureOffshore Structure
Offshore StructureIsmail Topal
 
Design & operation of topsides gas field
Design & operation of topsides gas fieldDesign & operation of topsides gas field
Design & operation of topsides gas fieldashutoshgugnani
 
Offshore Structures Presentation
Offshore Structures PresentationOffshore Structures Presentation
Offshore Structures Presentationsurya3303
 
Overview of subsea production systems
Overview of subsea production systemsOverview of subsea production systems
Overview of subsea production systemsGiuseppe Moricca
 
Shell and deck plating
Shell and deck platingShell and deck plating
Shell and deck platingCorrodere
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overviewminh nguyễn
 
Offshore platform ln1_au_06_12_2019
Offshore platform ln1_au_06_12_2019Offshore platform ln1_au_06_12_2019
Offshore platform ln1_au_06_12_2019UnitedLiftTechnologi
 
C1. Introduction to Offshore Production Tech
C1. Introduction to Offshore Production TechC1. Introduction to Offshore Production Tech
C1. Introduction to Offshore Production TechDavid Seow
 

Mais procurados (20)

Oil Production Facilities
Oil Production FacilitiesOil Production Facilities
Oil Production Facilities
 
Ship Construction (Structure Part)
Ship Construction (Structure Part)Ship Construction (Structure Part)
Ship Construction (Structure Part)
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems
 
FPSO SYSTEMS-1.pdf
FPSO SYSTEMS-1.pdfFPSO SYSTEMS-1.pdf
FPSO SYSTEMS-1.pdf
 
Final ppt of ts
Final ppt of tsFinal ppt of ts
Final ppt of ts
 
Spar Platforms
Spar PlatformsSpar Platforms
Spar Platforms
 
double bottom structure
double bottom structuredouble bottom structure
double bottom structure
 
FPSO Redeployment
FPSO RedeploymentFPSO Redeployment
FPSO Redeployment
 
Offshore Platforms
Offshore Platforms Offshore Platforms
Offshore Platforms
 
Offshore Structure
Offshore StructureOffshore Structure
Offshore Structure
 
Design & operation of topsides gas field
Design & operation of topsides gas fieldDesign & operation of topsides gas field
Design & operation of topsides gas field
 
Offshore Structures Presentation
Offshore Structures PresentationOffshore Structures Presentation
Offshore Structures Presentation
 
Offshore structures
Offshore structuresOffshore structures
Offshore structures
 
Introduction to Offshore Oil and Gas Surface Facilities
Introduction to Offshore Oil and Gas Surface FacilitiesIntroduction to Offshore Oil and Gas Surface Facilities
Introduction to Offshore Oil and Gas Surface Facilities
 
Overview of subsea production systems
Overview of subsea production systemsOverview of subsea production systems
Overview of subsea production systems
 
Shell and deck plating
Shell and deck platingShell and deck plating
Shell and deck plating
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overview
 
Offshore platform ln1_au_06_12_2019
Offshore platform ln1_au_06_12_2019Offshore platform ln1_au_06_12_2019
Offshore platform ln1_au_06_12_2019
 
Offshore platforms
Offshore platformsOffshore platforms
Offshore platforms
 
C1. Introduction to Offshore Production Tech
C1. Introduction to Offshore Production TechC1. Introduction to Offshore Production Tech
C1. Introduction to Offshore Production Tech
 

Semelhante a C9 FPSO Layout and Turret 2004

4.2 Offshore platform.pptx
4.2 Offshore platform.pptx4.2 Offshore platform.pptx
4.2 Offshore platform.pptxVijayalakshmiR64
 
Offshore 187
Offshore 187Offshore 187
Offshore 187leemayza
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundSigve Hamilton Aspelund
 
Offshore Oil & Gas Production Systems
Offshore Oil & Gas Production SystemsOffshore Oil & Gas Production Systems
Offshore Oil & Gas Production SystemsGaurav Singh Rajput
 
OFFSHORE PLATFORM_1.ppt (1).pdf
OFFSHORE PLATFORM_1.ppt (1).pdfOFFSHORE PLATFORM_1.ppt (1).pdf
OFFSHORE PLATFORM_1.ppt (1).pdfAisyah Asyikin
 
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.Emeka Ngwobia
 
AMV WITH FOCUS ON HOVERCRAFT
AMV WITH FOCUS ON HOVERCRAFT AMV WITH FOCUS ON HOVERCRAFT
AMV WITH FOCUS ON HOVERCRAFT KARIM KOTB
 
DRILLING ROTARY RIGS ENGINEERING ANALYSIS .ppt
DRILLING ROTARY RIGS ENGINEERING ANALYSIS .pptDRILLING ROTARY RIGS ENGINEERING ANALYSIS .ppt
DRILLING ROTARY RIGS ENGINEERING ANALYSIS .pptOKORIE1
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)coderweb
 
Sea Magic Fast Craft
Sea Magic Fast CraftSea Magic Fast Craft
Sea Magic Fast CraftValentineBond
 

Semelhante a C9 FPSO Layout and Turret 2004 (20)

4.2 Offshore platform.pptx
4.2 Offshore platform.pptx4.2 Offshore platform.pptx
4.2 Offshore platform.pptx
 
Offshore 187
Offshore 187Offshore 187
Offshore 187
 
Coastal Research Vessel
Coastal Research VesselCoastal Research Vessel
Coastal Research Vessel
 
Motor launch
Motor launchMotor launch
Motor launch
 
Frp boat (7m)
Frp boat (7m)Frp boat (7m)
Frp boat (7m)
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton Aspelund
 
Offshore Oil & Gas Production Systems
Offshore Oil & Gas Production SystemsOffshore Oil & Gas Production Systems
Offshore Oil & Gas Production Systems
 
Offshore part 2
Offshore part 2Offshore part 2
Offshore part 2
 
OFFSHORE PLATFORM_1.ppt (1).pdf
OFFSHORE PLATFORM_1.ppt (1).pdfOFFSHORE PLATFORM_1.ppt (1).pdf
OFFSHORE PLATFORM_1.ppt (1).pdf
 
Steel boat (5.5m)
Steel boat (5.5m)Steel boat (5.5m)
Steel boat (5.5m)
 
Steel boat (8m)
Steel boat (8m)Steel boat (8m)
Steel boat (8m)
 
Frp catamaran (8m)
Frp catamaran (8m) Frp catamaran (8m)
Frp catamaran (8m)
 
Offshore part 2
Offshore part 2Offshore part 2
Offshore part 2
 
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
 
AMV WITH FOCUS ON HOVERCRAFT
AMV WITH FOCUS ON HOVERCRAFT AMV WITH FOCUS ON HOVERCRAFT
AMV WITH FOCUS ON HOVERCRAFT
 
DRILLING ROTARY RIGS ENGINEERING ANALYSIS .ppt
DRILLING ROTARY RIGS ENGINEERING ANALYSIS .pptDRILLING ROTARY RIGS ENGINEERING ANALYSIS .ppt
DRILLING ROTARY RIGS ENGINEERING ANALYSIS .ppt
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
 
Sea Magic Fast Craft
Sea Magic Fast CraftSea Magic Fast Craft
Sea Magic Fast Craft
 
Introduction to offshore structure
Introduction to offshore structure Introduction to offshore structure
Introduction to offshore structure
 
apl-brochure
apl-brochureapl-brochure
apl-brochure
 

Mais de David Seow

C2. Functional Requirements of FPSO
C2. Functional Requirements of FPSOC2. Functional Requirements of FPSO
C2. Functional Requirements of FPSODavid Seow
 
C0. Module Brief to OPT_2022.ppt
C0. Module Brief to OPT_2022.pptC0. Module Brief to OPT_2022.ppt
C0. Module Brief to OPT_2022.pptDavid Seow
 
C7b. Mooring Components 2020
C7b. Mooring Components 2020C7b. Mooring Components 2020
C7b. Mooring Components 2020David Seow
 
C7a Mooring Layouts_2020
C7a Mooring Layouts_2020C7a Mooring Layouts_2020
C7a Mooring Layouts_2020David Seow
 
C3.2.3&4. Fluid Recovery _2020
C3.2.3&4. Fluid Recovery _2020C3.2.3&4. Fluid Recovery _2020
C3.2.3&4. Fluid Recovery _2020David Seow
 
C4 Subsea Production
C4 Subsea ProductionC4 Subsea Production
C4 Subsea ProductionDavid Seow
 
C3.2.11. Chemical Injection_2020
C3.2.11. Chemical Injection_2020C3.2.11. Chemical Injection_2020
C3.2.11. Chemical Injection_2020David Seow
 
C3.2.2. Topside Gas Compression_2020
 C3.2.2. Topside Gas Compression_2020 C3.2.2. Topside Gas Compression_2020
C3.2.2. Topside Gas Compression_2020David Seow
 
C3.2.1. Topside Separation_2020
C3.2.1. Topside Separation_2020C3.2.1. Topside Separation_2020
C3.2.1. Topside Separation_2020David Seow
 
C3.1.0. Topside Intro 2020
C3.1.0. Topside Intro 2020C3.1.0. Topside Intro 2020
C3.1.0. Topside Intro 2020David Seow
 

Mais de David Seow (10)

C2. Functional Requirements of FPSO
C2. Functional Requirements of FPSOC2. Functional Requirements of FPSO
C2. Functional Requirements of FPSO
 
C0. Module Brief to OPT_2022.ppt
C0. Module Brief to OPT_2022.pptC0. Module Brief to OPT_2022.ppt
C0. Module Brief to OPT_2022.ppt
 
C7b. Mooring Components 2020
C7b. Mooring Components 2020C7b. Mooring Components 2020
C7b. Mooring Components 2020
 
C7a Mooring Layouts_2020
C7a Mooring Layouts_2020C7a Mooring Layouts_2020
C7a Mooring Layouts_2020
 
C3.2.3&4. Fluid Recovery _2020
C3.2.3&4. Fluid Recovery _2020C3.2.3&4. Fluid Recovery _2020
C3.2.3&4. Fluid Recovery _2020
 
C4 Subsea Production
C4 Subsea ProductionC4 Subsea Production
C4 Subsea Production
 
C3.2.11. Chemical Injection_2020
C3.2.11. Chemical Injection_2020C3.2.11. Chemical Injection_2020
C3.2.11. Chemical Injection_2020
 
C3.2.2. Topside Gas Compression_2020
 C3.2.2. Topside Gas Compression_2020 C3.2.2. Topside Gas Compression_2020
C3.2.2. Topside Gas Compression_2020
 
C3.2.1. Topside Separation_2020
C3.2.1. Topside Separation_2020C3.2.1. Topside Separation_2020
C3.2.1. Topside Separation_2020
 
C3.1.0. Topside Intro 2020
C3.1.0. Topside Intro 2020C3.1.0. Topside Intro 2020
C3.1.0. Topside Intro 2020
 

Último

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Último (20)

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

C9 FPSO Layout and Turret 2004

  • 1. Offshore Production Technology FPSO Layout and Turret Marine & Offshore Technology
  • 2. Learning Outcomes 1. Explain the key considerations in the FPSO layout and design 2. Explain the features of an internal and external turret for a FPSO 3. Explain the considerations for deciding whether to use internal turret or external turret for a FPSO 4. Explain how the internal turret may be placed along the length of a FPSO
  • 3. 1. Explain the key considerations in the FPSO layout and design
  • 4. FPSO Layout / General Arrangement
  • 5. FPSO Layout and GA Key Issues  Deadweight  Cargo (storage) capacity  Equipment (payload) capacity  Hull structure - Global and local strength  Main vessel layout - Deck space - Location of accommodation (NB)  Location of turret % LBP Need to be considered  Hull form, fineness and sea-keeping considerations (NB)  Bow shape, free board (forecastle & ship side) (NB)  Green water protection NB = Issues where scope for choice exists with new- builds
  • 6. FPSO layout-aft accommodation UtilitiesBlast wall Fwd AccommodationHelideck Process Turret
  • 7. FPSO layout -fwd accommodation TurretProcess HelideckUtilities Accommodation Blast wall Fwd
  • 8. FPSO Layout - Hull systems and utilities  Layout of major features (NB)  Accommodation and Turret  Main marine systems & utilities • Cargo & ballast & Pump room • Main Power, emergency power, • Fire pumps. • Heating, Ventilation and Air-Con (HVAC) • Inert Gas (IG)  Other spaces and services required for auxiliary equipment and shared systems  Vessel upper deck piping arrangements (pipe rack integration)  Integration of hull marine and topsides systems  Power/fuel  Control and safety systems  Emergency power NB = Issues where scope for choice exists with new- builds
  • 9. Interface with Topsides equipment and systems  There are a number of key issues that need to be considered by the hull design process  Structural integration of topsides support stools & module support structure into hull structure layout  Hydrostatics considerations of required maximum topsides weight and Centres of Gravity  Layout and space considerations in the area of the vessel upper deck  Systems integration of hull and topsides systems
  • 10. Examples of Layout Considerations 1. Vessel Motions Minimise the effects of vessel motions – The process equipment located as close to midship 2. Helicopter Operations – Accommodation block with the helicopter platform must be located clear of hazardous zones – Ideally upwind of the flare stack 3. Metering arrangements – Export (esp. North Sea) is always likely to be by tandem moored tanker and so the offloading facilities as well as the metering arrangements will be at the stern if the turret is near the bow.
  • 11. BUMI ARMARDA CLAIRE • Layout Considerations
  • 12. 2. Explain the features of an internal and external turret for a FPSO
  • 13. Turret Technology  Turret and swivel systems (allow n x 360 degrees rotation) has been the key technology for the deployment of FPSOs in all met-ocean environments  Turret allows vessel to weathervane – that is, to take up a position that aligns her heading towards the dominant forces of wave, wind and current.  Weathervaning has the effect of minimising environmental loads on the station keeping system, and minimises the most sensitive vessel motions – generally for a mono-hull – roll.  This has the effect of minimising disturbance to process equipment and personnel and maximising the facility uptime.
  • 14. Different Turret Types  Internal turrets  External turrets (forward of bow - normally)  Permanent or disconnectable  Yoke moored
  • 15. Internal Turret • An internal turret is convenient when a large number of risers are to be installed, and therefore a large turret and swivel assembly are required. • An internal position also reduces the risk of slamming due to the reduction of the effect of pitch. • Internal turrets can be used in deep waters and the most severe environments – up to 18 m significant wave height
  • 20. Internal Turrets Images courtesy of Bluewater Turntable Access Structure (alternative: Deckhouse) Swivel Stack Turntable Turret Casing / Moonpool Spider (bottom ship) (upper deck)
  • 21. Internal Turrets Images courtesy of Bluewater Casing/Moonpool Mooring Legs Spider Lower Radial Bearing Turret (with riser pipes) Main Roller Bearing
  • 22. Entry of risers and chains at bottom of Internal Turret
  • 23. External Turret • An external turret eliminates the CALM buoy and allows the turntable and swivels to be directly attached to the vessel bow or stern. • Suitable for deep waters and large wave heights – 12 m significant wave heights • Can be used up to the point where the combined heave and pitch motions may cause slamming on the bottom of the turret (depending on vessel size and length, up to approximately wave height).
  • 25. External turrets - Baobab Ivoirien FPSO, Baobab Oilfield (Ivory Coast) Images courtesy of Modec/Sofec  970 m water depth  8-leg polyester mooring  357,000 dwt tanker conversion  2.0 million bbls storage
  • 26. External turrets- FPSO Fluminense Brazil Images courtesy of Modec/Sofec  800 m water depth  357,000 dwt tanker conversion  1.2 million bbls storage
  • 27. External turrets - Cuulong MV9 FPSO, Su Tu Den Field (Vietnam) Images courtesy of Modec/Sofec
  • 28. Turntable- Typical Lay-out Includes for example:  Subsea Control Skids  Pipe headers  Control valves  Pig receivers  Pig launchers  Installation Winch  Images courtesy of Bluewater
  • 29. Yoke Mooring CNOOC Bohai Bay QHD32-6 FPSO (China) Kome Kribi FSO w/ Tower Yoke Mooring System Images courtesy of Modec/Sofec  66 ft water depth  New-build vessel  1.0 million bbls storage
  • 30. Disconnectable systems SBM’s External and Internal solutions External or Riser Turret Mooring Internal turret with disconnectable buoy Images courtesy of SBM
  • 31. The Riser Turret Mooring (RTM)  Cossack Pioneer  Location NW Shelf Australia  Vessel size: 152,000 Dwt  Topsides  115,000 bopd Images courtesy of SBM
  • 32. Disconnectable internal turret system APL’s STP system (Submerged Turret Point) Images courtesy of APL
  • 33. Disconnectable systems –Terra Nova Images courtesy of Modec/Sofec Turret Access Structure Upper Turret Lower Turret Spider Buoy Fluid Swivel Manifold System Upper Bearing Connector System Quick Connect/Disconnect (QC/DC) Connectors Lower Bearing
  • 35. Swivel systems  Swivel systems allow the transfer of:  Production fluids from the subsea equipment to the vessel  Export fluids from the vessel to the sub-sea infrastructure  Well/subsea management/control fluids e.g. methanol  Electrical signals for control and monitoring  Electrical power for driving subsea/down-hole equipment  Swivel systems allow n x 360 degrees rotation  Swivel manufacturers are pushing back the boundaries of pressure and temperature to:  ~400+ bar  ~120 ⁰C
  • 36. Various Deck Levels of Turret
  • 37. Swivel stack located on top of the turret Swivel stack (Anasuria)
  • 38. Swivel stack modules Images courtesy of Bluewater
  • 39. P37 Swivel stack Images courtesy of Bluewater
  • 40. Leadon FPSO stack Images courtesy of Framo Leadon power slip ring to be installed later when required (4 x 1 MW) Fluid paths Utilities
  • 41. Swivel stack located on top of the turret
  • 42. What is going on inside a swivel? Images courtesy of Bluewater
  • 43. What is going on inside a swivel? Images courtesy of Framo
  • 44. 45 What is going on inside a swivel? Stator Rotor Roller Bearing (3-race) Wiper Seal Dust/Grease Seal Outer Seal Backup Sliding Bearings Stator Rotor Roller Bearing (3-race) Wiper Seal Dust/Grease Seal Outer Seal Backup Sliding Bearings Images courtesy of Bluewater
  • 45. 3. Explain the considerations for deciding whether to use internal turret or external turret for a FPSO
  • 46. Internal Turret • An internal turret is convenient when a large number of risers are to be installed, and therefore a large turret and swivel assembly are required. • Internal turrets can be used in deep waters and the most severe environments – up to 18 m significant wave height • An internal position also reduces the risk of slamming due to the reduction of the effect of pitch. External Turret • An external turret eliminates the CALM buoy and allows the turntable and swivels to be directly attached to the vessel bow or stern. • Suitable for deep waters and large wave heights – 12 m significant wave heights • Can be used up to the point where the combined heave and pitch motions may cause slamming on the bottom of the turret (depending on vessel size and length, up to approximately wave height).
  • 47. 4. Explain how the internal turret may be placed along the length of a FPSO
  • 48. 4. Explain how the internal turret may be placed along the length of a FPSO Pg 5-10: • if the vessel is passive i.e. no Dynamic-Position (DP) thrusters or has a minimum thruster capacity, the internal turret is positioned within the first 25% of the vessel length from the bow in severe environments • if the vessel is active i.e. sufficient Dynamic-Position (DP) thruster capacity, the internal turret is positioned just forward of midships
  • 49. Key Questions 1. Explain the key considerations in the FPSO layout and design 2. Explain the features of an internal and external turret for a FPSO 3. Explain the considerations for deciding whether to use internal turret or external turret for a FPSO 4. Explain how the internal turret may be placed along the length of a FPSO