Davis street improvement project final2 21-13 4.16.13
1. City Council Meeting April 16, 2013
STREETSCAPE PROJECT
CONCEPT PLANS
DAVIS STREET
IMPROVEMENT PROJECT
2. City Council Meeting April 16, 2013
2
Davis Street Improvement Project
Limits of the Project
• Hinman to Orrington
• Orrington to Ridge
• Ridge to Asbury
3. City Council Meeting April 16, 2013
3
Davis Street Improvement Project
Project Scope
• Water Main Replacement (Benson to
Hinman)
• Sewer Replacement (Orrington to Hinman)
• Streetscape Upgrade (Hinman to Ridge)
• Street Resurfacing (Hinman to Ridge)
• Protected Bike Path (Hinman to Asbury)
4. City Council Meeting April 16, 2013
4
Davis Street Improvement Project
Hinman to Chicago
5. City Council Meeting April 16, 2013
5
Davis Street Improvement Project
Chicago to Orrington
6. City Council Meeting April 16, 2013
6
Davis Street Improvement Project
Sherman to Benson
7. City Council Meeting April 16, 2013
7
Davis Street Improvement Project
Parking Impacts
Hinman Ave. to Chicago Ave.
• Number of parking stalls on the south side of the block
• Existing angle – 24
• Proposed parallel with sidewalk widening – 14
• Reduction – 10
Oak Ave. to Ridge Ave.
• Number of existing parking spaces – 14 on south side
and 14 on north side
• Proposed parking spaces – 17 on south side and 14 on
north side
• Increase - 3
Net Impact: -7
8. City Council Meeting April 16, 2013
8
Davis Street Improvement Project
Design Elements
• Sidewalk Brick Replacement
• Protected Bike Path
• Bike Shelter
• Sidewalk Furniture (Trash Cans & Benches)
• Pedestrian Lighting
9. City Council Meeting April 16, 2013
9
Davis Street Improvement Project
Bike Racks & Trash Receptacles
Bike racks will be
placed along Davis
Street
10. City Council Meeting April 16, 2013
10
Davis Street Improvement Project
Bike Shelter Visual
Proposed Locations: Orrington @ Davis and Hinman @
Davis
11. City Council Meeting April 16, 2013
11
Church Street Project 2012
Bike Shelter Revised Location
Proposed Location: Orrington @ Library
12. City Council Meeting April 16, 2013
12
Davis Street Improvement Project
Green Elements
Porous Concrete Sidewalk and
Parking Lanes
Rain Gardens
13. City Council Meeting April 16, 2013
13
Davis Street Improvement Project
Green Elements Continued
• LED Pedestrian Lighting
• Re-used Brick Materials
14. City Council Meeting April 16, 2013
14
Davis Street Improvement Project
Community Engagement
• Presented to Downtown Evanston at Board
Meeting
• Presented at the First Ward Meeting.
• Presented to Fourth Ward Alderman.
• Downtown Evanston sent out survey to
Davis Street Businesses
15. City Council Meeting April 16, 2013
• Questions
– Are you in favor of losing 24 parking spaces?
Approx. 34 No, 1 Yes
Staff: Revised the plan to reduce only 7 spaces
– Are you in favor of widening the sidewalks?
Approx. 34 No; 2 Yes
Staff: Revised the plan to eliminate widening.
- How will project impact business/property negatively or
positively? Approx. 34 negatively, 1 positively
Staff: Construction project will temporarily impact
businesses staff will work with each business to minimize
the impact.
15
Downtown Evanston Survey
16. City Council Meeting April 16, 2013
16
Davis Street Improvement Project
Next Steps
• Meet with Davis Street businesses/properties to finalize
schedule.
• Water main and sewer project bid April 2013.
• Street resurfacing and streetscape bid May 2013.
• Conduct traffic analysis and meetings to design bike path
connections between Chicago Avenue and the Lakefront
and between Asbury and Mason Park, Fall 2013
• Coordinate with ETHS and neighborhood to design bike
path connection between Dodge and McCormick, Fall
2013.
17. City Council Meeting April 16, 2013
17
Davis Street Improvement Project
Proposed Construction Schedule
Dates of Work Streets/Property Effected
June— August
Water Main & Sewer Replacement (Orrington to
Hinman)
July-
August –
August-September
Sidewalk Widening & Streetscape
South side - Benson to Hinman
North side - Ridge to Benson
North side - Benson to Hinman
South side- Ridge to Benson
September 15 - October 10 Grinding & Street Resurfacing
October 14—28 Protected Bike Lane
October Pedestrian Lights, Bike Shelter & Bike Racks
18. City Council Meeting April 16, 2013
18
Davis Street Improvement Project
QUESTIONS