22-Mar-17 Power System Operation Corporation Limited, India
Selection of Reference Node and Angular
Baselining using Synchrophasors Measurement
for Real Time Operation
Pradeep Kumar Sanodiya
Vivek Pandey
Rajkumar Anumasula
Chandan Kumar
Sunil Patil
Srinivas Chitturi
NASPI Work Group Meeting-March 2017
22-Mar-17 Power System Operation Corporation Limited, India
Power System Operation Corporation Limited
is an Independent Company w.e.f.
3rd January 2017
Reference Node Selection
• Need for Selection of Reference Node
• Case Studies with different Reference Node
• Summary
Angular Baselining
• Angular Baselining Need & Case Studies
• Summary
Power System Operation Corporation Limited, India22-Mar-17
Outline
Power System Operation Corporation Limited, India22-Mar-17
Need for Reference Node Selection
• Required for Offline Power System Simulations
• Required for EMS/SCADA
• Similarly required for Synchrophasors based analysis
Power System Operation Corporation Limited, India22-Mar-17
Angular separation is vital in Wide Area Monitoring
System
• Assessing the stress in the grid
• Oscillation Monitoring
• Event Detection and localization
• Visualizing power flow pattern
Power System Operation Corporation Limited, India22-Mar-17
Case Studies with different Reference Nodes
➡ Case-1- Weak Vs Strong Bus as Reference Node
➡ Case-2- Bus with Unreliable Vs Reliable Communication as Reference Node
➡ Case-3- Reference Node Near Vs Far from Event Location
➡ Case-4- Reference Node away from HVDC
➡ Case-5- Reference Node near to Varying Generation Complex
Power System Operation Corporation Limited, India22-Mar-17
Case-1 : Weak vs Strong Bus as Reference Node
Grid 1
110 GW
Grid 2
40 GW
B
D
A
PMU Locations
Weak Bus as Reference
Strong Bus as Reference
Power System Operation Corporation Limited, India22-Mar-17
Case-2 : Bus with Unreliable vs Reliable Communication
as Reference Node
Data from one of the node is
non current
Reliable Communication
When PMU has taken as reference
whose data is not updating , Rest
of Angular Separation can not be
visualized
Unreliable Communication
22-Mar-17 Power System Operation Corporation Limited, India
Case-3 : Reference Node Near vs Far from Event Location
B
A
C
D
E
F
G
H
JI
KL
PMU Locations
Event Occurred at Node C
which is near to Node A
Reference node distant from Event node Helps in
identifying the event location
Near Reference Node is A
Reference Node is BFar
B
A
C
D
E
F
G
H
JI
KL
Power System Operation Corporation Limited, India22-Mar-17
Case-4 : Reference Node away from HVDC
Ref
HVDC Link
HVDC Pole Blocking & De-blocking
M
PMU Locations
B
A
C
D
E
F
G
H
JI
KL
Power System Operation Corporation Limited, India22-Mar-17
Case-5 : Reference node near to Varying Generation
Complex
Ref
M
PMU Locations
High Hydro
Generation
Hydro generation varying and
Reference Node H is near to the
Varying generation Complex
Power System Operation Corporation Limited, India22-Mar-17
Summary
• Preferred locations for reference node
• Node with strong Interconnections
• Nodes with reliable communication
• Node close to base load Generation Complex
• Node with High fault level
• Nodes consistent with offline simulation/EMS studies
• Should be system-wide available and reliable
• Nodes to be avoided
• Nodes with Low inertia, Weak tie lines, Low fault level,
• Nodes located in Oscillation prone area,
• Nodes near to HVDC Bus,
• Nodes near to Varying Generation Complex
Power System Operation Corporation Limited, India22-Mar-17
Summary Contd…
• Reference node selection lookup table to be prepared
• Priority list for reference node selection based on above experiences.
• To be reviewed depending on Visualization and Application
Requirement and
• To be reviewed periodically
22-Mar-17 Power System Operation Corporation Limited, India
Angular Baselining
22-Mar-17 Power System Operation Corporation Limited, India
Need for Angular Baselining
• Validation of the data/Plausibility check
• To compare and validate angle limits with the state estimator
and offline load flow studies
• To distinguish between normal and abnormal grid
conditions-
• Discriminate seasonal off peak and peak stressed conditions
• For alarm generation to alert the operator
22-Mar-17 Power System Operation Corporation Limited, India
Validation of the data/Plausibility check
Wide Variation in
Angular Separation
due to Leap Second
System Islanding or
Loss of time
synchronization
22-Mar-17 Power System Operation Corporation Limited, India
Normal and Alert Grid Operation
FA
C
E
Bus-B
400kV Line765kV Line Line Open
PMU Locations
Bus E
B
Bus D
Bus F
GH
Bus G
Bus C
D
22-Mar-17 Power System Operation Corporation Limited, India
Criteria for Selection of Angle Node Pairs
• Wide Area Node Angle Pair
• Generation complex to load complex
• Power Corridors/Flow Gates
• Power Corridors from One Region to Other.
• Maximum Angular Separation in the Grid(wide distant node).
• Adjacent Node Angle Pair
• Both ends angle should be available
Power System Operation Corporation Limited, India22-Mar-17
Typical wide angle pair for baselining
B
A
C
D
E
F
G
H
JI
KL
N
M
Node O : Generation Complex
Node N : Load Centre
O
22-Mar-17 Power System Operation Corporation Limited, India
Typical wide angle pair for baselining Contd……
B
A
C
D
E
F
G
H
JI
KL
N
M
Flow Gate between
Node M and I
Max Angle-39
Min Angle-14
22-Mar-17 Power System Operation Corporation Limited, India
Typical wide angle pair for baselining Contd……
B
A
C
D
E
F
G
H
JI
KL
N
M
Node B : Generation Complex
Node C: Load Centre
22-Mar-17 Power System Operation Corporation Limited, India
Maximum Angular Separation Monitoring in the Grid
Angular Separation going Out of 90 Degree Range :
High Over drawal by One of the Region causing high
angular separation and stress in the Grid
During Normal Operation
maximum angle was 77
degrees all grid parameters
were with in limits
Power System Operation Corporation Limited, India22-Mar-17
Summary
• Angular Baselining helps in understanding the grid
condition during operational horizon.
• It helps in finding the various threshold for angle pairs for
monitoring and alarm generation.
22-Mar-17 Power System Operation Corporation Limited, India
References
• https://posoco.in/download/synchrophasors-initiatives-in-india-decmber-2013-
web/?wpdmdl=713
• http://wrldc.org/Docs/Angular_separation_report/
• EIPP Performance Requirements Task Team, “Definition and Implementation of a
System-Wide Phase Angle Reference for Real-Time Visualization Applications”,
October 13, 2005.
• https://posoco.in/reports/system-reliability-indices/daily-angular-difference/daily-
angular-difference-2016-17/
• Eastern Interconnection Wide Area. SynchroPhasor Angles Baselining Study.
Mahendra Patel, PJM. Co-chair: NASPI PITT. (Planning Implementation Task Team)
• https://www.wecc.biz/Reliability/JSIS_AZ_PhaseAngleBaselining_BB-FA_011413-
D_FA%20Rev_aEPG.pdf
Email : psanodiya@posoco.in
WRLDC,POSOCO, Mumbai

Thank You
22-Mar-17 Power System Operation Corporation Limited, India

Mais conteúdo relacionado

Mais procurados

Evaluation of standby power system architectures
Evaluation of standby power system architecturesEvaluation of standby power system architectures
Evaluation of standby power system architectures
michaeljmack
 
FFC-MM Plantsite Power System Protection
FFC-MM Plantsite Power System ProtectionFFC-MM Plantsite Power System Protection
FFC-MM Plantsite Power System Protection
farazrafi87
 
Selective Coordination "The Rest of the Story"
Selective Coordination "The Rest of the Story"Selective Coordination "The Rest of the Story"
Selective Coordination "The Rest of the Story"
michaeljmack
 
Emergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby SystemsEmergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby Systems
michaeljmack
 
Medium Voltage Reduced Voltage Autotransformer
Medium Voltage Reduced Voltage AutotransformerMedium Voltage Reduced Voltage Autotransformer
Medium Voltage Reduced Voltage Autotransformer
michaeljmack
 
Transformer protection using microcontroller and gsm technology
Transformer protection using microcontroller and gsm technologyTransformer protection using microcontroller and gsm technology
Transformer protection using microcontroller and gsm technology
Kartik Patel
 
891 Switchboard vs. 1558 Switchgear
891 Switchboard vs. 1558 Switchgear891 Switchboard vs. 1558 Switchgear
891 Switchboard vs. 1558 Switchgear
michaeljmack
 
Modeling of a digital protective relay in a RT Digital Simulator
Modeling of a digital protective relay in a RT Digital SimulatorModeling of a digital protective relay in a RT Digital Simulator
Modeling of a digital protective relay in a RT Digital Simulator
michaeljmack
 

Mais procurados (20)

Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601
 
Electrical Lessons learned
Electrical Lessons learnedElectrical Lessons learned
Electrical Lessons learned
 
Evaluation of standby power system architectures
Evaluation of standby power system architecturesEvaluation of standby power system architectures
Evaluation of standby power system architectures
 
FFC-MM Plantsite Power System Protection
FFC-MM Plantsite Power System ProtectionFFC-MM Plantsite Power System Protection
FFC-MM Plantsite Power System Protection
 
Auxiliary relay 7PJ12, 7PJ113, 7PJ11, 7PJ15
Auxiliary relay 7PJ12, 7PJ113, 7PJ11, 7PJ15 Auxiliary relay 7PJ12, 7PJ113, 7PJ11, 7PJ15
Auxiliary relay 7PJ12, 7PJ113, 7PJ11, 7PJ15
 
Selective Coordination "The Rest of the Story"
Selective Coordination "The Rest of the Story"Selective Coordination "The Rest of the Story"
Selective Coordination "The Rest of the Story"
 
Differential protection of power transformer
Differential protection of power transformerDifferential protection of power transformer
Differential protection of power transformer
 
Grid stds
Grid stdsGrid stds
Grid stds
 
Emergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby SystemsEmergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby Systems
 
Pilot protection
Pilot protectionPilot protection
Pilot protection
 
Medium Voltage Reduced Voltage Autotransformer
Medium Voltage Reduced Voltage AutotransformerMedium Voltage Reduced Voltage Autotransformer
Medium Voltage Reduced Voltage Autotransformer
 
Transformer protection using microcontroller and gsm technology
Transformer protection using microcontroller and gsm technologyTransformer protection using microcontroller and gsm technology
Transformer protection using microcontroller and gsm technology
 
Solutions to wiring and grounding
Solutions to wiring and groundingSolutions to wiring and grounding
Solutions to wiring and grounding
 
891 Switchboard vs. 1558 Switchgear
891 Switchboard vs. 1558 Switchgear891 Switchboard vs. 1558 Switchgear
891 Switchboard vs. 1558 Switchgear
 
Relay testing procedure
Relay testing procedure Relay testing procedure
Relay testing procedure
 
Modeling of a digital protective relay in a RT Digital Simulator
Modeling of a digital protective relay in a RT Digital SimulatorModeling of a digital protective relay in a RT Digital Simulator
Modeling of a digital protective relay in a RT Digital Simulator
 
DETECTING POWER GRID SYNCHRONISATION FAILURE ON SENSING BAD VOLTAGE OR FREQUENCY
DETECTING POWER GRID SYNCHRONISATION FAILURE ON SENSING BAD VOLTAGE OR FREQUENCYDETECTING POWER GRID SYNCHRONISATION FAILURE ON SENSING BAD VOLTAGE OR FREQUENCY
DETECTING POWER GRID SYNCHRONISATION FAILURE ON SENSING BAD VOLTAGE OR FREQUENCY
 
IEEE Blue Book
IEEE Blue BookIEEE Blue Book
IEEE Blue Book
 
Relay & Protection
Relay  & ProtectionRelay  & Protection
Relay & Protection
 
Siemens MV GIS Switchgear
Siemens MV GIS SwitchgearSiemens MV GIS Switchgear
Siemens MV GIS Switchgear
 

Semelhante a Selection of Reference Node and Angular Baselining using Synchrophasors Measurement for Real Time Operation

vss102_lewis_2013_o
vss102_lewis_2013_ovss102_lewis_2013_o
vss102_lewis_2013_o
Allan Lewis
 
vss102_lewis_2014_o
vss102_lewis_2014_ovss102_lewis_2014_o
vss102_lewis_2014_o
Allan Lewis
 
Vijay_04_ 16-Photo-2
Vijay_04_ 16-Photo-2Vijay_04_ 16-Photo-2
Vijay_04_ 16-Photo-2
Vijay Pawar
 
EV infrastructure - AC charger ABB
EV infrastructure - AC charger ABBEV infrastructure - AC charger ABB
EV infrastructure - AC charger ABB
Davide Malacalza
 

Semelhante a Selection of Reference Node and Angular Baselining using Synchrophasors Measurement for Real Time Operation (20)

400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
 
Distributed generation placement
Distributed generation placementDistributed generation placement
Distributed generation placement
 
vss102_lewis_2013_o
vss102_lewis_2013_ovss102_lewis_2013_o
vss102_lewis_2013_o
 
vss102_lewis_2014_o
vss102_lewis_2014_ovss102_lewis_2014_o
vss102_lewis_2014_o
 
9 incorporating energy storage into pv system design
9   incorporating energy storage into pv system design9   incorporating energy storage into pv system design
9 incorporating energy storage into pv system design
 
krishnaraj CV1
krishnaraj CV1krishnaraj CV1
krishnaraj CV1
 
Vijay_04_ 16-Photo-2
Vijay_04_ 16-Photo-2Vijay_04_ 16-Photo-2
Vijay_04_ 16-Photo-2
 
Smart Residential Energy Management System Using Machine Learning.pptx
Smart Residential Energy Management System Using Machine Learning.pptxSmart Residential Energy Management System Using Machine Learning.pptx
Smart Residential Energy Management System Using Machine Learning.pptx
 
Renewable energy resources for highway lighting
Renewable energy resources for highway lightingRenewable energy resources for highway lighting
Renewable energy resources for highway lighting
 
Solar power generation
Solar power generationSolar power generation
Solar power generation
 
Solar power generation
Solar power generationSolar power generation
Solar power generation
 
Solar power generation
Solar power generationSolar power generation
Solar power generation
 
10.5_Concordville Microgrid_PECO_EPRI/SNL Microgrid Symposium
10.5_Concordville Microgrid_PECO_EPRI/SNL Microgrid Symposium10.5_Concordville Microgrid_PECO_EPRI/SNL Microgrid Symposium
10.5_Concordville Microgrid_PECO_EPRI/SNL Microgrid Symposium
 
EV infrastructure - AC charger ABB
EV infrastructure - AC charger ABBEV infrastructure - AC charger ABB
EV infrastructure - AC charger ABB
 
coned-presentation-in-pdf-final.pdf
coned-presentation-in-pdf-final.pdfconed-presentation-in-pdf-final.pdf
coned-presentation-in-pdf-final.pdf
 
Windsun solar quarter
Windsun solar quarterWindsun solar quarter
Windsun solar quarter
 
Dhruv patel resume
Dhruv patel resumeDhruv patel resume
Dhruv patel resume
 
SMART GRID.pptx
SMART GRID.pptxSMART GRID.pptx
SMART GRID.pptx
 
DYNAMIC CHARGING OF ELECTRIC VEHICLES
DYNAMIC CHARGING OF ELECTRIC VEHICLESDYNAMIC CHARGING OF ELECTRIC VEHICLES
DYNAMIC CHARGING OF ELECTRIC VEHICLES
 
GREEN CHARGE: MANAGING RENEWABLE ENERGY IN SMART BUILDING’S
GREEN CHARGE: MANAGING RENEWABLE ENERGY IN SMART BUILDING’SGREEN CHARGE: MANAGING RENEWABLE ENERGY IN SMART BUILDING’S
GREEN CHARGE: MANAGING RENEWABLE ENERGY IN SMART BUILDING’S
 

Mais de Chandan Kumar

‌Intergration of wind farms in indian transmission system
‌Intergration of wind farms in indian transmission system‌Intergration of wind farms in indian transmission system
‌Intergration of wind farms in indian transmission system
Chandan Kumar
 
Hybrid energy system ,ge edison challenege 2009
Hybrid energy system ,ge edison challenege 2009Hybrid energy system ,ge edison challenege 2009
Hybrid energy system ,ge edison challenege 2009
Chandan Kumar
 

Mais de Chandan Kumar (12)

Substation and It's Equipment
Substation and It's Equipment Substation and It's Equipment
Substation and It's Equipment
 
Power System Stability Issues
Power System Stability IssuesPower System Stability Issues
Power System Stability Issues
 
Challenges and Best Practices : Indian Grid Management
Challenges and Best Practices : Indian Grid Management Challenges and Best Practices : Indian Grid Management
Challenges and Best Practices : Indian Grid Management
 
Power system stability issues and Defence Mechanism in Indian Grid
Power system stability issues and Defence Mechanism in Indian GridPower system stability issues and Defence Mechanism in Indian Grid
Power system stability issues and Defence Mechanism in Indian Grid
 
Comparison of analytical methods of analysing linear induction motors
Comparison of analytical methods of analysing linear induction motors Comparison of analytical methods of analysing linear induction motors
Comparison of analytical methods of analysing linear induction motors
 
Smart grid- Indian Perspective
Smart grid- Indian PerspectiveSmart grid- Indian Perspective
Smart grid- Indian Perspective
 
Short Term Open Access in inter state transmission
Short Term Open Access in inter state transmissionShort Term Open Access in inter state transmission
Short Term Open Access in inter state transmission
 
‌Intergration of wind farms in indian transmission system
‌Intergration of wind farms in indian transmission system‌Intergration of wind farms in indian transmission system
‌Intergration of wind farms in indian transmission system
 
Hybrid energy system ,ge edison challenege 2009
Hybrid energy system ,ge edison challenege 2009Hybrid energy system ,ge edison challenege 2009
Hybrid energy system ,ge edison challenege 2009
 
Analysis of space charge controlled electric field 1
Analysis of space charge controlled electric field 1Analysis of space charge controlled electric field 1
Analysis of space charge controlled electric field 1
 
Static test study on linear induction motor iccee
Static test study on linear induction motor icceeStatic test study on linear induction motor iccee
Static test study on linear induction motor iccee
 
Major blackout in the world
Major blackout in the worldMajor blackout in the world
Major blackout in the world
 

Último

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 

Último (20)

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 

Selection of Reference Node and Angular Baselining using Synchrophasors Measurement for Real Time Operation

  • 1. 22-Mar-17 Power System Operation Corporation Limited, India Selection of Reference Node and Angular Baselining using Synchrophasors Measurement for Real Time Operation Pradeep Kumar Sanodiya Vivek Pandey Rajkumar Anumasula Chandan Kumar Sunil Patil Srinivas Chitturi NASPI Work Group Meeting-March 2017
  • 2. 22-Mar-17 Power System Operation Corporation Limited, India Power System Operation Corporation Limited is an Independent Company w.e.f. 3rd January 2017
  • 3. Reference Node Selection • Need for Selection of Reference Node • Case Studies with different Reference Node • Summary Angular Baselining • Angular Baselining Need & Case Studies • Summary Power System Operation Corporation Limited, India22-Mar-17 Outline
  • 4. Power System Operation Corporation Limited, India22-Mar-17 Need for Reference Node Selection • Required for Offline Power System Simulations • Required for EMS/SCADA • Similarly required for Synchrophasors based analysis
  • 5. Power System Operation Corporation Limited, India22-Mar-17 Angular separation is vital in Wide Area Monitoring System • Assessing the stress in the grid • Oscillation Monitoring • Event Detection and localization • Visualizing power flow pattern
  • 6. Power System Operation Corporation Limited, India22-Mar-17 Case Studies with different Reference Nodes ➡ Case-1- Weak Vs Strong Bus as Reference Node ➡ Case-2- Bus with Unreliable Vs Reliable Communication as Reference Node ➡ Case-3- Reference Node Near Vs Far from Event Location ➡ Case-4- Reference Node away from HVDC ➡ Case-5- Reference Node near to Varying Generation Complex
  • 7. Power System Operation Corporation Limited, India22-Mar-17 Case-1 : Weak vs Strong Bus as Reference Node Grid 1 110 GW Grid 2 40 GW B D A PMU Locations Weak Bus as Reference Strong Bus as Reference
  • 8. Power System Operation Corporation Limited, India22-Mar-17 Case-2 : Bus with Unreliable vs Reliable Communication as Reference Node Data from one of the node is non current Reliable Communication When PMU has taken as reference whose data is not updating , Rest of Angular Separation can not be visualized Unreliable Communication
  • 9. 22-Mar-17 Power System Operation Corporation Limited, India Case-3 : Reference Node Near vs Far from Event Location B A C D E F G H JI KL PMU Locations Event Occurred at Node C which is near to Node A Reference node distant from Event node Helps in identifying the event location Near Reference Node is A Reference Node is BFar
  • 10. B A C D E F G H JI KL Power System Operation Corporation Limited, India22-Mar-17 Case-4 : Reference Node away from HVDC Ref HVDC Link HVDC Pole Blocking & De-blocking M PMU Locations
  • 11. B A C D E F G H JI KL Power System Operation Corporation Limited, India22-Mar-17 Case-5 : Reference node near to Varying Generation Complex Ref M PMU Locations High Hydro Generation Hydro generation varying and Reference Node H is near to the Varying generation Complex
  • 12. Power System Operation Corporation Limited, India22-Mar-17 Summary • Preferred locations for reference node • Node with strong Interconnections • Nodes with reliable communication • Node close to base load Generation Complex • Node with High fault level • Nodes consistent with offline simulation/EMS studies • Should be system-wide available and reliable • Nodes to be avoided • Nodes with Low inertia, Weak tie lines, Low fault level, • Nodes located in Oscillation prone area, • Nodes near to HVDC Bus, • Nodes near to Varying Generation Complex
  • 13. Power System Operation Corporation Limited, India22-Mar-17 Summary Contd… • Reference node selection lookup table to be prepared • Priority list for reference node selection based on above experiences. • To be reviewed depending on Visualization and Application Requirement and • To be reviewed periodically
  • 14. 22-Mar-17 Power System Operation Corporation Limited, India Angular Baselining
  • 15. 22-Mar-17 Power System Operation Corporation Limited, India Need for Angular Baselining • Validation of the data/Plausibility check • To compare and validate angle limits with the state estimator and offline load flow studies • To distinguish between normal and abnormal grid conditions- • Discriminate seasonal off peak and peak stressed conditions • For alarm generation to alert the operator
  • 16. 22-Mar-17 Power System Operation Corporation Limited, India Validation of the data/Plausibility check Wide Variation in Angular Separation due to Leap Second System Islanding or Loss of time synchronization
  • 17. 22-Mar-17 Power System Operation Corporation Limited, India Normal and Alert Grid Operation FA C E Bus-B 400kV Line765kV Line Line Open PMU Locations Bus E B Bus D Bus F GH Bus G Bus C D
  • 18. 22-Mar-17 Power System Operation Corporation Limited, India Criteria for Selection of Angle Node Pairs • Wide Area Node Angle Pair • Generation complex to load complex • Power Corridors/Flow Gates • Power Corridors from One Region to Other. • Maximum Angular Separation in the Grid(wide distant node). • Adjacent Node Angle Pair • Both ends angle should be available
  • 19. Power System Operation Corporation Limited, India22-Mar-17 Typical wide angle pair for baselining B A C D E F G H JI KL N M Node O : Generation Complex Node N : Load Centre O
  • 20. 22-Mar-17 Power System Operation Corporation Limited, India Typical wide angle pair for baselining Contd…… B A C D E F G H JI KL N M Flow Gate between Node M and I Max Angle-39 Min Angle-14
  • 21. 22-Mar-17 Power System Operation Corporation Limited, India Typical wide angle pair for baselining Contd…… B A C D E F G H JI KL N M Node B : Generation Complex Node C: Load Centre
  • 22. 22-Mar-17 Power System Operation Corporation Limited, India Maximum Angular Separation Monitoring in the Grid Angular Separation going Out of 90 Degree Range : High Over drawal by One of the Region causing high angular separation and stress in the Grid During Normal Operation maximum angle was 77 degrees all grid parameters were with in limits
  • 23. Power System Operation Corporation Limited, India22-Mar-17 Summary • Angular Baselining helps in understanding the grid condition during operational horizon. • It helps in finding the various threshold for angle pairs for monitoring and alarm generation.
  • 24. 22-Mar-17 Power System Operation Corporation Limited, India References • https://posoco.in/download/synchrophasors-initiatives-in-india-decmber-2013- web/?wpdmdl=713 • http://wrldc.org/Docs/Angular_separation_report/ • EIPP Performance Requirements Task Team, “Definition and Implementation of a System-Wide Phase Angle Reference for Real-Time Visualization Applications”, October 13, 2005. • https://posoco.in/reports/system-reliability-indices/daily-angular-difference/daily- angular-difference-2016-17/ • Eastern Interconnection Wide Area. SynchroPhasor Angles Baselining Study. Mahendra Patel, PJM. Co-chair: NASPI PITT. (Planning Implementation Task Team) • https://www.wecc.biz/Reliability/JSIS_AZ_PhaseAngleBaselining_BB-FA_011413- D_FA%20Rev_aEPG.pdf
  • 25. Email : psanodiya@posoco.in WRLDC,POSOCO, Mumbai  Thank You 22-Mar-17 Power System Operation Corporation Limited, India