Bathroom Renovation Carpenter Plan and Prepare
Preliminaries
Particulars Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Day 9 Day 10 Day 11
Contact Client
Asbestos
Site Services
Rubbish
Electrician
Plumber
Materials
PC item
Materials Storage
Site Toilet
Client Bathroom
Plasterer
Waterproofing
Tiler
Joiner
Electrician
Plumber
Painter
Shower Screen
Carpenter
Organise Carpentry Tasks page 1
Task Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Day 9 Day 10 Day 11
Carpenter
Carpenter
Carpenter
Carpenter
Carpenter
Carpenter
Carpenter
Carpenter
Electrician
Plumber
Carpenter
Carpenter
Carpenter
Carpenter
Carpenter
Plasterer
Carpenter
Waterproofing
Electrician
Tiler
Tiler
Carpenter
Tiler
Shower screen
i ll
Carpenter
Plumber
Carpenter
Electrician
Painter
Shower screen
i ll
Carpenter
Carpenter
Carpenter
Tasks
Notify start day
Notify start day
Notify start day
Notify start day
wet seal
Tidy up for client return. call plumber
book in fit off and shower screen
installer for site measure
Site measure
Tiler walls
Architraves window &door
Tile floor
Beds shower base and floor
Install under-tile heating
Install shower screen and mirrors
Paint ceiling architrave reveals, door
Fit off
Towel rails, fixtures and fittings
including mirror
Fit off
Fit vanity
Sheet ceiling/walls
Call electrician confirm under tile
heating install and fit off
Install Tile underlay over existing floor
Set joins Plasterboard ceiling villa
board walls ensure plasterer uses wet
area base coat to walls
Hand over to builder to inspect
Silicone
Clean and detail
Notify start day
Notify start day
Notify start day
Rough in
Rough in
Tidy ready for client/ call plasterer for
day 5
Batten ceiling ensure battens don’t
coincide with downlight or exhaust fan
positions
Clean and vacuum dust from
framework prior to sheeting
Mark out Position of services prior to
sheeting Insulate ceiling/walls
Organise from stock & cut temporary
floor covering , drop sheets &
temporary wall & door protection
Tentatively book day 3 morning
plumber afternoon electrician
Strip out existing Bathroom Remove
rubbish as you go. Remove to skip
Make good De-nail /remove and
replace bad frame/floor
Pre sheet
Block, trimmers for fixtures
Install ducting for exhaust fan to
eaves.
Tidy ready for client
Confirm electrician & plumber for
rough in
Ensure all PC items are onsite prior to
starting
Arrange with client an appropriate
storage area
Order /client
Prepare for portable bathroom i
Notify start day
Arrangements
Confirm Start date
- Schedule
- What to expect ie dust, noise,
household disruption
-Temp bathroom and toilet facilities
Check with builder That existing FC
sheeting has been tested and clear of
asbestos
Identify and locate Electrical switch
board and main switch, Locate water
main and check it works correctly,
Locate gas main and bidcock prior to
starting.
Organise site skip
Make Safe for demolition
Cap off plumbing and drainage prior to
demolition

Mais conteúdo relacionado

Semelhante a Bathroom Renovation Student Gant Chart.pdf

Tips To Follow Before Moving Into Your Pg.pdf
Tips To Follow Before Moving Into Your Pg.pdfTips To Follow Before Moving Into Your Pg.pdf
Tips To Follow Before Moving Into Your Pg.pdf
GetSetHome
 
Indoor environmental-quality-in-healthcare (3)
Indoor environmental-quality-in-healthcare (3)Indoor environmental-quality-in-healthcare (3)
Indoor environmental-quality-in-healthcare (3)
Yong Sy
 
Swimming Pool and SpaRisk Assessment Project Objective1Ver.docx
Swimming Pool and SpaRisk Assessment Project Objective1Ver.docxSwimming Pool and SpaRisk Assessment Project Objective1Ver.docx
Swimming Pool and SpaRisk Assessment Project Objective1Ver.docx
mattinsonjanel
 
HLB Maintenance Brochure
HLB Maintenance BrochureHLB Maintenance Brochure
HLB Maintenance Brochure
Tony Feleppa
 

Semelhante a Bathroom Renovation Student Gant Chart.pdf (20)

What to ask During a New Home Walk-Through
What to ask During a New Home Walk-ThroughWhat to ask During a New Home Walk-Through
What to ask During a New Home Walk-Through
 
Maintenance residential property chart
Maintenance residential property chartMaintenance residential property chart
Maintenance residential property chart
 
Home Remodeling & Renovation - Hidden Mistakes & Surprises
Home Remodeling & Renovation - Hidden Mistakes & SurprisesHome Remodeling & Renovation - Hidden Mistakes & Surprises
Home Remodeling & Renovation - Hidden Mistakes & Surprises
 
Tips To Follow Before Moving Into Your Pg.pdf
Tips To Follow Before Moving Into Your Pg.pdfTips To Follow Before Moving Into Your Pg.pdf
Tips To Follow Before Moving Into Your Pg.pdf
 
Using Aerosol Sealant to Reduce Multifamily Envelope Leakage
Using Aerosol Sealant to Reduce Multifamily Envelope LeakageUsing Aerosol Sealant to Reduce Multifamily Envelope Leakage
Using Aerosol Sealant to Reduce Multifamily Envelope Leakage
 
Automated House Sealing - Aerosol Envelope Sealing of New Homes
Automated House Sealing - Aerosol Envelope Sealing of New HomesAutomated House Sealing - Aerosol Envelope Sealing of New Homes
Automated House Sealing - Aerosol Envelope Sealing of New Homes
 
Indoor environmental-quality-in-healthcare-3-2
Indoor environmental-quality-in-healthcare-3-2Indoor environmental-quality-in-healthcare-3-2
Indoor environmental-quality-in-healthcare-3-2
 
February Home Maintenance
February Home MaintenanceFebruary Home Maintenance
February Home Maintenance
 
Rowland
RowlandRowland
Rowland
 
How to choose a lot and select a builder
How to choose a lot and select a builderHow to choose a lot and select a builder
How to choose a lot and select a builder
 
Indoor environmental-quality-in-healthcare (3)
Indoor environmental-quality-in-healthcare (3)Indoor environmental-quality-in-healthcare (3)
Indoor environmental-quality-in-healthcare (3)
 
Swimming Pool and SpaRisk Assessment Project Objective1Ver.docx
Swimming Pool and SpaRisk Assessment Project Objective1Ver.docxSwimming Pool and SpaRisk Assessment Project Objective1Ver.docx
Swimming Pool and SpaRisk Assessment Project Objective1Ver.docx
 
Reframed Tech Series: Prefabricated panels & deep retrofits
Reframed Tech Series: Prefabricated panels & deep retrofitsReframed Tech Series: Prefabricated panels & deep retrofits
Reframed Tech Series: Prefabricated panels & deep retrofits
 
HLB Maintenance Brochure
HLB Maintenance BrochureHLB Maintenance Brochure
HLB Maintenance Brochure
 
Kitchen & Bar Design Essentials
Kitchen & Bar Design EssentialsKitchen & Bar Design Essentials
Kitchen & Bar Design Essentials
 
Home Improvement Advice - InfoBarrel
Home Improvement Advice - InfoBarrelHome Improvement Advice - InfoBarrel
Home Improvement Advice - InfoBarrel
 
Puckett Skills List email
Puckett Skills List emailPuckett Skills List email
Puckett Skills List email
 
Construction practices and quality control
Construction practices and quality controlConstruction practices and quality control
Construction practices and quality control
 
A thru Z Inspections Sample Report 2010
A thru Z Inspections Sample Report 2010A thru Z Inspections Sample Report 2010
A thru Z Inspections Sample Report 2010
 
A thru Z Inspections Sample Report 2010
A thru Z Inspections Sample Report 2010A thru Z Inspections Sample Report 2010
A thru Z Inspections Sample Report 2010
 

Mais de Canberra Institute of technology

Mais de Canberra Institute of technology (20)

Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxPlace and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
 
Demolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptxDemolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptx
 
Practical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docxPractical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docx
 
Hansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdfHansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdf
 
Small House Plans & Calculations.pdf
Small House Plans & Calculations.pdfSmall House Plans & Calculations.pdf
Small House Plans & Calculations.pdf
 
Deck and Screen plans & Calculations
Deck and Screen plans & CalculationsDeck and Screen plans & Calculations
Deck and Screen plans & Calculations
 
CIT Subject Guide EPT
CIT Subject Guide EPTCIT Subject Guide EPT
CIT Subject Guide EPT
 
Example Site Induction Map .pdf
Example Site Induction Map .pdfExample Site Induction Map .pdf
Example Site Induction Map .pdf
 
Hansens Lodge for Plan and Organise
Hansens Lodge for Plan and OrganiseHansens Lodge for Plan and Organise
Hansens Lodge for Plan and Organise
 
Work Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxWork Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docx
 
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfHansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
 
Axon Cladding Installation Guide
Axon Cladding Installation GuideAxon Cladding Installation Guide
Axon Cladding Installation Guide
 
Woodhouse installation guide for cladding boards
Woodhouse installation guide for cladding boardsWoodhouse installation guide for cladding boards
Woodhouse installation guide for cladding boards
 
Optical Dumpy Enlarge staff reading.docx
Optical Dumpy Enlarge staff reading.docxOptical Dumpy Enlarge staff reading.docx
Optical Dumpy Enlarge staff reading.docx
 
Cladding introduction class presentation
Cladding introduction class presentationCladding introduction class presentation
Cladding introduction class presentation
 
Practical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal cornerPractical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal corner
 
Practical Assessment 1 - Install horizontal weatherboards
Practical Assessment 1 - Install horizontal weatherboardsPractical Assessment 1 - Install horizontal weatherboards
Practical Assessment 1 - Install horizontal weatherboards
 
Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels
 
Makita cold cut manual
Makita cold cut manualMakita cold cut manual
Makita cold cut manual
 
Small House Calculations
Small House CalculationsSmall House Calculations
Small House Calculations
 

Último

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 

Último (20)

Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 

Bathroom Renovation Student Gant Chart.pdf

  • 1. Bathroom Renovation Carpenter Plan and Prepare Preliminaries Particulars Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Day 9 Day 10 Day 11 Contact Client Asbestos Site Services Rubbish Electrician Plumber Materials PC item Materials Storage Site Toilet Client Bathroom Plasterer Waterproofing Tiler Joiner Electrician Plumber Painter Shower Screen Carpenter
  • 2. Organise Carpentry Tasks page 1 Task Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Day 9 Day 10 Day 11 Carpenter Carpenter Carpenter Carpenter Carpenter Carpenter Carpenter Carpenter Electrician Plumber Carpenter Carpenter Carpenter Carpenter Carpenter Plasterer Carpenter Waterproofing Electrician Tiler Tiler Carpenter Tiler Shower screen i ll Carpenter Plumber Carpenter Electrician Painter Shower screen i ll Carpenter Carpenter Carpenter
  • 3. Tasks Notify start day Notify start day Notify start day Notify start day wet seal Tidy up for client return. call plumber book in fit off and shower screen installer for site measure Site measure Tiler walls Architraves window &door Tile floor Beds shower base and floor Install under-tile heating Install shower screen and mirrors Paint ceiling architrave reveals, door Fit off Towel rails, fixtures and fittings including mirror Fit off Fit vanity Sheet ceiling/walls Call electrician confirm under tile heating install and fit off Install Tile underlay over existing floor Set joins Plasterboard ceiling villa board walls ensure plasterer uses wet area base coat to walls Hand over to builder to inspect Silicone Clean and detail Notify start day Notify start day Notify start day Rough in Rough in Tidy ready for client/ call plasterer for day 5 Batten ceiling ensure battens don’t coincide with downlight or exhaust fan positions Clean and vacuum dust from framework prior to sheeting Mark out Position of services prior to sheeting Insulate ceiling/walls Organise from stock & cut temporary floor covering , drop sheets & temporary wall & door protection Tentatively book day 3 morning plumber afternoon electrician Strip out existing Bathroom Remove rubbish as you go. Remove to skip Make good De-nail /remove and replace bad frame/floor Pre sheet Block, trimmers for fixtures Install ducting for exhaust fan to eaves. Tidy ready for client Confirm electrician & plumber for rough in Ensure all PC items are onsite prior to starting Arrange with client an appropriate storage area Order /client Prepare for portable bathroom i Notify start day Arrangements Confirm Start date - Schedule - What to expect ie dust, noise, household disruption -Temp bathroom and toilet facilities Check with builder That existing FC sheeting has been tested and clear of asbestos Identify and locate Electrical switch board and main switch, Locate water main and check it works correctly, Locate gas main and bidcock prior to starting. Organise site skip Make Safe for demolition Cap off plumbing and drainage prior to demolition