SlideShare uma empresa Scribd logo
1 de 26
A reputation for delivering innovative,
  integrated environmental systems
               globally
Presentation Outline

•   Who are Greenspan?
•   What projects have we completed?
•   Flood Warning Systems
     –   What is a typical flood warning system
     –   Field Stations
     –   Communications
     –   Base Stations
     –   The path forward
Flood Warning
   Who are Greenspan?      Systems


                                   Hydrographic &
Irrigation                          Water Quality
Solutions




 Water Infrastructure
     Monitoring                         Oceanographic
Who are Greenspan?


                                                2010
                                  2000          • >100 Australian Projects
                                  • Purchased   • Coffs Harbour, Brisbane,
                                    by Tyco       Sydney, Perth,
                   1998                           Singapore, Kuala
                   • First >$1m                   Lumpur, Vancouver
                     project                    • World leading projects:
                                                  • SMART,
     1995                                         • Yangtze,
     • 2 offices                                  • Environment Canada
Our Staff

                 And Vancouver!         •    Experts comprising:
Malaysia                                      – Hydrologists, Hydrographers and
                                                Scientists
 Singapore                                    – Engineers (Installation & Service)
                                                  • Civil, Mechanical, Chemical,
                                                    Instrumentation, IT
                                              – Project Managers
                                              – Factory and Field Technicians
                                              – Consultants
           Newcastle        Brisbane          – Sales and Marketing
                             Coffs Harbour    – Administrative
    Perth
                           Sydney        •   Leading experts, all in-house

                       Hobart
Our Affiliations

 •   Campbell Scientific
      – Asian distributor for environmental
        monitoring projects
 •   Control Microsystems
      – Regional Representation and
        SCADAPartner Integrator
 •   Aquatic Informatics
      – Alliance Partner
      – Distributor for Asia, Pacific and
        Middle East

Although we are affiliated with these companies, we are free to choose the most
suitable product for each application. Companies that manufacture
everything in house have a tendency to recommend their
products when others may be more suitable.
Our Projects

         Environment Canada                Yangtze River 3 Gorges
         Hydrometric Network               Dam
                                                  Malaysian SMART Tunnel
     Khuzestan Water                                Singapore Overflow
     Quality Initiative                             Network


          Kenya            Indonesian
          Hydrometric     Hydro-Electric            Over 100 projects in
          Network         Power Plants              Australia
                                                     (including QLD Main roads FWS
                                                     and Coffs Harbour FWS design)
Flood Event Review – Hurricane Katrina

•   Costliest natural disaster in the history
    of the US
     – USD$81b, >1,836 deaths
•   Most severe loss of life in New Orleans
    when the levee system (2000 miles)
    failed, resulting in lawsuit against US
    Army Corp of Engineers.
•   Canal design helped funnel storm
    surge to at 20% height to the flood and
    make it much faster
•   WMO, BoM, USGS promote “Live with
    the flood”
The goal of a flood warning system

• To provide timely measurement and modelling of
  flood potential to areas at risk
• Engineer a system that will not fail during flood
  conditions
• Maximise the ability of those who are charged
  with the responsibility for preserving life to have
  sufficient warning of impending danger.
Typical Field Stations


             Weather Stations
                 •   To provide data to model storm
                     potential
                 •   To measure when the storm starts and
                     the intensity of the storm
                 •   To understand dynamic conditions that
                     have an impact on flood run off, such
                     as soil moisture
                 •   To collect valuable meteorological data
                     for historical data set
Typical Field Stations


             Upper Catchment Rainfall
                 •   Early warning indicator
                 •   Quantify what the models have
                     predicted
                 •   Without meteorological models, these
                     are the first indicator, along with
                     weather conditions
Typical Field Stations


             Modernisation of existing stilling wells
                 •   Replace chart records or mechanical
                     devices with accurate instruments and
                     telemetry systems
                 •   Often have the best historical records
                     for levels and flood events which are
                     valuable for calibrating flood models
Typical Field Stations


             Raised Platform Hydrometric Station
                 •   Above the flood zone
                 •   Rainfall and gas purge level
Typical Field Stations


             Surface Radar Velocity
                 •   First of its type measures velocity, not
                     just level
                 •   Requires calibration to relate velocity to
                     flow (volume)
                 •   Can be used over large ranges such as
                     those experienced in flood conditions
Typical Field Stations


             In-stream Doppler Current Meter
                 •   Velocity provides much more
                     information than simply level
                 •   For flow with hysteresis or backwater
                     effects
                 •   Or where high flow/velocity gauging’s
                     have not been made
                 •   Below cease to flow for total load
                     calculations, higher for flood warning
                     measurements
Typical Field Stations


             Stormwater blockages or build up in cities
                 •   Detects blockages in the underground
                     network of stormwater or sewer
                     systems to alert for maintenance before
                     an failure occurs
                 •   Localised city flooding is often cause by
                     drainage failures
                 •   Can also be used for underground car
                     parks or other systems to provide early
                     warning to parked vehicles to remove
                     the imminent danger
Typical Field Stations


             Audible Warning Stations
                 •   To alert those in the flood zone
                 •   Combination of high intensity sirens as
                     well as voiced announcements through
                     loud speakers
                 •   Critical anywhere that experiences high
                     rates of change in level, or below dams
                     or levees that can be breached
                 •   Combine with direct warning systems
Typical Field Stations


             On site visible warning
                 •   Road signs with warning lights when
                     flooding is active
                 •   One of the greatest dangers in more
                     developed areas are people trying to
                     cross flood zones in their vehicle
Typical Field Stations


             Flood Gate Control
                 •   To control and divert the flow of the
                     flood waters
                 •   When flood warning can also be flood
                     mitigation
                 •   Pumps can also be controlled
Typical Field Stations


             CCTV
                •   To verify measurements and view things not
                    directly measured
                •   Can help stop people putting themselves in
                    danger during flood conditions, such as to
                    inspect dams
Communications


           Customised to suit every application, mixing between:
           - Wired (cable, leased line, PSTN)
           - Radio (UHF/VHF/Microwave etc)
           - Cellular (GSM, GPRS, 3G)
           - Satellite
           - True redundancy is achieved by mixing 2 of the
             above methods, with the most reliable during flood
             events being satellite
           - SMS should not be used to transmit data from a
             station as these can overload in flood events
Control Centres


                  Typically include
                      •   Redundant communications
                          infrastructure
                      •   Redundant locations (disaster
                          recovery centre)
                      •   SCADA
                      •   Modelling
                      •   Historian
                      •   Alarm dissemination
Modelling


            Data once collected is of value to understand the
            conditions in the field without having to visit the
            field. However, with the implementation of a
            model, these current conditions can be used to
            understand what may occur in the future.

            Models can be anything, from a basic rainfall run-
            off model to highly detailed and complex models
            including numerical weather prediction.
Data Correction, Validation and Statistics


                      Hydrographic data should be
                      processed with hydrographic tools.
                      Particularly, the following items are
                      important:
                      •   Data Correction (i.e. to repair data
                          incorrectly measured in the field)
                      •   Quality coding to ensure only high
                          quality data is used in model forecasts
                      •   Data Processing such as using rating
                          curves to develop stage-discharge
                          relationships
                      •   Statistics
                      •   Reporting
RECAP:
The goal of a flood warning system

• To provide timely measurement and modelling of
  flood potential to areas at risk
• Engineer a system that will not fail during flood
  conditions
• Maximise the ability of those who are charged
  with the responsibility for preserving life to have
  sufficient warning of impending danger.
Where to from here?

•   Make sure that there is a commitment to save lives and property
    through the investment required to engineer a suitable solution
•   Develop a scope of works and specification through expert
    consultancy
•   Manage the project implementation

•   We highly recommend a visit to the Stormwater Management And
    Road Tunnel (SMART) in Kuala Lumpur if at all possible as it is
    an excellent example of the topics discussed here today.

Mais conteúdo relacionado

Mais procurados

Methods Of Flood Control
Methods Of Flood Control Methods Of Flood Control
Methods Of Flood Control HNurton
 
types of flood & flood mitigation/management techniques - damages
types of  flood & flood mitigation/management techniques - damagestypes of  flood & flood mitigation/management techniques - damages
types of flood & flood mitigation/management techniques - damagesEddy Ankit Gangani
 
Disaster management flood
Disaster management  flood Disaster management  flood
Disaster management flood Shubham Koshti
 
GROUNDWATER QUALITY:- PROBLEMS CHALLENGES, & MANAGEMENT PROSPECTS IN INDIA
GROUNDWATER QUALITY:- PROBLEMS CHALLENGES, &  MANAGEMENT  PROSPECTS  IN  INDIA GROUNDWATER QUALITY:- PROBLEMS CHALLENGES, &  MANAGEMENT  PROSPECTS  IN  INDIA
GROUNDWATER QUALITY:- PROBLEMS CHALLENGES, & MANAGEMENT PROSPECTS IN INDIA Prashant Sharma
 
Purification of water
Purification of waterPurification of water
Purification of waterGaurav Arora
 
engineering-hydrology-ppt.pdf
engineering-hydrology-ppt.pdfengineering-hydrology-ppt.pdf
engineering-hydrology-ppt.pdfgovardhanaswamy1
 
Rain Water Harvesting in Urban areas
Rain Water Harvesting in Urban areas Rain Water Harvesting in Urban areas
Rain Water Harvesting in Urban areas Water Mangement Forum
 
Ground Water Quality Monitoring Using Remote Sensing And GIS
Ground Water Quality Monitoring Using Remote Sensing And GIS Ground Water Quality Monitoring Using Remote Sensing And GIS
Ground Water Quality Monitoring Using Remote Sensing And GIS Nzar Braim
 
EARLY WARNING SYSTEM(EWS)
EARLY WARNING SYSTEM(EWS)EARLY WARNING SYSTEM(EWS)
EARLY WARNING SYSTEM(EWS)umang talpara
 
Fluvial processes and_land_forms
Fluvial processes and_land_formsFluvial processes and_land_forms
Fluvial processes and_land_formsZeeshan Khan
 
Coastal Morphology and processes
Coastal Morphology and processes Coastal Morphology and processes
Coastal Morphology and processes Hafez Ahmad
 
Flood project case study rk
Flood project case study rkFlood project case study rk
Flood project case study rkankitkalariya
 
Urban Flooding causes and Management Dr.Reddy
Urban Flooding causes and Management Dr.ReddyUrban Flooding causes and Management Dr.Reddy
Urban Flooding causes and Management Dr.ReddySai Bhaskar Reddy Nakka
 
Disaster management- case study on 26 July 2005 Mumbai flood
Disaster management- case study on 26 July 2005 Mumbai floodDisaster management- case study on 26 July 2005 Mumbai flood
Disaster management- case study on 26 July 2005 Mumbai floodmadhura92
 
Tsunami Warning System
Tsunami Warning SystemTsunami Warning System
Tsunami Warning SystemGirish1020
 
Earthquake Early Warning Technology
Earthquake Early Warning TechnologyEarthquake Early Warning Technology
Earthquake Early Warning TechnologyICP DAS USA, Inc.
 

Mais procurados (20)

Methods Of Flood Control
Methods Of Flood Control Methods Of Flood Control
Methods Of Flood Control
 
types of flood & flood mitigation/management techniques - damages
types of  flood & flood mitigation/management techniques - damagestypes of  flood & flood mitigation/management techniques - damages
types of flood & flood mitigation/management techniques - damages
 
Drought
DroughtDrought
Drought
 
Disaster management flood
Disaster management  flood Disaster management  flood
Disaster management flood
 
GROUNDWATER QUALITY:- PROBLEMS CHALLENGES, & MANAGEMENT PROSPECTS IN INDIA
GROUNDWATER QUALITY:- PROBLEMS CHALLENGES, &  MANAGEMENT  PROSPECTS  IN  INDIA GROUNDWATER QUALITY:- PROBLEMS CHALLENGES, &  MANAGEMENT  PROSPECTS  IN  INDIA
GROUNDWATER QUALITY:- PROBLEMS CHALLENGES, & MANAGEMENT PROSPECTS IN INDIA
 
Faecal sludge management
Faecal sludge managementFaecal sludge management
Faecal sludge management
 
Purification of water
Purification of waterPurification of water
Purification of water
 
Flood Management
Flood ManagementFlood Management
Flood Management
 
engineering-hydrology-ppt.pdf
engineering-hydrology-ppt.pdfengineering-hydrology-ppt.pdf
engineering-hydrology-ppt.pdf
 
Rain Water Harvesting in Urban areas
Rain Water Harvesting in Urban areas Rain Water Harvesting in Urban areas
Rain Water Harvesting in Urban areas
 
Ground Water Quality Monitoring Using Remote Sensing And GIS
Ground Water Quality Monitoring Using Remote Sensing And GIS Ground Water Quality Monitoring Using Remote Sensing And GIS
Ground Water Quality Monitoring Using Remote Sensing And GIS
 
EARLY WARNING SYSTEM(EWS)
EARLY WARNING SYSTEM(EWS)EARLY WARNING SYSTEM(EWS)
EARLY WARNING SYSTEM(EWS)
 
Storm Surges
Storm SurgesStorm Surges
Storm Surges
 
Fluvial processes and_land_forms
Fluvial processes and_land_formsFluvial processes and_land_forms
Fluvial processes and_land_forms
 
Coastal Morphology and processes
Coastal Morphology and processes Coastal Morphology and processes
Coastal Morphology and processes
 
Flood project case study rk
Flood project case study rkFlood project case study rk
Flood project case study rk
 
Urban Flooding causes and Management Dr.Reddy
Urban Flooding causes and Management Dr.ReddyUrban Flooding causes and Management Dr.Reddy
Urban Flooding causes and Management Dr.Reddy
 
Disaster management- case study on 26 July 2005 Mumbai flood
Disaster management- case study on 26 July 2005 Mumbai floodDisaster management- case study on 26 July 2005 Mumbai flood
Disaster management- case study on 26 July 2005 Mumbai flood
 
Tsunami Warning System
Tsunami Warning SystemTsunami Warning System
Tsunami Warning System
 
Earthquake Early Warning Technology
Earthquake Early Warning TechnologyEarthquake Early Warning Technology
Earthquake Early Warning Technology
 

Destaque

Flood Early Warning System in Pakistan
Flood Early Warning System in PakistanFlood Early Warning System in Pakistan
Flood Early Warning System in PakistanDawood Jan
 
Technology presentation watershed 2014
Technology presentation watershed 2014Technology presentation watershed 2014
Technology presentation watershed 2014johngn4
 
Automatic flood detection and warning device a prototype
Automatic flood detection and warning device a prototypeAutomatic flood detection and warning device a prototype
Automatic flood detection and warning device a prototypeShaina Mavreen Villaroza
 
Early warning System Disaster Management
Early warning System Disaster ManagementEarly warning System Disaster Management
Early warning System Disaster ManagementVraj Pandya
 
Data security in cloud computing
Data security in cloud computingData security in cloud computing
Data security in cloud computingPrince Chandu
 

Destaque (7)

Flood Early Warning System in Pakistan
Flood Early Warning System in PakistanFlood Early Warning System in Pakistan
Flood Early Warning System in Pakistan
 
Technology presentation watershed 2014
Technology presentation watershed 2014Technology presentation watershed 2014
Technology presentation watershed 2014
 
Future Flood Warning System Project | Kevin Barnes
Future Flood Warning System Project | Kevin BarnesFuture Flood Warning System Project | Kevin Barnes
Future Flood Warning System Project | Kevin Barnes
 
Thailand flood v1
Thailand flood v1Thailand flood v1
Thailand flood v1
 
Automatic flood detection and warning device a prototype
Automatic flood detection and warning device a prototypeAutomatic flood detection and warning device a prototype
Automatic flood detection and warning device a prototype
 
Early warning System Disaster Management
Early warning System Disaster ManagementEarly warning System Disaster Management
Early warning System Disaster Management
 
Data security in cloud computing
Data security in cloud computingData security in cloud computing
Data security in cloud computing
 

Semelhante a Flood Warning Systems - A practical approach

10 - Xylem River Water Monitoring WORLD BANK-Sep-15
10 - Xylem River Water Monitoring WORLD BANK-Sep-1510 - Xylem River Water Monitoring WORLD BANK-Sep-15
10 - Xylem River Water Monitoring WORLD BANK-Sep-15indiawrm
 
Under Water wireless communication
Under Water wireless communicationUnder Water wireless communication
Under Water wireless communicationEr. Saba karim
 
Pentair - Coastal Capability
Pentair - Coastal CapabilityPentair - Coastal Capability
Pentair - Coastal CapabilityChris Goding
 
T. Peters - NHAZCA Open Day
T. Peters - NHAZCA Open DayT. Peters - NHAZCA Open Day
T. Peters - NHAZCA Open DayNHAZCA
 
T. Peters - NHAZCA Open Day
T. Peters - NHAZCA Open DayT. Peters - NHAZCA Open Day
T. Peters - NHAZCA Open Dayalfredorocca
 
7 - AECOM Water Resources Seminar World Bank -16-Sept
7 - AECOM Water Resources Seminar World Bank -16-Sept7 - AECOM Water Resources Seminar World Bank -16-Sept
7 - AECOM Water Resources Seminar World Bank -16-Septindiawrm
 
underwater_wireless_communication_networ.pptx
underwater_wireless_communication_networ.pptxunderwater_wireless_communication_networ.pptx
underwater_wireless_communication_networ.pptxSYETRajatChaskar2462
 
DSD-INT 2015 - Operational system for the eThekwini municipality - Angus Gowar
DSD-INT 2015 - Operational system for the eThekwini municipality - Angus GowarDSD-INT 2015 - Operational system for the eThekwini municipality - Angus Gowar
DSD-INT 2015 - Operational system for the eThekwini municipality - Angus GowarDeltares
 
Hydrography for Maximising Port Capacity
Hydrography for Maximising Port CapacityHydrography for Maximising Port Capacity
Hydrography for Maximising Port CapacityNeil Hewitt
 
wireless Communication Underwater(Ocean)
wireless Communication Underwater(Ocean)wireless Communication Underwater(Ocean)
wireless Communication Underwater(Ocean)tanveer alam
 
26-grover-john-draft
26-grover-john-draft26-grover-john-draft
26-grover-john-draftJohn Grover
 
IsodaqGPRSbrochureapril15v6a4lro
IsodaqGPRSbrochureapril15v6a4lroIsodaqGPRSbrochureapril15v6a4lro
IsodaqGPRSbrochureapril15v6a4lroAnjie Stevens
 
Safe System Of Work [SSOW Gen 01 [Digging In Vicinity Of Und
Safe System Of Work [SSOW Gen 01 [Digging In Vicinity Of UndSafe System Of Work [SSOW Gen 01 [Digging In Vicinity Of Und
Safe System Of Work [SSOW Gen 01 [Digging In Vicinity Of Undbobolewis
 
Use of LiDAR in Floodplain Managment
Use of LiDAR in Floodplain ManagmentUse of LiDAR in Floodplain Managment
Use of LiDAR in Floodplain ManagmentFungis Queensland
 
DSD-INT 2015 - Towards new hydrological forecasting systems in Wales - Andrew...
DSD-INT 2015 - Towards new hydrological forecasting systems in Wales - Andrew...DSD-INT 2015 - Towards new hydrological forecasting systems in Wales - Andrew...
DSD-INT 2015 - Towards new hydrological forecasting systems in Wales - Andrew...Deltares
 

Semelhante a Flood Warning Systems - A practical approach (20)

10 - Xylem River Water Monitoring WORLD BANK-Sep-15
10 - Xylem River Water Monitoring WORLD BANK-Sep-1510 - Xylem River Water Monitoring WORLD BANK-Sep-15
10 - Xylem River Water Monitoring WORLD BANK-Sep-15
 
Under Water wireless communication
Under Water wireless communicationUnder Water wireless communication
Under Water wireless communication
 
Pentair - Coastal Capability
Pentair - Coastal CapabilityPentair - Coastal Capability
Pentair - Coastal Capability
 
T. Peters - NHAZCA Open Day
T. Peters - NHAZCA Open DayT. Peters - NHAZCA Open Day
T. Peters - NHAZCA Open Day
 
T. Peters - NHAZCA Open Day
T. Peters - NHAZCA Open DayT. Peters - NHAZCA Open Day
T. Peters - NHAZCA Open Day
 
T. Peters - NHAZCA Open Day
T. Peters - NHAZCA Open DayT. Peters - NHAZCA Open Day
T. Peters - NHAZCA Open Day
 
7 - AECOM Water Resources Seminar World Bank -16-Sept
7 - AECOM Water Resources Seminar World Bank -16-Sept7 - AECOM Water Resources Seminar World Bank -16-Sept
7 - AECOM Water Resources Seminar World Bank -16-Sept
 
Shell Subsea Control.pdf
Shell Subsea Control.pdfShell Subsea Control.pdf
Shell Subsea Control.pdf
 
rajat Ppt mwc.pptx
rajat Ppt mwc.pptxrajat Ppt mwc.pptx
rajat Ppt mwc.pptx
 
underwater_wireless_communication_networ.pptx
underwater_wireless_communication_networ.pptxunderwater_wireless_communication_networ.pptx
underwater_wireless_communication_networ.pptx
 
DSD-INT 2015 - Operational system for the eThekwini municipality - Angus Gowar
DSD-INT 2015 - Operational system for the eThekwini municipality - Angus GowarDSD-INT 2015 - Operational system for the eThekwini municipality - Angus Gowar
DSD-INT 2015 - Operational system for the eThekwini municipality - Angus Gowar
 
Eau de paris
Eau de parisEau de paris
Eau de paris
 
Hydrography for Maximising Port Capacity
Hydrography for Maximising Port CapacityHydrography for Maximising Port Capacity
Hydrography for Maximising Port Capacity
 
wireless Communication Underwater(Ocean)
wireless Communication Underwater(Ocean)wireless Communication Underwater(Ocean)
wireless Communication Underwater(Ocean)
 
26-grover-john-draft
26-grover-john-draft26-grover-john-draft
26-grover-john-draft
 
IsodaqGPRSbrochureapril15v6a4lro
IsodaqGPRSbrochureapril15v6a4lroIsodaqGPRSbrochureapril15v6a4lro
IsodaqGPRSbrochureapril15v6a4lro
 
Safe System Of Work [SSOW Gen 01 [Digging In Vicinity Of Und
Safe System Of Work [SSOW Gen 01 [Digging In Vicinity Of UndSafe System Of Work [SSOW Gen 01 [Digging In Vicinity Of Und
Safe System Of Work [SSOW Gen 01 [Digging In Vicinity Of Und
 
Use of LiDAR in Floodplain Managment
Use of LiDAR in Floodplain ManagmentUse of LiDAR in Floodplain Managment
Use of LiDAR in Floodplain Managment
 
DSD-INT 2015 - Towards new hydrological forecasting systems in Wales - Andrew...
DSD-INT 2015 - Towards new hydrological forecasting systems in Wales - Andrew...DSD-INT 2015 - Towards new hydrological forecasting systems in Wales - Andrew...
DSD-INT 2015 - Towards new hydrological forecasting systems in Wales - Andrew...
 
BLD brochure
BLD brochureBLD brochure
BLD brochure
 

Último

Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024SynarionITSolutions
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 

Último (20)

Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 

Flood Warning Systems - A practical approach

  • 1. A reputation for delivering innovative, integrated environmental systems globally
  • 2. Presentation Outline • Who are Greenspan? • What projects have we completed? • Flood Warning Systems – What is a typical flood warning system – Field Stations – Communications – Base Stations – The path forward
  • 3. Flood Warning Who are Greenspan? Systems Hydrographic & Irrigation Water Quality Solutions Water Infrastructure Monitoring Oceanographic
  • 4. Who are Greenspan? 2010 2000 • >100 Australian Projects • Purchased • Coffs Harbour, Brisbane, by Tyco Sydney, Perth, 1998 Singapore, Kuala • First >$1m Lumpur, Vancouver project • World leading projects: • SMART, 1995 • Yangtze, • 2 offices • Environment Canada
  • 5. Our Staff And Vancouver! • Experts comprising: Malaysia – Hydrologists, Hydrographers and Scientists Singapore – Engineers (Installation & Service) • Civil, Mechanical, Chemical, Instrumentation, IT – Project Managers – Factory and Field Technicians – Consultants Newcastle Brisbane – Sales and Marketing Coffs Harbour – Administrative Perth Sydney • Leading experts, all in-house Hobart
  • 6. Our Affiliations • Campbell Scientific – Asian distributor for environmental monitoring projects • Control Microsystems – Regional Representation and SCADAPartner Integrator • Aquatic Informatics – Alliance Partner – Distributor for Asia, Pacific and Middle East Although we are affiliated with these companies, we are free to choose the most suitable product for each application. Companies that manufacture everything in house have a tendency to recommend their products when others may be more suitable.
  • 7. Our Projects Environment Canada Yangtze River 3 Gorges Hydrometric Network Dam Malaysian SMART Tunnel Khuzestan Water Singapore Overflow Quality Initiative Network Kenya Indonesian Hydrometric Hydro-Electric Over 100 projects in Network Power Plants Australia (including QLD Main roads FWS and Coffs Harbour FWS design)
  • 8. Flood Event Review – Hurricane Katrina • Costliest natural disaster in the history of the US – USD$81b, >1,836 deaths • Most severe loss of life in New Orleans when the levee system (2000 miles) failed, resulting in lawsuit against US Army Corp of Engineers. • Canal design helped funnel storm surge to at 20% height to the flood and make it much faster • WMO, BoM, USGS promote “Live with the flood”
  • 9. The goal of a flood warning system • To provide timely measurement and modelling of flood potential to areas at risk • Engineer a system that will not fail during flood conditions • Maximise the ability of those who are charged with the responsibility for preserving life to have sufficient warning of impending danger.
  • 10. Typical Field Stations Weather Stations • To provide data to model storm potential • To measure when the storm starts and the intensity of the storm • To understand dynamic conditions that have an impact on flood run off, such as soil moisture • To collect valuable meteorological data for historical data set
  • 11. Typical Field Stations Upper Catchment Rainfall • Early warning indicator • Quantify what the models have predicted • Without meteorological models, these are the first indicator, along with weather conditions
  • 12. Typical Field Stations Modernisation of existing stilling wells • Replace chart records or mechanical devices with accurate instruments and telemetry systems • Often have the best historical records for levels and flood events which are valuable for calibrating flood models
  • 13. Typical Field Stations Raised Platform Hydrometric Station • Above the flood zone • Rainfall and gas purge level
  • 14. Typical Field Stations Surface Radar Velocity • First of its type measures velocity, not just level • Requires calibration to relate velocity to flow (volume) • Can be used over large ranges such as those experienced in flood conditions
  • 15. Typical Field Stations In-stream Doppler Current Meter • Velocity provides much more information than simply level • For flow with hysteresis or backwater effects • Or where high flow/velocity gauging’s have not been made • Below cease to flow for total load calculations, higher for flood warning measurements
  • 16. Typical Field Stations Stormwater blockages or build up in cities • Detects blockages in the underground network of stormwater or sewer systems to alert for maintenance before an failure occurs • Localised city flooding is often cause by drainage failures • Can also be used for underground car parks or other systems to provide early warning to parked vehicles to remove the imminent danger
  • 17. Typical Field Stations Audible Warning Stations • To alert those in the flood zone • Combination of high intensity sirens as well as voiced announcements through loud speakers • Critical anywhere that experiences high rates of change in level, or below dams or levees that can be breached • Combine with direct warning systems
  • 18. Typical Field Stations On site visible warning • Road signs with warning lights when flooding is active • One of the greatest dangers in more developed areas are people trying to cross flood zones in their vehicle
  • 19. Typical Field Stations Flood Gate Control • To control and divert the flow of the flood waters • When flood warning can also be flood mitigation • Pumps can also be controlled
  • 20. Typical Field Stations CCTV • To verify measurements and view things not directly measured • Can help stop people putting themselves in danger during flood conditions, such as to inspect dams
  • 21. Communications Customised to suit every application, mixing between: - Wired (cable, leased line, PSTN) - Radio (UHF/VHF/Microwave etc) - Cellular (GSM, GPRS, 3G) - Satellite - True redundancy is achieved by mixing 2 of the above methods, with the most reliable during flood events being satellite - SMS should not be used to transmit data from a station as these can overload in flood events
  • 22. Control Centres Typically include • Redundant communications infrastructure • Redundant locations (disaster recovery centre) • SCADA • Modelling • Historian • Alarm dissemination
  • 23. Modelling Data once collected is of value to understand the conditions in the field without having to visit the field. However, with the implementation of a model, these current conditions can be used to understand what may occur in the future. Models can be anything, from a basic rainfall run- off model to highly detailed and complex models including numerical weather prediction.
  • 24. Data Correction, Validation and Statistics Hydrographic data should be processed with hydrographic tools. Particularly, the following items are important: • Data Correction (i.e. to repair data incorrectly measured in the field) • Quality coding to ensure only high quality data is used in model forecasts • Data Processing such as using rating curves to develop stage-discharge relationships • Statistics • Reporting
  • 25. RECAP: The goal of a flood warning system • To provide timely measurement and modelling of flood potential to areas at risk • Engineer a system that will not fail during flood conditions • Maximise the ability of those who are charged with the responsibility for preserving life to have sufficient warning of impending danger.
  • 26. Where to from here? • Make sure that there is a commitment to save lives and property through the investment required to engineer a suitable solution • Develop a scope of works and specification through expert consultancy • Manage the project implementation • We highly recommend a visit to the Stormwater Management And Road Tunnel (SMART) in Kuala Lumpur if at all possible as it is an excellent example of the topics discussed here today.