The study area ran from Mills Avenue between Lake Formosa to East Concord Street and along Colonial Drive between Summerlin and Fern Creek. It also included from Rosedale Road to East South Street and the area between Bumby and Crystal Lake Drive.
5. District Pedestrian & Bicycle Direction
o Understand the past
o Align the goals and objectives
o Develop evaluation criteria
District Feasibility Analysis
o Identify issues in the field & through stakeholder outreach
o Develop & evaluate projects
o Hear from the public
District Action Plans
o Draft improvement plans
o Mapping, costing, & phasing
o Document & Present
STUDY PROCESS
6. Action Plans for Top Three Projects in
Each District
o Refined concept plans
o Proposed implementation steps/strategies
o Proposed project phasing
Remaining Improvement Concepts
o Included in District Master Plans for future
consideration / implementation
NEXT STEPS
9. Through stakeholder outreach, study goals
and principles developed for each district
This feedback informed evaluation criteria for
analyzing improvements for each district
STUDY GOALS
Robinson Street Study
State Road 50 Study
Theme Mills 50 Milk
Safe 30% 30%
Convenient 30% 10%
Comfortable 15% 25%
Connected 10% 25%
Attractive 15% 10%
10. • Improve the safety of residents and visitors of all
ages walking, bicycling, and driving throughout the
Districts
Safe
• Make biking/walking more convenient by adding
crosswalks, improving operations, and increasing
bicycle parking
Convenient
• Make biking/walking more comfortable by buffering
from traffic with items such as street furniture,
shade, and other improvements to sidewalks
Comfortable
• Ensure the Districts’ bikeways and sidewalks are
continuous and connect to citywide mobility
networks
Connected
• Increase District appeal and branding through
aesthetic, maintenance and design enhancements
to support a more attractive business environment
Attractive
Visioning:
Benchmarking Objective Evaluation Criteria
Goal: Comfortable
Increase
bicyclist comfort
Widening or providing
separation of bicycle facilities or
providing alternate routes with
lower traffic volumes
Improves
sidewalk
conditions
Improvements such as reducing
cross-slope, widening
sidewalks, or repairing broken
or uneven sidewalks
Mitigates climate
conditions
Mitigate the effect of rain or
heat by providing shade and/or
rain attenuation, increasing tree
cover, or decreasing heat island
by reducing asphalt coverage
VISION, GOALS & PERFORMANCE MEASURES
13. MILK DISTRICT PROJECT LIST & SCORING
Rank Concept Name Score
1 North Primrose Drive Complete Street 18.0
2 South Street Complete Street 16.0
3 Bumby Avenue Access Management 14.6
4 Graham Avenue Sidewalks 14.2
5 Graham Avenue Roundabouts 5.3
6 South Primrose Drive Complete Street 4.8
7 Primrose Drive at Colonial Drive Protected Pedestrian Signal Phases 4.1
8 Amelia Street Cycle Track 3.6
9 Graham Avenue Festival Block 2.7
10 Livingston Street Sidewalks 1.3
14. MILLS 50 PROJECT LIST & SCORING
Rank Concept Name Score
1 Intersection Corner Enhancements between Park Lake and Montana Street 17.1
2 Oregon, Canton and Weber Streets Crosswalks and Medians 13.2
3 Hyer and Thornton Avenue Crosswalk and Median 11.8
4 North Mills Avenue Streetscape 4.9
5 Nebraska Street East Approach Corner Enhancements 4.8
6 Altaloma Avenue Crosswalk and Median 4.4
7 Concord Street Crosswalks and Intersection Branding 4.2
8 Virginia Drive and Nebraska Street Protected Pedestrian Signal Phases 3.6
9 Park Lake Street Crosswalk and Median 3.5
10 Montana Street Crosswalk and Median 3.5
16. CONCEPT |
N PRIMROSE DR
Complete Street
Center
Turning Lane
Pedestrian
Crossing
Reduced to
3 lanes
Shared-
Use Path
PrimroseDr
Colonial Plaza Amelia Street
17. N PRIMROSE DR Complete Street (cont.)
Refuge
Island
Marked
Crossing
Landscaped
Medians
Marked
Crossings
Primrose Dr
Primrose Dr
ColonialDr
LivingstronSt
RobinsonSt
Festival Park
Colonial Plaza
FairgreenSt
City Recreation
Offices
RosedaleRd
18. CONCEPT |
SOUTH ST
Complete Street
Corner
Enhancement
Sidewalk
Added
Primrose Dr
Bumby Ave
Reduced to
2 Lanes
Back-in Angle
Parking
20. SOUTH ST Complete Street (cont.)
Marked
Crossing
Sidewalk
South St
Back-in Angle
Parking
South St
South St
21. CONCEPT |
BUMBY AVE
Access Management
Marked
Crossing
Refuge
Island
Marked
Crossing
Marked
Crossing
Central Blvd
Pine St
Kilgore St
Washington St
Robinson St
Jefferson St
1/4th Mile
5min Walk
33. Participate in Interactive Activity:
o www.menti.com
o Participation code: 39 13 50
Fill out Public Comment Form
o Leave form today with comments/concerns
o Comments open until Friday July 27
Submit Comments to City
o Can submit additional comments to
Ian Sikonia
Ian.Sikonia@cityoforlando.net
YOUR FEEDBACK
Primrose Dr at Amelia St