IndianStandard
CODE OF PRACTICE FOR
LIME CONCRETE LINING FOR CANALS
( Second Reprint JUNE 1990 )
UDC 627.841.034.92:666.972
@ Copyright 1976
BUREAU OF INDIAN STANDARDS
MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARC
NEW DELHI 110002
Gr3 January 1976
IndianStandard
CODE OF PRACTICE FOR
LIME CONCRETE LINING FOR CANALS
Canals and Canal Linings Sectional Committee, BDC 57
Chairman
SHRIK. S. ~PATHAK
Members
SHRI M. M. ANAND
SERI S. S. SAEI ( Alternate )
SHRIS. P. BEAT
CrrrnvENOWEER( IRRITATION)
SHRIK. SUND~RAY( Alternate )
SHRI0. P. DATTA
Srzn~R. L. DEWAN
D~~E~To=
DIRECTOR
Representing
Water and Power Development Consultancy
Services (India ) Ltd, New Delhi
Irrigation & Power Department, Government of
Punjab
Public Works Department, Government of Mysore
PublEay;rks Department, Government of Tam11
BeasDesigns Organization, Nangal Township
Bihar Institute of Hydraulic 8s Allied Research,
Khagaul
Irrigation Department, Government of Rajastban
Land Reclamation, Irrigation & Power .Research
Institute, Amritsar
PHYSICIST( Altemate)
DIRECTOR ( BD ) Central Water Commission, New Delhi
DEPUTYDIRECTOR( BD ) ( Alternate )
SHRI S. D. KIJLKARNI Irrigation & Power Department, Government of
Maharashtra
SERI A. A. PAI (Alternate)
SHRIK. M. MAHESHWARI
SHRIP. W. PARWANI( Altemate )
Planning Commission, Government of India
SHRIM. A. MEETA
SHRI9. K. MEETA ( Alternate )
Concrete Association of India, Bombay
REPRESENTATIVE Irrigation Department, Government of Haryana
SHEIP. C. SAXEN’~ Central Water & Power Research Station, Poona
Snm V. P. BHATT( Alternate )
SE(1BE!cABY Central Board of Irrigation & Power, New Delhi
SEIBIH. D. SMBMA Irrigation Research Institute, Roorkee
SERI M. K. SINQHaL Water Resources & Development Training Centre,
University of Roorkee
( Continuedon#age 2 )
@ Copyright 1976
BUREAU OF INDIAN STANDARDS
This publication is protected under the Indian Copyright Act (XIV of 1957) and
reproduction in whole or in part by any meannexcept with written permission of the
publisher shall be deemed to be an infringement of copyright under the said Act.
IS t 7873- X975
( Centinuedfrom page 1 )
Members Re&wenting
Saab K. T. SUBUDEI Irriggata& Power Department, Government of
SUPERIIWENDXNOk’WINEEB Irrigation &. Power Department, Government of
SEE1 P. s. Yoa
Haryana
Irrigation & Power Department, Government of
SHRI D. AJITEA SIMEA,
Uttar Pradesh
Director ( Civ Engg )
Director General, IS1 ( Ex-o$cio Member )
Secretary
Sxuu V. K.~LYANA~~D.~~A~J
Assistant Director ( Civ Engg ), IS1
2
IS: 7873-1975
CODE Oi; PRACTICE FOR
LIME CONCRETE LINING F-OR CANALS
0. FOREWOR-D
0.1This Indian Standard was adopted by the Indian Standards Institution
on 25 November 1975, after the draft finalized by the Canals and Canal
Linings Sectional Committee had been approved by the Civil Engineering
Division Council.
0.2 Lime concrete lining had been used with success on some canal systems.
The question of their selection for use on a particular project, however,
would be governed by the economics of the proposal which would depend
to a very great extent on the availability of good banker for manufacturing
lime vis-a& the availability of cement,
0.3 For the purpose of deciding whether a particular requirement of this
standard is complied with, the final value, observed or calculated, expressing
the result of a test or analysis, shall be rounded off in accordance with
IS : 2-1960*. The number of significant places retained in the rounded off
value should be the same as that of the specified value in this standard.
1.SCOPE
1.1This standard covers lining of canals using kankar-lime concrete and
any other type ofcheap lining where kankar is available.
1.2 The use of this type of lining shall be restricted to small medium size
irrigation channels with capacities up to 200 cumecs and in which the
velocity of water does not exceed 2 m/s.
2. TERMINOLOGY
2.1 For the purpose of this standard, the definitions given in IS : 3872-1966t
shall apply.
3. NECESSARY INFORMATION
3.1 The following information shall be procured for the entire length of the
canal before commencing the work:
a) Nature of soil ( physical properties ) up to suitable depth below
the canal bed,
*Rules for rounding off numerical values ( reoised ) .
iCode of practice for lining of canals with burnt clay tiles.
3
IS t 7873 - 1975
b) Subsoil water levels,
c) Salt contents of soil, and
d) Longitudinal and cross sections of the canal.
4. MATERIALS
4.1 Lime - Kankar lime composition and quality shall conform to IS : 712-
1973*.
4.2 Sand ( or Kankar Grit ) - Sand shall conform to IS : 2116-1965t
and IS : 1542-1960: as specified by the Engineer-in-charge.
4.3 Coarse Aggregate- Brick ballast, stone ballast or kankar coarse
aggregate.
4.4 Water - Water used for both mixing the mortar and curing shall be
free from injurious amounts of deleterious materials. Potable waters are
generally considered satisfactory for mixing and curing.
4.4.1 Water containing excessive acid, alkali or salt may not be suitable.
As a guide, the following concentrations represent the maximum permissible
values:
Concentration
Organic
Inorganic
Sulphate
Alkali chlorides
Percent
0.02
0’30
0.05
0.10
5. PREPARATION OF SUBGRADE
5.1 Reaches With Expansive Soils -_ .~. As far as possible lining should be
avoided in expansive clays. But if the canal has to traverse a reach of
expansive clay with no alternate route of economically feasible condition,
it may be done with any of the practices detailed under 51.1 and 5.1.2 to
reduce the damage depending upon the swelling properties of the soil
encountered.
NOTE - Clays vary So much in characteristics that the pressure required to pre-
vent expansion may be less than 0’07 kgf/cms (*068 kN/ms ) in some types and as much
as 103 kgf/cms ( 10.297 kN/ms) or higher in others. In many cases the practices
recommended in 5.1.1and 5.13 may not be adequate needing detailed investigations
to find out a practicable solution.
5.1.1 If the expansive clay is in thin layer or in small pockets in an
otherwise suitable subgrade it shall be over excavated and replaced with a
suitable non-expansive soil and compacted suitably.
*Specification for building limes ( second revision ).
tSpecification for sand for masonry mortars.
$Specification for sand for plaster.
4
IS : 7873 - 1975
5.1.2 Swelling of the clay encountered can be controlled by loading the
surface with a non-expansive compacted soil or gravel 60’0 cm and filled
to the grade of the underside of lining with good draining material leading
away the seepage water to specially constructed point either to the outside
of the canal or releasing it into the canal by providing suitable pressure-relief
valves. However, the excavated surface of expansive clay shall be given a
coat of asphalt before loading it to prevent the entry of water into the clay.
5.2 Preparation of Subgrade Consisting of Rock- The subgrade shall
be~prepared and dressed true to level and according to the required cross
section of the canal.
5.2.1 All excavation including overbreakage below lines of underside of
lining shall be filled completely up to the lines of the underside of lining
with compacted graded filter material. Care shall be exercized in selecting
refill material for use over fractured rock or cobbles because of the danger
of washing fines into the subgrade voids and thus losing lining support. The
selected material shall be such as to resist such piping and, otherwise, shall
.be selected for impermeability and ease of placement.
5.3 Preparation of SabgadeConsisting of Earth - The subgrade shall
be prepared, dressed and rolled true to level and according to the required
cross section of the canal to form a firm compacted bed for the lining.
5.3.1 In other than predominantly sandy reaches where the dry bulk
density of the natural soil is not less than 1.8 g/cm’, initial excavation shall
be done up to about 30 cm above the final section and the cutting to final
shape shall be done immediately before lining ( see also 5.3.6 ).
5.3.2 Sample profiles true to the cross section of the canal shall be made
at suitable intervals of 3 to 5 metres to ensure correct formation of subgrade.
To ensure uniformity of side slopes a chord shall be stretched across two-
third spacer which shall be run under the chord to check the evenness of the
surface. This process shall be repeated at short intervals along the slopes
till the surface between two profiles is properly levelled and dressed from
top to bottom.
the profile.
Suitable wooden templates may be used to lay and check
NOTE-In straight reaches, an interval of 3 to 4 m is recommended for sample
profile.
S-3.3 If at any point material as prepared subgrade has been excavated
beyond the neat lines required to receive lining the excess excavation sha!l
be filled with material compatible with subgrade material and thoroughly
compacted in accordance with 5.3.5 and 53.6.
5.3.3.1 When partial filling of an existing canal is necessary to reduce
the cross-sectional area to that required for lined canals the fill shall be
5
IS t 7873 - 1975
placed and suitably compacted to avoid its settlement and rupture of the
lining.
5.3.4 To cover up any lapses in the compaction of the inner core of the
banks near the edges and to allow sufficient width for a labourer to work
conveniently a lip-cutting width of not less than 50’0 cm horizontally shall
be provided. Depending upon the nature of soil and the side slopes of the
canal the lip cutting width may be in the range of 50 to 100 cm,
5.3.5 Compaction of Subgrade in Predominantly Sand3 Reaches
5.3.5.1 Bed - The compaction of the bed shall be done by oversatu-
rating the bed by flooding it with water before lining is laid.
5.3.5.2 Sides
vibrocompactors.
- The compaction of sides shall be done preferably by
To prevent loss of moisture of the lining, suitable mea-
sures should be adopted. Wherever there is over cutting, refilling should
be done with lean concrete.
NOTE - Admixtures of 5 percent cement are generally found satisfactory.
5.3.6 Compaction of Subgrade in Other Than Predominantly Sandy Reaches -
All compaction shall be done at optimum moisture in convenient layers not
more than 15’0 cm thick to “obtain a dry bulk density of not less than
95 percent of the density of optimum moisture content obtained in accord-
ance with IS : 2720 ( Part VII )-1965*.
5.3.6.1 Where the dry bulk density of the natural soil is equal to or
more than 1’8 g/cm8, the procedure described in 5.3.1 shall be followed.
5.3.6.2 Bed-Where the dry bulk density of the natural soil is less
than 1’8 g/cm5 and the subsoil water is near the subgrade, the compaction
shall be done by under cutting the bed by 7’5 cm and then ploughing up to
15’0 cm below the subgrade level. The loosened’soil shall then be recom-
pacted with sheep foot rollers or other suitable devices. Where the subsoil
water is low, requiring no dewatering and the dry bulk density of the
natural soil is less than 1’8 g/cm*, compaction shall be done by digging the
canal up to subgrade level and after that loosening the earth below subgrade
up to 15.0 cm by disc harrows, or ploughing and compacting the same to a
layer of 11’0 cm. After that, the second layer of 15’0 cm of earthshall be
laid over the compacted layer by taking earth from lip cutting and
compacting this to a depth of 11’0 cm. The compacted layer of 7.0 cm
above the subgrade level shall be removed and the subgrade brought to
design profile before laying the lining.
5.3.6.3 Sides - Compaction of sides shall be done by manual labour
or suitable compactors to a depth of 30’0 cm to obtain a minimum dry bulk
density of not less than 90 percent of the density of optimum moisture
content obtained in accordance with IS : 2720 ( Part VIf )-1965*.
*Methods of test for soils: Part VII Determination of moisture content-dry density
relation using light compaction.
6
IS : 7873 - 1975
5.4 Underdrainage - For a lined canal whcrc tlic ground water level is
higher or likely to be higher than water level inside the canal so as to cause
damaging differential pressures on the lining., or where the subgrade is
sufficiently impermeable to prevent free drainage of the underside of lining
in case of rapid draw down, pressure relief arrangements for underdrainage
shall be provided in accordance with IS :4558-1968*.
5.5 Anti-salt Treatment - Soil in all reaches shall bc tested for salt
contents before the lining is started. Where the salt contents are over
I.00 percent or sodium sulphate is over 0’36 percent, the subgradc shall be
first covered with about 2 mm thick layer of bitumen obtained by evenly
spraying bitumen at a rate of about 2’35 l/m?-. To get a good bond between
bitumen and soil, crude oil at a rate of 0’5 l/m” shall be sprayed over it in
advance of spraying bitumen. In case such a situation is encountered only
in small pockets the replacement of subgrade by suitable earth for a suitable
depth from adjoining reaches shall be considered, if economical.
5J.l Before spraying crude oil, subgrade shall be perfectly dry, clean
and free from dirt, and crude oil shall be allowed to penetrate the subgrade
surface. Bitumen shall be heated to a temperature of 175°C and applied
to the subgrade by a suitable sprayer. Immediately following the application
of bitumen, dry Sand shall be uniformly spread. Lining should be started
6 to 12 hours after spraying.
6. LAYING OF CONCRETE LINING
6.1 Lime concrete mix should be proportioned in such a way that, after
compaction, it shall have a minimum compressive strength of 50 kgf/cm’
( 4 903.3 kN/ms ) at the age of 28 days, the specimens being moist cured
during the period. For determining compressive strength ‘unconfined
compression tests eon cylindrical specimens with a height to diameter ratio
of two shall be carried out according to IS : 2541-1974t. The mix should
have a minimum flexural strength of 14 kgf/cm2 ( 13’729 kN/m2 ).
6.2 Lime concrete to be used for lining shall also meet the following
additional requirements:
a) Test specimen shall effectively withstand erosion by the continuous
lateral action of jets of water with a velocity not less than 4 m/s
for at least 150 hours.
b) The permeability ~of lime concrete test specimen shall not exceed
IO-’ cm/s.
*Code of practice for underdrainage of lined canals.
t&de of practice for preparation and use of lime concrete (Jirst revision).
7
IS t7873- 1975
6.3 The following proportions of the materials in normal case will meet the
requirements given in 6.2:
1 : 14 : 3 of kankar lime : kankar grit or sand : kankar aggregate,
stone aggregate or ,brick ballast. Kankar grit or sand shall have a
uniform grading with overall fineness modulus determined according
to specified practice not less than 2.0. Kankar aggregate, stone
aggregate or brick ballast will have the maximum size of 2 cm with
not more than 5 percent passing.
6.4 Thickness of Lining - The thickness of lining may vary from 10 to
15 cm for discharge ranges up to 200 cumecs.
6.5 Lines and Grade --Concrete lining shall be constructed in canal
prism where shown on the drainge or as directed by engineer-in-charge.
6.5.1 Abrupt departure from and return to alignment and grade shall
be avoided.
6.6 Mixing - Mixing shall be continued until there is uniform distribution
of the materials and the mass is uniform in colour and consistency, but in
no case the mixing shall be done for less than two minutes.
6.6.1 When hand mixing is permitted by the engineer-in-charge, it shall
be carried out on a water-tight platform and care shall be taken to ensure
that mixing is continued until the mass is uniform in colour and consistency.
6.7 Transporting - Concrete ihall be handled from the place of mixing
to the place of final deposit as rapidly as practicable by methods which will
prevent the segregation or loss of any of the ingredients. If segregation
does occur during transport, the concrete shall be remixed before being
placed.
6.7.1 During hot or cold weather, concrete shall be transported in deep
containers; the deep containers, on account of their lower ratio of surface
area to mass, reduce the rate of loss of water by evaporation during hot
weather and loss of heat during cold weather.
6.8 Placing - The mixed material shall be discharged uniformly on to the
prepared subgrade and distributed to a uniform loose layer by means of
shovels and rakes. It will be compacted to uniform thickness by mechanical
vibrators. Compaction shall be carried out continuously as the mixed
material is spread, but the equipment shall be kept sufficiently far back
from the free edges of the layer to prevent lateral movement of the mixed
material. The time between the discharge of the mixed material and the
commencement af the compactions shall be as short as possible, and in no
case shall exceed 30 minutes. Compaction of any portion of the layer to
the required thickness shall be completed tiithin 14 hours after the material
has been spread.
’
8
IS : 7873 - 1975
6.9 Finishing - .AIier compacting the final finish shall be obtained by
wooden and stcrl floats.
6.10 Curing - Immediately after final compaction and finishing, the sur-
face of concrete shall be kept continuously damp for at least 14 days. This
shall be achieved by fog spraying with water or covering the suri‘acc with
damp hessian, straw or sand maintain4 moist throughout the period of
curing.
6.11 Repairs to Concrete Placed with Forms - The surface of concrclc
finished against forms shall bc smooth and shall be fret from projections,
honeycombing and other objectionable-defects. Immediately on the removal
of forms all unsightly ridges or lips shall be removed and undesirable
local bulging on exposed surface shall be remedied by tooling and rubbing.
Repairs -to concrete surfaces and additions where required shall be made by
cutting regula
f
openingsinto the concrete and placing fresh concrete to the
required lines, The chipped openings shall be sharp and shall not be less
than 7.0 cm in depth. The fresh concrete shall be reinforced and chipped
and welled to the surface of the openings. The concrete shall be placed in
layers not more than 2-O cm in thickness after being compacted and each
layer shall be compacted thoroughly. All exposed concrete surfaces shall be
cleaned of impurities, lumps of mortar or grout and unsightly stains.
7. JOINTING
7.1 In order to minimize cracking the lime concrete shall be laid in panels
of suitable size depending upon the~size of the channel. A panel of 3 x 3 m
or 9 m2 is recommended. The joints between the adjacent panels, after the
curing is over, will be sealed leak-tight with suitable sealing compounds, such
as asphaltic materials. A straight transverse construction joint ‘shall be
formed, whenever there is a break of even a Sew hours during the lining
operation. Such a joint shall be sealed leak-tight with a suitahlc sealing
compound after the expiry of the curing period.
5, YIELD CONTROL
5.1 The following factors shall be checked for controlling field conditions
luring the progress of the work:
a) Subgrade Condition- Prior to placing of the lime concrete, the condi-
tion of subgrade shall~be checked to ensure that it is well compacted
( to a density not less than 95 percent of the standard maximum
for the soil ), clean and surface moist.
b) Thickness of Processed Layer-This shall be checked continuously
during the construction to ensure that the correct thickness is
being laid,
9
IS:7873-1975
Hegrdarity vf the Surface - There shall not be any depression in the
level of the final surface either transversly or longitudinally or
more than 5 mm under 3 m template or straight edge.
Curing - It shall be ensured that the surface of the lime concrete
is maintained moist continuously throughout the curing period by
checking at frequent intervals.
Qality of Concrete - The quality of lime concrete shaI1 be controlled
in the field in accordance with IS : 456-1964*.
*Code of practice for plain and reinforced concrete.
19
BUREAU OF INDIAN STANDARDS
Headquarters:
Manak Bhavan, 9 Bahadur Shah Zafar Matg, NEW DELHI 110002
Telephones: 331 01 31, 331 13 75 Telegrams: Mairaksanstha
( Common to all Offices )
Regional Offices: Telephone
Central : Manak Bhavan, 9 Bahadur Shah Zafar Marg,
I
331 01 35
NEW DELHI 110002 331 1376
*Eastern : 1/14 C. I. T. Scheme VII M, V. I, P. Road, 36 24 99
Maniktola, CALCUTTA 700064
Northern : SC0 445-446, Sector 36-C,
I
2 18 43
CHANDIGARH 160036 3 1641
Southern : C. I. T. Campus, MADRAS 600113
r
tlz:%
41 29 16
twestern : Manakalaya, E9 MIDC, Marol, Andheri ( East 1, 6 32 92 95
BOMBAY 400093
Branch Offices:
‘Pushpak’. Nurmohamed Shaikh Marg, Khanpur,
I
2 63 48
AHMADA5AD 380001 2 63 49
$Peenya lndust rial Area 1st Stage, Bangalore Tumkur Road 38 49 55
BANGALORE 560058
I
38 49 56
Gangotri Complex, 5th Floor, Bhadbhada Road, T. T. Nagar, 667 16
BHOPAL 462003
Plot No. 82/83. Lewis Road, BHUBANESHWAR 751002
531’6. Ward No. 29, R.G. Barua Road, 5th Byelane,
GUWAHATI 781003
5 36 27
3 31 77
5-B-56(3 L. N. Gupta Marg ( Nampally Station Road ),
HYDERABAD 500001
23 1083
R14 Yudhister Marg. C Scheme, JAIPUR 302005
1171418 6 Sarvodaya Nagar, KANPUR 208005
Patliputra Industrial Estate, PATNA 800013
T.C. No. 14/l 421. University P.O.. Palayam
TRIVANDRUM 695035
(
6 34 71
6 96 32
1f: 68; 3;
6 23 05
16 21 04
16 21 17
inspection Offices ( With Sale Point ):
Pushpanjali, First Floor, 205-A West High Court Road,
Shankar Naaar Sauare, NAGPUR 440010
2 61 71
Institution of Ecginee’rs ( India ) Building, 1332 Shivaji Nagar, 6 24 36
PUNE 411005
*Sales Office in Calcutta is at 5 Chowringhrs Approach, P. 0. Princep 27 68 00
Street. Calcutta 700072
tSales Office in Bombay is at Novelty Chamber& Grant Road, 89 66 28
Bombay 400007
3Sales Office in Bangalore is at Unity Building, Narasimharajs Square, 22 30 71
Bangalore 560002
Reprography Unit, BIS, New Delhi, India

Mais conteúdo relacionado

Mais procurados

THE ENGINEERING CHARACTERISTICS OF BLACK COTTON SOIL TREATED WITH CORN STRAW ASH
THE ENGINEERING CHARACTERISTICS OF BLACK COTTON SOIL TREATED WITH CORN STRAW ASHTHE ENGINEERING CHARACTERISTICS OF BLACK COTTON SOIL TREATED WITH CORN STRAW ASH
THE ENGINEERING CHARACTERISTICS OF BLACK COTTON SOIL TREATED WITH CORN STRAW ASH
EditorIJAERD
 
Presentation on well point system
Presentation on well point systemPresentation on well point system
Presentation on well point system
Anshuman Tyagi
 

Mais procurados (17)

Soil nailing seminar report by ankush choudhury
Soil nailing seminar report by ankush choudhurySoil nailing seminar report by ankush choudhury
Soil nailing seminar report by ankush choudhury
 
SOIL NAILING
SOIL NAILINGSOIL NAILING
SOIL NAILING
 
soil nailing seminar report
soil nailing seminar reportsoil nailing seminar report
soil nailing seminar report
 
Soil nailing
Soil nailingSoil nailing
Soil nailing
 
Soil nailing
Soil nailing Soil nailing
Soil nailing
 
THE ENGINEERING CHARACTERISTICS OF BLACK COTTON SOIL TREATED WITH CORN STRAW ASH
THE ENGINEERING CHARACTERISTICS OF BLACK COTTON SOIL TREATED WITH CORN STRAW ASHTHE ENGINEERING CHARACTERISTICS OF BLACK COTTON SOIL TREATED WITH CORN STRAW ASH
THE ENGINEERING CHARACTERISTICS OF BLACK COTTON SOIL TREATED WITH CORN STRAW ASH
 
Breakwater construction
Breakwater constructionBreakwater construction
Breakwater construction
 
IRJET- Laboratory Study on Effect of GBSF and Lime on Subgrade
IRJET-  	  Laboratory Study on Effect of GBSF and Lime on SubgradeIRJET-  	  Laboratory Study on Effect of GBSF and Lime on Subgrade
IRJET- Laboratory Study on Effect of GBSF and Lime on Subgrade
 
Strengthening Of Subgrade by Using RBI Grade-81 A Case Study
Strengthening Of Subgrade by Using RBI Grade-81 A Case StudyStrengthening Of Subgrade by Using RBI Grade-81 A Case Study
Strengthening Of Subgrade by Using RBI Grade-81 A Case Study
 
IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED-V2I3P90
IJSRED-V2I3P90
 
Presentation on well point system
Presentation on well point systemPresentation on well point system
Presentation on well point system
 
Flyash in geotechnical engineering
Flyash in geotechnical engineeringFlyash in geotechnical engineering
Flyash in geotechnical engineering
 
Performance review of TBM
Performance review of TBMPerformance review of TBM
Performance review of TBM
 
Soil Nailing
Soil NailingSoil Nailing
Soil Nailing
 
IRJET- Effect of Cement and Sodium Hydroxide on the Geotechnical Properties o...
IRJET- Effect of Cement and Sodium Hydroxide on the Geotechnical Properties o...IRJET- Effect of Cement and Sodium Hydroxide on the Geotechnical Properties o...
IRJET- Effect of Cement and Sodium Hydroxide on the Geotechnical Properties o...
 
soil stabilization report presentation
soil stabilization report presentationsoil stabilization report presentation
soil stabilization report presentation
 
Foundation Design of a Fixed Fuel Station (Case Study; Niger Delta Region of ...
Foundation Design of a Fixed Fuel Station (Case Study; Niger Delta Region of ...Foundation Design of a Fixed Fuel Station (Case Study; Niger Delta Region of ...
Foundation Design of a Fixed Fuel Station (Case Study; Niger Delta Region of ...
 

Semelhante a 7873

gr_2016_cir-lam-card_fnl
gr_2016_cir-lam-card_fnlgr_2016_cir-lam-card_fnl
gr_2016_cir-lam-card_fnl
Dennis McElroy
 
Rev 01 dt 01.03.2010 - soil investigation
Rev 01 dt 01.03.2010 - soil investigationRev 01 dt 01.03.2010 - soil investigation
Rev 01 dt 01.03.2010 - soil investigation
Siddhartha Bhamidipati
 
Influence of subgrade condition on rutting in flexible pavements
Influence of subgrade condition on rutting in flexible pavementsInfluence of subgrade condition on rutting in flexible pavements
Influence of subgrade condition on rutting in flexible pavements
IAEME Publication
 

Semelhante a 7873 (20)

3873
38733873
3873
 
5878 5
5878 55878 5
5878 5
 
3068
30683068
3068
 
IJSRED-V2I3P89
IJSRED-V2I3P89IJSRED-V2I3P89
IJSRED-V2I3P89
 
IJSRED-V2I3P89
IJSRED-V2I3P89IJSRED-V2I3P89
IJSRED-V2I3P89
 
gr_2016_cir-lam-card_fnl
gr_2016_cir-lam-card_fnlgr_2016_cir-lam-card_fnl
gr_2016_cir-lam-card_fnl
 
Steven speaks use and sizing of effluent disposal field beds presentation
Steven speaks use and sizing of effluent disposal field beds presentationSteven speaks use and sizing of effluent disposal field beds presentation
Steven speaks use and sizing of effluent disposal field beds presentation
 
5491
54915491
5491
 
A presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNIT
A presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNITA presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNIT
A presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNIT
 
2571
25712571
2571
 
3036
30363036
3036
 
Effect of encasement length on geosynthetic reinforced stone columns
Effect of encasement length on geosynthetic reinforced stone columnsEffect of encasement length on geosynthetic reinforced stone columns
Effect of encasement length on geosynthetic reinforced stone columns
 
Rev 01 dt 01.03.2010 - soil investigation
Rev 01 dt 01.03.2010 - soil investigationRev 01 dt 01.03.2010 - soil investigation
Rev 01 dt 01.03.2010 - soil investigation
 
5758
57585758
5758
 
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...
 
Jj3516091620
Jj3516091620Jj3516091620
Jj3516091620
 
Influence of subgrade condition on rutting in flexible pavements
Influence of subgrade condition on rutting in flexible pavementsInfluence of subgrade condition on rutting in flexible pavements
Influence of subgrade condition on rutting in flexible pavements
 
IRJET- The Study of Porous Asphalt Pavement with Emphasis in Road Constructio...
IRJET- The Study of Porous Asphalt Pavement with Emphasis in Road Constructio...IRJET- The Study of Porous Asphalt Pavement with Emphasis in Road Constructio...
IRJET- The Study of Porous Asphalt Pavement with Emphasis in Road Constructio...
 
383
383383
383
 
383.pdf
383.pdf383.pdf
383.pdf
 

Mais de Boopathi Yoganathan (20)

28-5.21 Company Profile of Pyrmaid structural consultant.pptx
28-5.21 Company Profile of Pyrmaid structural consultant.pptx28-5.21 Company Profile of Pyrmaid structural consultant.pptx
28-5.21 Company Profile of Pyrmaid structural consultant.pptx
 
Front page upto content new
Front page upto content newFront page upto content new
Front page upto content new
 
Book report new
Book report newBook report new
Book report new
 
Fem
FemFem
Fem
 
Exopy injection
Exopy injectionExopy injection
Exopy injection
 
Embedded
EmbeddedEmbedded
Embedded
 
Earthquakes seminar
Earthquakes seminarEarthquakes seminar
Earthquakes seminar
 
10334
1033410334
10334
 
10302
1030210302
10302
 
10297
1029710297
10297
 
9527 1
9527 19527 1
9527 1
 
9459
94599459
9459
 
9456
94569456
9456
 
9429
94299429
9429
 
9417
94179417
9417
 
7563
75637563
7563
 
7500
75007500
7500
 
7436 2
7436 27436 2
7436 2
 
7436 1
7436 17436 1
7436 1
 
7251
72517251
7251
 

Último

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Último (20)

Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 

7873

  • 1. “g;T$= q&$” “RUE-AFFIRrl:‘ED 199.T 1s : 7873 - 1975 IndianStandard CODE OF PRACTICE FOR LIME CONCRETE LINING FOR CANALS ( Second Reprint JUNE 1990 ) UDC 627.841.034.92:666.972 @ Copyright 1976 BUREAU OF INDIAN STANDARDS MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARC NEW DELHI 110002 Gr3 January 1976
  • 2. IndianStandard CODE OF PRACTICE FOR LIME CONCRETE LINING FOR CANALS Canals and Canal Linings Sectional Committee, BDC 57 Chairman SHRIK. S. ~PATHAK Members SHRI M. M. ANAND SERI S. S. SAEI ( Alternate ) SHRIS. P. BEAT CrrrnvENOWEER( IRRITATION) SHRIK. SUND~RAY( Alternate ) SHRI0. P. DATTA Srzn~R. L. DEWAN D~~E~To= DIRECTOR Representing Water and Power Development Consultancy Services (India ) Ltd, New Delhi Irrigation & Power Department, Government of Punjab Public Works Department, Government of Mysore PublEay;rks Department, Government of Tam11 BeasDesigns Organization, Nangal Township Bihar Institute of Hydraulic 8s Allied Research, Khagaul Irrigation Department, Government of Rajastban Land Reclamation, Irrigation & Power .Research Institute, Amritsar PHYSICIST( Altemate) DIRECTOR ( BD ) Central Water Commission, New Delhi DEPUTYDIRECTOR( BD ) ( Alternate ) SHRI S. D. KIJLKARNI Irrigation & Power Department, Government of Maharashtra SERI A. A. PAI (Alternate) SHRIK. M. MAHESHWARI SHRIP. W. PARWANI( Altemate ) Planning Commission, Government of India SHRIM. A. MEETA SHRI9. K. MEETA ( Alternate ) Concrete Association of India, Bombay REPRESENTATIVE Irrigation Department, Government of Haryana SHEIP. C. SAXEN’~ Central Water & Power Research Station, Poona Snm V. P. BHATT( Alternate ) SE(1BE!cABY Central Board of Irrigation & Power, New Delhi SEIBIH. D. SMBMA Irrigation Research Institute, Roorkee SERI M. K. SINQHaL Water Resources & Development Training Centre, University of Roorkee ( Continuedon#age 2 ) @ Copyright 1976 BUREAU OF INDIAN STANDARDS This publication is protected under the Indian Copyright Act (XIV of 1957) and reproduction in whole or in part by any meannexcept with written permission of the publisher shall be deemed to be an infringement of copyright under the said Act.
  • 3. IS t 7873- X975 ( Centinuedfrom page 1 ) Members Re&wenting Saab K. T. SUBUDEI Irriggata& Power Department, Government of SUPERIIWENDXNOk’WINEEB Irrigation &. Power Department, Government of SEE1 P. s. Yoa Haryana Irrigation & Power Department, Government of SHRI D. AJITEA SIMEA, Uttar Pradesh Director ( Civ Engg ) Director General, IS1 ( Ex-o$cio Member ) Secretary Sxuu V. K.~LYANA~~D.~~A~J Assistant Director ( Civ Engg ), IS1 2
  • 4. IS: 7873-1975 CODE Oi; PRACTICE FOR LIME CONCRETE LINING F-OR CANALS 0. FOREWOR-D 0.1This Indian Standard was adopted by the Indian Standards Institution on 25 November 1975, after the draft finalized by the Canals and Canal Linings Sectional Committee had been approved by the Civil Engineering Division Council. 0.2 Lime concrete lining had been used with success on some canal systems. The question of their selection for use on a particular project, however, would be governed by the economics of the proposal which would depend to a very great extent on the availability of good banker for manufacturing lime vis-a& the availability of cement, 0.3 For the purpose of deciding whether a particular requirement of this standard is complied with, the final value, observed or calculated, expressing the result of a test or analysis, shall be rounded off in accordance with IS : 2-1960*. The number of significant places retained in the rounded off value should be the same as that of the specified value in this standard. 1.SCOPE 1.1This standard covers lining of canals using kankar-lime concrete and any other type ofcheap lining where kankar is available. 1.2 The use of this type of lining shall be restricted to small medium size irrigation channels with capacities up to 200 cumecs and in which the velocity of water does not exceed 2 m/s. 2. TERMINOLOGY 2.1 For the purpose of this standard, the definitions given in IS : 3872-1966t shall apply. 3. NECESSARY INFORMATION 3.1 The following information shall be procured for the entire length of the canal before commencing the work: a) Nature of soil ( physical properties ) up to suitable depth below the canal bed, *Rules for rounding off numerical values ( reoised ) . iCode of practice for lining of canals with burnt clay tiles. 3
  • 5. IS t 7873 - 1975 b) Subsoil water levels, c) Salt contents of soil, and d) Longitudinal and cross sections of the canal. 4. MATERIALS 4.1 Lime - Kankar lime composition and quality shall conform to IS : 712- 1973*. 4.2 Sand ( or Kankar Grit ) - Sand shall conform to IS : 2116-1965t and IS : 1542-1960: as specified by the Engineer-in-charge. 4.3 Coarse Aggregate- Brick ballast, stone ballast or kankar coarse aggregate. 4.4 Water - Water used for both mixing the mortar and curing shall be free from injurious amounts of deleterious materials. Potable waters are generally considered satisfactory for mixing and curing. 4.4.1 Water containing excessive acid, alkali or salt may not be suitable. As a guide, the following concentrations represent the maximum permissible values: Concentration Organic Inorganic Sulphate Alkali chlorides Percent 0.02 0’30 0.05 0.10 5. PREPARATION OF SUBGRADE 5.1 Reaches With Expansive Soils -_ .~. As far as possible lining should be avoided in expansive clays. But if the canal has to traverse a reach of expansive clay with no alternate route of economically feasible condition, it may be done with any of the practices detailed under 51.1 and 5.1.2 to reduce the damage depending upon the swelling properties of the soil encountered. NOTE - Clays vary So much in characteristics that the pressure required to pre- vent expansion may be less than 0’07 kgf/cms (*068 kN/ms ) in some types and as much as 103 kgf/cms ( 10.297 kN/ms) or higher in others. In many cases the practices recommended in 5.1.1and 5.13 may not be adequate needing detailed investigations to find out a practicable solution. 5.1.1 If the expansive clay is in thin layer or in small pockets in an otherwise suitable subgrade it shall be over excavated and replaced with a suitable non-expansive soil and compacted suitably. *Specification for building limes ( second revision ). tSpecification for sand for masonry mortars. $Specification for sand for plaster. 4
  • 6. IS : 7873 - 1975 5.1.2 Swelling of the clay encountered can be controlled by loading the surface with a non-expansive compacted soil or gravel 60’0 cm and filled to the grade of the underside of lining with good draining material leading away the seepage water to specially constructed point either to the outside of the canal or releasing it into the canal by providing suitable pressure-relief valves. However, the excavated surface of expansive clay shall be given a coat of asphalt before loading it to prevent the entry of water into the clay. 5.2 Preparation of Subgrade Consisting of Rock- The subgrade shall be~prepared and dressed true to level and according to the required cross section of the canal. 5.2.1 All excavation including overbreakage below lines of underside of lining shall be filled completely up to the lines of the underside of lining with compacted graded filter material. Care shall be exercized in selecting refill material for use over fractured rock or cobbles because of the danger of washing fines into the subgrade voids and thus losing lining support. The selected material shall be such as to resist such piping and, otherwise, shall .be selected for impermeability and ease of placement. 5.3 Preparation of SabgadeConsisting of Earth - The subgrade shall be prepared, dressed and rolled true to level and according to the required cross section of the canal to form a firm compacted bed for the lining. 5.3.1 In other than predominantly sandy reaches where the dry bulk density of the natural soil is not less than 1.8 g/cm’, initial excavation shall be done up to about 30 cm above the final section and the cutting to final shape shall be done immediately before lining ( see also 5.3.6 ). 5.3.2 Sample profiles true to the cross section of the canal shall be made at suitable intervals of 3 to 5 metres to ensure correct formation of subgrade. To ensure uniformity of side slopes a chord shall be stretched across two- third spacer which shall be run under the chord to check the evenness of the surface. This process shall be repeated at short intervals along the slopes till the surface between two profiles is properly levelled and dressed from top to bottom. the profile. Suitable wooden templates may be used to lay and check NOTE-In straight reaches, an interval of 3 to 4 m is recommended for sample profile. S-3.3 If at any point material as prepared subgrade has been excavated beyond the neat lines required to receive lining the excess excavation sha!l be filled with material compatible with subgrade material and thoroughly compacted in accordance with 5.3.5 and 53.6. 5.3.3.1 When partial filling of an existing canal is necessary to reduce the cross-sectional area to that required for lined canals the fill shall be 5
  • 7. IS t 7873 - 1975 placed and suitably compacted to avoid its settlement and rupture of the lining. 5.3.4 To cover up any lapses in the compaction of the inner core of the banks near the edges and to allow sufficient width for a labourer to work conveniently a lip-cutting width of not less than 50’0 cm horizontally shall be provided. Depending upon the nature of soil and the side slopes of the canal the lip cutting width may be in the range of 50 to 100 cm, 5.3.5 Compaction of Subgrade in Predominantly Sand3 Reaches 5.3.5.1 Bed - The compaction of the bed shall be done by oversatu- rating the bed by flooding it with water before lining is laid. 5.3.5.2 Sides vibrocompactors. - The compaction of sides shall be done preferably by To prevent loss of moisture of the lining, suitable mea- sures should be adopted. Wherever there is over cutting, refilling should be done with lean concrete. NOTE - Admixtures of 5 percent cement are generally found satisfactory. 5.3.6 Compaction of Subgrade in Other Than Predominantly Sandy Reaches - All compaction shall be done at optimum moisture in convenient layers not more than 15’0 cm thick to “obtain a dry bulk density of not less than 95 percent of the density of optimum moisture content obtained in accord- ance with IS : 2720 ( Part VII )-1965*. 5.3.6.1 Where the dry bulk density of the natural soil is equal to or more than 1’8 g/cm8, the procedure described in 5.3.1 shall be followed. 5.3.6.2 Bed-Where the dry bulk density of the natural soil is less than 1’8 g/cm5 and the subsoil water is near the subgrade, the compaction shall be done by under cutting the bed by 7’5 cm and then ploughing up to 15’0 cm below the subgrade level. The loosened’soil shall then be recom- pacted with sheep foot rollers or other suitable devices. Where the subsoil water is low, requiring no dewatering and the dry bulk density of the natural soil is less than 1’8 g/cm*, compaction shall be done by digging the canal up to subgrade level and after that loosening the earth below subgrade up to 15.0 cm by disc harrows, or ploughing and compacting the same to a layer of 11’0 cm. After that, the second layer of 15’0 cm of earthshall be laid over the compacted layer by taking earth from lip cutting and compacting this to a depth of 11’0 cm. The compacted layer of 7.0 cm above the subgrade level shall be removed and the subgrade brought to design profile before laying the lining. 5.3.6.3 Sides - Compaction of sides shall be done by manual labour or suitable compactors to a depth of 30’0 cm to obtain a minimum dry bulk density of not less than 90 percent of the density of optimum moisture content obtained in accordance with IS : 2720 ( Part VIf )-1965*. *Methods of test for soils: Part VII Determination of moisture content-dry density relation using light compaction. 6
  • 8. IS : 7873 - 1975 5.4 Underdrainage - For a lined canal whcrc tlic ground water level is higher or likely to be higher than water level inside the canal so as to cause damaging differential pressures on the lining., or where the subgrade is sufficiently impermeable to prevent free drainage of the underside of lining in case of rapid draw down, pressure relief arrangements for underdrainage shall be provided in accordance with IS :4558-1968*. 5.5 Anti-salt Treatment - Soil in all reaches shall bc tested for salt contents before the lining is started. Where the salt contents are over I.00 percent or sodium sulphate is over 0’36 percent, the subgradc shall be first covered with about 2 mm thick layer of bitumen obtained by evenly spraying bitumen at a rate of about 2’35 l/m?-. To get a good bond between bitumen and soil, crude oil at a rate of 0’5 l/m” shall be sprayed over it in advance of spraying bitumen. In case such a situation is encountered only in small pockets the replacement of subgrade by suitable earth for a suitable depth from adjoining reaches shall be considered, if economical. 5J.l Before spraying crude oil, subgrade shall be perfectly dry, clean and free from dirt, and crude oil shall be allowed to penetrate the subgrade surface. Bitumen shall be heated to a temperature of 175°C and applied to the subgrade by a suitable sprayer. Immediately following the application of bitumen, dry Sand shall be uniformly spread. Lining should be started 6 to 12 hours after spraying. 6. LAYING OF CONCRETE LINING 6.1 Lime concrete mix should be proportioned in such a way that, after compaction, it shall have a minimum compressive strength of 50 kgf/cm’ ( 4 903.3 kN/ms ) at the age of 28 days, the specimens being moist cured during the period. For determining compressive strength ‘unconfined compression tests eon cylindrical specimens with a height to diameter ratio of two shall be carried out according to IS : 2541-1974t. The mix should have a minimum flexural strength of 14 kgf/cm2 ( 13’729 kN/m2 ). 6.2 Lime concrete to be used for lining shall also meet the following additional requirements: a) Test specimen shall effectively withstand erosion by the continuous lateral action of jets of water with a velocity not less than 4 m/s for at least 150 hours. b) The permeability ~of lime concrete test specimen shall not exceed IO-’ cm/s. *Code of practice for underdrainage of lined canals. t&de of practice for preparation and use of lime concrete (Jirst revision). 7
  • 9. IS t7873- 1975 6.3 The following proportions of the materials in normal case will meet the requirements given in 6.2: 1 : 14 : 3 of kankar lime : kankar grit or sand : kankar aggregate, stone aggregate or ,brick ballast. Kankar grit or sand shall have a uniform grading with overall fineness modulus determined according to specified practice not less than 2.0. Kankar aggregate, stone aggregate or brick ballast will have the maximum size of 2 cm with not more than 5 percent passing. 6.4 Thickness of Lining - The thickness of lining may vary from 10 to 15 cm for discharge ranges up to 200 cumecs. 6.5 Lines and Grade --Concrete lining shall be constructed in canal prism where shown on the drainge or as directed by engineer-in-charge. 6.5.1 Abrupt departure from and return to alignment and grade shall be avoided. 6.6 Mixing - Mixing shall be continued until there is uniform distribution of the materials and the mass is uniform in colour and consistency, but in no case the mixing shall be done for less than two minutes. 6.6.1 When hand mixing is permitted by the engineer-in-charge, it shall be carried out on a water-tight platform and care shall be taken to ensure that mixing is continued until the mass is uniform in colour and consistency. 6.7 Transporting - Concrete ihall be handled from the place of mixing to the place of final deposit as rapidly as practicable by methods which will prevent the segregation or loss of any of the ingredients. If segregation does occur during transport, the concrete shall be remixed before being placed. 6.7.1 During hot or cold weather, concrete shall be transported in deep containers; the deep containers, on account of their lower ratio of surface area to mass, reduce the rate of loss of water by evaporation during hot weather and loss of heat during cold weather. 6.8 Placing - The mixed material shall be discharged uniformly on to the prepared subgrade and distributed to a uniform loose layer by means of shovels and rakes. It will be compacted to uniform thickness by mechanical vibrators. Compaction shall be carried out continuously as the mixed material is spread, but the equipment shall be kept sufficiently far back from the free edges of the layer to prevent lateral movement of the mixed material. The time between the discharge of the mixed material and the commencement af the compactions shall be as short as possible, and in no case shall exceed 30 minutes. Compaction of any portion of the layer to the required thickness shall be completed tiithin 14 hours after the material has been spread. ’ 8
  • 10. IS : 7873 - 1975 6.9 Finishing - .AIier compacting the final finish shall be obtained by wooden and stcrl floats. 6.10 Curing - Immediately after final compaction and finishing, the sur- face of concrete shall be kept continuously damp for at least 14 days. This shall be achieved by fog spraying with water or covering the suri‘acc with damp hessian, straw or sand maintain4 moist throughout the period of curing. 6.11 Repairs to Concrete Placed with Forms - The surface of concrclc finished against forms shall bc smooth and shall be fret from projections, honeycombing and other objectionable-defects. Immediately on the removal of forms all unsightly ridges or lips shall be removed and undesirable local bulging on exposed surface shall be remedied by tooling and rubbing. Repairs -to concrete surfaces and additions where required shall be made by cutting regula f openingsinto the concrete and placing fresh concrete to the required lines, The chipped openings shall be sharp and shall not be less than 7.0 cm in depth. The fresh concrete shall be reinforced and chipped and welled to the surface of the openings. The concrete shall be placed in layers not more than 2-O cm in thickness after being compacted and each layer shall be compacted thoroughly. All exposed concrete surfaces shall be cleaned of impurities, lumps of mortar or grout and unsightly stains. 7. JOINTING 7.1 In order to minimize cracking the lime concrete shall be laid in panels of suitable size depending upon the~size of the channel. A panel of 3 x 3 m or 9 m2 is recommended. The joints between the adjacent panels, after the curing is over, will be sealed leak-tight with suitable sealing compounds, such as asphaltic materials. A straight transverse construction joint ‘shall be formed, whenever there is a break of even a Sew hours during the lining operation. Such a joint shall be sealed leak-tight with a suitahlc sealing compound after the expiry of the curing period. 5, YIELD CONTROL 5.1 The following factors shall be checked for controlling field conditions luring the progress of the work: a) Subgrade Condition- Prior to placing of the lime concrete, the condi- tion of subgrade shall~be checked to ensure that it is well compacted ( to a density not less than 95 percent of the standard maximum for the soil ), clean and surface moist. b) Thickness of Processed Layer-This shall be checked continuously during the construction to ensure that the correct thickness is being laid, 9
  • 11. IS:7873-1975 Hegrdarity vf the Surface - There shall not be any depression in the level of the final surface either transversly or longitudinally or more than 5 mm under 3 m template or straight edge. Curing - It shall be ensured that the surface of the lime concrete is maintained moist continuously throughout the curing period by checking at frequent intervals. Qality of Concrete - The quality of lime concrete shaI1 be controlled in the field in accordance with IS : 456-1964*. *Code of practice for plain and reinforced concrete. 19
  • 12. BUREAU OF INDIAN STANDARDS Headquarters: Manak Bhavan, 9 Bahadur Shah Zafar Matg, NEW DELHI 110002 Telephones: 331 01 31, 331 13 75 Telegrams: Mairaksanstha ( Common to all Offices ) Regional Offices: Telephone Central : Manak Bhavan, 9 Bahadur Shah Zafar Marg, I 331 01 35 NEW DELHI 110002 331 1376 *Eastern : 1/14 C. I. T. Scheme VII M, V. I, P. Road, 36 24 99 Maniktola, CALCUTTA 700064 Northern : SC0 445-446, Sector 36-C, I 2 18 43 CHANDIGARH 160036 3 1641 Southern : C. I. T. Campus, MADRAS 600113 r tlz:% 41 29 16 twestern : Manakalaya, E9 MIDC, Marol, Andheri ( East 1, 6 32 92 95 BOMBAY 400093 Branch Offices: ‘Pushpak’. Nurmohamed Shaikh Marg, Khanpur, I 2 63 48 AHMADA5AD 380001 2 63 49 $Peenya lndust rial Area 1st Stage, Bangalore Tumkur Road 38 49 55 BANGALORE 560058 I 38 49 56 Gangotri Complex, 5th Floor, Bhadbhada Road, T. T. Nagar, 667 16 BHOPAL 462003 Plot No. 82/83. Lewis Road, BHUBANESHWAR 751002 531’6. Ward No. 29, R.G. Barua Road, 5th Byelane, GUWAHATI 781003 5 36 27 3 31 77 5-B-56(3 L. N. Gupta Marg ( Nampally Station Road ), HYDERABAD 500001 23 1083 R14 Yudhister Marg. C Scheme, JAIPUR 302005 1171418 6 Sarvodaya Nagar, KANPUR 208005 Patliputra Industrial Estate, PATNA 800013 T.C. No. 14/l 421. University P.O.. Palayam TRIVANDRUM 695035 ( 6 34 71 6 96 32 1f: 68; 3; 6 23 05 16 21 04 16 21 17 inspection Offices ( With Sale Point ): Pushpanjali, First Floor, 205-A West High Court Road, Shankar Naaar Sauare, NAGPUR 440010 2 61 71 Institution of Ecginee’rs ( India ) Building, 1332 Shivaji Nagar, 6 24 36 PUNE 411005 *Sales Office in Calcutta is at 5 Chowringhrs Approach, P. 0. Princep 27 68 00 Street. Calcutta 700072 tSales Office in Bombay is at Novelty Chamber& Grant Road, 89 66 28 Bombay 400007 3Sales Office in Bangalore is at Unity Building, Narasimharajs Square, 22 30 71 Bangalore 560002 Reprography Unit, BIS, New Delhi, India