Lean Six Sigma




   Department of Defense
      Lean Six Sigma

            -Introduction-




                             UNCLASSIFIED
Learning Objectives
      Lean Six Sigma


 Class Introductions
 Review Training Materials and Software
 Establish Code of Conduct, Instructor
  Expectations, and Logistics
 Understand the Adult Learning Environment
 Use data to establish a Lean Six Sigma baseline
  for the class
 Review the Lean Six Sigma improvement process
  and topics to be covered in class




                           2                    UNCLASSIFIED
Class Introductions
        Lean Six Sigma


   Name
   Organization and location
   Years experience with DoD
   Hobby/interest
   Project problem statement
   Expectations




                            3         UNCLASSIFIED
Training Materials and Software
          Lean Six Sigma


 DEPMS: DoD Enterprise        MINITAB:
Performance Management System    Data Analysis
     Document Projects          Requires License
       Research Replicates
                                               www.minitab.com
       Gate Approvals
       DMAIC Templates                   EXCEL:
       Other tools                            Data Analysis
 https://psxl.psteering.com/DEPMS              Requires Data Analysis add-in
                                                    Choose Office-> EXCEL options; Select
Class Materials:                                    Add-ins; Select Analysis ToolPak; click Go.
                                                     Select Analysis ToolPak, click OK.
    Laptop with MINITAB & EXCEL
     Access to DEPMS
                                          Simulation:
     Print-out of Class Slides                Role Instructions
     Web-link to:                             Supply Store
        Student Participant Guide             Document Repository
        Minitab and EXCEL PEs
        DEPMS training (Prework)
        Glossary
                                     4                                        UNCLASSIFIED
Code of Conduct
          Lean Six Sigma


   Everyone participates with equal voice
   High level of participation needed for success
   Single discussions (respect the speaker)
   All ideas welcome
   Confidentiality - what happens here stays here!
   Respect our time together
       Return from breaks/lunch on time
       Use “parking lot” and “ELMO” to manage discussions
       Handle outside business on breaks
   Blackberries / Phones / electronics off or on vibrate
   Function as a team – everyone facilitates at least one
    exercise
   Have fun!
                                  5                          UNCLASSIFIED
Instructor Expectations
            Lean Six Sigma


 Instructors’ expectations are that you will:
      Come to class prepared
      Adhere to the Code of Conduct
      Ask questions and participate
      Practice team leadership and facilitation skills during class
            Teach-backs
            Simulation
            Class Exercises
      Keep an open mind
      Have fun!




                                    6                             UNCLASSIFIED
Classroom Logistics
          Lean Six Sigma


 Class Hours
 Safety
       Fire exits and where to congregate
       Trips and other hazards
   Restroom facilities
   Breaks
   Lunch accommodations
   Others?




                                   7         UNCLASSIFIED
Our Learning Environment
       Lean Six Sigma


   Prework
   Classroom concept lecture / discussion
   Classroom application – Instructor led
   Classroom application – Team lead
   Classroom team teach-back
   Homework assignments
   Homework debrief




                             8               UNCLASSIFIED
How Do We Learn?
   Lean Six Sigma


Retention Rate   Teaching Techniques          Characteristics
                                               Time Pressured
         5%              Presentation
                                               Content Focused
                                                Spray and Pray
        10%                Reading

        20%              Audio-Visual

        30%             Demonstration

        50%              Discussion

        75%         Practice with Feedback      Learner Focused
                                                   Interactive
        80%      Teach Others/Immediate Use     Time-Consuming




                             9                         UNCLASSIFIED
Class Baseline
       Lean Six Sigma



 Statistical Baseline - Our personal knowledge:
      1 – I have never used statistical methods
      3 – I use some data occasionally
      5 – I use data frequently
      7 – I almost always use data and know what to do with it
      9 – I should be teaching this stuff


 Lean Baseline – Our personal knowledge:
      1 – I have never used lean tools/techniques
      3 – I use lean tools sometimes
      5 – I use lean tools a lot
      7 – I always use lean, regardless of the process/environment
      9 – I should be teaching this stuff
                                 10                          UNCLASSIFIED
Course Schedule
                     Lean Six Sigma


    Monday                     Tuesday               Wednesday             Thursday            Friday
                25 Nov
1 – Introduction            Teachbacks               Teachbacks          Teachbacks             Review


                            6 – Measure              6 – Measure         9 - Round 2       13 – OSD Final
2 –Performance
                            Phase                                3 Dec
                                                                         Simulation        Exam
Improvement                            1 Dec
Overview                                                                 10 – Improve
                                                     7– Analyze
                                                                         Phase Cont        14 - Project
                                                     Phase
3 – Management                                                                    10 Dec   Presentations
   Team
                                                                                                     17 Dec
   Change                                            8– Improve          11– Control
   Project                                           Phase               Phase               *Saturday
                                                                 8 Dec                     15 – DA Exam
4 – Define Phase                                                         12 – Class
                                                                                           Prep
                                                                         Review                      18 Dec
5 – Round 1
Simulation                                                                                 16 – DA Final
                                                                                  15 Dec
                                                                                           Exam
              28 Nov



* Optional: Required for the award of the ARMY LSS ASI      11                             UNCLASSIFIED
What We Have Covered
       Lean Six Sigma


 Introduction to class instructors and participants
 Necessary software and training materials
 Code of Conduct, Instructor Expectations, and Class
  Logistics
 An understanding of the learning process, learning
  environment, and LSS learning focus
 Appreciation of our baseline familiarity and comfort level
  working with statistical data and Lean
 Overview of the Lean Six Sigma Course Schedule




                              12                      UNCLASSIFIED
Lean Six Sigma




   Department of Defense
      Lean Six Sigma

                 -Overview-




                              UNCLASSIFIED
Learning Objectives
         Lean Six Sigma


 At the end of this training you will:
      Be aware of DoD policy regarding Lean Six Sigma deployment
      Be aware that Performance Improvement efforts should link to
       enterprise value streams, linking mission and vision
      Appreciate that different deployment models that exist
      Appreciate differences between various project implementation
       strategies and when to use each model
      Be aware of the history of Lean, Six Sigma and Theory of
       Constraints
      Be aware of OSD’s LSS certification requirements




                                  14                         UNCLASSIFIED
Foundation to Lean 6 Sigma
           Lean Six Sigma



Definitions of Insanity:

Doing the same thing over and over
and expecting a different outcome!

AND

Using the same logic to get out of the
trouble that got you there in the first
place!


                            -Albert Einstein

                                     15        UNCLASSIFIED
Policy Overview
        Lean Six Sigma


 Process Improvement Guidelines
 Principles and Tools
 OSD Performance Improvement / LSS Charter
      DepSecDef memo of 11 May 2006
      DepSecDef memo of 30 April 2007
      DoDD 5010.42 15 May 2008
      DoDI 5010.43 17 Jul 2009

 Performance Excellence… A Lean Six Sigma World-
  Class Methodology
 Where to Start…Voice of the Customer
                                  16          UNCLASSIFIED
Performance Improvement Cycle
        Lean Six Sigma

                                      PLANNING
                                    1. Develop Vision,
                                    Mission & Strategy

                                •    Who am I?
                                •    Where am I going?
                                •    What do I need to get
                                     done?


                                                   B.
                                              Implement
                                            Operational Plan                  2. Conduct a Value
RE-ENTRY                                       (Meet my
                                                                               Stream Analysis
                                             commitment)

                                                                              •   How will I get there?
                               A.                                 C.
                        Create & Refine                    Monitor Progress
                        Operational Plan    IMPLEMENTATION    (How am I
                          (What’s my                           doing?)
                            plan?)



                                           D.
                                           Focus D. PIPI
                                                    on (How
                                           Focus on CPI
                                           can I do it again?
                                       (How can can I it again?
                                           How I do do it
                                       How can I do it better?
          4. Align &                       better? How can I
                                          How can I kill it?)          3. Develop
                                           kill it?
         Deploy Goals                                             Structure & Behavior
    •    How will I get                                           •   What will I need?
         people to do it?


                                                      17                                        UNCLASSIFIED
Strategic Alignment
       Lean Six Sigma



 The Define Tollgate requires a linkage to how this
  project aligns to the organizational strategy.

     Include an organizational metric/metrics for which your
      project will help improve

     Refer to your organization’s Strategic Plan and/or other
      referenced documents




                                         Required Define
                                         Phase Deliverable
                                 18                              UNCLASSIFIED
Value Streams & DoD Enterprise
        Lean Six Sigma




                                                                  g
                                                                in
                                                              et




                                                                                                     g
                     re




                                                                                                   in
                                                             g




                                                                                   on
                    u




                                                                                                  n
                                                            d
                  ct




                                                           t




                                                                                 ce
                                                           t




                                                                                                 n
                                                          u




                                                                                 ti
                                                        en




                                                                             or &
                                                        en
                 u




                                                         B




                                                                                               la
                                                                               ta
                                                   op &




                                                                              an
                                 el
               tr




                                                                           sp e
                                                       m




                                                      m




                                                                                              P
                                              ,
                                             g




                                                                        an ag
                                n




                                                 el n
             as




                                                                             n
                                                    re




                                                                                             on
                                           in
                               n




                                               ev ig




                                                                           te
                                                                      Tr tor
           fr




                             so




                                          n




                                                 cu
   al




                                                 es




                                                                                           si
                                                                          n
         In




                                         n
                           er
  g




                                                                        ai




                                                                                         is
                                                                        S
                                               D




                                              ro
                                       la
Le




                                                                      M




                                                                                        M
                          P
        IT




                                      P




                                             D




                                             P
                                 Human Resource Management

                                                                                                    W
                                                                                                    A
                            Weapon System Lifecycle Management                                      R
                                                                                                    F
                                                                                                    I
                 Real Property & Installation Lifecycle Management
                                                                                                    G
                                                                                                    H
                                                                                                    T
                            Materiel Supply & Service Management
                                                                                                    E
                                                                                                    R
                                      Financial Management
                                                                                                    S


                                        Value Streams
                                           (red and yellow)

                                                      19                                 UNCLASSIFIED
DMAIC Model
Lean Six Sigma




                  20       UNCLASSIFIED
DMAIC Linkages
                        Lean Six Sigma

                                                                                                                                                                                                                                                       Gage R&R
                                                                                                                                                                                         Critical
 Suppliers     Inputs     Process        Outputs                             Customers                                                                                                  Customer
                                                                                                                                                                                      Requirements

                                                                                                                                                   CTQ
   Input, Process
      & Output                                                                                                                                       Defects
                                                                                                                                                                                                Fishbone - Potential X’s & Modes
     Indicators
                                                                                                                                                                                                            Process                         People       Measurement
 Operational
                          Step 3    Step 4
Definitions and                                                                            Data                                                                                                                X4                        X2
  Indicators                  Rework
                                       No                                                                                                                                            Y                                         X3
                                                                                                                                                                                                 X5                                               X1
                                             Yes
               Step 1     Step 2    Step 5           Step 6                                                 Step 7                                                                                     Environment                       Equipment        Materials




                                                                                         ProcessCapabilityofLength
                                             UCL
                                                                                                                                                                                                            XY MATRIX




                                                                                                                                                                                                                                OCC
                                                                                                                                                                                                                                                       Improved Process




                                                                                                                                                                                                             SEV




                                                                                                                                                                                                                                                 RP
                                                                                                                                                                                                                                                 ET
                                                                                                                                                                           Proces




                                                                                                                                                                                                                                                 N
                                                                                                                                                                                                                                                 D
                                                             Process Data
                                                                                                    LSL             USL
                                                                                                                                                  Within
                                                                                                                                                                                    Potential   Potential          Potential          Current
                                                       LSL             599                                                                        Overall
                                                                                                                                                                           s Step    Failure     Failure           Causes             Controls
                                                                                                                                                                                                                                                           Control &
                                                       Target          *

                                             X-bar     USL             601
                                                       Sample Mean 600.072
                                                                                                                                           Potential (Within) Capability
                                                                                                                                                   Cp 0.28
                                                                                                                                                                                     Modes       Effects
                                                       Sample N
                                                       StDev(W
                                                                       100
                                                                ithin) 1.17308
                                                       StDev(Overall) 1.33501
                                                                                                                                                   CPL 0.30
                                                                                                                                                   CPU 0.26
                                                                                                                                                   Cpk 0.26
                                                                                                                                                                           Step 1      M1          Y                  X1
                                             LCL                                                                                               Overall Capability
                                                                                                                                                   Pp 0.25
                                                                                                                                                   PPL 0.27
                                                                                                                                                   PPU 0.23
                                                                                                                                                   Ppk 0.23
                                                                                                                                                                           Step 2      M2          Y                  X2                                 Performance
                        Process Baseline
                                                                                                                                                   Cpm    *




      Pareto                                                                                                                                                               Step 3      M3          Y                  X3

                                                                                                                                                                                                        FMEA
                                                                                  597      598     599     600      601 602          603
                                                        ObservedPerformance
                                                       PPM <LSL 280000.00
                                                                                 Exp. WithinPerform
                                                                                 PPM <LSL 180401.78
                                                                                                   ance   Exp. Overall Perform
                                                                                                          PPM<LSL 210989.32
                                                                                                                              ance
                                                                                                                                                                           Step 4      M4          Y                  X4
Stratification
                                                       PPM >USL 350000.00        PPM >USL 214448.35       PPM>USL 243487.40
                                                       PPM Total 630000.00       PPM Total 394850.13      PPMTotal 454476.72


                                                                                                                                                                           Step 5      M5          Y                  X5
                                                              Baseline
                                                              Capability                                                                                                                                                                                      1



                                                                                                                                                                           21                                                                            UNCLASSIFIED

Mais conteúdo relacionado

Semelhante a OSDGB1

Becoming Agile: Agile Transitions in Practice - Rashina Hoda - AgileNZ 2017
Becoming Agile: Agile Transitions in Practice - Rashina Hoda - AgileNZ 2017Becoming Agile: Agile Transitions in Practice - Rashina Hoda - AgileNZ 2017
Becoming Agile: Agile Transitions in Practice - Rashina Hoda - AgileNZ 2017AgileNZ Conference
 
Agile Coaching by ScrumMasterNZ
Agile Coaching by ScrumMasterNZAgile Coaching by ScrumMasterNZ
Agile Coaching by ScrumMasterNZscrummasternz
 
Waterfall vs agile approach scrum framework and best practices in software d...
Waterfall vs agile approach  scrum framework and best practices in software d...Waterfall vs agile approach  scrum framework and best practices in software d...
Waterfall vs agile approach scrum framework and best practices in software d...Tayfun Bilsel
 
Pushing the awareness envelope
Pushing the awareness envelopePushing the awareness envelope
Pushing the awareness envelopeIsrael Gutiérrez
 
Stefan bargaoanu we're agile. and now what v1.1
Stefan bargaoanu we're agile. and now what v1.1Stefan bargaoanu we're agile. and now what v1.1
Stefan bargaoanu we're agile. and now what v1.1Agora Group
 
20100811 Jwv Dommel Valley Group Workshop
20100811 Jwv Dommel Valley Group Workshop20100811 Jwv Dommel Valley Group Workshop
20100811 Jwv Dommel Valley Group WorkshopJan Willem Vernhout
 
Project Management Club - how to manage risks in Agile (Bykovets)
Project Management Club - how to manage risks in Agile (Bykovets)Project Management Club - how to manage risks in Agile (Bykovets)
Project Management Club - how to manage risks in Agile (Bykovets)Artem Bykovets
 
Hacking Primavera P6 - Creative Solutions to Common Problems From the Primave...
Hacking Primavera P6 - Creative Solutions to Common Problems From the Primave...Hacking Primavera P6 - Creative Solutions to Common Problems From the Primave...
Hacking Primavera P6 - Creative Solutions to Common Problems From the Primave...Plan Academy - Online Primavera P6 Training
 
The Lean Six Sigma Curriculum Rev 2
The Lean Six Sigma Curriculum Rev 2The Lean Six Sigma Curriculum Rev 2
The Lean Six Sigma Curriculum Rev 2ciaranmay
 
Lean 6 sigma simplified
Lean 6 sigma simplified Lean 6 sigma simplified
Lean 6 sigma simplified Blenson Paul
 
ANIn Coimbatore July 2023 | Business Agility in Data Science by Dr.Selvaraaju...
ANIn Coimbatore July 2023 | Business Agility in Data Science by Dr.Selvaraaju...ANIn Coimbatore July 2023 | Business Agility in Data Science by Dr.Selvaraaju...
ANIn Coimbatore July 2023 | Business Agility in Data Science by Dr.Selvaraaju...AgileNetwork
 
AIR Presentation: OPAPP and FAMS: Two Studies of Interim Assessments
AIR Presentation: OPAPP and FAMS: Two Studies of Interim AssessmentsAIR Presentation: OPAPP and FAMS: Two Studies of Interim Assessments
AIR Presentation: OPAPP and FAMS: Two Studies of Interim AssessmentsOhio Education Research Center
 
Kiker.ronald
Kiker.ronaldKiker.ronald
Kiker.ronaldNASAPMC
 
Rapid usability testing
Rapid usability testingRapid usability testing
Rapid usability testinglisarex
 
SAP Education in Nepal by Blue Ocean Systems
SAP Education in Nepal by Blue Ocean SystemsSAP Education in Nepal by Blue Ocean Systems
SAP Education in Nepal by Blue Ocean SystemsBOS_NP
 

Semelhante a OSDGB1 (20)

Becoming Agile: Agile Transitions in Practice - Rashina Hoda - AgileNZ 2017
Becoming Agile: Agile Transitions in Practice - Rashina Hoda - AgileNZ 2017Becoming Agile: Agile Transitions in Practice - Rashina Hoda - AgileNZ 2017
Becoming Agile: Agile Transitions in Practice - Rashina Hoda - AgileNZ 2017
 
Agile Coaching by ScrumMasterNZ
Agile Coaching by ScrumMasterNZAgile Coaching by ScrumMasterNZ
Agile Coaching by ScrumMasterNZ
 
Waterfall vs agile approach scrum framework and best practices in software d...
Waterfall vs agile approach  scrum framework and best practices in software d...Waterfall vs agile approach  scrum framework and best practices in software d...
Waterfall vs agile approach scrum framework and best practices in software d...
 
Pushing the awareness envelope
Pushing the awareness envelopePushing the awareness envelope
Pushing the awareness envelope
 
University to Useful
University to UsefulUniversity to Useful
University to Useful
 
Stefan bargaoanu we're agile. and now what v1.1
Stefan bargaoanu we're agile. and now what v1.1Stefan bargaoanu we're agile. and now what v1.1
Stefan bargaoanu we're agile. and now what v1.1
 
Liderazgo de lean
Liderazgo de leanLiderazgo de lean
Liderazgo de lean
 
Disciplined agile Delivery
Disciplined agile DeliveryDisciplined agile Delivery
Disciplined agile Delivery
 
20100811 Jwv Dommel Valley Group Workshop
20100811 Jwv Dommel Valley Group Workshop20100811 Jwv Dommel Valley Group Workshop
20100811 Jwv Dommel Valley Group Workshop
 
Project Management Club - how to manage risks in Agile (Bykovets)
Project Management Club - how to manage risks in Agile (Bykovets)Project Management Club - how to manage risks in Agile (Bykovets)
Project Management Club - how to manage risks in Agile (Bykovets)
 
Hacking Primavera P6 - Creative Solutions to Common Problems From the Primave...
Hacking Primavera P6 - Creative Solutions to Common Problems From the Primave...Hacking Primavera P6 - Creative Solutions to Common Problems From the Primave...
Hacking Primavera P6 - Creative Solutions to Common Problems From the Primave...
 
The Lean Six Sigma Curriculum Rev 2
The Lean Six Sigma Curriculum Rev 2The Lean Six Sigma Curriculum Rev 2
The Lean Six Sigma Curriculum Rev 2
 
Lean 6 sigma simplified
Lean 6 sigma simplified Lean 6 sigma simplified
Lean 6 sigma simplified
 
ANIn Coimbatore July 2023 | Business Agility in Data Science by Dr.Selvaraaju...
ANIn Coimbatore July 2023 | Business Agility in Data Science by Dr.Selvaraaju...ANIn Coimbatore July 2023 | Business Agility in Data Science by Dr.Selvaraaju...
ANIn Coimbatore July 2023 | Business Agility in Data Science by Dr.Selvaraaju...
 
AIR Presentation: OPAPP and FAMS: Two Studies of Interim Assessments
AIR Presentation: OPAPP and FAMS: Two Studies of Interim AssessmentsAIR Presentation: OPAPP and FAMS: Two Studies of Interim Assessments
AIR Presentation: OPAPP and FAMS: Two Studies of Interim Assessments
 
Ultimate agilisttokyo
Ultimate agilisttokyoUltimate agilisttokyo
Ultimate agilisttokyo
 
Kiker.ronald
Kiker.ronaldKiker.ronald
Kiker.ronald
 
Rapid usability testing
Rapid usability testingRapid usability testing
Rapid usability testing
 
SAP Education in Nepal by Blue Ocean Systems
SAP Education in Nepal by Blue Ocean SystemsSAP Education in Nepal by Blue Ocean Systems
SAP Education in Nepal by Blue Ocean Systems
 
Elearning through film
Elearning through filmElearning through film
Elearning through film
 

Último

PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000dlhescort
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceDamini Dixit
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceDamini Dixit
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 

Último (20)

PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 

OSDGB1

  • 1. Lean Six Sigma Department of Defense Lean Six Sigma -Introduction- UNCLASSIFIED
  • 2. Learning Objectives Lean Six Sigma  Class Introductions  Review Training Materials and Software  Establish Code of Conduct, Instructor Expectations, and Logistics  Understand the Adult Learning Environment  Use data to establish a Lean Six Sigma baseline for the class  Review the Lean Six Sigma improvement process and topics to be covered in class 2 UNCLASSIFIED
  • 3. Class Introductions Lean Six Sigma  Name  Organization and location  Years experience with DoD  Hobby/interest  Project problem statement  Expectations 3 UNCLASSIFIED
  • 4. Training Materials and Software Lean Six Sigma  DEPMS: DoD Enterprise  MINITAB: Performance Management System  Data Analysis  Document Projects  Requires License  Research Replicates  www.minitab.com  Gate Approvals  DMAIC Templates  EXCEL:  Other tools  Data Analysis https://psxl.psteering.com/DEPMS  Requires Data Analysis add-in  Choose Office-> EXCEL options; Select Class Materials: Add-ins; Select Analysis ToolPak; click Go. Select Analysis ToolPak, click OK.  Laptop with MINITAB & EXCEL  Access to DEPMS  Simulation:  Print-out of Class Slides  Role Instructions  Web-link to:  Supply Store  Student Participant Guide  Document Repository  Minitab and EXCEL PEs  DEPMS training (Prework)  Glossary 4 UNCLASSIFIED
  • 5. Code of Conduct Lean Six Sigma  Everyone participates with equal voice  High level of participation needed for success  Single discussions (respect the speaker)  All ideas welcome  Confidentiality - what happens here stays here!  Respect our time together  Return from breaks/lunch on time  Use “parking lot” and “ELMO” to manage discussions  Handle outside business on breaks  Blackberries / Phones / electronics off or on vibrate  Function as a team – everyone facilitates at least one exercise  Have fun! 5 UNCLASSIFIED
  • 6. Instructor Expectations Lean Six Sigma  Instructors’ expectations are that you will:  Come to class prepared  Adhere to the Code of Conduct  Ask questions and participate  Practice team leadership and facilitation skills during class  Teach-backs  Simulation  Class Exercises  Keep an open mind  Have fun! 6 UNCLASSIFIED
  • 7. Classroom Logistics Lean Six Sigma  Class Hours  Safety  Fire exits and where to congregate  Trips and other hazards  Restroom facilities  Breaks  Lunch accommodations  Others? 7 UNCLASSIFIED
  • 8. Our Learning Environment Lean Six Sigma  Prework  Classroom concept lecture / discussion  Classroom application – Instructor led  Classroom application – Team lead  Classroom team teach-back  Homework assignments  Homework debrief 8 UNCLASSIFIED
  • 9. How Do We Learn? Lean Six Sigma Retention Rate Teaching Techniques Characteristics Time Pressured 5% Presentation Content Focused Spray and Pray 10% Reading 20% Audio-Visual 30% Demonstration 50% Discussion 75% Practice with Feedback Learner Focused Interactive 80% Teach Others/Immediate Use Time-Consuming 9 UNCLASSIFIED
  • 10. Class Baseline Lean Six Sigma  Statistical Baseline - Our personal knowledge:  1 – I have never used statistical methods  3 – I use some data occasionally  5 – I use data frequently  7 – I almost always use data and know what to do with it  9 – I should be teaching this stuff  Lean Baseline – Our personal knowledge:  1 – I have never used lean tools/techniques  3 – I use lean tools sometimes  5 – I use lean tools a lot  7 – I always use lean, regardless of the process/environment  9 – I should be teaching this stuff 10 UNCLASSIFIED
  • 11. Course Schedule Lean Six Sigma Monday Tuesday Wednesday Thursday Friday 25 Nov 1 – Introduction Teachbacks Teachbacks Teachbacks Review 6 – Measure 6 – Measure 9 - Round 2 13 – OSD Final 2 –Performance Phase 3 Dec Simulation Exam Improvement 1 Dec Overview 10 – Improve 7– Analyze Phase Cont 14 - Project Phase 3 – Management 10 Dec Presentations Team 17 Dec Change 8– Improve 11– Control Project Phase Phase *Saturday 8 Dec 15 – DA Exam 4 – Define Phase 12 – Class Prep Review 18 Dec 5 – Round 1 Simulation 16 – DA Final 15 Dec Exam 28 Nov * Optional: Required for the award of the ARMY LSS ASI 11 UNCLASSIFIED
  • 12. What We Have Covered Lean Six Sigma  Introduction to class instructors and participants  Necessary software and training materials  Code of Conduct, Instructor Expectations, and Class Logistics  An understanding of the learning process, learning environment, and LSS learning focus  Appreciation of our baseline familiarity and comfort level working with statistical data and Lean  Overview of the Lean Six Sigma Course Schedule 12 UNCLASSIFIED
  • 13. Lean Six Sigma Department of Defense Lean Six Sigma -Overview- UNCLASSIFIED
  • 14. Learning Objectives Lean Six Sigma  At the end of this training you will:  Be aware of DoD policy regarding Lean Six Sigma deployment  Be aware that Performance Improvement efforts should link to enterprise value streams, linking mission and vision  Appreciate that different deployment models that exist  Appreciate differences between various project implementation strategies and when to use each model  Be aware of the history of Lean, Six Sigma and Theory of Constraints  Be aware of OSD’s LSS certification requirements 14 UNCLASSIFIED
  • 15. Foundation to Lean 6 Sigma Lean Six Sigma Definitions of Insanity: Doing the same thing over and over and expecting a different outcome! AND Using the same logic to get out of the trouble that got you there in the first place! -Albert Einstein 15 UNCLASSIFIED
  • 16. Policy Overview Lean Six Sigma  Process Improvement Guidelines  Principles and Tools  OSD Performance Improvement / LSS Charter  DepSecDef memo of 11 May 2006  DepSecDef memo of 30 April 2007  DoDD 5010.42 15 May 2008  DoDI 5010.43 17 Jul 2009  Performance Excellence… A Lean Six Sigma World- Class Methodology  Where to Start…Voice of the Customer 16 UNCLASSIFIED
  • 17. Performance Improvement Cycle Lean Six Sigma PLANNING 1. Develop Vision, Mission & Strategy • Who am I? • Where am I going? • What do I need to get done? B. Implement Operational Plan 2. Conduct a Value RE-ENTRY (Meet my Stream Analysis commitment) • How will I get there? A. C. Create & Refine Monitor Progress Operational Plan IMPLEMENTATION (How am I (What’s my doing?) plan?) D. Focus D. PIPI on (How Focus on CPI can I do it again? (How can can I it again? How I do do it How can I do it better? 4. Align & better? How can I How can I kill it?) 3. Develop kill it? Deploy Goals Structure & Behavior • How will I get • What will I need? people to do it? 17 UNCLASSIFIED
  • 18. Strategic Alignment Lean Six Sigma  The Define Tollgate requires a linkage to how this project aligns to the organizational strategy.  Include an organizational metric/metrics for which your project will help improve  Refer to your organization’s Strategic Plan and/or other referenced documents Required Define Phase Deliverable 18 UNCLASSIFIED
  • 19. Value Streams & DoD Enterprise Lean Six Sigma g in et g re in g on u n d ct t ce t n u ti en or & en u B la ta op & an el tr sp e m m P , g an ag n el n as n re on in n ev ig te Tr tor fr so n cu al es si n In n er g ai is S D ro la Le M M P IT P D P Human Resource Management W A Weapon System Lifecycle Management R F I Real Property & Installation Lifecycle Management G H T Materiel Supply & Service Management E R Financial Management S Value Streams (red and yellow) 19 UNCLASSIFIED
  • 20. DMAIC Model Lean Six Sigma 20 UNCLASSIFIED
  • 21. DMAIC Linkages Lean Six Sigma Gage R&R Critical Suppliers Inputs Process Outputs Customers Customer Requirements CTQ Input, Process & Output Defects Fishbone - Potential X’s & Modes Indicators Process People Measurement Operational Step 3 Step 4 Definitions and Data X4 X2 Indicators Rework No Y X3 X5 X1 Yes Step 1 Step 2 Step 5 Step 6 Step 7 Environment Equipment Materials ProcessCapabilityofLength UCL XY MATRIX OCC Improved Process SEV RP ET Proces N D Process Data LSL USL Within Potential Potential Potential Current LSL 599 Overall s Step Failure Failure Causes Controls Control & Target * X-bar USL 601 Sample Mean 600.072 Potential (Within) Capability Cp 0.28 Modes Effects Sample N StDev(W 100 ithin) 1.17308 StDev(Overall) 1.33501 CPL 0.30 CPU 0.26 Cpk 0.26 Step 1 M1 Y X1 LCL Overall Capability Pp 0.25 PPL 0.27 PPU 0.23 Ppk 0.23 Step 2 M2 Y X2 Performance Process Baseline Cpm * Pareto Step 3 M3 Y X3 FMEA 597 598 599 600 601 602 603 ObservedPerformance PPM <LSL 280000.00 Exp. WithinPerform PPM <LSL 180401.78 ance Exp. Overall Perform PPM<LSL 210989.32 ance Step 4 M4 Y X4 Stratification PPM >USL 350000.00 PPM >USL 214448.35 PPM>USL 243487.40 PPM Total 630000.00 PPM Total 394850.13 PPMTotal 454476.72 Step 5 M5 Y X5 Baseline Capability 1 21 UNCLASSIFIED