Cost Engineering Knowledgebases
Cost Engineering Knowledgebases


> Cost Engineering Knowledgebases contain the 
  cost assemblies based on DACE
> Each assembly is built up of details for material, 
  labour and rental
> Multi‐disciplinary (piping, E&I, Equipment, Civil, 
  etc.)
> Allows for fast estimating, while maintaining the 
  details
> Based on detailed data qualifications
> Quick‐reference card

                 >www.costengineering.eu
Cost Assembly




www.costengineering.eu
Unit-Rate


>   General description
>   Direct hours
>   Activity
>   Rate
>   Productivity
>   Indirect




                      >www.costengineering.eu
DACE
Publication




              6
Standardisation of “Labour norms”



> Initiative of the DACE workgroup
> Improve communication between 
  involved parties
> Avoid discussion by definitions
> Evolved from Linde’s dataset



                 www.costengineering.eu
Data Qualifications



>   Direct labour norms: activity description
>   Only hours, no pricing or rates
>   Definition of indirect costs
>   Composition of labour rates
>   Applicable factors 
>   Europe



                       www.costengineering.eu
Data Qualifications
Construction of the hourly rate
The hourly rate included:
   > The direct costs of the relevant staff till the range or 
     position of the cooperating foreman, including payroll 
     tax, social security, holiday pay, holidays, ATV days as 
     well as health insurance, accident and pension 
     insurance, profit, bonuses, transport costs, travel time, 
     normal travel expenses  commuter traffic and all further 
     indirect costs.
   > The costs for the use of normal hand tools and 
     protective clothing.
   > The costs for the use personal safety, such as safety 
     shoes, helmets, safety glass, gloves and work clothing
Productivity / efficiency
Productivity


  Definition
> Labour productivity is a relative measure for the labour 
  efficiency against a norm has been established based on 
  experience. It is a common misconception that labour 
  productivity really means “working hard”.

> Labour productivity is a function based on a number of specific 
  variables such as the organisation, the equipment and the 
  motivation of the people involved.
Productivity / efficiency, Bedaux
Productivity


  Specific site conditions
> Material costs have a tendency to be 5‐10% higher on a 
  renovation project than in greenfield development.
> Man hours can be 10‐50% higher and  detail engineering can be 
  about 50% higher.
> The unexpected cost is also in need of a much higher 
  percentage.
Cost Engineering
Knowledgebases




                   15

Mais conteúdo relacionado

Mais procurados

Cost Engineering for Turn Arounds
Cost Engineering for Turn AroundsCost Engineering for Turn Arounds
Cost Engineering for Turn AroundsMartin van Vliet
 
Cost Estimators Cost Engineeringand Total Cost
Cost Estimators Cost Engineeringand Total CostCost Estimators Cost Engineeringand Total Cost
Cost Estimators Cost Engineeringand Total CostYudi Setiawan
 
AACE Cost Engineering Journal ce15-01
AACE Cost Engineering Journal ce15-01AACE Cost Engineering Journal ce15-01
AACE Cost Engineering Journal ce15-01John Blodgett
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity SurveyingLIJI A
 
Purpose and importance of estimate
Purpose and importance of estimatePurpose and importance of estimate
Purpose and importance of estimateArpit Sethia
 
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9Moustafa Ismail Abu Dief
 
Chris Wright CV December 2015
Chris Wright CV December 2015Chris Wright CV December 2015
Chris Wright CV December 2015Chris Wright
 
Costing_Actual spendings & pricing
Costing_Actual spendings & pricingCosting_Actual spendings & pricing
Costing_Actual spendings & pricingAjinkya Deshpande
 
PPT on Construction Costing
PPT on Construction CostingPPT on Construction Costing
PPT on Construction CostingManish Kandpal
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyorSyafiq Deen
 
2# types of estimate
2# types of estimate2# types of estimate
2# types of estimateLIJI A
 
Estimating part 1
Estimating part 1Estimating part 1
Estimating part 1ArunRavi43
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionWaleed Liaqat
 

Mais procurados (20)

Cost Engineering for Turn Arounds
Cost Engineering for Turn AroundsCost Engineering for Turn Arounds
Cost Engineering for Turn Arounds
 
Cost Estimators Cost Engineeringand Total Cost
Cost Estimators Cost Engineeringand Total CostCost Estimators Cost Engineeringand Total Cost
Cost Estimators Cost Engineeringand Total Cost
 
AACE Cost Engineering Journal ce15-01
AACE Cost Engineering Journal ce15-01AACE Cost Engineering Journal ce15-01
AACE Cost Engineering Journal ce15-01
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity Surveying
 
Purpose and importance of estimate
Purpose and importance of estimatePurpose and importance of estimate
Purpose and importance of estimate
 
Marta Gou Presentation
Marta Gou PresentationMarta Gou Presentation
Marta Gou Presentation
 
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9
 
Chris Wright CV December 2015
Chris Wright CV December 2015Chris Wright CV December 2015
Chris Wright CV December 2015
 
Paint Shop Mods
Paint Shop ModsPaint Shop Mods
Paint Shop Mods
 
Costing_Actual spendings & pricing
Costing_Actual spendings & pricingCosting_Actual spendings & pricing
Costing_Actual spendings & pricing
 
PPT on Construction Costing
PPT on Construction CostingPPT on Construction Costing
PPT on Construction Costing
 
Ppv ppt
Ppv pptPpv ppt
Ppv ppt
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Contract costing
Contract costingContract costing
Contract costing
 
2# types of estimate
2# types of estimate2# types of estimate
2# types of estimate
 
Estimating part 1
Estimating part 1Estimating part 1
Estimating part 1
 
Estimating & Costing - I
Estimating & Costing - IEstimating & Costing - I
Estimating & Costing - I
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
 
ESTIMATING AND COSTING
ESTIMATING AND COSTINGESTIMATING AND COSTING
ESTIMATING AND COSTING
 

Semelhante a Cleopatra Enterprise and DACE Labour Norms

Economic justification of npd project and financial tools
Economic justification of npd project and financial toolsEconomic justification of npd project and financial tools
Economic justification of npd project and financial toolsOmid Aminzadeh Gohari
 
Airways (case study)
Airways (case study)Airways (case study)
Airways (case study)Intergen
 
Chapter 15 cost estimation
Chapter 15   cost estimationChapter 15   cost estimation
Chapter 15 cost estimationBich Lien Pham
 
Chapter 15 cost estimation
Chapter 15   cost estimationChapter 15   cost estimation
Chapter 15 cost estimationBich Lien Pham
 
UNIT 1 JOB COSTING (1).pptx
UNIT 1 JOB COSTING (1).pptxUNIT 1 JOB COSTING (1).pptx
UNIT 1 JOB COSTING (1).pptxENOCK13
 
Preparation and approaches of cost estimates
Preparation and approaches of cost estimatesPreparation and approaches of cost estimates
Preparation and approaches of cost estimatesnagashree123
 
Maintenance engineering
Maintenance engineeringMaintenance engineering
Maintenance engineeringAnirudh Goyal
 
Facts and Figures 2015 - TECOSIM at a glance
Facts and Figures 2015 - TECOSIM at a glance Facts and Figures 2015 - TECOSIM at a glance
Facts and Figures 2015 - TECOSIM at a glance TECOSIM Group
 
Amr Said_CV_2017cn
Amr Said_CV_2017cnAmr Said_CV_2017cn
Amr Said_CV_2017cnAmr elmasry
 
MBA UNIT 7 PROJECT FINANCE.doc
MBA UNIT 7 PROJECT FINANCE.docMBA UNIT 7 PROJECT FINANCE.doc
MBA UNIT 7 PROJECT FINANCE.docselam49
 
MBA UNIT VII PROJECT FINANCE-1.doc
MBA UNIT VII PROJECT FINANCE-1.docMBA UNIT VII PROJECT FINANCE-1.doc
MBA UNIT VII PROJECT FINANCE-1.docselam49
 
Engineering & Construction 4.0 – A Digital pathway to a more profitable future
Engineering & Construction 4.0 – A Digital pathway to a more profitable futureEngineering & Construction 4.0 – A Digital pathway to a more profitable future
Engineering & Construction 4.0 – A Digital pathway to a more profitable futureLaurianneSchillesDur
 
Md Danish Resume
Md Danish ResumeMd Danish Resume
Md Danish ResumeDanish Zia
 
Ss 05 Cost engineering management training- nov 2017 - moustafa part ii ch 10
 Ss 05 Cost engineering management  training- nov 2017 - moustafa part ii ch 10 Ss 05 Cost engineering management  training- nov 2017 - moustafa part ii ch 10
Ss 05 Cost engineering management training- nov 2017 - moustafa part ii ch 10Moustafa Ismail Abu Dief
 
Tracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementTracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementIRJET Journal
 

Semelhante a Cleopatra Enterprise and DACE Labour Norms (20)

Economic justification of npd project and financial tools
Economic justification of npd project and financial toolsEconomic justification of npd project and financial tools
Economic justification of npd project and financial tools
 
Cost accounting
Cost accountingCost accounting
Cost accounting
 
Chapter 07
Chapter 07Chapter 07
Chapter 07
 
COST ACCOUNTING.pptx
COST ACCOUNTING.pptxCOST ACCOUNTING.pptx
COST ACCOUNTING.pptx
 
Airways (case study)
Airways (case study)Airways (case study)
Airways (case study)
 
Chapter 15 cost estimation
Chapter 15   cost estimationChapter 15   cost estimation
Chapter 15 cost estimation
 
Chapter 15 cost estimation
Chapter 15   cost estimationChapter 15   cost estimation
Chapter 15 cost estimation
 
UNIT 1 JOB COSTING (1).pptx
UNIT 1 JOB COSTING (1).pptxUNIT 1 JOB COSTING (1).pptx
UNIT 1 JOB COSTING (1).pptx
 
MBA Presentation
MBA PresentationMBA Presentation
MBA Presentation
 
Preparation and approaches of cost estimates
Preparation and approaches of cost estimatesPreparation and approaches of cost estimates
Preparation and approaches of cost estimates
 
Maintenance engineering
Maintenance engineeringMaintenance engineering
Maintenance engineering
 
Facts and Figures 2015 - TECOSIM at a glance
Facts and Figures 2015 - TECOSIM at a glance Facts and Figures 2015 - TECOSIM at a glance
Facts and Figures 2015 - TECOSIM at a glance
 
Amr Said_CV_2017cn
Amr Said_CV_2017cnAmr Said_CV_2017cn
Amr Said_CV_2017cn
 
MBA UNIT 7 PROJECT FINANCE.doc
MBA UNIT 7 PROJECT FINANCE.docMBA UNIT 7 PROJECT FINANCE.doc
MBA UNIT 7 PROJECT FINANCE.doc
 
MBA UNIT VII PROJECT FINANCE-1.doc
MBA UNIT VII PROJECT FINANCE-1.docMBA UNIT VII PROJECT FINANCE-1.doc
MBA UNIT VII PROJECT FINANCE-1.doc
 
Cost Estimation
Cost EstimationCost Estimation
Cost Estimation
 
Engineering & Construction 4.0 – A Digital pathway to a more profitable future
Engineering & Construction 4.0 – A Digital pathway to a more profitable futureEngineering & Construction 4.0 – A Digital pathway to a more profitable future
Engineering & Construction 4.0 – A Digital pathway to a more profitable future
 
Md Danish Resume
Md Danish ResumeMd Danish Resume
Md Danish Resume
 
Ss 05 Cost engineering management training- nov 2017 - moustafa part ii ch 10
 Ss 05 Cost engineering management  training- nov 2017 - moustafa part ii ch 10 Ss 05 Cost engineering management  training- nov 2017 - moustafa part ii ch 10
Ss 05 Cost engineering management training- nov 2017 - moustafa part ii ch 10
 
Tracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementTracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value Management
 

Último

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 

Último (20)

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 

Cleopatra Enterprise and DACE Labour Norms

  • 2. Cost Engineering Knowledgebases > Cost Engineering Knowledgebases contain the  cost assemblies based on DACE > Each assembly is built up of details for material,  labour and rental > Multi‐disciplinary (piping, E&I, Equipment, Civil,  etc.) > Allows for fast estimating, while maintaining the  details > Based on detailed data qualifications > Quick‐reference card >www.costengineering.eu
  • 4. Unit-Rate > General description > Direct hours > Activity > Rate > Productivity > Indirect >www.costengineering.eu
  • 6. Standardisation of “Labour norms” > Initiative of the DACE workgroup > Improve communication between  involved parties > Avoid discussion by definitions > Evolved from Linde’s dataset www.costengineering.eu
  • 7. Data Qualifications > Direct labour norms: activity description > Only hours, no pricing or rates > Definition of indirect costs > Composition of labour rates > Applicable factors  > Europe www.costengineering.eu
  • 9. Construction of the hourly rate The hourly rate included: > The direct costs of the relevant staff till the range or  position of the cooperating foreman, including payroll  tax, social security, holiday pay, holidays, ATV days as  well as health insurance, accident and pension  insurance, profit, bonuses, transport costs, travel time,  normal travel expenses  commuter traffic and all further  indirect costs. > The costs for the use of normal hand tools and  protective clothing. > The costs for the use personal safety, such as safety  shoes, helmets, safety glass, gloves and work clothing
  • 11. Productivity Definition > Labour productivity is a relative measure for the labour  efficiency against a norm has been established based on  experience. It is a common misconception that labour  productivity really means “working hard”. > Labour productivity is a function based on a number of specific  variables such as the organisation, the equipment and the  motivation of the people involved.
  • 13. Productivity Specific site conditions > Material costs have a tendency to be 5‐10% higher on a  renovation project than in greenfield development. > Man hours can be 10‐50% higher and  detail engineering can be  about 50% higher. > The unexpected cost is also in need of a much higher  percentage.