CONTINUOUS MINER


         CHANDAN CHAMAN
U/G vs O/C PRODUCTION

• Over 4970 Mte coal is produced the world
  over
• 60% of world coal production comes from
  underground mines
              Country    UG     OC
        USA              33 %   67 %
        China (approx)   85 %   15 %
        India (10-11)    15 %   85%
        Australia        20%    80%
U/G production & productivity

• The declining trend in underground
  production is continuing
• Use of mechanization (SDL/LHD) and
  reduction of manpower has improved the
  productivity but failed in improving
  production
Technology wise production

                                      Production (Mte)
Mining Technology
                    2001-02   2002-03     2003-04    2004-05     2005-06

Conventional B&P     22.16     19.54       17.02         15.50    13.74

Conventional LW      0.20      0.20         0.15         0.15     0.15
Special Method       0.28      0.20         0.23         0.15     0.35

Mechanised B&P       21.02     25.98       26.99         28.93    30.85

Mechanised LW        2.54      2.10         2.42         1.75     2.06

Continuous Miner               0.40         0.66         0.56     0.70

Total                46.20     48.42       47.47         47.04    47.85
Reserve

• India has around 253 Bt of reserve i.e. about 10% of the
  world reserve
   – Depth wise reserve
      • 0 to 300m           : 155 Bt
      • 300 to 600m         : 66 Bt
      • 600 to 1200m        : 19 Bt
• Presently nearly all the mines are upto 300m depth only
• Around 90 Bt coal i.e 38% untouched virgin reserve lies
  at a depth of more than 300m which can be mined by
  u/g mining only.
• Hence the future production of coal will be from
  underground mining.
Improving U/G production and
          productivity
• How to improve production and productivity of
  u/g mines
  –   Mechanise loading, drilling and conveying system
  –   Increase depillaring
  –   Provide man riding system
  –   Introduce mass production technology, do away with
      blasting technology where feasible
  –   Encourage indigenous manufacturing of mass
      production equipment
  –   Introduce all man all job
  –   Introduce contract labour to overcome shortage
  –   Automation of the systems as far as possible
Mass Production Technology

• For survival of underground mines, it should
  compete with opencast mines
• This is possible by improving the production and
  OMS of U/G mines
• Even though CIL overall OMS has improved
  from 1.86 (1997) to 3.55 (2007) the share of
  manpower cost has remained around 45 to 50%.
• EMS today is around Rs 850, hence low
  productivity will not do.
• Adoption of mass production technology is a
  must
Continuous Miner

 Continuous miner is a mass production technology for
  underground mining that can be used in
    bord & pillar (room & pillar)
    rib pillar and
    shortwall methods.

 Continuous miner has been adopted for bord & pillar
  method in Anjan Hills/ NCPH of SECL and in Tandsi
  Mine of WCL. Adoption in Jhanjra, ECL is under
  process.
 SECL has achieved annual production of more than 0.5
  MTe with CM
 About 20 more mines have been identified for
  introduction of CM in future
Suitable conditions for CM

Though equipments are manufactured to
suit wide range of conditions, some of the
limitations of its use are as follows.
 Seam thickness: 1.8m to 5m
 Seam gradient: 1 in 8 or flatter
 Floor rock: Hard and dry floor condition
  desirable for efficient operation
 Roof condition: Bad roof condition
  adversely affects system performance.
  (RMR at NCPH Old – 55; Tandsi – 36)
Broad specifications of equipments
        being used in CIL
 Continuous        Miner       -    12CM15-10D           (Crawler-
  mounted)
  Operating height range: 2.28 – 4.6m; Cutting drum width: 3.3m;
  Total motor power: 564 kW
 Shuttle Cars - 10SC32B (Tyre-mounted)
  Safe carrying capacity: 13.6 t (It carries 8t of coal in NCPH); Cable
  reel capacity: 200m; Total motor power: 107 kW
 Quad Bolter – RT117 (Crawler-mounted)
  Minimum tram height: 2.15m; Operating height range: 2.4 – 4.775m;
  No. of bolters: 4 (2 per platform); Motor power: 112 kW
 Feeder-breaker – BF-14B-3-7C (Crawler-mounted)
  Throughput: 250 & 500 tph; Breaker Motor: 112 kW
 Load-Haul-Dump (LHD) (Tyre-mounted)
 Load-centre (Trolley-mounted)
Continuous Miner
Shuttle Car
Quad Bolter
Working system of CM
 In this technology, mining takes place by “Place
  Changing System”.
 Five heading panel is optimum. Gallery width should be
  minimum 5m
 The continuous miner cuts and load coal to shuttle car at
  a ‘place’. For developing full width of gallery, CM cuts in
  two passes at a place.
 The shuttle car hauls the load to the feeder-breaker.
 The feeder-breaker feeds sized coal to the gate-belt
  conveyor at a consistent rate when coal is dumped on it.
 After completing a cut of desired length (cut-out length),
  the CM moves out of the ‘place’ and the roof-bolter
  moves in for roof bolting. Resin capsule is used.
 Same sequence of operation is repeated at another
  ‘place’.
Safety factor as per squat formula

• As per squat formula the pillars are over sized
  as per regulation
• Safety factor of 2 and above is considered safe

         Depth        As per   2.5m Ht.    5m Ht
                       Reg        Safety factor

    > 60m             19.5       7.4        4.3
    60m -90m          21.0       5.5        3.0
    90m – 150m        25.5       4.6        2.1
Typical Multi-Pass Continuous Miner
             Operation
A typical cutting sequence for
     development panel
                                     5.0m                       30.0m


                          19    15            20   21             26    23           27   25
            11 14                     12 16             13 22                17 24             18

                        25.0m
            6                         7                 8                    9                 10
    30.0m




                25.0m
  10m




            1                         2                 3                    4                 5
A typical cutting sequence for
      depillaring panel
1                    C

           2


           3


           4




       C



C



Outside Lifts Overall Cut Sequence
8   7       6
C
                                1       3       5


                                    9
                           13               10
                                    4
                           14               11

                           15       2       12




                                            C


                                                    C


    Pocket and Wing Overall Cut Sequence
Twin Entry Development Layout

                                         Continuous
Belt   Feeder-Breaker      Shuttle Car     Miner




                        30 m




                        30 - 70 m
Rib Pillar
BLEEDER HEADINGS


                                        GAS
                                        BLEED




              LARGE STOCKS


                                          VENTILATION



                                                                   BREAKER
                                                                    PROPS
                                      NEXT FENDER

                 15                   NEXT SPLIT    16
                      CONVEYOR ROAD
RETURN ROAD




                                      WONGAWALLI BLOCK
Factors affecting production capacity
    for a given set of equipments
 Size of pillars (centre-to-centre)
 Width of galleries, splits, and slices
 Height of extraction
 Number of pillars in a row
 Maximum permissible cut-out length
 Bolting grid size/ No. of bolts per m2
 Time cycle of different equipment
 Specific gravity of coal
 Recovery percentage
 Available and utilisation hours of the system
 Sub-system capacity, spares, maintenance,
  trained manpower, etc.
Daily production considering
          utilization factor

Development:

Pillar width: 30m
 Extraction           Gallery width (m)
 height (m)     5     5.5          6      6.5
    2.5        1654   1679       1701     1720
     3         1837   1895       1947     1992
    3.5        1930   1985       2033     2075
     4         2006   2058       2103     2143
Daily production considering
         utilisation factor

Depillaring:


Extraction          Gallery width (m)
   height
    (m)        5    5.5          6      6.5
   2.5       2143   2054       1974     1887
    3        2317   2231       2152     2066
   3.5       2460   2377       2300     2216
    4        2583   2500       2426     2344
World Scenario of CM

              CM as % of   Best annual   Aver. annual
Country       total U/G    production    production
              production   from a mine   from a mine

South
              92%          1.44 MTY      0.78 MTY
Africa
USA           49%          1.32 MTY      0.86 MTY

China                      2.6 MTY       0.36 MTY

Australia     15%          0.72 MTY      0.48 MTY
Average production in USA with CM

  Seam Thickness (m)   Average Production
                        per shift (Short Te)
         2.5                   750

         3.0                   835

         3.5                   920

         4.0                   1005
AVERAGE TIME DISTRIBUTION OF VARIOUS ACTIVITIES FOR A DAY (pillar 30m, gallery 5m)
                        Time in
       Activity
                          hr                                                                     Hours

                                     1   2   3   4   5   6   7   8   9   10      11      12      13      14      15      16      17      18      19      20      21      22      23      24
                                      
                              4
Maintenance time                                                                                                                                                                              
                            10.07 
                            (8.44                 
Working of CM & SC           cut)                                                                                                                                                         

Marching,Shifting &         2.61                  
Positioning  time CM                                                                                                                                                                      

Shifting of Feeder-          2.5                  
breaker, belt                                                                                                                                                     

                            1.82                  
Break down of CM                                                                                                                                                                          

Electrical fault, 
outbye transport BD,          3                   
power failure etc                                                                                                                                                                         

                            13.03                 
Bolting time of RB                                                                                                        

                            2.57                  
Marching time of RB                                                                                                                                               
                                                                                                                                                                                          
                            0.14                  
Break down of RB                                                                                                                                                                  

                                                  
LAG TIME                                                                                                                                                                                  
                                                                                                                                                                                          
Further advancement (CM)

•   Continuous miner with satellite bolter
•   Flexible tram conveyor
•   Mobile breaker line support
•   Predictive maintenance
Continuous miner with satellite bolter
Continuous miner with satellite bolter
Man Riding

• Man-riding systems on tracks:
  – By rope haulage:
  – By locomotive (Trolley-wire/ Battery operated/
    Diesel operated)
• Trackless man-riding systems:
  – Belt conveyor
  – Chairlift:
  – Free-steered vehicle
THANKS


   chandanchaman@gmail.com

Mais conteúdo relacionado

Mais procurados

Selection of longwall powered roof support
Selection of longwall powered roof supportSelection of longwall powered roof support
Selection of longwall powered roof supportUlimella Siva Sankar
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines vanam mareswara rao
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam miningSafdar Ali
 
Haulage system in Mines
Haulage system in MinesHaulage system in Mines
Haulage system in Minesajeetkm
 
Mining Machinery Learning Material
Mining Machinery Learning MaterialMining Machinery Learning Material
Mining Machinery Learning MaterialBhaskar Naidu
 
Bord and pillar working with LHD/SDL
Bord and pillar working with LHD/SDLBord and pillar working with LHD/SDL
Bord and pillar working with LHD/SDLAnkit Narain
 
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELALongwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELAIndrajeetKumar110
 
Underground Mining Technology.pptx
Underground Mining Technology.pptxUnderground Mining Technology.pptx
Underground Mining Technology.pptxChandan Chaman
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with DraglineVR M
 
Kope winder or friction winder ppt
Kope winder or friction winder pptKope winder or friction winder ppt
Kope winder or friction winder pptAMIT SAHU
 

Mais procurados (20)

Selection of longwall powered roof support
Selection of longwall powered roof supportSelection of longwall powered roof support
Selection of longwall powered roof support
 
Highwall mining
Highwall miningHighwall mining
Highwall mining
 
CONTINUOUS MINERS
CONTINUOUS MINERSCONTINUOUS MINERS
CONTINUOUS MINERS
 
CONTINUOUS MINERS
CONTINUOUS MINERSCONTINUOUS MINERS
CONTINUOUS MINERS
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam mining
 
Side discharge loader
Side discharge loaderSide discharge loader
Side discharge loader
 
Haulage system in Mines
Haulage system in MinesHaulage system in Mines
Haulage system in Mines
 
Lpdt
LpdtLpdt
Lpdt
 
Oc mechanical excavation
Oc mechanical excavationOc mechanical excavation
Oc mechanical excavation
 
Mining Machinery Learning Material
Mining Machinery Learning MaterialMining Machinery Learning Material
Mining Machinery Learning Material
 
Bord and pillar working with LHD/SDL
Bord and pillar working with LHD/SDLBord and pillar working with LHD/SDL
Bord and pillar working with LHD/SDL
 
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELALongwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
 
Surface miner
Surface minerSurface miner
Surface miner
 
Underground Mining Technology.pptx
Underground Mining Technology.pptxUnderground Mining Technology.pptx
Underground Mining Technology.pptx
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with Dragline
 
Blasting Gallery Method
Blasting Gallery MethodBlasting Gallery Method
Blasting Gallery Method
 
Continuous miners
Continuous minersContinuous miners
Continuous miners
 
Kope winder or friction winder ppt
Kope winder or friction winder pptKope winder or friction winder ppt
Kope winder or friction winder ppt
 
Roof supports in coal mines
Roof supports in coal minesRoof supports in coal mines
Roof supports in coal mines
 

Semelhante a Continuous miner

Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...Roshan Kumar Patel
 
Ppt of pre casting yard
Ppt of pre casting yardPpt of pre casting yard
Ppt of pre casting yardRavinder Singh
 
Ppt u girder casting by l.k.prasad
Ppt u girder casting by l.k.prasadPpt u girder casting by l.k.prasad
Ppt u girder casting by l.k.prasadLachhmikant. Prasad
 
HIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case StudyHIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case Studyknowledge stuff
 
Construction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptConstruction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptbala506586
 
Project Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanProject Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanDavid H Moloney
 
Anant project work
Anant project workAnant project work
Anant project workRajat Dixit
 
Masafi Powertech Private Limited, Chennai, Electrical Supplies
Masafi Powertech Private Limited, Chennai, Electrical SuppliesMasafi Powertech Private Limited, Chennai, Electrical Supplies
Masafi Powertech Private Limited, Chennai, Electrical SuppliesIndiaMART InterMESH Limited
 
. Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
.   Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro.....   Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
. Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....IndraNathMishra2
 
Hard Rock Mine Design Project
Hard Rock Mine Design ProjectHard Rock Mine Design Project
Hard Rock Mine Design ProjectAshishKumar3265
 
Thermitrex Sks Crane Rail Process
Thermitrex Sks Crane Rail ProcessThermitrex Sks Crane Rail Process
Thermitrex Sks Crane Rail ProcessThermitrex
 
The productivity of lhd in underground coal mines
The productivity of   lhd in underground coal minesThe productivity of   lhd in underground coal mines
The productivity of lhd in underground coal minesSafdar Ali
 
Longwall AFC changing - innovation
Longwall AFC changing - innovationLongwall AFC changing - innovation
Longwall AFC changing - innovationVR M
 
Kubota stv36 tractor service repair manual
Kubota stv36 tractor service repair manualKubota stv36 tractor service repair manual
Kubota stv36 tractor service repair manualdfjjsjekfkskemme
 
Kubota stv36 tractor service repair manual
Kubota stv36 tractor service repair manualKubota stv36 tractor service repair manual
Kubota stv36 tractor service repair manualfjjsjekfkskekme
 
Kubota stv36 tractor service repair manual
Kubota stv36 tractor service repair manualKubota stv36 tractor service repair manual
Kubota stv36 tractor service repair manualfhjsjekdmme
 
Kubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualKubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualjjfjsekksemm
 
Kubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualKubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualfjjsjeskkekem
 
Kubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualKubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualfhjsekfksemert
 
Kubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualKubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualfhsjejkdm
 

Semelhante a Continuous miner (20)

Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
 
Ppt of pre casting yard
Ppt of pre casting yardPpt of pre casting yard
Ppt of pre casting yard
 
Ppt u girder casting by l.k.prasad
Ppt u girder casting by l.k.prasadPpt u girder casting by l.k.prasad
Ppt u girder casting by l.k.prasad
 
HIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case StudyHIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case Study
 
Construction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptConstruction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.ppt
 
Project Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanProject Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, Oman
 
Anant project work
Anant project workAnant project work
Anant project work
 
Masafi Powertech Private Limited, Chennai, Electrical Supplies
Masafi Powertech Private Limited, Chennai, Electrical SuppliesMasafi Powertech Private Limited, Chennai, Electrical Supplies
Masafi Powertech Private Limited, Chennai, Electrical Supplies
 
. Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
.   Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro.....   Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
. Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
 
Hard Rock Mine Design Project
Hard Rock Mine Design ProjectHard Rock Mine Design Project
Hard Rock Mine Design Project
 
Thermitrex Sks Crane Rail Process
Thermitrex Sks Crane Rail ProcessThermitrex Sks Crane Rail Process
Thermitrex Sks Crane Rail Process
 
The productivity of lhd in underground coal mines
The productivity of   lhd in underground coal minesThe productivity of   lhd in underground coal mines
The productivity of lhd in underground coal mines
 
Longwall AFC changing - innovation
Longwall AFC changing - innovationLongwall AFC changing - innovation
Longwall AFC changing - innovation
 
Kubota stv36 tractor service repair manual
Kubota stv36 tractor service repair manualKubota stv36 tractor service repair manual
Kubota stv36 tractor service repair manual
 
Kubota stv36 tractor service repair manual
Kubota stv36 tractor service repair manualKubota stv36 tractor service repair manual
Kubota stv36 tractor service repair manual
 
Kubota stv36 tractor service repair manual
Kubota stv36 tractor service repair manualKubota stv36 tractor service repair manual
Kubota stv36 tractor service repair manual
 
Kubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualKubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manual
 
Kubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualKubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manual
 
Kubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualKubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manual
 
Kubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manualKubota stv32 tractor service repair manual
Kubota stv32 tractor service repair manual
 

Mais de Chandan Chaman

List of central labour laws
List of central labour lawsList of central labour laws
List of central labour lawsChandan Chaman
 
Tyre maintenance in open cast mines
Tyre maintenance in open cast minesTyre maintenance in open cast mines
Tyre maintenance in open cast minesChandan Chaman
 
Trolley assist dumpers
Trolley assist dumpersTrolley assist dumpers
Trolley assist dumpersChandan Chaman
 
COAL BED METHANE & CO2 SEQUESTRATION
COAL BED METHANE & CO2 SEQUESTRATIONCOAL BED METHANE & CO2 SEQUESTRATION
COAL BED METHANE & CO2 SEQUESTRATIONChandan Chaman
 
Clean development mechanism
Clean development mechanismClean development mechanism
Clean development mechanismChandan Chaman
 

Mais de Chandan Chaman (7)

Railway Siding
Railway SidingRailway Siding
Railway Siding
 
List of central labour laws
List of central labour lawsList of central labour laws
List of central labour laws
 
Tyre maintenance in open cast mines
Tyre maintenance in open cast minesTyre maintenance in open cast mines
Tyre maintenance in open cast mines
 
Trolley assist dumpers
Trolley assist dumpersTrolley assist dumpers
Trolley assist dumpers
 
COAL BED METHANE & CO2 SEQUESTRATION
COAL BED METHANE & CO2 SEQUESTRATIONCOAL BED METHANE & CO2 SEQUESTRATION
COAL BED METHANE & CO2 SEQUESTRATION
 
Clean development mechanism
Clean development mechanismClean development mechanism
Clean development mechanism
 
Surface Miner
Surface MinerSurface Miner
Surface Miner
 

Último

Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfOrbitshub
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistandanishmna97
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontologyjohnbeverley2021
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusZilliz
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...apidays
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxRemote DBA Services
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamUiPathCommunity
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 

Último (20)

Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 

Continuous miner

  • 1. CONTINUOUS MINER CHANDAN CHAMAN
  • 2. U/G vs O/C PRODUCTION • Over 4970 Mte coal is produced the world over • 60% of world coal production comes from underground mines Country UG OC USA 33 % 67 % China (approx) 85 % 15 % India (10-11) 15 % 85% Australia 20% 80%
  • 3. U/G production & productivity • The declining trend in underground production is continuing • Use of mechanization (SDL/LHD) and reduction of manpower has improved the productivity but failed in improving production
  • 4. Technology wise production Production (Mte) Mining Technology 2001-02 2002-03 2003-04 2004-05 2005-06 Conventional B&P 22.16 19.54 17.02 15.50 13.74 Conventional LW 0.20 0.20 0.15 0.15 0.15 Special Method 0.28 0.20 0.23 0.15 0.35 Mechanised B&P 21.02 25.98 26.99 28.93 30.85 Mechanised LW 2.54 2.10 2.42 1.75 2.06 Continuous Miner 0.40 0.66 0.56 0.70 Total 46.20 48.42 47.47 47.04 47.85
  • 5. Reserve • India has around 253 Bt of reserve i.e. about 10% of the world reserve – Depth wise reserve • 0 to 300m : 155 Bt • 300 to 600m : 66 Bt • 600 to 1200m : 19 Bt • Presently nearly all the mines are upto 300m depth only • Around 90 Bt coal i.e 38% untouched virgin reserve lies at a depth of more than 300m which can be mined by u/g mining only. • Hence the future production of coal will be from underground mining.
  • 6. Improving U/G production and productivity • How to improve production and productivity of u/g mines – Mechanise loading, drilling and conveying system – Increase depillaring – Provide man riding system – Introduce mass production technology, do away with blasting technology where feasible – Encourage indigenous manufacturing of mass production equipment – Introduce all man all job – Introduce contract labour to overcome shortage – Automation of the systems as far as possible
  • 7. Mass Production Technology • For survival of underground mines, it should compete with opencast mines • This is possible by improving the production and OMS of U/G mines • Even though CIL overall OMS has improved from 1.86 (1997) to 3.55 (2007) the share of manpower cost has remained around 45 to 50%. • EMS today is around Rs 850, hence low productivity will not do. • Adoption of mass production technology is a must
  • 8. Continuous Miner  Continuous miner is a mass production technology for underground mining that can be used in  bord & pillar (room & pillar)  rib pillar and  shortwall methods.  Continuous miner has been adopted for bord & pillar method in Anjan Hills/ NCPH of SECL and in Tandsi Mine of WCL. Adoption in Jhanjra, ECL is under process.  SECL has achieved annual production of more than 0.5 MTe with CM  About 20 more mines have been identified for introduction of CM in future
  • 9. Suitable conditions for CM Though equipments are manufactured to suit wide range of conditions, some of the limitations of its use are as follows.  Seam thickness: 1.8m to 5m  Seam gradient: 1 in 8 or flatter  Floor rock: Hard and dry floor condition desirable for efficient operation  Roof condition: Bad roof condition adversely affects system performance. (RMR at NCPH Old – 55; Tandsi – 36)
  • 10. Broad specifications of equipments being used in CIL  Continuous Miner - 12CM15-10D (Crawler- mounted) Operating height range: 2.28 – 4.6m; Cutting drum width: 3.3m; Total motor power: 564 kW  Shuttle Cars - 10SC32B (Tyre-mounted) Safe carrying capacity: 13.6 t (It carries 8t of coal in NCPH); Cable reel capacity: 200m; Total motor power: 107 kW  Quad Bolter – RT117 (Crawler-mounted) Minimum tram height: 2.15m; Operating height range: 2.4 – 4.775m; No. of bolters: 4 (2 per platform); Motor power: 112 kW  Feeder-breaker – BF-14B-3-7C (Crawler-mounted) Throughput: 250 & 500 tph; Breaker Motor: 112 kW  Load-Haul-Dump (LHD) (Tyre-mounted)  Load-centre (Trolley-mounted)
  • 14. Working system of CM  In this technology, mining takes place by “Place Changing System”.  Five heading panel is optimum. Gallery width should be minimum 5m  The continuous miner cuts and load coal to shuttle car at a ‘place’. For developing full width of gallery, CM cuts in two passes at a place.  The shuttle car hauls the load to the feeder-breaker.  The feeder-breaker feeds sized coal to the gate-belt conveyor at a consistent rate when coal is dumped on it.  After completing a cut of desired length (cut-out length), the CM moves out of the ‘place’ and the roof-bolter moves in for roof bolting. Resin capsule is used.  Same sequence of operation is repeated at another ‘place’.
  • 15. Safety factor as per squat formula • As per squat formula the pillars are over sized as per regulation • Safety factor of 2 and above is considered safe Depth As per 2.5m Ht. 5m Ht Reg Safety factor > 60m 19.5 7.4 4.3 60m -90m 21.0 5.5 3.0 90m – 150m 25.5 4.6 2.1
  • 16.
  • 17. Typical Multi-Pass Continuous Miner Operation
  • 18. A typical cutting sequence for development panel 5.0m 30.0m 19 15 20 21 26 23 27 25 11 14 12 16 13 22 17 24 18 25.0m 6 7 8 9 10 30.0m 25.0m 10m 1 2 3 4 5
  • 19.
  • 20. A typical cutting sequence for depillaring panel
  • 21. 1 C 2 3 4 C C Outside Lifts Overall Cut Sequence
  • 22. 8 7 6 C 1 3 5 9 13 10 4 14 11 15 2 12 C C Pocket and Wing Overall Cut Sequence
  • 23. Twin Entry Development Layout Continuous Belt Feeder-Breaker Shuttle Car Miner 30 m 30 - 70 m
  • 25. BLEEDER HEADINGS GAS BLEED LARGE STOCKS VENTILATION BREAKER PROPS NEXT FENDER 15 NEXT SPLIT 16 CONVEYOR ROAD RETURN ROAD WONGAWALLI BLOCK
  • 26. Factors affecting production capacity for a given set of equipments Size of pillars (centre-to-centre) Width of galleries, splits, and slices Height of extraction Number of pillars in a row Maximum permissible cut-out length Bolting grid size/ No. of bolts per m2 Time cycle of different equipment Specific gravity of coal Recovery percentage Available and utilisation hours of the system Sub-system capacity, spares, maintenance, trained manpower, etc.
  • 27. Daily production considering utilization factor Development: Pillar width: 30m Extraction Gallery width (m) height (m) 5 5.5 6 6.5 2.5 1654 1679 1701 1720 3 1837 1895 1947 1992 3.5 1930 1985 2033 2075 4 2006 2058 2103 2143
  • 28. Daily production considering utilisation factor Depillaring: Extraction Gallery width (m) height (m) 5 5.5 6 6.5 2.5 2143 2054 1974 1887 3 2317 2231 2152 2066 3.5 2460 2377 2300 2216 4 2583 2500 2426 2344
  • 29. World Scenario of CM CM as % of Best annual Aver. annual Country total U/G production production production from a mine from a mine South 92% 1.44 MTY 0.78 MTY Africa USA 49% 1.32 MTY 0.86 MTY China 2.6 MTY 0.36 MTY Australia 15% 0.72 MTY 0.48 MTY
  • 30. Average production in USA with CM Seam Thickness (m) Average Production per shift (Short Te) 2.5 750 3.0 835 3.5 920 4.0 1005
  • 31. AVERAGE TIME DISTRIBUTION OF VARIOUS ACTIVITIES FOR A DAY (pillar 30m, gallery 5m) Time in Activity hr Hours     1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24   4 Maintenance time                                               10.07  (8.44          Working of CM & SC cut)         Marching,Shifting &  2.61         Positioning  time CM                   Shifting of Feeder- 2.5         breaker, belt                                   1.82         Break down of CM                               Electrical fault,  outbye transport BD,  3         power failure etc                               13.03         Bolting time of RB         2.57         Marching time of RB                   0.14         Break down of RB                                                 LAG TIME                                                                                        
  • 32. Further advancement (CM) • Continuous miner with satellite bolter • Flexible tram conveyor • Mobile breaker line support • Predictive maintenance
  • 33. Continuous miner with satellite bolter
  • 34. Continuous miner with satellite bolter
  • 35. Man Riding • Man-riding systems on tracks: – By rope haulage: – By locomotive (Trolley-wire/ Battery operated/ Diesel operated) • Trackless man-riding systems: – Belt conveyor – Chairlift: – Free-steered vehicle