OWNERSHIP COST
OF
CONSTRUCTION PLANT & EQUIPMENT

Kumar Gyanendra Mohan
www.constructionmechanizer.com
Introduction
 Construction equipment is one of the
biggest investments carried by
construction industry.
 Knowledge about owning cost and
operating cost is must before equipment
mobilization.
 Also, monitoring of actual operating and
owning cost of equipment on regular
basis is necessary for optimum
profitability.
www.constructionmechanizer.com
Introduction
 Owning cost and operating cost of
equipment has significant impact on
profitability of work executed.
 Owning and operating cost, need to be
calculated based on the financial
investment terms and condition,
depreciation method and operating
condition of equipment.
 OEM recommendation can be considered
for calculating owning and operating cost.
www.constructionmechanizer.com
Introduction
 Ownership and operating costs of
work need to be calculated based
on
1. units of work production per hour (ton/hr or
cum3/hr etc),
2. cost per hour (Rs./hr etc), or
3. unit cost (Rs./ton or Rs./cum)

 Establishing
the
unit
cost
is
especially useful as it can compare
dissimilar machines.
www.constructionmechanizer.com
Introduction
 The
ownership
costs
of
construction plant & equipment
can be categorized into
1.Fixed cost,
2.Variable cost, and
3.Employee cost
www.constructionmechanizer.com
Fixed Cost
Fixed costs are those which can be
predetermined as accumulating with
the passage of time, rather than with
the rate of work.
We need to pay these costs
regardless of weather the equipment
is used or not.
www.constructionmechanizer.com
Fixed Cost
 Commonly included in fixed costs
are
1.equipment depreciation,
2.interest on investment,
3.taxes,
4.storage and protection, and
5.insurance.

 Fixed costs of equipment are the
result of procurement and vanish
when it is sold.
www.constructionmechanizer.com
Variable Cost
 Variable costs incurred only when the machine
is put to work. These costs include the
1.costs of fuel,
2.lubricants,
3.wear parts,
4.equipment maintenance and repairs.
 Operating cost depends largely on the way
machine is operated (operator skill).
 Proper maintenance also play’s vital role in
operating cost.
www.constructionmechanizer.com
Employee Cost
 Employee
costs
are
those
costs
associated with employing people for
 operation,
 maintenance, and
 supervision.
 employee cost includes:
 direct wages,
 food contributions,
 transport,
 social costs,
 health and retirement, incentive.
www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
A. Purchase price (inc. options,
delivery & set up costs). Often these
are the cost known with certainty.
B. Wear parts cost: It cost of wear parts,
tires, tracks or ground engaging tool.
Wear parts, tires, tracks or ground
engaging tool are operating costs.

www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
C. Economic Life: This is the period over
which the equipment can be operated at an
acceptable operating cost and productivity.
The economic life is generally measured in
terms of years, hours, or kilometers.
D. Ownership period: The intended period
of the machine to be utilized by owner.
This can be based on economic life or
physical life, or a compromise of the two.
www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
E. Residual value: The future market
value of the machine - discounted back
to a present value. Estimate of realizable
value for disposal of equipment.
F. Depreciation Time: The intended
period of the machine over which
depreciation is divided. This can be
based on economic life or physical life,
or a compromise of the two.
www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
G. Annual depreciation cost: This is
calculated by deducting the residual value
from the purchase price and dividing the
remaining amount by the no. of years the
machine is to be kept or any other
depreciation method selected by owner.
H. Interest rate: Interest rate is used to
work out the cost of capital. (Can vary
depending on whether own funds are used
or borrowings).
www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
I. Interest Cost: Calculation of interest
cost based on average annual value.
J. Machine tax: Many equipment owners
must pay taxes or some type of usage
tax on equipment.
K. Machine tax cost: Taxes can be
calculated by either using the estimated
tax rate multiplied by the actual value of
the equipment or by multiplying the tax
rate by the average annual investment.
www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
L. Insurance costs (annual): Most private
equipment owners will have one or more
insurance policies against damage, fire,
and other destructive events.
M. Storage and Protection Cost: Costs for
equipment storage and off-duty protection
are fixed costs, largely independent of the
hours of use. Costs of storage and
protection must be spread over the total
hours of equipment use.
www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
N. Fuel cost (e.g. Rs. per liter): Assume the
present cost of fuel - as it can vary wildly over
the lifetime of a machine and is almost
impossible to predict accurately.
O. Fuel consumption per hour: Based on
engine power, application, environment,
operator skill/commitment, machine design,
load factor.
P. Cost of Major Overhaul: It is major overhaul
cost of equipment. It is depend on usages,
operator skill, working condition etc.
www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
Q. Life time of Major Overhaul: It is
lifetime of major overhaul, usually
expressed in year, hour, and kilometer. It
is depend on usages, operator skill,
working condition etc.
R. Planned maintenance cost: It is planned
regular maintenance to prevent failure,
preventive maintenance including material,
maintenance manpower, travel time and
mileage. It is depend on usages, operator
skill, working condition etc.
www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
S. Life time of planned maintenance: It
is lifetime of planned maintenance,
usually expressed in year, hour, and
kilometer. It is depend on usages,
operator skill, working condition etc.
T. Cost of Wear Parts: It is major wear
parts of equipment. It is depend on
usages, operator skill, working condition
etc.
www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
U. Life time of Wear Parts: It is lifetime of
wear parts, usually expressed in year, hour,
and kilometer. It is depend on usages,
operator skill, working condition etc.
V. Lubricants: These include engine oil,
transmission oil, final drive oil, grease and
filters. The replacement interval varies with
the type of equipment, environmental working
condition (temperature), the design of the
equipment and the level of maintenance. This
is based on OEM recommendation.
www.constructionmechanizer.com
A to Z Element for
calculation of Ownership Cost
W. Lubricant Interval: This is to be
calculated based on OEM recommendation.
X. Lubricant Cost: This is cost of lubricant
per litre.
Y. Operator Cost: It is operator salary
including facility as per method of
employment.
Z. Operating Hours: It is planned operating
hours of equipment on annual basis.
www.constructionmechanizer.com
Calculation of
Ownership Cost & Operating Cost

.

www.constructionmechanizer.com
Calculation of
Ownership Cost & Operating Cost

.

www.constructionmechanizer.com
Calculation of
Ownership Cost & Operating Cost

.

www.constructionmechanizer.com
Thought of

Construction Mechanizer

www.constructionmechanizer.com
Thought of

Construction Mechanizer

www.constructionmechanizer.com
THANK YOU

Web Site: www.constructionmechanizer.com
Email: constructionmechanizer@gmail.com
info@constructionmechanizer.com

www.constructionmechanizer.com

Mais conteúdo relacionado

Mais procurados

Job layout per
Job layout perJob layout per
Job layout perraj balar
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & managementManit Agarwal
 
PPT on Construction Costing
PPT on Construction CostingPPT on Construction Costing
PPT on Construction CostingManish Kandpal
 
Estimation and Costing
Estimation and Costing Estimation and Costing
Estimation and Costing Vijay325
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training pptSumit Singh
 
Repair & Rehabilitation of Structures
Repair & Rehabilitation of StructuresRepair & Rehabilitation of Structures
Repair & Rehabilitation of StructuresRamanuj Jaldhari
 
Construction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationConstruction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationSagar Radadiya
 
Purpose and importance of estimate
Purpose and importance of estimatePurpose and importance of estimate
Purpose and importance of estimateArpit Sethia
 
Estimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionEstimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionAshwiniChaudhari13
 
CONSTRUCTION EQUIPMENTS
CONSTRUCTION EQUIPMENTSCONSTRUCTION EQUIPMENTS
CONSTRUCTION EQUIPMENTSshalz_singh
 
Earth work equipment
Earth work equipmentEarth work equipment
Earth work equipmentswetha110
 
Estimating part 2
Estimating part 2Estimating part 2
Estimating part 2ArunRavi43
 
CONSTRUCTION METHODS BASICS BTCE-503-18
CONSTRUCTION METHODS BASICSBTCE-503-18CONSTRUCTION METHODS BASICSBTCE-503-18
CONSTRUCTION METHODS BASICS BTCE-503-18SANJEEV Wazir
 

Mais procurados (20)

Construction equipment
Construction equipmentConstruction equipment
Construction equipment
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 
Earthwork and excavation
Earthwork  and  excavationEarthwork  and  excavation
Earthwork and excavation
 
Job layout per
Job layout perJob layout per
Job layout per
 
Types of estimates
Types of estimatesTypes of estimates
Types of estimates
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & management
 
Demolition of buildings
Demolition of buildingsDemolition of buildings
Demolition of buildings
 
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
 
PPT on Construction Costing
PPT on Construction CostingPPT on Construction Costing
PPT on Construction Costing
 
Estimation and Costing
Estimation and Costing Estimation and Costing
Estimation and Costing
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training ppt
 
Repair & Rehabilitation of Structures
Repair & Rehabilitation of StructuresRepair & Rehabilitation of Structures
Repair & Rehabilitation of Structures
 
Construction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationConstruction equipments - Introduction and Classification
Construction equipments - Introduction and Classification
 
Purpose and importance of estimate
Purpose and importance of estimatePurpose and importance of estimate
Purpose and importance of estimate
 
Estimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionEstimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provision
 
Estimating & Costing - I
Estimating & Costing - IEstimating & Costing - I
Estimating & Costing - I
 
CONSTRUCTION EQUIPMENTS
CONSTRUCTION EQUIPMENTSCONSTRUCTION EQUIPMENTS
CONSTRUCTION EQUIPMENTS
 
Earth work equipment
Earth work equipmentEarth work equipment
Earth work equipment
 
Estimating part 2
Estimating part 2Estimating part 2
Estimating part 2
 
CONSTRUCTION METHODS BASICS BTCE-503-18
CONSTRUCTION METHODS BASICSBTCE-503-18CONSTRUCTION METHODS BASICSBTCE-503-18
CONSTRUCTION METHODS BASICS BTCE-503-18
 

Destaque

CIVIL ENGINEER TO ENTREPRENEUR
CIVIL ENGINEER TO ENTREPRENEURCIVIL ENGINEER TO ENTREPRENEUR
CIVIL ENGINEER TO ENTREPRENEURsvu tirupati
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 
Types of contract
Types of contractTypes of contract
Types of contractSweetp999
 
AI and Machine Learning Demystified by Carol Smith at Midwest UX 2017
AI and Machine Learning Demystified by Carol Smith at Midwest UX 2017AI and Machine Learning Demystified by Carol Smith at Midwest UX 2017
AI and Machine Learning Demystified by Carol Smith at Midwest UX 2017Carol Smith
 

Destaque (7)

CIVIL ENGINEER TO ENTREPRENEUR
CIVIL ENGINEER TO ENTREPRENEURCIVIL ENGINEER TO ENTREPRENEUR
CIVIL ENGINEER TO ENTREPRENEUR
 
Vision of construction mechanizer
Vision of construction mechanizerVision of construction mechanizer
Vision of construction mechanizer
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Types of conract
Types of conractTypes of conract
Types of conract
 
Types of contract
Types of contractTypes of contract
Types of contract
 
Idea[1]generation.ppt
Idea[1]generation.pptIdea[1]generation.ppt
Idea[1]generation.ppt
 
AI and Machine Learning Demystified by Carol Smith at Midwest UX 2017
AI and Machine Learning Demystified by Carol Smith at Midwest UX 2017AI and Machine Learning Demystified by Carol Smith at Midwest UX 2017
AI and Machine Learning Demystified by Carol Smith at Midwest UX 2017
 

Semelhante a OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT

Construction equipment need and factors-nrc
Construction equipment need and factors-nrcConstruction equipment need and factors-nrc
Construction equipment need and factors-nrcnarayanch1979
 
Operating costing m.com part 1 project
Operating costing m.com part 1 projectOperating costing m.com part 1 project
Operating costing m.com part 1 projectafukhan
 
Operation costing
Operation costingOperation costing
Operation costingKushal
 
POWER PLANT ECONOMICS AND ENVIRONMENTAL CONSIDERATIONS - SNIST
POWER  PLANT  ECONOMICS AND ENVIRONMENTAL  CONSIDERATIONS - SNISTPOWER  PLANT  ECONOMICS AND ENVIRONMENTAL  CONSIDERATIONS - SNIST
POWER PLANT ECONOMICS AND ENVIRONMENTAL CONSIDERATIONS - SNISTS.Vijaya Bhaskar
 
Economic consideration
Economic considerationEconomic consideration
Economic considerationMalavika M R
 
maintenance cost,approximate estimation,unit bay method
maintenance cost,approximate estimation,unit bay methodmaintenance cost,approximate estimation,unit bay method
maintenance cost,approximate estimation,unit bay methodNithin Thomas Alex
 
Photovoltaic Training Course - Module 4.1 - Importance of maintenance
Photovoltaic Training Course - Module 4.1 - Importance of maintenancePhotovoltaic Training Course - Module 4.1 - Importance of maintenance
Photovoltaic Training Course - Module 4.1 - Importance of maintenanceLeonardo ENERGY
 
Lecture -4.pptxTender & Tender Notice bfh
Lecture -4.pptxTender & Tender Notice bfhLecture -4.pptxTender & Tender Notice bfh
Lecture -4.pptxTender & Tender Notice bfh2cd
 
Workshop Accounts Smriti Rao pdf (1).pdf
Workshop Accounts Smriti Rao pdf (1).pdfWorkshop Accounts Smriti Rao pdf (1).pdf
Workshop Accounts Smriti Rao pdf (1).pdfpoderalo
 
ENGG ppt for exam by Achala Madam.ppt
ENGG ppt for exam by Achala Madam.pptENGG ppt for exam by Achala Madam.ppt
ENGG ppt for exam by Achala Madam.pptRupeshSingh438828
 

Semelhante a OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT (20)

Construction equipment need and factors-nrc
Construction equipment need and factors-nrcConstruction equipment need and factors-nrc
Construction equipment need and factors-nrc
 
Sneha
SnehaSneha
Sneha
 
Operating costing m.com part 1 project
Operating costing m.com part 1 projectOperating costing m.com part 1 project
Operating costing m.com part 1 project
 
Operation costing
Operation costingOperation costing
Operation costing
 
CH 1.pptx
CH 1.pptxCH 1.pptx
CH 1.pptx
 
Construction Equipment used in construction projects
Construction Equipment used in construction projectsConstruction Equipment used in construction projects
Construction Equipment used in construction projects
 
Unit 6 A Construction Equipments for civil engineering.pdf
Unit 6 A Construction Equipments for civil engineering.pdfUnit 6 A Construction Equipments for civil engineering.pdf
Unit 6 A Construction Equipments for civil engineering.pdf
 
POWER PLANT ECONOMICS AND ENVIRONMENTAL CONSIDERATIONS - SNIST
POWER  PLANT  ECONOMICS AND ENVIRONMENTAL  CONSIDERATIONS - SNISTPOWER  PLANT  ECONOMICS AND ENVIRONMENTAL  CONSIDERATIONS - SNIST
POWER PLANT ECONOMICS AND ENVIRONMENTAL CONSIDERATIONS - SNIST
 
Economic consideration
Economic considerationEconomic consideration
Economic consideration
 
Rate analysis brief
Rate analysis briefRate analysis brief
Rate analysis brief
 
maintenance cost,approximate estimation,unit bay method
maintenance cost,approximate estimation,unit bay methodmaintenance cost,approximate estimation,unit bay method
maintenance cost,approximate estimation,unit bay method
 
Depreciation 1
Depreciation 1Depreciation 1
Depreciation 1
 
Photovoltaic Training Course - Module 4.1 - Importance of maintenance
Photovoltaic Training Course - Module 4.1 - Importance of maintenancePhotovoltaic Training Course - Module 4.1 - Importance of maintenance
Photovoltaic Training Course - Module 4.1 - Importance of maintenance
 
Warranty
WarrantyWarranty
Warranty
 
Unit 5 or
Unit 5 orUnit 5 or
Unit 5 or
 
Cost concepts
Cost conceptsCost concepts
Cost concepts
 
Lecture -4.pptxTender & Tender Notice bfh
Lecture -4.pptxTender & Tender Notice bfhLecture -4.pptxTender & Tender Notice bfh
Lecture -4.pptxTender & Tender Notice bfh
 
Workshop Accounts Smriti Rao pdf (1).pdf
Workshop Accounts Smriti Rao pdf (1).pdfWorkshop Accounts Smriti Rao pdf (1).pdf
Workshop Accounts Smriti Rao pdf (1).pdf
 
Machine hour rate
Machine hour rateMachine hour rate
Machine hour rate
 
ENGG ppt for exam by Achala Madam.ppt
ENGG ppt for exam by Achala Madam.pptENGG ppt for exam by Achala Madam.ppt
ENGG ppt for exam by Achala Madam.ppt
 

Último

👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 

Último (20)

👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 

OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT

  • 1. OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT Kumar Gyanendra Mohan www.constructionmechanizer.com
  • 2. Introduction  Construction equipment is one of the biggest investments carried by construction industry.  Knowledge about owning cost and operating cost is must before equipment mobilization.  Also, monitoring of actual operating and owning cost of equipment on regular basis is necessary for optimum profitability. www.constructionmechanizer.com
  • 3. Introduction  Owning cost and operating cost of equipment has significant impact on profitability of work executed.  Owning and operating cost, need to be calculated based on the financial investment terms and condition, depreciation method and operating condition of equipment.  OEM recommendation can be considered for calculating owning and operating cost. www.constructionmechanizer.com
  • 4. Introduction  Ownership and operating costs of work need to be calculated based on 1. units of work production per hour (ton/hr or cum3/hr etc), 2. cost per hour (Rs./hr etc), or 3. unit cost (Rs./ton or Rs./cum)  Establishing the unit cost is especially useful as it can compare dissimilar machines. www.constructionmechanizer.com
  • 5. Introduction  The ownership costs of construction plant & equipment can be categorized into 1.Fixed cost, 2.Variable cost, and 3.Employee cost www.constructionmechanizer.com
  • 6. Fixed Cost Fixed costs are those which can be predetermined as accumulating with the passage of time, rather than with the rate of work. We need to pay these costs regardless of weather the equipment is used or not. www.constructionmechanizer.com
  • 7. Fixed Cost  Commonly included in fixed costs are 1.equipment depreciation, 2.interest on investment, 3.taxes, 4.storage and protection, and 5.insurance.  Fixed costs of equipment are the result of procurement and vanish when it is sold. www.constructionmechanizer.com
  • 8. Variable Cost  Variable costs incurred only when the machine is put to work. These costs include the 1.costs of fuel, 2.lubricants, 3.wear parts, 4.equipment maintenance and repairs.  Operating cost depends largely on the way machine is operated (operator skill).  Proper maintenance also play’s vital role in operating cost. www.constructionmechanizer.com
  • 9. Employee Cost  Employee costs are those costs associated with employing people for  operation,  maintenance, and  supervision.  employee cost includes:  direct wages,  food contributions,  transport,  social costs,  health and retirement, incentive. www.constructionmechanizer.com
  • 10. A to Z Element for calculation of Ownership Cost A. Purchase price (inc. options, delivery & set up costs). Often these are the cost known with certainty. B. Wear parts cost: It cost of wear parts, tires, tracks or ground engaging tool. Wear parts, tires, tracks or ground engaging tool are operating costs. www.constructionmechanizer.com
  • 11. A to Z Element for calculation of Ownership Cost C. Economic Life: This is the period over which the equipment can be operated at an acceptable operating cost and productivity. The economic life is generally measured in terms of years, hours, or kilometers. D. Ownership period: The intended period of the machine to be utilized by owner. This can be based on economic life or physical life, or a compromise of the two. www.constructionmechanizer.com
  • 12. A to Z Element for calculation of Ownership Cost E. Residual value: The future market value of the machine - discounted back to a present value. Estimate of realizable value for disposal of equipment. F. Depreciation Time: The intended period of the machine over which depreciation is divided. This can be based on economic life or physical life, or a compromise of the two. www.constructionmechanizer.com
  • 13. A to Z Element for calculation of Ownership Cost G. Annual depreciation cost: This is calculated by deducting the residual value from the purchase price and dividing the remaining amount by the no. of years the machine is to be kept or any other depreciation method selected by owner. H. Interest rate: Interest rate is used to work out the cost of capital. (Can vary depending on whether own funds are used or borrowings). www.constructionmechanizer.com
  • 14. A to Z Element for calculation of Ownership Cost I. Interest Cost: Calculation of interest cost based on average annual value. J. Machine tax: Many equipment owners must pay taxes or some type of usage tax on equipment. K. Machine tax cost: Taxes can be calculated by either using the estimated tax rate multiplied by the actual value of the equipment or by multiplying the tax rate by the average annual investment. www.constructionmechanizer.com
  • 15. A to Z Element for calculation of Ownership Cost L. Insurance costs (annual): Most private equipment owners will have one or more insurance policies against damage, fire, and other destructive events. M. Storage and Protection Cost: Costs for equipment storage and off-duty protection are fixed costs, largely independent of the hours of use. Costs of storage and protection must be spread over the total hours of equipment use. www.constructionmechanizer.com
  • 16. A to Z Element for calculation of Ownership Cost N. Fuel cost (e.g. Rs. per liter): Assume the present cost of fuel - as it can vary wildly over the lifetime of a machine and is almost impossible to predict accurately. O. Fuel consumption per hour: Based on engine power, application, environment, operator skill/commitment, machine design, load factor. P. Cost of Major Overhaul: It is major overhaul cost of equipment. It is depend on usages, operator skill, working condition etc. www.constructionmechanizer.com
  • 17. A to Z Element for calculation of Ownership Cost Q. Life time of Major Overhaul: It is lifetime of major overhaul, usually expressed in year, hour, and kilometer. It is depend on usages, operator skill, working condition etc. R. Planned maintenance cost: It is planned regular maintenance to prevent failure, preventive maintenance including material, maintenance manpower, travel time and mileage. It is depend on usages, operator skill, working condition etc. www.constructionmechanizer.com
  • 18. A to Z Element for calculation of Ownership Cost S. Life time of planned maintenance: It is lifetime of planned maintenance, usually expressed in year, hour, and kilometer. It is depend on usages, operator skill, working condition etc. T. Cost of Wear Parts: It is major wear parts of equipment. It is depend on usages, operator skill, working condition etc. www.constructionmechanizer.com
  • 19. A to Z Element for calculation of Ownership Cost U. Life time of Wear Parts: It is lifetime of wear parts, usually expressed in year, hour, and kilometer. It is depend on usages, operator skill, working condition etc. V. Lubricants: These include engine oil, transmission oil, final drive oil, grease and filters. The replacement interval varies with the type of equipment, environmental working condition (temperature), the design of the equipment and the level of maintenance. This is based on OEM recommendation. www.constructionmechanizer.com
  • 20. A to Z Element for calculation of Ownership Cost W. Lubricant Interval: This is to be calculated based on OEM recommendation. X. Lubricant Cost: This is cost of lubricant per litre. Y. Operator Cost: It is operator salary including facility as per method of employment. Z. Operating Hours: It is planned operating hours of equipment on annual basis. www.constructionmechanizer.com
  • 21. Calculation of Ownership Cost & Operating Cost . www.constructionmechanizer.com
  • 22. Calculation of Ownership Cost & Operating Cost . www.constructionmechanizer.com
  • 23. Calculation of Ownership Cost & Operating Cost . www.constructionmechanizer.com
  • 26. THANK YOU Web Site: www.constructionmechanizer.com Email: constructionmechanizer@gmail.com info@constructionmechanizer.com www.constructionmechanizer.com