ORLANDO MAIN STREET DISTRICT
BICYCLE AND PEDESTRIAN STUDY
MILLS 50 & MILK DISTRICTS
Public Meeting
Thursday, July 12th
Study Purpose & Process
District Master Plans
Milk District Improvement Concepts
Mills 50 Improvement Concepts
Your Feedback
STUDY PURPOSE &
PROCESS
PURPOSE
Improve pedestrian &
bicycle environments
in Milk District &
Mills50
 District Pedestrian & Bicycle Direction
o Understand the past
o Align the goals and objectives
o Develop evaluation criteria
 District Feasibility Analysis
o Identify issues in the field & through stakeholder outreach
o Develop & evaluate projects
o Hear from the public
 District Action Plans
o Draft improvement plans
o Mapping, costing, & phasing
o Document & Present
STUDY PROCESS
 Action Plans for Top Three Projects in
Each District
o Refined concept plans
o Proposed implementation steps/strategies
o Proposed project phasing
 Remaining Improvement Concepts
o Included in District Master Plans for future
consideration / implementation
NEXT STEPS
Online Mapping / Comment Tool
More than 230 comments received
Grassroots Outreach Efforts 110 Total Contacts
Through stakeholder outreach, study goals
and principles developed for each district
This feedback informed evaluation criteria for
analyzing improvements for each district
STUDY GOALS
Robinson Street Study
State Road 50 Study
Theme Mills 50 Milk
Safe 30% 30%
Convenient 30% 10%
Comfortable 15% 25%
Connected 10% 25%
Attractive 15% 10%
• Improve the safety of residents and visitors of all
ages walking, bicycling, and driving throughout the
Districts
Safe
• Make biking/walking more convenient by adding
crosswalks, improving operations, and increasing
bicycle parking
Convenient
• Make biking/walking more comfortable by buffering
from traffic with items such as street furniture,
shade, and other improvements to sidewalks
Comfortable
• Ensure the Districts’ bikeways and sidewalks are
continuous and connect to citywide mobility
networks
Connected
• Increase District appeal and branding through
aesthetic, maintenance and design enhancements
to support a more attractive business environment
Attractive
Visioning:
Benchmarking Objective Evaluation Criteria
Goal: Comfortable
Increase
bicyclist comfort
Widening or providing
separation of bicycle facilities or
providing alternate routes with
lower traffic volumes
Improves
sidewalk
conditions
Improvements such as reducing
cross-slope, widening
sidewalks, or repairing broken
or uneven sidewalks
Mitigates climate
conditions
Mitigate the effect of rain or
heat by providing shade and/or
rain attenuation, increasing tree
cover, or decreasing heat island
by reducing asphalt coverage
VISION, GOALS & PERFORMANCE MEASURES
FEASIBILITY
Typical Situation Is Currently Not:
11
Safe Convenient Comfortable Connected Attractive
DISTRICT MASTER
PLANS
MILK DISTRICT PROJECT LIST & SCORING
Rank Concept Name Score
1 North Primrose Drive Complete Street 18.0
2 South Street Complete Street 16.0
3 Bumby Avenue Access Management 14.6
4 Graham Avenue Sidewalks 14.2
5 Graham Avenue Roundabouts 5.3
6 South Primrose Drive Complete Street 4.8
7 Primrose Drive at Colonial Drive Protected Pedestrian Signal Phases 4.1
8 Amelia Street Cycle Track 3.6
9 Graham Avenue Festival Block 2.7
10 Livingston Street Sidewalks 1.3
MILLS 50 PROJECT LIST & SCORING
Rank Concept Name Score
1 Intersection Corner Enhancements between Park Lake and Montana Street 17.1
2 Oregon, Canton and Weber Streets Crosswalks and Medians 13.2
3 Hyer and Thornton Avenue Crosswalk and Median 11.8
4 North Mills Avenue Streetscape 4.9
5 Nebraska Street East Approach Corner Enhancements 4.8
6 Altaloma Avenue Crosswalk and Median 4.4
7 Concord Street Crosswalks and Intersection Branding 4.2
8 Virginia Drive and Nebraska Street Protected Pedestrian Signal Phases 3.6
9 Park Lake Street Crosswalk and Median 3.5
10 Montana Street Crosswalk and Median 3.5
MILK DISTRICT
IMPROVEMENT
CONCEPTS
CONCEPT | 
N PRIMROSE DR
Complete Street
Center
Turning Lane
Pedestrian
Crossing
Reduced to
3 lanes
Shared-
Use Path
PrimroseDr
Colonial Plaza Amelia Street
N PRIMROSE DR Complete Street (cont.)
Refuge
Island
Marked
Crossing
Landscaped
Medians
Marked
Crossings
Primrose Dr
Primrose Dr
ColonialDr
LivingstronSt
RobinsonSt
Festival Park
Colonial Plaza
FairgreenSt
City Recreation
Offices
RosedaleRd
CONCEPT | 
SOUTH ST
Complete Street
Corner
Enhancement
Sidewalk
Added
Primrose Dr
Bumby Ave
Reduced to
2 Lanes
Back-in Angle
Parking
FEASIBILITY
Typical Situation Is Currently Not:
19
Safe Convenient Comfortable Connected Attractive
SOUTH ST Complete Street (cont.)
Marked
Crossing
Sidewalk
South St
Back-in Angle
Parking
South St
South St
CONCEPT | 
BUMBY AVE
Access Management
Marked
Crossing
Refuge
Island
Marked
Crossing
Marked
Crossing
Central Blvd
Pine St
Kilgore St
Washington St
Robinson St
Jefferson St
1/4th Mile
5min Walk
Median
Island
Marked
Crossing
CentralBlvd
PineSt
BUMBY AVE Access Management (cont.)
Bumby Ave
Median Island with
Marked Crossing
Bumby Ave
Glenwood Ave
CONCEPT | 
GRAHAM AVE
Sidewalks
Improved
Landscape
Example
Complete
Sidewalk
CONCEPT | 
GRAHAM AVE
Roundabouts
Simple
Landscape
Example
Roundabout
Example Neighborhood Roundabout,
Clearwater, FL
MILLS 50
IMPROVEMENT
CONCEPTS
CONCEPT | 
PARK LAKE ST
TO MONTANA ST
Corner Enhancements
Larger
Pedestrian
Area
Shorter
Distance
to Cross
Marked
Crossing
CONCEPT | 
OREGON ST,
CANTON ST,
& WEBER ST
Crosswalks & Medians
Landscaped
Median
Refuge
Island Marked
Crossing
CONCEPT | 
HYER AVE &
THORNTON AVE
Crosswalks & Medians
Eastbound
Directional
Left-Turn
Marked
Crossing
Median
Island
Hyer Ave
Colonial Dr
HYER AVE & THORNTON AVE
Crosswalks & Medians (cont.)
Right-in
Right-out
Only
Raised
Concrete
Separator
Colonial Dr
HyerAve
Thornton
Ave
MillsAve
##
25 46
Left or Angle Crashes (2013-2017)
CONCEPT | 
N MILLS AVE
Streetscape
Restriping &
Narrower
Lanes
Added On-
Street Parking
Larger
Pedestrian
Area
Landscaped
Median
Mills Ave
CONCEPT | 
NEBRASKA ST
(East Approach)
Corner Enhancements
Larger
Pedestrian
Area
Shorter
Crossing
Distance
YOUR FEEDBACK
 Participate in Interactive Activity:
o www.menti.com
o Participation code: 39 13 50
 Fill out Public Comment Form
o Leave form today with comments/concerns
o Comments open until Friday July 27
 Submit Comments to City
o Can submit additional comments to
Ian Sikonia
Ian.Sikonia@cityoforlando.net
YOUR FEEDBACK
Primrose Dr at Amelia St

Mais conteúdo relacionado

Mais procurados

Jasper Downtown/Riverfront Plan Presentation May 21, 2014
Jasper Downtown/Riverfront Plan Presentation May 21, 2014Jasper Downtown/Riverfront Plan Presentation May 21, 2014
Jasper Downtown/Riverfront Plan Presentation May 21, 2014
Matthew Crane
 

Mais procurados (20)

Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
 
Lower Don Valley Trail 2015 Construction
Lower Don Valley Trail 2015 ConstructionLower Don Valley Trail 2015 Construction
Lower Don Valley Trail 2015 Construction
 
PIC 2 Display Boards
PIC 2 Display BoardsPIC 2 Display Boards
PIC 2 Display Boards
 
Lafayette Downtown Congestion Study - 15 Strategies
Lafayette Downtown Congestion Study - 15 StrategiesLafayette Downtown Congestion Study - 15 Strategies
Lafayette Downtown Congestion Study - 15 Strategies
 
Glen Road Pedestrian Bridge - for Design Review Panel July 2017
Glen Road Pedestrian Bridge - for Design Review Panel July 2017Glen Road Pedestrian Bridge - for Design Review Panel July 2017
Glen Road Pedestrian Bridge - for Design Review Panel July 2017
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Presentation for public information centres
Presentation for public information centresPresentation for public information centres
Presentation for public information centres
 
Jan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public MeetingJan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public Meeting
 
East Don Trail - Design Concepts
East Don Trail - Design ConceptsEast Don Trail - Design Concepts
East Don Trail - Design Concepts
 
Retrofitting Trees in an Urban Corridor: Perspectives from a Designer, a Fore...
Retrofitting Trees in an Urban Corridor: Perspectives from a Designer, a Fore...Retrofitting Trees in an Urban Corridor: Perspectives from a Designer, a Fore...
Retrofitting Trees in an Urban Corridor: Perspectives from a Designer, a Fore...
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
 
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
 
City Bayfront Connectivity Nov 08 Presentation
City Bayfront Connectivity Nov 08 PresentationCity Bayfront Connectivity Nov 08 Presentation
City Bayfront Connectivity Nov 08 Presentation
 
Lakevale Estates Collection Improvements Community Meeting
Lakevale Estates Collection Improvements Community MeetingLakevale Estates Collection Improvements Community Meeting
Lakevale Estates Collection Improvements Community Meeting
 
Jasper Downtown/Riverfront Plan Presentation May 21, 2014
Jasper Downtown/Riverfront Plan Presentation May 21, 2014Jasper Downtown/Riverfront Plan Presentation May 21, 2014
Jasper Downtown/Riverfront Plan Presentation May 21, 2014
 
Mount Vernon Memorial Highway Trail Public Information Meeting: March 14, 2018
Mount Vernon Memorial Highway Trail Public Information Meeting: March 14, 2018Mount Vernon Memorial Highway Trail Public Information Meeting: March 14, 2018
Mount Vernon Memorial Highway Trail Public Information Meeting: March 14, 2018
 
Congestion Reduction Plan Strategies
Congestion Reduction Plan StrategiesCongestion Reduction Plan Strategies
Congestion Reduction Plan Strategies
 
2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final
 
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
 
Martin Goodman Trail West – Project Overview
Martin Goodman Trail West – Project OverviewMartin Goodman Trail West – Project Overview
Martin Goodman Trail West – Project Overview
 

Semelhante a Orlando Main Streets Bicycle and Pedestrian Study

Portland's Complete Streets Policy - GSMSummit 2014, Bruce Hyman
Portland's Complete Streets Policy - GSMSummit 2014, Bruce HymanPortland's Complete Streets Policy - GSMSummit 2014, Bruce Hyman
Portland's Complete Streets Policy - GSMSummit 2014, Bruce Hyman
GrowSmart Maine
 
2015 Bond Election: Recommended Transportation & Parks Projects
2015 Bond Election: Recommended Transportation & Parks Projects2015 Bond Election: Recommended Transportation & Parks Projects
2015 Bond Election: Recommended Transportation & Parks Projects
City of College Station
 
Wpc.sw barriers
Wpc.sw barriersWpc.sw barriers
Wpc.sw barriers
WPCwalks
 
Rethinking Neighborhood Design
Rethinking Neighborhood DesignRethinking Neighborhood Design
Rethinking Neighborhood Design
Chris Hupp
 
Final recommendations Thinkbike Workshop DC
Final recommendations Thinkbike Workshop DCFinal recommendations Thinkbike Workshop DC
Final recommendations Thinkbike Workshop DC
NLandUSA
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)
GardinerEast
 
Complete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric SnyderComplete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric Snyder
njbikeped
 

Semelhante a Orlando Main Streets Bicycle and Pedestrian Study (20)

Portland Sdat
Portland SdatPortland Sdat
Portland Sdat
 
Gardiner short briefing package
Gardiner   short briefing packageGardiner   short briefing package
Gardiner short briefing package
 
Clairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingClairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee Meeting
 
Portland's Complete Streets Policy - GSMSummit 2014, Bruce Hyman
Portland's Complete Streets Policy - GSMSummit 2014, Bruce HymanPortland's Complete Streets Policy - GSMSummit 2014, Bruce Hyman
Portland's Complete Streets Policy - GSMSummit 2014, Bruce Hyman
 
2015 Bond Election: Recommended Transportation & Parks Projects
2015 Bond Election: Recommended Transportation & Parks Projects2015 Bond Election: Recommended Transportation & Parks Projects
2015 Bond Election: Recommended Transportation & Parks Projects
 
Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014
 
Wpc.sw barriers
Wpc.sw barriersWpc.sw barriers
Wpc.sw barriers
 
Sheridan Road Improvement Project
Sheridan Road Improvement ProjectSheridan Road Improvement Project
Sheridan Road Improvement Project
 
Beal Parkway Public Meeting (Oct. 14, 2014)
Beal Parkway Public Meeting (Oct. 14, 2014)Beal Parkway Public Meeting (Oct. 14, 2014)
Beal Parkway Public Meeting (Oct. 14, 2014)
 
January 28, 2022 Greening Lower Grand Avenue Update
January 28, 2022 Greening Lower Grand Avenue UpdateJanuary 28, 2022 Greening Lower Grand Avenue Update
January 28, 2022 Greening Lower Grand Avenue Update
 
Rethinking Neighborhood Design
Rethinking Neighborhood DesignRethinking Neighborhood Design
Rethinking Neighborhood Design
 
Final recommendations Thinkbike Workshop DC
Final recommendations Thinkbike Workshop DCFinal recommendations Thinkbike Workshop DC
Final recommendations Thinkbike Workshop DC
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)
 
Pic 2 panels june 23 2015
Pic 2 panels june 23 2015Pic 2 panels june 23 2015
Pic 2 panels june 23 2015
 
Public Meeting #2 Information Materials
Public Meeting #2 Information MaterialsPublic Meeting #2 Information Materials
Public Meeting #2 Information Materials
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
 
Imagine Bickett Boulevard: Louisburg, North Carolina
Imagine Bickett Boulevard: Louisburg, North CarolinaImagine Bickett Boulevard: Louisburg, North Carolina
Imagine Bickett Boulevard: Louisburg, North Carolina
 
The Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David PetersonThe Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David Peterson
 
Complete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric SnyderComplete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric Snyder
 
New NY Bridge Project
New NY Bridge ProjectNew NY Bridge Project
New NY Bridge Project
 

Mais de Brendan O'Connor

Mais de Brendan O'Connor (20)

City commission presentation of i 4 ultimate art selection rlf 02.24.20
City commission presentation of i 4 ultimate art selection rlf 02.24.20City commission presentation of i 4 ultimate art selection rlf 02.24.20
City commission presentation of i 4 ultimate art selection rlf 02.24.20
 
firehouse subs for lease
firehouse subs for leasefirehouse subs for lease
firehouse subs for lease
 
aldenhighland shift
aldenhighland shiftaldenhighland shift
aldenhighland shift
 
Sentinel Guild - statement 6 30 2020
Sentinel Guild - statement 6 30 2020Sentinel Guild - statement 6 30 2020
Sentinel Guild - statement 6 30 2020
 
EXECUTIVE ORDER
EXECUTIVE ORDEREXECUTIVE ORDER
EXECUTIVE ORDER
 
Emergency executive order no. 2020 04 - 03-24-20
Emergency executive order no. 2020 04 - 03-24-20Emergency executive order no. 2020 04 - 03-24-20
Emergency executive order no. 2020 04 - 03-24-20
 
MARCH 2020 BUNGALOWER ZINE ISSUE
MARCH 2020 BUNGALOWER ZINE ISSUEMARCH 2020 BUNGALOWER ZINE ISSUE
MARCH 2020 BUNGALOWER ZINE ISSUE
 
Rocchetta renderings
Rocchetta renderingsRocchetta renderings
Rocchetta renderings
 
Olive townhouse-interior-units-0919
Olive townhouse-interior-units-0919Olive townhouse-interior-units-0919
Olive townhouse-interior-units-0919
 
Olive townhouse-unit-6-0919
Olive townhouse-unit-6-0919Olive townhouse-unit-6-0919
Olive townhouse-unit-6-0919
 
Olive townhouse-central-units-0919
Olive townhouse-central-units-0919Olive townhouse-central-units-0919
Olive townhouse-central-units-0919
 
2020 SUMMIT PROGRAM
2020 SUMMIT PROGRAM2020 SUMMIT PROGRAM
2020 SUMMIT PROGRAM
 
FEBRUARY 2020 BUNGALOWER ZINE ISSUE
FEBRUARY 2020 BUNGALOWER ZINE ISSUEFEBRUARY 2020 BUNGALOWER ZINE ISSUE
FEBRUARY 2020 BUNGALOWER ZINE ISSUE
 
Orange Avenue Overlay Final Report
Orange Avenue Overlay Final ReportOrange Avenue Overlay Final Report
Orange Avenue Overlay Final Report
 
Updated zine jan_2020
Updated zine jan_2020Updated zine jan_2020
Updated zine jan_2020
 
BUNGALOWER ZINE DECEMBER 19
BUNGALOWER ZINE DECEMBER 19BUNGALOWER ZINE DECEMBER 19
BUNGALOWER ZINE DECEMBER 19
 
Mills Park Consent Order
Mills Park Consent OrderMills Park Consent Order
Mills Park Consent Order
 
Asphalt art-guide
Asphalt art-guideAsphalt art-guide
Asphalt art-guide
 
2020 historical society calendar
2020 historical society calendar2020 historical society calendar
2020 historical society calendar
 
City of Winter Park Agenda Item
City of Winter Park Agenda ItemCity of Winter Park Agenda Item
City of Winter Park Agenda Item
 

Último

Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
gajnagarg
 
cholilithiasis, cholecystitis,gall bladdder .pdf
cholilithiasis, cholecystitis,gall bladdder .pdfcholilithiasis, cholecystitis,gall bladdder .pdf
cholilithiasis, cholecystitis,gall bladdder .pdf
RawalRafiqLeghari
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
awasv46j
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
ehyxf
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora Agency
Isadora Agency
 
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
HyderabadDolls
 
Resume all my skills and educations and achievement
Resume all my skills and educations and  achievement Resume all my skills and educations and  achievement
Resume all my skills and educations and achievement
210303105569
 
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
nirzagarg
 

Último (20)

Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
 
Abu Dhabi Call girls Service0556255850 Call girls in Abu Dhabi
Abu Dhabi Call girls Service0556255850 Call girls in Abu DhabiAbu Dhabi Call girls Service0556255850 Call girls in Abu Dhabi
Abu Dhabi Call girls Service0556255850 Call girls in Abu Dhabi
 
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime PondicherryPondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
 
cholilithiasis, cholecystitis,gall bladdder .pdf
cholilithiasis, cholecystitis,gall bladdder .pdfcholilithiasis, cholecystitis,gall bladdder .pdf
cholilithiasis, cholecystitis,gall bladdder .pdf
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
 
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora Agency
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentation
 
TRose UXPA Experience Design Concord .pptx
TRose UXPA Experience Design Concord .pptxTRose UXPA Experience Design Concord .pptx
TRose UXPA Experience Design Concord .pptx
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptx
 
Branding in the Psychedelic Landscape Report.pdf
Branding in the Psychedelic Landscape Report.pdfBranding in the Psychedelic Landscape Report.pdf
Branding in the Psychedelic Landscape Report.pdf
 
Nishatganj ? Book Call Girls in Lucknow | Book 9548273370 Extreme Naughty Cal...
Nishatganj ? Book Call Girls in Lucknow | Book 9548273370 Extreme Naughty Cal...Nishatganj ? Book Call Girls in Lucknow | Book 9548273370 Extreme Naughty Cal...
Nishatganj ? Book Call Girls in Lucknow | Book 9548273370 Extreme Naughty Cal...
 
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
 
Aminabad * High Profile Escorts Service in Lucknow Phone No 9548273370 Elite ...
Aminabad * High Profile Escorts Service in Lucknow Phone No 9548273370 Elite ...Aminabad * High Profile Escorts Service in Lucknow Phone No 9548273370 Elite ...
Aminabad * High Profile Escorts Service in Lucknow Phone No 9548273370 Elite ...
 
How to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfHow to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdf
 
Independent Escorts Goregaon WhatsApp +91-9930687706, Best Service
Independent Escorts Goregaon WhatsApp +91-9930687706, Best ServiceIndependent Escorts Goregaon WhatsApp +91-9930687706, Best Service
Independent Escorts Goregaon WhatsApp +91-9930687706, Best Service
 
Resume all my skills and educations and achievement
Resume all my skills and educations and  achievement Resume all my skills and educations and  achievement
Resume all my skills and educations and achievement
 
The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024
 
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
 

Orlando Main Streets Bicycle and Pedestrian Study

  • 1. ORLANDO MAIN STREET DISTRICT BICYCLE AND PEDESTRIAN STUDY MILLS 50 & MILK DISTRICTS Public Meeting Thursday, July 12th
  • 2. Study Purpose & Process District Master Plans Milk District Improvement Concepts Mills 50 Improvement Concepts Your Feedback
  • 4. PURPOSE Improve pedestrian & bicycle environments in Milk District & Mills50
  • 5.  District Pedestrian & Bicycle Direction o Understand the past o Align the goals and objectives o Develop evaluation criteria  District Feasibility Analysis o Identify issues in the field & through stakeholder outreach o Develop & evaluate projects o Hear from the public  District Action Plans o Draft improvement plans o Mapping, costing, & phasing o Document & Present STUDY PROCESS
  • 6.  Action Plans for Top Three Projects in Each District o Refined concept plans o Proposed implementation steps/strategies o Proposed project phasing  Remaining Improvement Concepts o Included in District Master Plans for future consideration / implementation NEXT STEPS
  • 7. Online Mapping / Comment Tool More than 230 comments received
  • 8. Grassroots Outreach Efforts 110 Total Contacts
  • 9. Through stakeholder outreach, study goals and principles developed for each district This feedback informed evaluation criteria for analyzing improvements for each district STUDY GOALS Robinson Street Study State Road 50 Study Theme Mills 50 Milk Safe 30% 30% Convenient 30% 10% Comfortable 15% 25% Connected 10% 25% Attractive 15% 10%
  • 10. • Improve the safety of residents and visitors of all ages walking, bicycling, and driving throughout the Districts Safe • Make biking/walking more convenient by adding crosswalks, improving operations, and increasing bicycle parking Convenient • Make biking/walking more comfortable by buffering from traffic with items such as street furniture, shade, and other improvements to sidewalks Comfortable • Ensure the Districts’ bikeways and sidewalks are continuous and connect to citywide mobility networks Connected • Increase District appeal and branding through aesthetic, maintenance and design enhancements to support a more attractive business environment Attractive Visioning: Benchmarking Objective Evaluation Criteria Goal: Comfortable Increase bicyclist comfort Widening or providing separation of bicycle facilities or providing alternate routes with lower traffic volumes Improves sidewalk conditions Improvements such as reducing cross-slope, widening sidewalks, or repairing broken or uneven sidewalks Mitigates climate conditions Mitigate the effect of rain or heat by providing shade and/or rain attenuation, increasing tree cover, or decreasing heat island by reducing asphalt coverage VISION, GOALS & PERFORMANCE MEASURES
  • 11. FEASIBILITY Typical Situation Is Currently Not: 11 Safe Convenient Comfortable Connected Attractive
  • 13. MILK DISTRICT PROJECT LIST & SCORING Rank Concept Name Score 1 North Primrose Drive Complete Street 18.0 2 South Street Complete Street 16.0 3 Bumby Avenue Access Management 14.6 4 Graham Avenue Sidewalks 14.2 5 Graham Avenue Roundabouts 5.3 6 South Primrose Drive Complete Street 4.8 7 Primrose Drive at Colonial Drive Protected Pedestrian Signal Phases 4.1 8 Amelia Street Cycle Track 3.6 9 Graham Avenue Festival Block 2.7 10 Livingston Street Sidewalks 1.3
  • 14. MILLS 50 PROJECT LIST & SCORING Rank Concept Name Score 1 Intersection Corner Enhancements between Park Lake and Montana Street 17.1 2 Oregon, Canton and Weber Streets Crosswalks and Medians 13.2 3 Hyer and Thornton Avenue Crosswalk and Median 11.8 4 North Mills Avenue Streetscape 4.9 5 Nebraska Street East Approach Corner Enhancements 4.8 6 Altaloma Avenue Crosswalk and Median 4.4 7 Concord Street Crosswalks and Intersection Branding 4.2 8 Virginia Drive and Nebraska Street Protected Pedestrian Signal Phases 3.6 9 Park Lake Street Crosswalk and Median 3.5 10 Montana Street Crosswalk and Median 3.5
  • 16. CONCEPT |  N PRIMROSE DR Complete Street Center Turning Lane Pedestrian Crossing Reduced to 3 lanes Shared- Use Path PrimroseDr Colonial Plaza Amelia Street
  • 17. N PRIMROSE DR Complete Street (cont.) Refuge Island Marked Crossing Landscaped Medians Marked Crossings Primrose Dr Primrose Dr ColonialDr LivingstronSt RobinsonSt Festival Park Colonial Plaza FairgreenSt City Recreation Offices RosedaleRd
  • 18. CONCEPT |  SOUTH ST Complete Street Corner Enhancement Sidewalk Added Primrose Dr Bumby Ave Reduced to 2 Lanes Back-in Angle Parking
  • 19. FEASIBILITY Typical Situation Is Currently Not: 19 Safe Convenient Comfortable Connected Attractive
  • 20. SOUTH ST Complete Street (cont.) Marked Crossing Sidewalk South St Back-in Angle Parking South St South St
  • 21. CONCEPT |  BUMBY AVE Access Management Marked Crossing Refuge Island Marked Crossing Marked Crossing Central Blvd Pine St Kilgore St Washington St Robinson St Jefferson St 1/4th Mile 5min Walk
  • 22. Median Island Marked Crossing CentralBlvd PineSt BUMBY AVE Access Management (cont.) Bumby Ave Median Island with Marked Crossing Bumby Ave Glenwood Ave
  • 23. CONCEPT |  GRAHAM AVE Sidewalks Improved Landscape Example Complete Sidewalk
  • 24. CONCEPT |  GRAHAM AVE Roundabouts Simple Landscape Example Roundabout Example Neighborhood Roundabout, Clearwater, FL
  • 26. CONCEPT |  PARK LAKE ST TO MONTANA ST Corner Enhancements Larger Pedestrian Area Shorter Distance to Cross Marked Crossing
  • 27. CONCEPT |  OREGON ST, CANTON ST, & WEBER ST Crosswalks & Medians Landscaped Median Refuge Island Marked Crossing
  • 28. CONCEPT |  HYER AVE & THORNTON AVE Crosswalks & Medians Eastbound Directional Left-Turn Marked Crossing Median Island Hyer Ave Colonial Dr
  • 29. HYER AVE & THORNTON AVE Crosswalks & Medians (cont.) Right-in Right-out Only Raised Concrete Separator Colonial Dr HyerAve Thornton Ave MillsAve ## 25 46 Left or Angle Crashes (2013-2017)
  • 30. CONCEPT |  N MILLS AVE Streetscape Restriping & Narrower Lanes Added On- Street Parking Larger Pedestrian Area Landscaped Median Mills Ave
  • 31. CONCEPT |  NEBRASKA ST (East Approach) Corner Enhancements Larger Pedestrian Area Shorter Crossing Distance
  • 33.  Participate in Interactive Activity: o www.menti.com o Participation code: 39 13 50  Fill out Public Comment Form o Leave form today with comments/concerns o Comments open until Friday July 27  Submit Comments to City o Can submit additional comments to Ian Sikonia Ian.Sikonia@cityoforlando.net YOUR FEEDBACK Primrose Dr at Amelia St