SlideShare uma empresa Scribd logo
1 de 24
How Well Does ERP Facilitate
Project Based Business Models?
         November 2012
Background
In September 2012, a study was conducted
among manufacturing executives and
                                              This study was
professionals of middle market to large     conducted by IFS
manufacturers to better understand how        North America
well current enterprise resource planning    and Mint Jutras,
(ERP) options meet the needs of              an independent
companies in project-driven industries       research-based
including:                                   consulting firm
• Engineer to order manufacturing.          that specializes in
                                               analyzing the
• Aerospace and defense manufacturing.       business impact
• Engineering, procurement and                 of enterprise
   construction contracting.                   applications.
• Asset-intensive business like batch
   process manufacturing.

                                                                  2
Methodology
• A survey was sent to subscribers to a
  specialized industrial publication.       This study was
                                          conducted by IFS
• Sample size: 200.                         North America
• Respondents were screened for            and Mint Jutras,
                                           an independent
  involvement in enterprise software       research-based
  decisions and for company size of        consulting firm
  greater than $100 million in annual     that specializes in
                                             analyzing the
  revenue.                                 business impact
                                             of enterprise
                                             applications.




                                                                3
Methodology
• Frequencies on the data were run to reflect
  the differing technological approaches taken
                                                   This study was
  by some specific types of companies,           conducted by IFS
  including:                                       North America
   – Companies engaged in engineer to order       and Mint Jutras,
      manufacturing.                              an independent
                                                  research-based
   – Companies delivering projects as an
                                                  consulting firm
      engineering, procurement, and              that specializes in
      construction contractor.                      analyzing the
   – Those involved in batch process, which       business impact
      would cause them to be involved heavily       of enterprise
      in enterprise asset management of             applications.
      process manufacturing plants and
      equipment.

                                                                       4
Major Areas Explored
– Which project elements can be       Applications such as:
  controlled in real-time in a         Enterprise Resource
  combined ERP and Project              Planning (ERP)
                                       Project and portfolio
  Management software
                                        Mgt (PPM)
  environment.                         Customer Relationship
                                        Mgt (CRM)
                                       Enterprise Asset
– What level of integration exists?     Management (EAM)
                                       Computerized Maint.
– How well applications currently       Mgt System (CMMS)
                                       Supply Chain Mgt (SCM)
  satisfy needs.



                                                            5
Key Findings
– Most manufacturers must deal with managing a variety
  of styles of manufacture including multiple flavors of “to
  order.”
   • Engineer to order
   • Configure to order
   • Make to order
– While projects are a necessity for 85% of respondents,
  39% have no integration between their project
  management systems and enterprise system of record.
– The ability to control processes in real-time correlates
  directly with better integration.

                                                               6
Company Size (Annual Revenue)
         $100M -
       $149.9M, 16%
                                $2.5 Billion or
                                 more, 29%

   $150M -
 $249.9M, 10%



     $250M -                            $1B -
   $499.9M, 20%                      $2.49B, 12%



                        $500M -
                      $999.9M, 13%

                                                   7
Manufacturing Styles
            Make to Order                                      66%
             Make to Stock                               48%
             Batch Process                         36%
         Engineer to Order                         36%
    Custom Manufacturing                       32%
        Configure to Order                    31%
       Continuous Process                    27%
    Design Fabricate Install           15%
Engineer Procure Construct            12%

                               0%   10% 20% 30% 40% 50% 60% 70%

       Respondents were allowed to select all that apply.
       On average each respondent selected 3.26 different
       styles, adding to the complexity of the environments.
                                                                     8
Why is This Interesting?
• Although projects are an integral part of the environment for 85%
  of respondents, 39% had no integration between their project
  management and their enterprise system of record, which is
  typically an ERP solution.

• Whether an enterprise handles projects through a fully integrated
  suite or an accounting, order administration and manufacturing
  system of record, that system needs to integrate with project
  management functionality in a meaningful way.

• The ability to control processes in real time correlates with better
  integration, with the ideal being an ERP solution that is set up to be
  for project-oriented companies.

                                                                           9
Length of Projects
      Engineer to Order         Batch Process            Engineer Procure Construct
40%                                          37%                38%

                                       31%                            30%
30%    26%
                                                   23%
                                                          19%                          20%
20%
                  13%   12% 12% 13%                                         12%
10%                                                                               7%
             5%

0%
      We don’t use      Less than 1   1 to 6 months 6 to 12 months          Multi-year
       projects           month                                              projects

                       The longer the duration of the
             project, presumably the more complex. How are
                  these ETO managing the order without                                       10
                                 projects?
Months-Long Projects Require
 Project Management Software
• Another measure of complexity is the length of projects. The
  longer the duration of the project, the more complex.

• In some cases, projects are fairly well contained at less than a
  month long. But the largest percentage of engineer to order
  environment respondents are involved in projects of between one
  and six months.

• Batch process manufacturers are likely handling projects that are
  refits or design of a batch process or process equipment.



                                                                      11
Enterprise Applications in Place
      Enterprise Resource Plan. (ERP)                                  71%
             Supply Chain Mgt (SCM)                       40%
      Manufac. Execution Sys. (MES)                   29%
     Computerized Maint Mgt (CMMS)                    29%
             Product Data Mgt (PDM)                  27%
    Customer Relationship Mgt (CRM)                  26%
          Enterprise Asset Mgt (EAM)               23%
            Human Capital Mgt (HCM)               19%
           Project Portfolio Mgt (PPM)           15%
              Field Service Mgt (FSM)          12%       All Respondents
                               Other          7%

                                         0%       25%      50%       75%

    On average companies have a total of 3.24 different
      enterprise application products implemented.
                                                                           12
What Level of Integration?
Between Project Management & Enterprise System of Record

                             All Respondents
  40%      39%

                       30%
  30%


  20%
                                     13%           14%

  10%
                                                                 4%

   0%
           None      Selective     Financial        Full    Embedded as
                    integration   integration   integration a native part
                                                               of ERP

                                                                        13
Most Common Solutions Used
      to Manage Projects
1.   Microsoft Project (71%)
2.   Microsoft Excel (48%)
3.   A module of an ERP solution (20%)
4.   IBM (10%)
5.   Primavera (8%)
6.   No others named were used by more than 4%

           Many projects are still managed using
          desktop applications. Use of enterprise-
              level apps is quite fragmented.
                                                     14
Avoiding Fragmented Data
• Many respondents are still using desktop applications to manage projects.
  This can fragment data by pulling it out of shared enterprise environment.
• Microsoft Project is prevalent. There is an enterprise level version, but the
  vast majority of Microsoft Project use is in a desktop configuration.
• Microsoft Excel, the universal spreadsheet management tool, is also
  heavily used. The key to using Excel without creating silos or islands of
  data is to integrate it with your enterprise applications so you can share
  the enterprise data through Excel while it still in fact resides in ERP. Once
  an Excel spreadsheet exists wholly outside of the enterprise software
  environment, managers are at risk of making decision based on bad
  data, or your enterprise application may cease to be the true system of
  record.
• One in five reported using a module of their ERP solution.

                                                                           15
Which of the Following Project Elements
  Can You Control in Real-Time in Your
 ERP/Project Management Integration?
    Time/Schedules                                                    78%
               Cost                                                  76%
           Materials                                  52%
  Human Resources                             40%
Machinery Resources                          39%              All
                                                              Respondents
              Cash                        34%
   Risk Management                        34%

                       0%      20%         40%          60%          80%

           Schedules & Costs are controlled fairly well – these
           are the primary objectives. But other elements lack.
                                                                        16
Which of the Following Project Elements
     Can You Control in Real-Time in Your
    ERP/Project Management Integration?
               Cost                                                     90%
                                                           70%
    Time/Schedules                                                     88%
                                                              74%
           Materials                                    63%
                                               48%
  Human Resources                                       63%
                                      31%                           Full or
                                                   56%              embedded
Machinery Resources                    33%
              Cash                                 56%              Partial
                                   25%
                                                                    integration
   Risk Management                             49%
                                    28%

                       0%    20%         40%      60%         80%         100%
                  Yet with full integration, the level of control
                                 typically doubles.
                                                                                  17
Controlled in Real-time?
                                                                       82%
                   Cost                                            75%
                                                                    76%
                                                       59%
Manufacturing Materials                           48%
                                                    52%
                                                     55%
        Time/Schedules                                                       92%
                                                                     81%
                                             41%
                  Cash               25%
                                                      57%
                                                                        Engineer to Order
                                           36%
  Machinery Resources                       38%
                                                    52%
                                                                        Batch Process
                                      27%
      Risk Management                  29%
                                                      57%               Engineer Procure
                                    23%                                 Construct
     Human Resources                          44%
                                                             67%


                          0%                  50%                            100%
              Engineering Procurement Construction respondents
              have best control but use different 7.6 applications.
                   ETO uses 3.8 and Batch Process uses 4.6.                                 18
The Risk Management Gap
• Risk management may be intuitively associated with assuring on time
  and under budget project performance, but also has implications for
  the environment, safety risks & hazardous material risks & contractual
  commitments.
   – These more challenging areas of risk, which extend beyond the
      budget and timeline, become harder to manage than more
      concrete factors like cash, machines and materials.
   – While 78% of respondents can control schedules in real time and
      76% can control costs, a much smaller percentage can manage risk
      in real time. However, respondents reporting full integration or
      embedded project control within their ERP system, the ability to
      control the cost and schedules goes from the high seventies to 90%
      and 88%.
   – The ability to manage the materials, the human
      resources, machinery, cash and risk also increases from the 30%
      range to about 50% with increased integration.
                                                                      19
Integration Fosters Better Control
      Engineer to Order           Batch Process          Engineer Procure Construct
50%   45%
40%                    38%
        33%                31%
           30%                                                   30%
30%                                          24%
                               20%
20%
                                                  10%    10%12%                     10%
10%                                                                       5%
                                        2%                                     0%
0%
        None             Selective       Financial      Full integration Embedded as a
                        integration     integration                       native part of
                                                                               ERP
                 Engineer Procure Construct also has better
            integration, so not surprising they have better control
                                                                                    20
Varying Levels of Integration
• It is amazing that a sizable minority that an engineer to
  order, engineering, procurement or construction or even batch
  process oriented company reports no integration between their
  system of record and project management.
• They may be discounting the need for that level of integration or
  could fear the cost and/or the limited returns that come from
  point-to-point integrations between disparate products
• The data shows us that many elements of project management
  are underserved by existing ERP offerings.
• Overall, the ability of enterprise software to facilitate a
  spectrum of important business processes increases with
  greater project integration, with the use of Project ERP being a
  gold standard.
                                                                      21
Project Integration Facilitates
     Business Processes




                                  22
About IFS
IFS is a public company (OMX STO: IFS) founded in 1983 that
develops, supplies, and implements IFS Applications™, a
component-based extended ERP suite built on SOA technology.

IFS focuses on agile businesses where any of four core
processes are strategic: Service & asset
management, manufacturing, supply chain and projects.

The company has 2,000 customers and is present in more than
50 countries with 2,8 00 employees in total.


                                                              23
Contact Information:
  Charles Rathmann, Analyst
      IFS North America
         262.317.7419
chuck.rathmann@ifsworld.com

Mais conteúdo relacionado

Mais procurados

Agile Implementations - Tim FitzGerald - US Assure
Agile Implementations - Tim FitzGerald - US AssureAgile Implementations - Tim FitzGerald - US Assure
Agile Implementations - Tim FitzGerald - US Assure
JAX Chamber IT Council
 
Integrative KeynoteV2
Integrative KeynoteV2Integrative KeynoteV2
Integrative KeynoteV2
Murray Cantor
 
Agile Management Part 1+2-MCFINAL
Agile Management Part 1+2-MCFINALAgile Management Part 1+2-MCFINAL
Agile Management Part 1+2-MCFINAL
Murray Cantor
 
Deloitte lean agile state of the nation
Deloitte lean   agile state of the nationDeloitte lean   agile state of the nation
Deloitte lean agile state of the nation
Alexis Hui
 

Mais procurados (20)

Introduction to Recipes for Agile Governance in the Enterprise (RAGE)
Introduction to Recipes for Agile Governance in the Enterprise (RAGE)Introduction to Recipes for Agile Governance in the Enterprise (RAGE)
Introduction to Recipes for Agile Governance in the Enterprise (RAGE)
 
Agile governance The New Disinfectant
Agile governance The New DisinfectantAgile governance The New Disinfectant
Agile governance The New Disinfectant
 
Agile 101
Agile 101Agile 101
Agile 101
 
Lean Implementation Overview
Lean Implementation OverviewLean Implementation Overview
Lean Implementation Overview
 
Agile Governance for Hybrid Programs
Agile Governance for Hybrid ProgramsAgile Governance for Hybrid Programs
Agile Governance for Hybrid Programs
 
Agile Implementations - Tim FitzGerald - US Assure
Agile Implementations - Tim FitzGerald - US AssureAgile Implementations - Tim FitzGerald - US Assure
Agile Implementations - Tim FitzGerald - US Assure
 
The 3 Revolutions (Agile, Lean, Lean Startup)
The 3 Revolutions (Agile, Lean, Lean Startup)The 3 Revolutions (Agile, Lean, Lean Startup)
The 3 Revolutions (Agile, Lean, Lean Startup)
 
Agile Governance Workshop @Agile India 2012
Agile Governance Workshop @Agile India 2012Agile Governance Workshop @Agile India 2012
Agile Governance Workshop @Agile India 2012
 
Executive Presentation on Agile Project Management by Boardroom Metrics Inc.
Executive Presentation on Agile Project Management by Boardroom Metrics Inc.Executive Presentation on Agile Project Management by Boardroom Metrics Inc.
Executive Presentation on Agile Project Management by Boardroom Metrics Inc.
 
Lean & Agile Value Streams
Lean & Agile Value StreamsLean & Agile Value Streams
Lean & Agile Value Streams
 
Integrative KeynoteV2
Integrative KeynoteV2Integrative KeynoteV2
Integrative KeynoteV2
 
Agile Management Part 1+2-MCFINAL
Agile Management Part 1+2-MCFINALAgile Management Part 1+2-MCFINAL
Agile Management Part 1+2-MCFINAL
 
Scaling Agile - Multiple Team Dynamics
Scaling Agile - Multiple Team DynamicsScaling Agile - Multiple Team Dynamics
Scaling Agile - Multiple Team Dynamics
 
Agile Test Transformation
Agile Test TransformationAgile Test Transformation
Agile Test Transformation
 
Agile Transformation
Agile TransformationAgile Transformation
Agile Transformation
 
Identifying and Managing Waste in Complex Product Development Environments
Identifying and Managing Waste in Complex Product Development EnvironmentsIdentifying and Managing Waste in Complex Product Development Environments
Identifying and Managing Waste in Complex Product Development Environments
 
Deloitte lean agile state of the nation
Deloitte lean   agile state of the nationDeloitte lean   agile state of the nation
Deloitte lean agile state of the nation
 
Agile and Scrum 101 –PMI Central Indiana Chapter - Michael Nir - Slide deck
Agile and Scrum 101 –PMI Central Indiana Chapter -  Michael Nir - Slide deckAgile and Scrum 101 –PMI Central Indiana Chapter -  Michael Nir - Slide deck
Agile and Scrum 101 –PMI Central Indiana Chapter - Michael Nir - Slide deck
 
Introduction to Lean Six Sigma in Government
Introduction to Lean Six Sigma in GovernmentIntroduction to Lean Six Sigma in Government
Introduction to Lean Six Sigma in Government
 
Agile and Lean Software Development
Agile and Lean Software DevelopmentAgile and Lean Software Development
Agile and Lean Software Development
 

Destaque

Kanban for Software Development and Kaizen Culture
Kanban for Software Development and Kaizen CultureKanban for Software Development and Kaizen Culture
Kanban for Software Development and Kaizen Culture
Acquate
 
Kanban For Software Engineering Apr 242
Kanban For Software Engineering Apr 242Kanban For Software Engineering Apr 242
Kanban For Software Engineering Apr 242
Ross Lawley
 
Product development success story with kanban final
Product development success story with kanban   finalProduct development success story with kanban   final
Product development success story with kanban final
Digite, Inc.
 
Cloud enabled business process management systems
Cloud enabled business process management systemsCloud enabled business process management systems
Cloud enabled business process management systems
Ja'far Railton
 
ZERO STOCK OUT CASE STUDY
ZERO STOCK OUT CASE STUDYZERO STOCK OUT CASE STUDY
ZERO STOCK OUT CASE STUDY
Buen Guido
 
Lean manufacturing toyota indonesia 2011_2
Lean manufacturing toyota indonesia 2011_2Lean manufacturing toyota indonesia 2011_2
Lean manufacturing toyota indonesia 2011_2
Muljati Muli
 
HowTo Design your kanban board
HowTo Design your kanban boardHowTo Design your kanban board
HowTo Design your kanban board
Jo Seibert
 
Milk run distribution
Milk run distributionMilk run distribution
Milk run distribution
Hammaduddin
 

Destaque (20)

Kanban for Software Development and Kaizen Culture
Kanban for Software Development and Kaizen CultureKanban for Software Development and Kaizen Culture
Kanban for Software Development and Kaizen Culture
 
Kanban For Software Engineering Apr 242
Kanban For Software Engineering Apr 242Kanban For Software Engineering Apr 242
Kanban For Software Engineering Apr 242
 
Project Management And Business Process
Project Management And Business ProcessProject Management And Business Process
Project Management And Business Process
 
Value-based Process Project Portfolio Management
Value-based Process Project Portfolio ManagementValue-based Process Project Portfolio Management
Value-based Process Project Portfolio Management
 
Product development success story with kanban final
Product development success story with kanban   finalProduct development success story with kanban   final
Product development success story with kanban final
 
Isp
IspIsp
Isp
 
Free Kaizen guide
Free Kaizen guideFree Kaizen guide
Free Kaizen guide
 
Cloud enabled business process management systems
Cloud enabled business process management systemsCloud enabled business process management systems
Cloud enabled business process management systems
 
ZERO STOCK OUT CASE STUDY
ZERO STOCK OUT CASE STUDYZERO STOCK OUT CASE STUDY
ZERO STOCK OUT CASE STUDY
 
Thomas Axen - Lean Kaizen Applied To Software Testing - EuroSTAR 2010
Thomas Axen - Lean Kaizen Applied To Software Testing - EuroSTAR 2010Thomas Axen - Lean Kaizen Applied To Software Testing - EuroSTAR 2010
Thomas Axen - Lean Kaizen Applied To Software Testing - EuroSTAR 2010
 
Develop An End to End Process Architecture
Develop An End to End Process ArchitectureDevelop An End to End Process Architecture
Develop An End to End Process Architecture
 
How to Build in Quality from Day 1 using Lean QA and Agile Testing
How to Build in Quality from Day 1 using Lean QA and Agile TestingHow to Build in Quality from Day 1 using Lean QA and Agile Testing
How to Build in Quality from Day 1 using Lean QA and Agile Testing
 
Agile Kaizen - Improvement Beyond Retrospectives
Agile Kaizen - Improvement Beyond RetrospectivesAgile Kaizen - Improvement Beyond Retrospectives
Agile Kaizen - Improvement Beyond Retrospectives
 
Lean manufacturing toyota indonesia 2011_2
Lean manufacturing toyota indonesia 2011_2Lean manufacturing toyota indonesia 2011_2
Lean manufacturing toyota indonesia 2011_2
 
Production Planning
Production PlanningProduction Planning
Production Planning
 
HowTo Design your kanban board
HowTo Design your kanban boardHowTo Design your kanban board
HowTo Design your kanban board
 
Milk run distribution
Milk run distributionMilk run distribution
Milk run distribution
 
Toyota logistics
Toyota logisticsToyota logistics
Toyota logistics
 
Kanban Board Examples
Kanban Board ExamplesKanban Board Examples
Kanban Board Examples
 
Toyota Supply chain Management
Toyota Supply chain Management Toyota Supply chain Management
Toyota Supply chain Management
 

Semelhante a How Well Does ERP Facilitate Project Based Business Models?

Customer Survey
Customer SurveyCustomer Survey
Customer Survey
rleungym
 
2011 3DCIC Management Forum Opening
2011 3DCIC Management Forum Opening2011 3DCIC Management Forum Opening
2011 3DCIC Management Forum Opening
Lifecycle Insights
 
Unlocking Your Organization\'s Warranty Management Potential
Unlocking Your Organization\'s Warranty Management PotentialUnlocking Your Organization\'s Warranty Management Potential
Unlocking Your Organization\'s Warranty Management Potential
ImranMasood
 
Consequences of a Failed ECM Implementation
Consequences of a Failed ECM ImplementationConsequences of a Failed ECM Implementation
Consequences of a Failed ECM Implementation
iDatix
 
Lecture 7 - Sectoral characteristics of technological change
Lecture 7 - Sectoral characteristics of technological changeLecture 7 - Sectoral characteristics of technological change
Lecture 7 - Sectoral characteristics of technological change
UNU.MERIT
 

Semelhante a How Well Does ERP Facilitate Project Based Business Models? (20)

How Well Does ERP Facilitate Project-Based Business Models?
How Well Does ERP Facilitate Project-Based Business Models?How Well Does ERP Facilitate Project-Based Business Models?
How Well Does ERP Facilitate Project-Based Business Models?
 
Complexity in Industrial ERP: Getting Back to One Version of the Truth
Complexity in Industrial ERP: Getting Back to One Version of the TruthComplexity in Industrial ERP: Getting Back to One Version of the Truth
Complexity in Industrial ERP: Getting Back to One Version of the Truth
 
Complexity in Industrial ERP: Getting Back to One Version of the Truth
Complexity in Industrial ERP:Getting Back to One Version of the TruthComplexity in Industrial ERP:Getting Back to One Version of the Truth
Complexity in Industrial ERP: Getting Back to One Version of the Truth
 
Rational collaborative-lifecycle-management-2012
Rational collaborative-lifecycle-management-2012Rational collaborative-lifecycle-management-2012
Rational collaborative-lifecycle-management-2012
 
Enterprise software delivery
Enterprise software deliveryEnterprise software delivery
Enterprise software delivery
 
EPPM Webcast
EPPM WebcastEPPM Webcast
EPPM Webcast
 
Enterprise Applications
Enterprise ApplicationsEnterprise Applications
Enterprise Applications
 
Tml Deployment Strategy Overview V 1
Tml Deployment Strategy Overview V 1Tml Deployment Strategy Overview V 1
Tml Deployment Strategy Overview V 1
 
Customer Survey
Customer SurveyCustomer Survey
Customer Survey
 
Higher education IAM-seminar Turku 10.12.2009
Higher education IAM-seminar Turku 10.12.2009Higher education IAM-seminar Turku 10.12.2009
Higher education IAM-seminar Turku 10.12.2009
 
IBM Cognos TM1 Version 10.1 Demonstration and Financial Planning Best Practic...
IBM Cognos TM1 Version 10.1 Demonstration and Financial Planning Best Practic...IBM Cognos TM1 Version 10.1 Demonstration and Financial Planning Best Practic...
IBM Cognos TM1 Version 10.1 Demonstration and Financial Planning Best Practic...
 
2011 3DCIC Management Forum Opening
2011 3DCIC Management Forum Opening2011 3DCIC Management Forum Opening
2011 3DCIC Management Forum Opening
 
Unlocking Your Organization\'s Warranty Management Potential
Unlocking Your Organization\'s Warranty Management PotentialUnlocking Your Organization\'s Warranty Management Potential
Unlocking Your Organization\'s Warranty Management Potential
 
Software Lifecycle
Software LifecycleSoftware Lifecycle
Software Lifecycle
 
Business Process Re-Engineering
Business Process Re-Engineering Business Process Re-Engineering
Business Process Re-Engineering
 
Dr Lango - Lecture Notes Trends in PM.pptx
Dr Lango - Lecture Notes Trends in PM.pptxDr Lango - Lecture Notes Trends in PM.pptx
Dr Lango - Lecture Notes Trends in PM.pptx
 
From Waterfall to Agile - from predictive to adaptive methods
From Waterfall to Agile - from predictive to adaptive methodsFrom Waterfall to Agile - from predictive to adaptive methods
From Waterfall to Agile - from predictive to adaptive methods
 
Consequences of a Failed ECM Implementation
Consequences of a Failed ECM ImplementationConsequences of a Failed ECM Implementation
Consequences of a Failed ECM Implementation
 
Lecture 7 - Sectoral characteristics of technological change
Lecture 7 - Sectoral characteristics of technological changeLecture 7 - Sectoral characteristics of technological change
Lecture 7 - Sectoral characteristics of technological change
 
Project Portfolio Management
Project Portfolio ManagementProject Portfolio Management
Project Portfolio Management
 

Último

Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 

Último (20)

Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 

How Well Does ERP Facilitate Project Based Business Models?

  • 1. How Well Does ERP Facilitate Project Based Business Models? November 2012
  • 2. Background In September 2012, a study was conducted among manufacturing executives and This study was professionals of middle market to large conducted by IFS manufacturers to better understand how North America well current enterprise resource planning and Mint Jutras, (ERP) options meet the needs of an independent companies in project-driven industries research-based including: consulting firm • Engineer to order manufacturing. that specializes in analyzing the • Aerospace and defense manufacturing. business impact • Engineering, procurement and of enterprise construction contracting. applications. • Asset-intensive business like batch process manufacturing. 2
  • 3. Methodology • A survey was sent to subscribers to a specialized industrial publication. This study was conducted by IFS • Sample size: 200. North America • Respondents were screened for and Mint Jutras, an independent involvement in enterprise software research-based decisions and for company size of consulting firm greater than $100 million in annual that specializes in analyzing the revenue. business impact of enterprise applications. 3
  • 4. Methodology • Frequencies on the data were run to reflect the differing technological approaches taken This study was by some specific types of companies, conducted by IFS including: North America – Companies engaged in engineer to order and Mint Jutras, manufacturing. an independent research-based – Companies delivering projects as an consulting firm engineering, procurement, and that specializes in construction contractor. analyzing the – Those involved in batch process, which business impact would cause them to be involved heavily of enterprise in enterprise asset management of applications. process manufacturing plants and equipment. 4
  • 5. Major Areas Explored – Which project elements can be Applications such as: controlled in real-time in a  Enterprise Resource combined ERP and Project Planning (ERP)  Project and portfolio Management software Mgt (PPM) environment.  Customer Relationship Mgt (CRM)  Enterprise Asset – What level of integration exists? Management (EAM)  Computerized Maint. – How well applications currently Mgt System (CMMS)  Supply Chain Mgt (SCM) satisfy needs. 5
  • 6. Key Findings – Most manufacturers must deal with managing a variety of styles of manufacture including multiple flavors of “to order.” • Engineer to order • Configure to order • Make to order – While projects are a necessity for 85% of respondents, 39% have no integration between their project management systems and enterprise system of record. – The ability to control processes in real-time correlates directly with better integration. 6
  • 7. Company Size (Annual Revenue) $100M - $149.9M, 16% $2.5 Billion or more, 29% $150M - $249.9M, 10% $250M - $1B - $499.9M, 20% $2.49B, 12% $500M - $999.9M, 13% 7
  • 8. Manufacturing Styles Make to Order 66% Make to Stock 48% Batch Process 36% Engineer to Order 36% Custom Manufacturing 32% Configure to Order 31% Continuous Process 27% Design Fabricate Install 15% Engineer Procure Construct 12% 0% 10% 20% 30% 40% 50% 60% 70% Respondents were allowed to select all that apply. On average each respondent selected 3.26 different styles, adding to the complexity of the environments. 8
  • 9. Why is This Interesting? • Although projects are an integral part of the environment for 85% of respondents, 39% had no integration between their project management and their enterprise system of record, which is typically an ERP solution. • Whether an enterprise handles projects through a fully integrated suite or an accounting, order administration and manufacturing system of record, that system needs to integrate with project management functionality in a meaningful way. • The ability to control processes in real time correlates with better integration, with the ideal being an ERP solution that is set up to be for project-oriented companies. 9
  • 10. Length of Projects Engineer to Order Batch Process Engineer Procure Construct 40% 37% 38% 31% 30% 30% 26% 23% 19% 20% 20% 13% 12% 12% 13% 12% 10% 7% 5% 0% We don’t use Less than 1 1 to 6 months 6 to 12 months Multi-year projects month projects The longer the duration of the project, presumably the more complex. How are these ETO managing the order without 10 projects?
  • 11. Months-Long Projects Require Project Management Software • Another measure of complexity is the length of projects. The longer the duration of the project, the more complex. • In some cases, projects are fairly well contained at less than a month long. But the largest percentage of engineer to order environment respondents are involved in projects of between one and six months. • Batch process manufacturers are likely handling projects that are refits or design of a batch process or process equipment. 11
  • 12. Enterprise Applications in Place Enterprise Resource Plan. (ERP) 71% Supply Chain Mgt (SCM) 40% Manufac. Execution Sys. (MES) 29% Computerized Maint Mgt (CMMS) 29% Product Data Mgt (PDM) 27% Customer Relationship Mgt (CRM) 26% Enterprise Asset Mgt (EAM) 23% Human Capital Mgt (HCM) 19% Project Portfolio Mgt (PPM) 15% Field Service Mgt (FSM) 12% All Respondents Other 7% 0% 25% 50% 75% On average companies have a total of 3.24 different enterprise application products implemented. 12
  • 13. What Level of Integration? Between Project Management & Enterprise System of Record All Respondents 40% 39% 30% 30% 20% 13% 14% 10% 4% 0% None Selective Financial Full Embedded as integration integration integration a native part of ERP 13
  • 14. Most Common Solutions Used to Manage Projects 1. Microsoft Project (71%) 2. Microsoft Excel (48%) 3. A module of an ERP solution (20%) 4. IBM (10%) 5. Primavera (8%) 6. No others named were used by more than 4% Many projects are still managed using desktop applications. Use of enterprise- level apps is quite fragmented. 14
  • 15. Avoiding Fragmented Data • Many respondents are still using desktop applications to manage projects. This can fragment data by pulling it out of shared enterprise environment. • Microsoft Project is prevalent. There is an enterprise level version, but the vast majority of Microsoft Project use is in a desktop configuration. • Microsoft Excel, the universal spreadsheet management tool, is also heavily used. The key to using Excel without creating silos or islands of data is to integrate it with your enterprise applications so you can share the enterprise data through Excel while it still in fact resides in ERP. Once an Excel spreadsheet exists wholly outside of the enterprise software environment, managers are at risk of making decision based on bad data, or your enterprise application may cease to be the true system of record. • One in five reported using a module of their ERP solution. 15
  • 16. Which of the Following Project Elements Can You Control in Real-Time in Your ERP/Project Management Integration? Time/Schedules 78% Cost 76% Materials 52% Human Resources 40% Machinery Resources 39% All Respondents Cash 34% Risk Management 34% 0% 20% 40% 60% 80% Schedules & Costs are controlled fairly well – these are the primary objectives. But other elements lack. 16
  • 17. Which of the Following Project Elements Can You Control in Real-Time in Your ERP/Project Management Integration? Cost 90% 70% Time/Schedules 88% 74% Materials 63% 48% Human Resources 63% 31% Full or 56% embedded Machinery Resources 33% Cash 56% Partial 25% integration Risk Management 49% 28% 0% 20% 40% 60% 80% 100% Yet with full integration, the level of control typically doubles. 17
  • 18. Controlled in Real-time? 82% Cost 75% 76% 59% Manufacturing Materials 48% 52% 55% Time/Schedules 92% 81% 41% Cash 25% 57% Engineer to Order 36% Machinery Resources 38% 52% Batch Process 27% Risk Management 29% 57% Engineer Procure 23% Construct Human Resources 44% 67% 0% 50% 100% Engineering Procurement Construction respondents have best control but use different 7.6 applications. ETO uses 3.8 and Batch Process uses 4.6. 18
  • 19. The Risk Management Gap • Risk management may be intuitively associated with assuring on time and under budget project performance, but also has implications for the environment, safety risks & hazardous material risks & contractual commitments. – These more challenging areas of risk, which extend beyond the budget and timeline, become harder to manage than more concrete factors like cash, machines and materials. – While 78% of respondents can control schedules in real time and 76% can control costs, a much smaller percentage can manage risk in real time. However, respondents reporting full integration or embedded project control within their ERP system, the ability to control the cost and schedules goes from the high seventies to 90% and 88%. – The ability to manage the materials, the human resources, machinery, cash and risk also increases from the 30% range to about 50% with increased integration. 19
  • 20. Integration Fosters Better Control Engineer to Order Batch Process Engineer Procure Construct 50% 45% 40% 38% 33% 31% 30% 30% 30% 24% 20% 20% 10% 10%12% 10% 10% 5% 2% 0% 0% None Selective Financial Full integration Embedded as a integration integration native part of ERP Engineer Procure Construct also has better integration, so not surprising they have better control 20
  • 21. Varying Levels of Integration • It is amazing that a sizable minority that an engineer to order, engineering, procurement or construction or even batch process oriented company reports no integration between their system of record and project management. • They may be discounting the need for that level of integration or could fear the cost and/or the limited returns that come from point-to-point integrations between disparate products • The data shows us that many elements of project management are underserved by existing ERP offerings. • Overall, the ability of enterprise software to facilitate a spectrum of important business processes increases with greater project integration, with the use of Project ERP being a gold standard. 21
  • 22. Project Integration Facilitates Business Processes 22
  • 23. About IFS IFS is a public company (OMX STO: IFS) founded in 1983 that develops, supplies, and implements IFS Applications™, a component-based extended ERP suite built on SOA technology. IFS focuses on agile businesses where any of four core processes are strategic: Service & asset management, manufacturing, supply chain and projects. The company has 2,000 customers and is present in more than 50 countries with 2,8 00 employees in total. 23
  • 24. Contact Information: Charles Rathmann, Analyst IFS North America 262.317.7419 chuck.rathmann@ifsworld.com