Flow chart of the process of application for
building plan approval
Consultant prepare and
submit the building plan
MPSJ
Plan is checked for
compliance of basic
requirements for
submission of plan.
If incomplete,
prepare letter of
non-compliance
and return to
consultant
If complied, open
file, calculate plan
processing fee and
send payment
notice to
Circulate plan to relevant
departments, i.e. Jabatan
Bomba, Health Department
and other departments, where
Jabatan Bomba, Health
Department and other
departments give comments
regarding the plan
Plan will be checked and if
there are complications or case
is not " straight forward " one,
the plan will be referred to the
Building Plans Committee
If does not
comply with
requirements,
letter
requesting
revision will be
prepared and
If complies with
requirements,
approval letter will be
prepared.
The consultant will be
contacted to collect the
building plan which has been
endorsed with approval
The approved
plan is filed.

Mais conteúdo relacionado

Mais procurados

Prosedur jkr-reka-dan-bina
Prosedur jkr-reka-dan-binaProsedur jkr-reka-dan-bina
Prosedur jkr-reka-dan-binayusof hussin
 
History report final [pdf] [updated]
History report final [pdf] [updated]History report final [pdf] [updated]
History report final [pdf] [updated]Soh Shing
 
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAHOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAFakhrul Afifi
 
Menara Tabung Haji Case Study
Menara Tabung Haji Case StudyMenara Tabung Haji Case Study
Menara Tabung Haji Case StudyLovie Tey
 
Balai Seni Negeri Drawings
Balai Seni Negeri DrawingsBalai Seni Negeri Drawings
Balai Seni Negeri DrawingsXin Dean Chong
 
Final BUILDING CONSTRUCTION 1
Final BUILDING CONSTRUCTION 1 Final BUILDING CONSTRUCTION 1
Final BUILDING CONSTRUCTION 1 Dexter Ng
 
Mosque typology AND MOSQUE architecture in Malaysia
Mosque typology AND MOSQUE architecture in MalaysiaMosque typology AND MOSQUE architecture in Malaysia
Mosque typology AND MOSQUE architecture in MalaysiaEraz
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in MalaysiaDayat Mohamad
 
Local authority of lumut, perak
Local authority of lumut, perakLocal authority of lumut, perak
Local authority of lumut, perakEraz
 
Architecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe OnnArchitecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe OnnJoe Onn Lim
 
building services project 1
building services project 1building services project 1
building services project 1Baddy Peigun
 
Malaysia's Architect Act 1967 & Architect Rules 1996 (amended 2010)
Malaysia's Architect Act 1967 & Architect Rules 1996 (amended 2010)Malaysia's Architect Act 1967 & Architect Rules 1996 (amended 2010)
Malaysia's Architect Act 1967 & Architect Rules 1996 (amended 2010)Zhao Wei Kim
 
Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Jannah Jailani
 
Building construction 1 group report
Building construction 1 group reportBuilding construction 1 group report
Building construction 1 group reportXingYue0907
 
Architecture Design Project Report
Architecture Design Project ReportArchitecture Design Project Report
Architecture Design Project Reportdouglasloon
 
Various Methods of Redevelopment
Various Methods of RedevelopmentVarious Methods of Redevelopment
Various Methods of RedevelopmentAdithyaA16
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second editionBt Lee
 
Presentation ibs
Presentation ibsPresentation ibs
Presentation ibsUTHM
 

Mais procurados (20)

Prosedur jkr-reka-dan-bina
Prosedur jkr-reka-dan-binaProsedur jkr-reka-dan-bina
Prosedur jkr-reka-dan-bina
 
History report final [pdf] [updated]
History report final [pdf] [updated]History report final [pdf] [updated]
History report final [pdf] [updated]
 
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAHOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
 
Menara Tabung Haji Case Study
Menara Tabung Haji Case StudyMenara Tabung Haji Case Study
Menara Tabung Haji Case Study
 
Balai Seni Negeri Drawings
Balai Seni Negeri DrawingsBalai Seni Negeri Drawings
Balai Seni Negeri Drawings
 
Final BUILDING CONSTRUCTION 1
Final BUILDING CONSTRUCTION 1 Final BUILDING CONSTRUCTION 1
Final BUILDING CONSTRUCTION 1
 
Mosque typology AND MOSQUE architecture in Malaysia
Mosque typology AND MOSQUE architecture in MalaysiaMosque typology AND MOSQUE architecture in Malaysia
Mosque typology AND MOSQUE architecture in Malaysia
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 
Transit Oriented Development.
Transit Oriented Development.Transit Oriented Development.
Transit Oriented Development.
 
Local authority of lumut, perak
Local authority of lumut, perakLocal authority of lumut, perak
Local authority of lumut, perak
 
UBBL 2021.pdf
UBBL 2021.pdfUBBL 2021.pdf
UBBL 2021.pdf
 
Architecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe OnnArchitecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe Onn
 
building services project 1
building services project 1building services project 1
building services project 1
 
Malaysia's Architect Act 1967 & Architect Rules 1996 (amended 2010)
Malaysia's Architect Act 1967 & Architect Rules 1996 (amended 2010)Malaysia's Architect Act 1967 & Architect Rules 1996 (amended 2010)
Malaysia's Architect Act 1967 & Architect Rules 1996 (amended 2010)
 
Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Project management project 1 report (pr architects)
Project management project 1 report (pr architects)
 
Building construction 1 group report
Building construction 1 group reportBuilding construction 1 group report
Building construction 1 group report
 
Architecture Design Project Report
Architecture Design Project ReportArchitecture Design Project Report
Architecture Design Project Report
 
Various Methods of Redevelopment
Various Methods of RedevelopmentVarious Methods of Redevelopment
Various Methods of Redevelopment
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second edition
 
Presentation ibs
Presentation ibsPresentation ibs
Presentation ibs
 

Mais de chiasueyi

Cnc documentary
Cnc documentaryCnc documentary
Cnc documentarychiasueyi
 
Design journal 5
Design journal 5Design journal 5
Design journal 5chiasueyi
 
Design journal 4
Design journal 4Design journal 4
Design journal 4chiasueyi
 
Psy final project
Psy final projectPsy final project
Psy final projectchiasueyi
 
psy Report (1)
psy Report (1)psy Report (1)
psy Report (1)chiasueyi
 
Psy journal 2
Psy journal 2Psy journal 2
Psy journal 2chiasueyi
 
Psy journal 1
Psy journal 1Psy journal 1
Psy journal 1chiasueyi
 
Animated movies
Animated moviesAnimated movies
Animated movieschiasueyi
 
Animated movies (1) new
Animated movies (1) newAnimated movies (1) new
Animated movies (1) newchiasueyi
 
Object essay final
Object essay finalObject essay final
Object essay finalchiasueyi
 
Design journal 2
Design journal 2Design journal 2
Design journal 2chiasueyi
 
Design journal 2
Design journal 2Design journal 2
Design journal 2chiasueyi
 
Ici company profile
Ici company profileIci company profile
Ici company profilechiasueyi
 

Mais de chiasueyi (20)

Csi outdoor
Csi outdoorCsi outdoor
Csi outdoor
 
20 sketch
20 sketch20 sketch
20 sketch
 
20 sketch
20 sketch20 sketch
20 sketch
 
Week3
Week3Week3
Week3
 
Week2
Week2Week2
Week2
 
Cnc documentary
Cnc documentaryCnc documentary
Cnc documentary
 
Design journal 5
Design journal 5Design journal 5
Design journal 5
 
Design journal 4
Design journal 4Design journal 4
Design journal 4
 
Psy final project
Psy final projectPsy final project
Psy final project
 
psy Report (1)
psy Report (1)psy Report (1)
psy Report (1)
 
Psy journal 2
Psy journal 2Psy journal 2
Psy journal 2
 
Psy journal 1
Psy journal 1Psy journal 1
Psy journal 1
 
Animated movies
Animated moviesAnimated movies
Animated movies
 
Animated movies (1) new
Animated movies (1) newAnimated movies (1) new
Animated movies (1) new
 
Object essay final
Object essay finalObject essay final
Object essay final
 
Design journal 2
Design journal 2Design journal 2
Design journal 2
 
Design journal 2
Design journal 2Design journal 2
Design journal 2
 
Project
Project Project
Project
 
Ici company profile
Ici company profileIci company profile
Ici company profile
 
Ici
IciIci
Ici
 

Flow chart of the process of application for build

  • 1. Flow chart of the process of application for building plan approval Consultant prepare and submit the building plan MPSJ Plan is checked for compliance of basic requirements for submission of plan. If incomplete, prepare letter of non-compliance and return to consultant If complied, open file, calculate plan processing fee and send payment notice to Circulate plan to relevant departments, i.e. Jabatan Bomba, Health Department and other departments, where Jabatan Bomba, Health Department and other departments give comments regarding the plan Plan will be checked and if there are complications or case is not " straight forward " one, the plan will be referred to the Building Plans Committee If does not comply with requirements, letter requesting revision will be prepared and If complies with requirements, approval letter will be prepared. The consultant will be contacted to collect the building plan which has been endorsed with approval The approved plan is filed.