Name_______________Cole Ross_______________________ Date ________July 2011_____

Product _________Teaching a Class-Education_________________________________



Date/Time:            Activity:                                  Comment/Suggestions:

Tuesday, 7/19/11                                                  The website was for
                      Contact Project Facilitator and            the students to access
                      building website.                          to get make-up work,
8:00-11:00                                                           daily essential
                                                                  questions and other
                                                                 information about the
                      Commentary:                                         class.


                      I contacted Chad Lanier to ask him if
                      he would be my project facilitator.
                      After he said yes, I built a website for
                      the students to use.
Product Work Log

Name_______________Cole Ross_______________________ Date _____August 2011

Product _________Teaching a Class-Education_________________________________



Date/Time:            Activity:                                   Comment/Suggestions:
Thursday, 8/4/11
12:45-1:10
                      Observing project facilitator
Monday, 8/8/11
12:35-1:00

Monday, 8/22/11       Commentary:
12:45-1:50

Tuesday, 8/23/11      On these days, I was observing my
12:35- 2:00           project facilitator to see how he ran his
                      classroom.
Wednesday, 8/24/11
12:33-2:00

Thursday, 8/25/11
12:55-2:00

Friday, 8/26/11
12:07-2:00

Monday, 8/29/11
1:12-2:00

Tuesday, 8/30/11
12:35-2:00

Wednesday, 8/31/11
12:42-2:00
Product Work Log

Name_______________Cole Ross_______________________ Date _________August 2011

Product _________Teaching a Class-Education_________________________________



Date/Time:            Activity:                               Comment/Suggestions:



Tuesday, 8/2/11       Project Facilitator Meetings
12:45- 1:30

Wednesday, 8/3/11
12:45-1:05            Commentary:



                      I met with him about what the year
                      was going to be about and what my
                      schedule was going to be. We decided
                      it best that I do my observing the
                      whole first semester with a few
                      activities. The second semester would
                      be for me to teach and create lesson
                      plans for three weeks.
Product Work Log

Name_______________Cole Ross_______________________ Date _____September 2011

Product _________Teaching a Class-Education_________________________________



Date/Time:            Activity:                                 Comment/Suggestions:

Tuesday, 9/6/11
1:15-1:45             Observing other teachers

Wednesday, 9/7/11
1:00-2:00
                      Commentary:
Thursday, 9/8/11
12:59-2:00
                      This Month, I observed many teachers,
Friday, 9/9/11        with permission; I wanted to get ideas
12:45-2:00            of different ways to run the classroom.


Monday, 9/12/11
12:55-2:00

Wednesday, 9/14/11
12:45-1:10

Thursday, 9/15/11
12:49-2:00

Friday, 9/16/11
12:40-2:00

Monday, 9/26/11
12:45-2:00

Tuesday, 9/27/11
12:45-2:00
Product Work Log

Name_______________Cole Ross_______________________ Date _____October 2011

Product _________Teaching a Class-Education_________________________________



Date/Time:            Activity:                                Comment/Suggestions:
Monday,10/3/11
1:07-2:00             Observing project facilitator

Wednesday,10/5/11
12:45-2:00            Commentary:


Thursday, 10/6/11
11:34-2:00            This month, I was back in the
                      classroom to observe and start putting
Friday, 10/7/11       different teacher’s ideas together and
12:45-2:00            thinking about lesson plans.


Tuesday, 10/18/11
12:50-2:00

Thursday, 10/20/11
1:00-2:00

Monday, 10/24/11
12:53-1:38

Thursday, 10/27/11
12:55-2:00

Friday, 10/28/11
12:57-1:40

Monday, 10/31/11
12:40-2:00
Product Work Log

Name_______________Cole Ross_______________________ Date _________October 2011

Product _________Teaching a Class-Education_________________________________



Date/Time:            Activity:                                   Comment/Suggestions:

Thursday, 10/13/11
12:50-12:55           Project Facilitator Meetings

Thursday, 10/20/11
7:10-7:30
                      Commentary:

                      As the second semester approached, I
                      tried to meet with my project facilitator
                      at least once a month.
Product Work Log

Name_______________Cole Ross_______________________ Date ______November 2011

Product _________Teaching a Class-Education_________________________________



Date/Time:            Activity:                                 Comment/Suggestions:
Wednesday, 11/2/11
12:50-2:00
                      Observing project facilitator and a
Wednesday, 11/2/11    sixth grade teacher
9:40-11:01

Thursday, 11/3/11
12:50-1:21
                      Commentary:
Friday, 11/4/11
10:56-4:15            In the month of November, I spent a
                      lot of time in a sixth-grade classroom
Monday, 11/7/11       observing and working with students.
12:35-2:00            I also continued observing my project
                      facilitator.
Wednesday, 11/9/11
12:46-3:00            *On November 2nd, I graded a warm-
                      up assignment that I gave the students;
Thursday, 11/10/11    I also updated the website with
12:42-2:00            upcoming information.


Friday, 11/11/11      *On November 11th, the whole school
12:50-2:00            was at an assembly, I used this time as
                      a work day to organize and plan for
Friday, 11/18/11      the second semester.
12:35-2:00

Monday, 11/30/11
12:40-2:00
Product Work Log

Name_______________Cole Ross_______________________ Date ______December 2011

Product _________Teaching a Class-Education_________________________________



Date/Time:            Activity:                                   Comment/Suggestions:
Thursday, 12/1/11
12:42-1:00            Observing                                   A lot of patience was
                                                                    needed to do the
Tuesday, 12/6/11      Working with students                        Christmas project,
12:47-2:03                                                        many of the students
                      Commentary:                                 wanted to put a lot of
Wednesday, 12/7/11                                                detail into the cards.
12:43-2:00
                      On December 13th, 14th, and 15th, I did a
Thursday, 12/8/11     “Christmas Card for Soldiers” with a
12:45-2:00            class of sixth grade and a class of
                      seventh grade. We worked with
Friday, 12/9/11       Creekview High School to do this.
12:45-1:45            Overall, around 100 cards were turned
                      in and sent off to the soldiers.
Monday, 12/12/11
12:43-2:00

Tuesday, 12/13/11
12:10-2:00

Wednesday, 12/14/11
11:50-2:00

Thursday, 12/15/11
10:10-2:00

Friday, 12/16/11
10:10-2:00
Product Work Log

Name_______________Cole Ross_______________________ Date ______December 2011

Product _________Teaching a Class-Education_________________________________



Date/Time:            Activity:                                   Comment/Suggestions:

Wednesday, 12/7/11    Project Facilitator Meeting

                      Commentary:

                      This particular meeting was for my
                      project facilitator to approve the lesson
                      plans that I had planned for the second
                      semester.
Product Work Log

Name_______________Cole Ross_______________________ Date ______January 2012

Product _________Teaching a Class-Education_________________________________

Date/Time:
Monday, 1/2/12        Activity:                                   Comment/Suggestions:
11:30-4:00
                      Teaching
Tuesday, 1/3/12
12:55-2:05            Commentary:

Tuesday, 1/3/12       I began teaching in January; we did
10:20-10:45           such things as the spelling bee, subject-
                      verb agreement, daily warm-ups,
Wednesday, 1/4/12     pronoun antecedent agreement, and
12:45-2:00            creative writing assignments.


Wednesday, 1/4/12     *January 3nd was a work day for
8:50-9:15             teachers; I used this day to change
                      some things and continued making
Thursday, 1/5/12      lesson plans.
12:42-2:00
                      *On January 4th and 5th, the evening
Thursday, 1/5/12      times were for grading and fixing the
6:00-7:00             website!


Friday, 1/6/12
12:42-2:00

Friday, 1/6/12
12:56-2:00

Monday, 1/9/12

Tuesday, 1/10/12
12:50-1:00

Tuesday, 1/17/12
12:55-2:00
Product Work Log

Name_______________Cole Ross_______________________ Date ______January 2012

Product _________Teaching a Class-Education_________________________________



Date/Time:            Activity:                               Comment/Suggestions:

                      Peer Facilitator Meetings
Wednesday, 1/4/12
7:40-8:15             Commentary:

Friday, 1/6/12        These meetings were for my project
7:07-8:15             facilitator to tell me how I did and
                      discuss how I could improve or better
                      my skills.
Product Work Log

Name_______________Cole Ross_______________________ Date ______February 2012

Product _________Teaching a Class-Education_________________________________



Date/Time:            Activity:                                  Comment/Suggestions:

                      Career Unit Lesson- Teaching
Wednesday, 2/15/12
12:40-2:00            Commentary:

Wednesday, 2/29/12    In February, We started the career unit;
12:50-1:30            I was out most of the time because of a
                      change in schedule and college
                      business I had to take care of.

                      *On February 15th, We talked about the
                      upcoming career unit and how it was
                      going to work. Some information was
                      handed out on this day!

                      *On February 29th, the students were
                      allowed more time in the computer lab
                      to work on their career project.
Product Work Log

Name_______________Cole Ross_______________________ Date ______March 2012

Product _________Teaching a Class-Education_________________________________



Date/Time:            Activity:                                Comment/Suggestions:

                      Career Unit Lesson Interviews
Monday, 3/5/12
12:45-2:00            Packing Up

Tuesday 3/6/12        Commentary:


12:50-2:00            On March 5th and 6th, the students
Wednesday, 3/7/12     were interviewed for the job that they
1:00-1:20             had researched. They had to turn in a
                      resume and were each asked between
                      3-5 questions!

                      *On March 7th, I went in to pack up
                      my stuff and get final grades in.
                      March 7th was my last day on the job.
Product Work Log

Mais conteúdo relacionado

Semelhante a Product Work Log

Semelhante a Product Work Log (20)

Product work log 1
Product work log 1Product work log 1
Product work log 1
 
Product work log
Product work logProduct work log
Product work log
 
Product Work Log 4
Product Work Log 4Product Work Log 4
Product Work Log 4
 
Planeaciones de ingles 2016 2017
Planeaciones de ingles 2016 2017Planeaciones de ingles 2016 2017
Planeaciones de ingles 2016 2017
 
Product work log
Product work logProduct work log
Product work log
 
Day 3 training
Day 3 trainingDay 3 training
Day 3 training
 
Product Work Log
Product Work Log Product Work Log
Product Work Log
 
PLC Project Plan PDF
PLC Project Plan PDFPLC Project Plan PDF
PLC Project Plan PDF
 
P3E Townhall 19 Jan 2018
P3E Townhall 19 Jan 2018P3E Townhall 19 Jan 2018
P3E Townhall 19 Jan 2018
 
Week 11
Week 11Week 11
Week 11
 
Work Log
Work LogWork Log
Work Log
 
Product work log template 2011 12
Product work log template 2011 12Product work log template 2011 12
Product work log template 2011 12
 
Field study 6: On Becoming A Teacher
Field study 6: On Becoming A TeacherField study 6: On Becoming A Teacher
Field study 6: On Becoming A Teacher
 
Running record of the class observed
Running record of the class observedRunning record of the class observed
Running record of the class observed
 
Field Study 3 Episode 3
Field Study 3 Episode 3Field Study 3 Episode 3
Field Study 3 Episode 3
 
Instructional decision making
Instructional decision making Instructional decision making
Instructional decision making
 
Student-Led Conferences, Professional Development for Teachers
Student-Led Conferences, Professional Development for TeachersStudent-Led Conferences, Professional Development for Teachers
Student-Led Conferences, Professional Development for Teachers
 
Dimensions of Diversity Capstone Example 2
Dimensions of Diversity Capstone Example 2Dimensions of Diversity Capstone Example 2
Dimensions of Diversity Capstone Example 2
 
6.docx
6.docx6.docx
6.docx
 
PD Revisited - Region 7
PD Revisited - Region 7PD Revisited - Region 7
PD Revisited - Region 7
 

Último

Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterMateoGardella
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.MateoGardella
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 

Último (20)

Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 

Product Work Log

  • 1. Product Work Log Name_______________Cole Ross_______________________ Date ________July 2011_____ Product _________Teaching a Class-Education_________________________________ Date/Time: Activity: Comment/Suggestions: Tuesday, 7/19/11 The website was for Contact Project Facilitator and the students to access building website. to get make-up work, 8:00-11:00 daily essential questions and other information about the Commentary: class. I contacted Chad Lanier to ask him if he would be my project facilitator. After he said yes, I built a website for the students to use.
  • 2. Product Work Log Name_______________Cole Ross_______________________ Date _____August 2011 Product _________Teaching a Class-Education_________________________________ Date/Time: Activity: Comment/Suggestions: Thursday, 8/4/11 12:45-1:10 Observing project facilitator Monday, 8/8/11 12:35-1:00 Monday, 8/22/11 Commentary: 12:45-1:50 Tuesday, 8/23/11 On these days, I was observing my 12:35- 2:00 project facilitator to see how he ran his classroom. Wednesday, 8/24/11 12:33-2:00 Thursday, 8/25/11 12:55-2:00 Friday, 8/26/11 12:07-2:00 Monday, 8/29/11 1:12-2:00 Tuesday, 8/30/11 12:35-2:00 Wednesday, 8/31/11 12:42-2:00
  • 3. Product Work Log Name_______________Cole Ross_______________________ Date _________August 2011 Product _________Teaching a Class-Education_________________________________ Date/Time: Activity: Comment/Suggestions: Tuesday, 8/2/11 Project Facilitator Meetings 12:45- 1:30 Wednesday, 8/3/11 12:45-1:05 Commentary: I met with him about what the year was going to be about and what my schedule was going to be. We decided it best that I do my observing the whole first semester with a few activities. The second semester would be for me to teach and create lesson plans for three weeks.
  • 4. Product Work Log Name_______________Cole Ross_______________________ Date _____September 2011 Product _________Teaching a Class-Education_________________________________ Date/Time: Activity: Comment/Suggestions: Tuesday, 9/6/11 1:15-1:45 Observing other teachers Wednesday, 9/7/11 1:00-2:00 Commentary: Thursday, 9/8/11 12:59-2:00 This Month, I observed many teachers, Friday, 9/9/11 with permission; I wanted to get ideas 12:45-2:00 of different ways to run the classroom. Monday, 9/12/11 12:55-2:00 Wednesday, 9/14/11 12:45-1:10 Thursday, 9/15/11 12:49-2:00 Friday, 9/16/11 12:40-2:00 Monday, 9/26/11 12:45-2:00 Tuesday, 9/27/11 12:45-2:00
  • 5. Product Work Log Name_______________Cole Ross_______________________ Date _____October 2011 Product _________Teaching a Class-Education_________________________________ Date/Time: Activity: Comment/Suggestions: Monday,10/3/11 1:07-2:00 Observing project facilitator Wednesday,10/5/11 12:45-2:00 Commentary: Thursday, 10/6/11 11:34-2:00 This month, I was back in the classroom to observe and start putting Friday, 10/7/11 different teacher’s ideas together and 12:45-2:00 thinking about lesson plans. Tuesday, 10/18/11 12:50-2:00 Thursday, 10/20/11 1:00-2:00 Monday, 10/24/11 12:53-1:38 Thursday, 10/27/11 12:55-2:00 Friday, 10/28/11 12:57-1:40 Monday, 10/31/11 12:40-2:00
  • 6. Product Work Log Name_______________Cole Ross_______________________ Date _________October 2011 Product _________Teaching a Class-Education_________________________________ Date/Time: Activity: Comment/Suggestions: Thursday, 10/13/11 12:50-12:55 Project Facilitator Meetings Thursday, 10/20/11 7:10-7:30 Commentary: As the second semester approached, I tried to meet with my project facilitator at least once a month.
  • 7. Product Work Log Name_______________Cole Ross_______________________ Date ______November 2011 Product _________Teaching a Class-Education_________________________________ Date/Time: Activity: Comment/Suggestions: Wednesday, 11/2/11 12:50-2:00 Observing project facilitator and a Wednesday, 11/2/11 sixth grade teacher 9:40-11:01 Thursday, 11/3/11 12:50-1:21 Commentary: Friday, 11/4/11 10:56-4:15 In the month of November, I spent a lot of time in a sixth-grade classroom Monday, 11/7/11 observing and working with students. 12:35-2:00 I also continued observing my project facilitator. Wednesday, 11/9/11 12:46-3:00 *On November 2nd, I graded a warm- up assignment that I gave the students; Thursday, 11/10/11 I also updated the website with 12:42-2:00 upcoming information. Friday, 11/11/11 *On November 11th, the whole school 12:50-2:00 was at an assembly, I used this time as a work day to organize and plan for Friday, 11/18/11 the second semester. 12:35-2:00 Monday, 11/30/11 12:40-2:00
  • 8. Product Work Log Name_______________Cole Ross_______________________ Date ______December 2011 Product _________Teaching a Class-Education_________________________________ Date/Time: Activity: Comment/Suggestions: Thursday, 12/1/11 12:42-1:00 Observing A lot of patience was needed to do the Tuesday, 12/6/11 Working with students Christmas project, 12:47-2:03 many of the students Commentary: wanted to put a lot of Wednesday, 12/7/11 detail into the cards. 12:43-2:00 On December 13th, 14th, and 15th, I did a Thursday, 12/8/11 “Christmas Card for Soldiers” with a 12:45-2:00 class of sixth grade and a class of seventh grade. We worked with Friday, 12/9/11 Creekview High School to do this. 12:45-1:45 Overall, around 100 cards were turned in and sent off to the soldiers. Monday, 12/12/11 12:43-2:00 Tuesday, 12/13/11 12:10-2:00 Wednesday, 12/14/11 11:50-2:00 Thursday, 12/15/11 10:10-2:00 Friday, 12/16/11 10:10-2:00
  • 9. Product Work Log Name_______________Cole Ross_______________________ Date ______December 2011 Product _________Teaching a Class-Education_________________________________ Date/Time: Activity: Comment/Suggestions: Wednesday, 12/7/11 Project Facilitator Meeting Commentary: This particular meeting was for my project facilitator to approve the lesson plans that I had planned for the second semester.
  • 10. Product Work Log Name_______________Cole Ross_______________________ Date ______January 2012 Product _________Teaching a Class-Education_________________________________ Date/Time: Monday, 1/2/12 Activity: Comment/Suggestions: 11:30-4:00 Teaching Tuesday, 1/3/12 12:55-2:05 Commentary: Tuesday, 1/3/12 I began teaching in January; we did 10:20-10:45 such things as the spelling bee, subject- verb agreement, daily warm-ups, Wednesday, 1/4/12 pronoun antecedent agreement, and 12:45-2:00 creative writing assignments. Wednesday, 1/4/12 *January 3nd was a work day for 8:50-9:15 teachers; I used this day to change some things and continued making Thursday, 1/5/12 lesson plans. 12:42-2:00 *On January 4th and 5th, the evening Thursday, 1/5/12 times were for grading and fixing the 6:00-7:00 website! Friday, 1/6/12 12:42-2:00 Friday, 1/6/12 12:56-2:00 Monday, 1/9/12 Tuesday, 1/10/12 12:50-1:00 Tuesday, 1/17/12 12:55-2:00
  • 11. Product Work Log Name_______________Cole Ross_______________________ Date ______January 2012 Product _________Teaching a Class-Education_________________________________ Date/Time: Activity: Comment/Suggestions: Peer Facilitator Meetings Wednesday, 1/4/12 7:40-8:15 Commentary: Friday, 1/6/12 These meetings were for my project 7:07-8:15 facilitator to tell me how I did and discuss how I could improve or better my skills.
  • 12. Product Work Log Name_______________Cole Ross_______________________ Date ______February 2012 Product _________Teaching a Class-Education_________________________________ Date/Time: Activity: Comment/Suggestions: Career Unit Lesson- Teaching Wednesday, 2/15/12 12:40-2:00 Commentary: Wednesday, 2/29/12 In February, We started the career unit; 12:50-1:30 I was out most of the time because of a change in schedule and college business I had to take care of. *On February 15th, We talked about the upcoming career unit and how it was going to work. Some information was handed out on this day! *On February 29th, the students were allowed more time in the computer lab to work on their career project.
  • 13. Product Work Log Name_______________Cole Ross_______________________ Date ______March 2012 Product _________Teaching a Class-Education_________________________________ Date/Time: Activity: Comment/Suggestions: Career Unit Lesson Interviews Monday, 3/5/12 12:45-2:00 Packing Up Tuesday 3/6/12 Commentary: 12:50-2:00 On March 5th and 6th, the students Wednesday, 3/7/12 were interviewed for the job that they 1:00-1:20 had researched. They had to turn in a resume and were each asked between 3-5 questions! *On March 7th, I went in to pack up my stuff and get final grades in. March 7th was my last day on the job.