Measures to Minimize Energy Usage
     Our Focuses:


Solar -20 kW Photovoltaic system provide energy for the site

Wind-300 kW wind turbines provide energy on site


We can mimic the Queens Botanical Garden
and explore other measures to conserve energy:


 1-Ground-source heat pumps as a source for heating
 and cooling
 2-Large windows and 16’ ceilings increase daylighting
 3-Operable windows allow for cooling near
 summertime
 4-Modulating photoelectric daylight sensors
 5-Occupancy sensors
Budget Analysis
Phase 1: Assuming we get solar panels and two wind turbines donated and installed at least a
year before the harbor school moves into the site, we could generate up to $806,200 in profit
from energy sales to the grid. This would cover the cost of extending the pier to accommodate
the turbines.

Phase 2: To construct the first floor of the waterfront building, which houses all the necessary
student activities, we assume a square foot cost of $430. The building footprint is 6800 sq. ft.
which gives an estimated cost of $2.9 million. The actual cost may in fact be lower since the
new SPAT center will make use of the existing foundation and structure. This figure is above
the target budget of 2 million but revenue from the turbines and solar panels should bring it
within range.

Phase 3: The green roof will cost an estimated $78000, which combined with the cost of a
pool, aquariums, and additional remodeling on the second floor, will total around $1 million.
We hope, however, to get sponsorships for several of these features including the green roof
and pool.

Phase 4: We don’t have an estimate for the cost of the habitat restoration but it would include
demolition of the bulkhead, transport of raw materials, and labor. This phase would coincide
chronologically and programmatically with the West 8/Rogers-Marvel landscaping scheme for
Governors Island so it a financial collaboration is conceivable.
Team Spat
Team Spat
Team Spat
Team Spat
Team Spat

Mais conteúdo relacionado

Mais procurados

50 Mwe Concentrated Solar Power Plant (1)
50 Mwe Concentrated Solar Power Plant (1)50 Mwe Concentrated Solar Power Plant (1)
50 Mwe Concentrated Solar Power Plant (1)
VICTOR MANICKAM
 
Micro-Hydro Design Project
Micro-Hydro Design ProjectMicro-Hydro Design Project
Micro-Hydro Design Project
Michael Clarke
 
Caes gen presentation
Caes gen presentationCaes gen presentation
Caes gen presentation
LukeBatten
 
Caes projects worldwide
Caes projects worldwideCaes projects worldwide
Caes projects worldwide
LukeBatten
 

Mais procurados (20)

Gould - Thermal Energy Storage
Gould - Thermal Energy StorageGould - Thermal Energy Storage
Gould - Thermal Energy Storage
 
Concentrated Solar Power Plant
Concentrated Solar Power PlantConcentrated Solar Power Plant
Concentrated Solar Power Plant
 
Solar Thermal Energy: Parabolic Trough Technology versus Tower Technology
Solar Thermal Energy: Parabolic Trough Technology versus Tower TechnologySolar Thermal Energy: Parabolic Trough Technology versus Tower Technology
Solar Thermal Energy: Parabolic Trough Technology versus Tower Technology
 
Frier - Concentrating Solar Power
Frier - Concentrating Solar PowerFrier - Concentrating Solar Power
Frier - Concentrating Solar Power
 
50 Mwe Concentrated Solar Power Plant (1)
50 Mwe Concentrated Solar Power Plant (1)50 Mwe Concentrated Solar Power Plant (1)
50 Mwe Concentrated Solar Power Plant (1)
 
Renewable Energy and conventional power integration
Renewable Energy and conventional power integrationRenewable Energy and conventional power integration
Renewable Energy and conventional power integration
 
term paper
term paperterm paper
term paper
 
Owen Square Community Energy Project
Owen Square Community Energy ProjectOwen Square Community Energy Project
Owen Square Community Energy Project
 
A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.
 
Solar Compound parabolic collector
Solar Compound parabolic collectorSolar Compound parabolic collector
Solar Compound parabolic collector
 
Concentrated solar power
Concentrated solar powerConcentrated solar power
Concentrated solar power
 
Solar power tower
Solar power towerSolar power tower
Solar power tower
 
Central receiver power system
Central receiver power systemCentral receiver power system
Central receiver power system
 
Flüssigsalzbasierte Hochtemperaturwärmespeicher – die Schlüsseltechnologie fü...
Flüssigsalzbasierte Hochtemperaturwärmespeicher – die Schlüsseltechnologie fü...Flüssigsalzbasierte Hochtemperaturwärmespeicher – die Schlüsseltechnologie fü...
Flüssigsalzbasierte Hochtemperaturwärmespeicher – die Schlüsseltechnologie fü...
 
Conventional Power generation
Conventional Power generationConventional Power generation
Conventional Power generation
 
Micro-Hydro Design Project
Micro-Hydro Design ProjectMicro-Hydro Design Project
Micro-Hydro Design Project
 
Caes gen presentation
Caes gen presentationCaes gen presentation
Caes gen presentation
 
Thermal Energy
Thermal EnergyThermal Energy
Thermal Energy
 
Caes projects worldwide
Caes projects worldwideCaes projects worldwide
Caes projects worldwide
 
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...
 

Destaque (10)

The Faces Of Global Camps Africa
The Faces Of Global Camps AfricaThe Faces Of Global Camps Africa
The Faces Of Global Camps Africa
 
Bichos
BichosBichos
Bichos
 
Team GIRAFFE
Team GIRAFFETeam GIRAFFE
Team GIRAFFE
 
Team Monkeys
Team MonkeysTeam Monkeys
Team Monkeys
 
Cloud os vision
Cloud os visionCloud os vision
Cloud os vision
 
2011 t1 workshop
2011 t1 workshop2011 t1 workshop
2011 t1 workshop
 
Taringa Revista 7 Pdf
Taringa Revista 7 PdfTaringa Revista 7 Pdf
Taringa Revista 7 Pdf
 
Bc Dc Oh
Bc Dc OhBc Dc Oh
Bc Dc Oh
 
Podcast Learning@School
Podcast Learning@SchoolPodcast Learning@School
Podcast Learning@School
 
Team Merc
Team MercTeam Merc
Team Merc
 

Semelhante a Team Spat

SHB+ALP_Poster
SHB+ALP_PosterSHB+ALP_Poster
SHB+ALP_Poster
Anna Pleto
 
Solar Power: Solar Heating, Photovoltaics, and Solar Thermal Power
Solar Power: Solar Heating, Photovoltaics, and Solar Thermal PowerSolar Power: Solar Heating, Photovoltaics, and Solar Thermal Power
Solar Power: Solar Heating, Photovoltaics, and Solar Thermal Power
Toni Menninger
 

Semelhante a Team Spat (20)

Solar Power
Solar PowerSolar Power
Solar Power
 
Concentrating Solar Power
Concentrating Solar PowerConcentrating Solar Power
Concentrating Solar Power
 
Photovoltaic Project
Photovoltaic ProjectPhotovoltaic Project
Photovoltaic Project
 
Photovoltaic Project
Photovoltaic ProjectPhotovoltaic Project
Photovoltaic Project
 
Development of an inexpensive data logger for solar water heating system regu...
Development of an inexpensive data logger for solar water heating system regu...Development of an inexpensive data logger for solar water heating system regu...
Development of an inexpensive data logger for solar water heating system regu...
 
118910007-Solar-Collectors.ppt
118910007-Solar-Collectors.ppt118910007-Solar-Collectors.ppt
118910007-Solar-Collectors.ppt
 
Benefits of csp with thermal storage
Benefits of csp with thermal storageBenefits of csp with thermal storage
Benefits of csp with thermal storage
 
concentrated solar power technology - csp
concentrated solar power technology - cspconcentrated solar power technology - csp
concentrated solar power technology - csp
 
Concentrating solar power
Concentrating solar powerConcentrating solar power
Concentrating solar power
 
SHB+ALP_Poster
SHB+ALP_PosterSHB+ALP_Poster
SHB+ALP_Poster
 
Renewable Energy
Renewable EnergyRenewable Energy
Renewable Energy
 
Solar energy presentation
Solar energy presentationSolar energy presentation
Solar energy presentation
 
Newport Collaborative Architects
Newport Collaborative Architects Newport Collaborative Architects
Newport Collaborative Architects
 
Irrigation water production1
Irrigation water production1Irrigation water production1
Irrigation water production1
 
Proposal snowflake ski basin case
Proposal snowflake ski basin caseProposal snowflake ski basin case
Proposal snowflake ski basin case
 
Solar Power: Solar Heating, Photovoltaics, and Solar Thermal Power
Solar Power: Solar Heating, Photovoltaics, and Solar Thermal PowerSolar Power: Solar Heating, Photovoltaics, and Solar Thermal Power
Solar Power: Solar Heating, Photovoltaics, and Solar Thermal Power
 
Solar for the home installation and maintenance-20161
Solar for the home installation and maintenance-20161Solar for the home installation and maintenance-20161
Solar for the home installation and maintenance-20161
 
IRJET- Rankine Cycle Coupled with Heliostat Solar Receiver; A Review
IRJET- Rankine Cycle Coupled with Heliostat Solar Receiver; A ReviewIRJET- Rankine Cycle Coupled with Heliostat Solar Receiver; A Review
IRJET- Rankine Cycle Coupled with Heliostat Solar Receiver; A Review
 
SOLAR MISSION
SOLAR MISSION SOLAR MISSION
SOLAR MISSION
 
Martin Orio - Water Energy - Ground source heat pump growth opportunities in ...
Martin Orio - Water Energy - Ground source heat pump growth opportunities in ...Martin Orio - Water Energy - Ground source heat pump growth opportunities in ...
Martin Orio - Water Energy - Ground source heat pump growth opportunities in ...
 

Último

Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
HyderabadDolls
 
Resume all my skills and educations and achievement
Resume all my skills and educations and  achievement Resume all my skills and educations and  achievement
Resume all my skills and educations and achievement
210303105569
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
awasv46j
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora Agency
Isadora Agency
 
cholilithiasis, cholecystitis,gall bladdder .pdf
cholilithiasis, cholecystitis,gall bladdder .pdfcholilithiasis, cholecystitis,gall bladdder .pdf
cholilithiasis, cholecystitis,gall bladdder .pdf
RawalRafiqLeghari
 
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
nirzagarg
 
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
gajnagarg
 
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
nirzagarg
 
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
wpkuukw
 

Último (20)

Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
 
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
 
Kondapur ] High Profile Call Girls in Hyderabad (Adult Only) 9352988975 Escor...
Kondapur ] High Profile Call Girls in Hyderabad (Adult Only) 9352988975 Escor...Kondapur ] High Profile Call Girls in Hyderabad (Adult Only) 9352988975 Escor...
Kondapur ] High Profile Call Girls in Hyderabad (Adult Only) 9352988975 Escor...
 
Resume all my skills and educations and achievement
Resume all my skills and educations and  achievement Resume all my skills and educations and  achievement
Resume all my skills and educations and achievement
 
Aminabad * High Profile Escorts Service in Lucknow Phone No 9548273370 Elite ...
Aminabad * High Profile Escorts Service in Lucknow Phone No 9548273370 Elite ...Aminabad * High Profile Escorts Service in Lucknow Phone No 9548273370 Elite ...
Aminabad * High Profile Escorts Service in Lucknow Phone No 9548273370 Elite ...
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
 
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service AvailableCall Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora Agency
 
cholilithiasis, cholecystitis,gall bladdder .pdf
cholilithiasis, cholecystitis,gall bladdder .pdfcholilithiasis, cholecystitis,gall bladdder .pdf
cholilithiasis, cholecystitis,gall bladdder .pdf
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
 
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKLANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
 
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
 
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
 
How to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfHow to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdf
 
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
 
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
 
Essential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive GuideEssential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive Guide
 
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
 
Dahisar Comfortable Call Girls ,09167354423,Mira Road Model Call Girls
Dahisar Comfortable Call Girls ,09167354423,Mira Road Model Call GirlsDahisar Comfortable Call Girls ,09167354423,Mira Road Model Call Girls
Dahisar Comfortable Call Girls ,09167354423,Mira Road Model Call Girls
 
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
 

Team Spat

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10. Measures to Minimize Energy Usage Our Focuses: Solar -20 kW Photovoltaic system provide energy for the site Wind-300 kW wind turbines provide energy on site We can mimic the Queens Botanical Garden and explore other measures to conserve energy: 1-Ground-source heat pumps as a source for heating and cooling 2-Large windows and 16’ ceilings increase daylighting 3-Operable windows allow for cooling near summertime 4-Modulating photoelectric daylight sensors 5-Occupancy sensors
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16. Budget Analysis Phase 1: Assuming we get solar panels and two wind turbines donated and installed at least a year before the harbor school moves into the site, we could generate up to $806,200 in profit from energy sales to the grid. This would cover the cost of extending the pier to accommodate the turbines. Phase 2: To construct the first floor of the waterfront building, which houses all the necessary student activities, we assume a square foot cost of $430. The building footprint is 6800 sq. ft. which gives an estimated cost of $2.9 million. The actual cost may in fact be lower since the new SPAT center will make use of the existing foundation and structure. This figure is above the target budget of 2 million but revenue from the turbines and solar panels should bring it within range. Phase 3: The green roof will cost an estimated $78000, which combined with the cost of a pool, aquariums, and additional remodeling on the second floor, will total around $1 million. We hope, however, to get sponsorships for several of these features including the green roof and pool. Phase 4: We don’t have an estimate for the cost of the habitat restoration but it would include demolition of the bulkhead, transport of raw materials, and labor. This phase would coincide chronologically and programmatically with the West 8/Rogers-Marvel landscaping scheme for Governors Island so it a financial collaboration is conceivable.