Job Description:-
Development and Implementation of Project Specific Contract Quality Plan, Procedure,
work instructions and quality Control plans.
Ensuring maintenance of Companys QMS in compliance with ISO 9000 / ASME / other
standards.
Ensuring use of latest revision of all Contract Documents, Contract Specifications and
engineering reference and Standards.
Internal Auditing, Verification of quality records and follow up of corrective actions, at
various projects Sites.
Identification, investigation resolution and close out of non conformities.
Ensuring all inspection & test points are correctly carried by designated person & duly
recorded. Identify& schedule all testing weekly according to work progress & on ITP
and assign such duties to Quality Engineers.
Identifying training needs of personnel and provide training on Quality Management.
Maintain Training Records.
Ensuring the smooth handing over documentation for completed projects.
Maintain good relationships with the client and develop a professional team to establish
the company (BEC) as the contractor of choice
2. EDUCATIONAL QUALIFICATION:-
Metric: S.B.S.H.S.Karhan, Bihar Board Patna . Year 1984.
TECHNICAL SKILLS:-
Diploma in Mechanical.400 The Oxford Polytechnic, Banglore
(INDIA) 1987 Division 1st
NDT QUALIFICATION NON-DESTRUCTIVETESTING (ASNT)
LEVEL-II Radiographic Testing
LEVEL-II Dye PenetrantTesting
LEVEL-II Magnatic Particle Testing
LEVEL-II UltrasonicTesting
QualifiedaccordingWrittenPractice-I,in accordance with the requirementsof
ASNT RecommendedPractice No.SNT-TC-1A.
B.U.ENGG. & INSPECTION PVT. LTD.
FARIDABAD , HARIYANA. (INDIA)
COMPUTER LITRACY
MicrosoftWindowsand its relevantoffice program.
MicrosoftExcel, MicrosoftWord,Live link,Outlook, powerpoint, PACER
WORKING EXPERIENCE:-
NAME OF ORGANIZATION; INDIAN ERECTORS ENGINEERING CONTRACTORS.
DESIGNATION: Manager.QA/QC
DURATION 23TH
OCTOBER 2013 TO TILL DATE.
CLIENT:- (VISATHERMAL POWER PROJECT) (FABRICATION&ERECTION-TG-BUILDING-25000MT
STRUCTURAL STEEL. )
3. NAME OF ORGANIZATION : M.P.ENGINEERINGCONSTRUCTIONS INDAI PVT LTD.
DESIGNATION: Manager.QA/QC
DURATION 14TH
DECAMBER 2011 TO 20.09.2013.
CLIENT:- (MAHANAGERGASNAVI MUMBAI) (CITYGAS DISTRIBUTION STEEL PROJECT)
NAME OF ORGANIZATION “JYOTI ENGINEERING CO. (INDIA)
Project : NOCIAL(PETROCHEMICAL DIVISON)NEW BOMBAY(INDIA)
Client : GAIL
Duration: 05th Jan, 1994 to 10th
apr 1998
Position : Engineer.QA/QC.
NAME OF ORGANIZATION:BRIGE & ROOF COMPANYLTD(INDIA)
Project : BPCL:-CHEMBUR MUMBAI (INDIA)
Client : Gail India limited.
Duration : 07.06.1998 to 21.05.2004
Position : Engineer.QA/QC.
NAME OF ORGANIZATION:ARIO INFRSTRUCTUREPVT. LTD(INDIA)
CITY GASDISTRIBUTION
STEEL PIPE LINE
PROJECT: Thane Belapur
Pipelines.,BARIALLY,SUR
ENDRA
NAGAR,JAMNAGAR,
Client:MAHANAGER
GAS(MUMBAI),CUGL(U.P
,GSPC(GUJRAT),
DESIGNATION : Engineer.QA/QC.
Duration : 15.07. 2004 to 13.12.-2009.
4. NAME OF ORGANIZATION: NANDINI IMPEX PVT LTD.(INDIA)
DESIGNATION: Engineer.QA/QC
DURATION : 25TH JAN 2010 to 23 OCT 2011.
CLIENT:-SABERMATIGAS.PROJECT:-MMPL
CROSS COUNTRY PIPE LINE.(GANDHINAGAR)
NAME OF ORGANIZATION: M.P.ENGINEERINGCONSTRUCTIONS INDAI PVT LTD.
DESIGNATION: Engineer.QA/QC
DURATION 14TH
DECAMBER 2011 TO 20.09.20
GENERAL KNOWLEDGE OF INTERNATIONAL CODE/STANDARDS
Well Familiar with following international Code/Standards
American Society of Mechanical Engineers
ASME 31.3, 31.4, 31.8, for Plant/Transport/Gas Piping), ASME Sec IX for Qualification Standard for
Welding Procedures, Welders & Welding Operators, ASME VIII, Div-I (Pressure Vessels), ASME Sec V
(NDT) AWS D 1.1 (Steel Structure)
American Petroleum Institute
API-510 (Pressure Vessel), API-571 (Damage Mechanism Affecting Equipment in Refining), API-572
(Inspection of Pressure Vessels), API-576 (Inspection of Pressure Relief Valves), API-577 (Welding
Inspectionand Metallurgy),API-653 (Tank InspectionRepair,Alteration& Reconstruction), API-650 (A/G
Atmosphere Storage Tanks) & API-1104 (Welding of Pipeline & Related Facilities)
Detail of Work Performed/Achievement
General
AttendingPre- Inspectionmeetingwithcontractors, vender/suppliersandclientrepresentative.
Conducting quality audits of vender/suppliers and sub-contractors.
Reviewedofthe WeldingProcedure Specification(WPS)andProcedure QualificationRecord
(PQR) as per specificationsandstandards for differentmaterials.
Witnessedthe WelderQualificationTestasper ASME SEC IX, AWSD 1.1, API1104.
Reviewedthe QA/QC procedures,Quality Plan as per projectspecificationand standards.
Materialsinspectionsand verificationswithMTC certificatesand project specifications.
Responsible for reviewing requisition & purchase order as per specification requirements.
Coordination with contractor for vendor inspections.
Reviewing project specs compliance at the quotation stage.
Coordination with NDT group for carrying-out of non-destructive testing.
Inspection of critical coating inside of the Pressure Vessels & Tanks.
Inspection of the internal & external coating of the Pipes, Vessels & Tanks.
5. Process Piping & Pipe Line (as per ASME 31.3, 31.4, 31.8 & API 1104)
Incoming Material Inspection of pipes, plates, & valves etc.
Inspectionof pipingfabrication,fit up, dimensional andorientationas perconstruction drawings
Identifying and confirming of all the NDT requirements e.g. PWHT, Hardness Testing, RT, DPT,
MPI against piping material line class and service
Dimensional and fabrication inspection of pipe supports as per drawings.
Checking of welding parameters, volts, amperes, speed & heat input against approved WPS.
Interpretationof radiography filmand reviewofreports includingwelding reports Witnessing &
Monitoring of PWHT, hardness, DPT, MPI and reviewing NDT reports.
For Pipeline;MonitorPipeline activities,trenching,stringing,welding,lowering,tie-in,coating,
holidaytest and hydro test.
Inspections of heat shrink sleeve installation and Inspection of temperature Tie-in joints
Test pack preparations and review all related documents and Punch list preparations.
Witness of hydro testing, pneumatic and leak testing.
Internal cleaning by water flashing, air blowing, pigging, and drying.
Storage Tank (as per API 650, API 653)
Inspection for different types of tanks including cone roof, dome roof, internal floating roof,
single/double deck floating roof, Hemi Spheroid and Spherical tanks
Foundation level check, tank bottom plates laying inspection. Material traceability
Inspections of marking, cutting, fabrications and erections of shell plates.
Witness of welder and welding operator qualification test for SAW and SMAW welding
procedures.
Shell plate’s erection, fit-up of vertical & horizontal joints, stair & structure related to tank.
Welding inspection, peaking, banding check of vertical & horizontal joints.
Nozzles orientation, fit-up, alignment, level & welding inspection.
Witnessing of Vacuum box testing of bottom plates.
Bottom test (Vacuum box test), oil penetrant test (OPT), and pneumatic test of nozzle’s pad.
Hydro test and NDT according to Code API 650 & ASME SEC V.
Inspection of Fiber Glass Coating application and existing condition of tank bottom plates.
Painting and Grid blasting
Inspection of weather condition, relative humidity and dew point.
Inspection of Surface temperature, and ambient temperature
Inspection of abrasive material and size ( Grit, copper slag silica free, steel shot, garnet,
aluminum oxide) by laboratory.
Inspection of surface preparation and profile as per SSPC, SIS 05 59 00
Inspections of wet film thickness and dry film thickness.
Adhesion test by X-cut, V-cut, tape, and pull off test.
Inspection of coating and wrapping of C.S piping.
Inspection of holiday test (Pin hole test)
6. Steel Structure
Marking, cutting and Fit-up inspection.
Visual welding inspection and NDT inspection by MPI & DPT & UT.
Dimensional inspection according to approved construction drawings.
Erection inspection, to make sure all the bolting are properly tightened, fixing and matching
properly with out stresses.
Vessels
Inspection of fabrication and erection of pressure vessels as per ASME Sec. VIII Div 1.
Inspection of fabrication as per ITP.
Dimensional inspections for marking & cutting.
Fit-up & welding inspection.
Witness the PWHT.
Hydro test for vessels for new and after re-rating or alteration.
PERSNAL-PROFILE:-
NAME : CHANDESHWAR PRASAD SINGH.
FATHER’S NAME : RAMA PRASAD SINGH.
DATE OF BIRTH : 13TH
JULY 1968
ADDRESS : VILL &PO –KARHAN.
P.S : KESARIA
DISTRIC : MOTIHARI
STATE : BIHAR
GENDER : MALE
RELIGION : HINDU.
MARITAL STATUS : MARRIED.
NATIONNALITY : INDIAN.
LANGUAGE KNOWN : HINDI & ENGLISH.
HOBBIES : LISTENING MUSIC & READING BOOK,S.
SALARY EXPECTED : NEGOTIABLE.
7. PASSPORT DETAILS
PASSPORT NO. PLACE OF ISSUE DATE OF ISSUE DATE OF EXPIRY
G 7814722 PATNA 07/03/2008 06/03/2018
CTC-5 lacs per anm.
Expected Salary-7.5 lacs Per anm.
Notice period-1mont.
DECLARATION:
I do hereby declare that statements as mentioned above are true and correct to
the best of my knowledge and belief.
Anticipating your favorable response in this regard, I shall remain grateful to you.
DATE: Yours Faithfully,
PLACE: (Chandeshwar Prasad Singh)