SlideShare uma empresa Scribd logo
1 de 12
Baixar para ler offline
Overview of Solar Power
Generation in India
5,137.91 MW
7,277.93 MW
2,948.37 MW
2,258.46 MW
1,801.8 MW
3,915.88 MW
3,610.02 MW
3,620.75 MW
1,095.1 MW
947.1 MW
On Grid Installed Solar Capacity
Catalyst for development of renewable energy (RE) sector
India to improve the emissions intensity of its GDP by 33% to 35% by
2030 below 2005 level
Increase the share of non-fossil fuels-based electricity to 40% by
2030
Nationally Determined
Contributions (NDC)
Electricity Act 2003 notified the State Electricity Regulatory
Commissions (SERCs) to promote renewable energy by setting
yearly RPO targets for obligated entities (utilities and consumers)
Renewable
Purchase Obligation
(RPO)
Targets 100 GW of solar capacity
Mandates the SERCs to revise the solar RPO target to 8%
National Tariff
Policy 2016
Announcement of Jawaharlal Nehru National Solar Mission
Scheme on Energy Efficient Solar / Green Buildings and Solar cities
Establishment of International Solar Alliance
A trans-national electricity grid supplying solar power across the globe
- One Sun, One World, One Grid
Major Government
Initiatives
Capital infusion of INR 1,000 Cr to Solar Energy Corporation of India
and INR 1,500 Cr to Indian Renewable Energy Development Agency
Duties on solar inverters and Solar lanterns have been increased from
5% to 20%, and 5% to 15% respectively, thus encouraging domestic
manufacturing
Union Budget 2021
Source: MNRE, SECI, GoI websites
Targeted Solar capacity addition
United
States
China
Mainland
Australia
India
Installed solar PV capacity in India has skyrocketed in the past
few years, reaching more than 35 GW recently
India gained 4th position in Renewable Energy Country
Attractiveness Index (RECAI) in 2020 from 7th position in 2019
Source: MNRE, GoI
RECAI, EY
2022 2030
60 GW – Ground
Mounted Solar PV
40 GW – Rooftop
Solar PV
300 GW – Ground
Mounted +
Rooftop Solar PV
Economic attractiveness of Solar system has
led to record low tariff bids, with India striving to
reach its 450 GW target of installed renewables
by 2030.
Current progress in Solar Installations in India
Street Lighting
6,59,218 Nos
AJAY scheme
Lanterns / Lamp
58,23,800 Nos
UJALA Scheme
Grid connected
35 GW
Solar Parks and Ultra Mega Solar Power
Projects Scheme
Stand Alone
212 MW
Saubhagya Scheme
Scale-Up Of Access To Clean Energy
Scheme
Rooftop
5,953 MW
Grid Connected Solar Rooftop Programme
Solar Pumps
2,37,120 Nos
PM KUSUM Scheme
Source: MNRE, GoI As on Mar 2020
Home lighting System
17,15,214 Nos
Microcredit scheme
Indian Solar sector at a glance
- 10,000 20,000 30,000 40,000
2016
2017
2018
2019
Solar Installed capacity (MW)
On-grid Off-grid Concentrated
27,355
35,060
- 5,000 10,000 15,000 20,000 25,000 30,000 35,000
2015
2016
2017
2018
Solar Electricity Generation (GWh)
On-grid Off-grid Concentrated
5,979
10,182
31,067
- 12.2%
- 24.5%
- 61.5%
- 1.8%
Thermal
Large Hydro
Renewable
Nuclear
- 29.3%
- 27.3%
- 35.4%
- 8.0%
Small Hydro
Wind
Solar
Bio Energy
India’s focus on RE stems from the fact that the country’s
energy import bill of around USD 150 billion is expected to
reach USD 300 billion by 20301
India’s solar power generation potential of 748 GW will
utilize only 3% of the total waste land available2
The current installed capacity of solar power of 35 GW, is
less than 5% of the estimated potential
9,879
18,152
18,128
Source: IRENA stats tool
1 GoI websites
2 NISE
Energy Mix (%) 2020
Competitive landscape in solar power generation
7.90
6.50
5.20
3.25
2.44 2.48
2.00
5.00 5.00
5.25
3.46
2.43
2.80 2.77
4.90
4.10 4.15 4.27 4.40 4.24
3.36
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
FY14 FY15 FY16 FY17 FY18 FY19 FY20
INR/kWh
Renewable energy tariff achieving grid parity
Solar Wind Thermal (Coal)
Steep decline in solar tariff
from INR 15/kWh in 2010
Solar tariff
matching wind
Fall in wind tariffs
after bidding
introduced for wind
Solar and wind
tariff achieve grid
parity
Source: GoI websites
▪ The renewable energy sector in India was operated under the Feed-in-Tariff regime till 2010. Till that time, the
renewable energy capacity was mostly dominated by wind energy (accounting for more than 70% market share)
▪ The tariffs for solar energy have declined by around 86% since 2010. This steep drop has been facilitated by a
combination of factors (Annexure 1) like:
• Decline in photovoltaic (PV) module cost
• Increase in scale of projects
• Innovative project development models like solar parks developed by the Government agencies
• Access to cheaper financing, and decline in return on equity expectation due to reduced risks, etc.
Imposition of safeguard duty
on PV modules in 2018
have trended upward the
tariff
Typical EPC supply chain for 50-100 MW solar project
Material delivery on site
Sl. No. Material details Tentative dispatch timeline
1 Module Mounting Structure 3 – 4 Weeks
2 PV Modules 5 – 8 Weeks
3 Solar Inverter 6 – 8 Weeks
4
Balance of Materials
• Cables
• HT & LT Panels
• Transformers
• String combiner box
• SCADA, etc.
6 – 12 Weeks
Source: Industry practice and site experience
Key implementation risks faced by solar project developers
Construction Risks
Country and Macro-economic risk; and Political risk
Operation & Maintenance Risks
Contractual Risks
■ Off-Taker Risks
■ Legal Risks
■ Commercial general liability
■ Land Risk (including availability, permissibility and environmental and social
aspects)
■ Procurement Risks
■ Legal Risks (Regulation, Arbitration and judicial)
■ Grid Risks (Connection)
■ Regulatory Risk
■ Warranty Coverages
■ Loss in generation
■ Professional Design Risks
■ Risk of breach of contract,
■ Expropriation, transfer restriction, currency inconvertibility, war and civil
disturbance.
Market Risk
■ Currency risk and interest rate risk
Typical Solar
Projects Risks
Source: GCube Insurance Services
Typical risk mitigation measures and key success
factors
3
Insurance consortium to be formed with lead insurers, co-insurers and re-insurers to provide a
comprehensive viable insurance policy and risk mitigation assurance instruments(examples
IDA, MIGA, IFC, IBRD, etc.)
2
Shall conduct tripartite meeting with concerned authorities and lead insurer of the
member country to prepare country specific detailed action plan
Shall conduct detailed study to assess the market need and existing
gaps in addressing risks associated with solar projects
1
Proper demand
assessment
Confirmed and agreed
action plan
Risk free
implementation and
operation
Source: World Bank, IRENA
Project timeline for 50-100 MW solar project
20 Days
Kick-off Meeting I Inception Report
65 Days
Site data collection and analysis Ɩ Evaluation of the technical options for solar plants
Detailed Feasibility Report
30 Days
Assessment of various business models
Development business model and project structure
45 Days
Preparation & Finalizing termsheets for PPA & land lease agreement & RFP/RFQ document
Detailed Drafting of RFP, RFQ & PPA & land lease agreement
30 Days
Development and circulation of flyers for invitation letter to investors
Preparation & circulations of Project Information Memorandum
10 Days
Signing of PPA and Implementation Agreement
Project Inception
Preparation of Detailed
Feasibility Report
Development of term sheets / Bid
documents
Project Information Memorandum
/ Investor Outreach
Bid Process Management
Financial Closure
68 Days
Publish the Bid documents Ɩ Pre bid meeting Ɩ Amendments to the box documents
Submission and Evaluation of Bids Ɩ Recommendation and feedback on the bid process
Selection of developer(s) Ɩ Award of project (issuance of LOE)
Commissioning of the project
Development of Project
Implementation Structure
270 Days
The developer is expected to complete the project as per agreed timeline Source: Industry practice
Thank You
Binit Kumar Das
Annexure 1
Source: CEEW
The breakdown of the tariff contains a modelling discrepancy of INR 0.05/kWh.
▪ Financing costs are the largest components of the tariff followed by the module costs and
Solar park charges
Breakdown of Solar Reverse Bidding Tariff

Mais conteúdo relacionado

Mais procurados

Affordable and clean energy.pptx
Affordable and clean energy.pptxAffordable and clean energy.pptx
Affordable and clean energy.pptxSakhiRafe
 
Battery energy storage systems (BESS) – an overview of the basics
Battery energy storage systems (BESS) – an overview of the basicsBattery energy storage systems (BESS) – an overview of the basics
Battery energy storage systems (BESS) – an overview of the basicsBushveld Energy
 
Solar Energy in India
Solar Energy in IndiaSolar Energy in India
Solar Energy in IndiaShivam Mittal
 
wireless power system
wireless power systemwireless power system
wireless power systemHinalshah1991
 
Interconnection issue in microgrid
Interconnection issue in microgridInterconnection issue in microgrid
Interconnection issue in microgridAmarjeet S Pandey
 
Canal top solar power plant
Canal top solar power plantCanal top solar power plant
Canal top solar power plantSHASHI KUMAR
 
POWER INSULATOR PPT persented by DK
POWER INSULATOR PPT persented by DKPOWER INSULATOR PPT persented by DK
POWER INSULATOR PPT persented by DKDHARMENDRA KUMAR
 
Restructuring and deregulation of INDIAN POWER SECTOR
Restructuring and deregulation of INDIAN POWER SECTORRestructuring and deregulation of INDIAN POWER SECTOR
Restructuring and deregulation of INDIAN POWER SECTORANKUR MAHESHWARI
 
Design planning & layout of high voltage laboratory
Design planning & layout of high voltage laboratoryDesign planning & layout of high voltage laboratory
Design planning & layout of high voltage laboratoryvishalgohel12195
 
Pusad solar power plant presentation (rev 7)
Pusad solar power plant presentation  (rev 7)Pusad solar power plant presentation  (rev 7)
Pusad solar power plant presentation (rev 7)California Free Solar
 
Design of wireless power transfer system via magnetic resonant coupling at 13...
Design of wireless power transfer system via magnetic resonant coupling at 13...Design of wireless power transfer system via magnetic resonant coupling at 13...
Design of wireless power transfer system via magnetic resonant coupling at 13...Ajay Kumar Sah
 
Smart grid the future grid
Smart grid the future gridSmart grid the future grid
Smart grid the future gridsubhankar Dash
 
Solar Power Feasibility in Pakistan
Solar Power Feasibility in PakistanSolar Power Feasibility in Pakistan
Solar Power Feasibility in Pakistanata601
 
Monitoring and Control of Solar Power System using Reliance SCADA
Monitoring and Control of Solar Power System using Reliance SCADAMonitoring and Control of Solar Power System using Reliance SCADA
Monitoring and Control of Solar Power System using Reliance SCADAijtsrd
 
Substation Earthing Design
Substation Earthing DesignSubstation Earthing Design
Substation Earthing DesignIOSRJEEE
 
performance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterperformance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterAshish Verma
 
Kolar solar pv plant a case study of
Kolar solar pv plant a case study ofKolar solar pv plant a case study of
Kolar solar pv plant a case study ofSavitha PB savitha
 

Mais procurados (20)

Affordable and clean energy.pptx
Affordable and clean energy.pptxAffordable and clean energy.pptx
Affordable and clean energy.pptx
 
Hydro Power in India
Hydro Power in IndiaHydro Power in India
Hydro Power in India
 
Battery energy storage systems (BESS) – an overview of the basics
Battery energy storage systems (BESS) – an overview of the basicsBattery energy storage systems (BESS) – an overview of the basics
Battery energy storage systems (BESS) – an overview of the basics
 
Solar Energy in India
Solar Energy in IndiaSolar Energy in India
Solar Energy in India
 
wireless power system
wireless power systemwireless power system
wireless power system
 
Interconnection issue in microgrid
Interconnection issue in microgridInterconnection issue in microgrid
Interconnection issue in microgrid
 
Canal top solar power plant
Canal top solar power plantCanal top solar power plant
Canal top solar power plant
 
POWER INSULATOR PPT persented by DK
POWER INSULATOR PPT persented by DKPOWER INSULATOR PPT persented by DK
POWER INSULATOR PPT persented by DK
 
Restructuring and deregulation of INDIAN POWER SECTOR
Restructuring and deregulation of INDIAN POWER SECTORRestructuring and deregulation of INDIAN POWER SECTOR
Restructuring and deregulation of INDIAN POWER SECTOR
 
Design planning & layout of high voltage laboratory
Design planning & layout of high voltage laboratoryDesign planning & layout of high voltage laboratory
Design planning & layout of high voltage laboratory
 
Indian Solar Market Potential
Indian Solar Market PotentialIndian Solar Market Potential
Indian Solar Market Potential
 
Pusad solar power plant presentation (rev 7)
Pusad solar power plant presentation  (rev 7)Pusad solar power plant presentation  (rev 7)
Pusad solar power plant presentation (rev 7)
 
Design of wireless power transfer system via magnetic resonant coupling at 13...
Design of wireless power transfer system via magnetic resonant coupling at 13...Design of wireless power transfer system via magnetic resonant coupling at 13...
Design of wireless power transfer system via magnetic resonant coupling at 13...
 
Smart grid the future grid
Smart grid the future gridSmart grid the future grid
Smart grid the future grid
 
Solar Power Feasibility in Pakistan
Solar Power Feasibility in PakistanSolar Power Feasibility in Pakistan
Solar Power Feasibility in Pakistan
 
Monitoring and Control of Solar Power System using Reliance SCADA
Monitoring and Control of Solar Power System using Reliance SCADAMonitoring and Control of Solar Power System using Reliance SCADA
Monitoring and Control of Solar Power System using Reliance SCADA
 
Substation Earthing Design
Substation Earthing DesignSubstation Earthing Design
Substation Earthing Design
 
performance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterperformance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverter
 
Net metering ppt
Net metering pptNet metering ppt
Net metering ppt
 
Kolar solar pv plant a case study of
Kolar solar pv plant a case study ofKolar solar pv plant a case study of
Kolar solar pv plant a case study of
 

Semelhante a Overview of solar power generation in india

Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsSanman Rajput
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentivesChirag Jain
 
Mrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy SectorMrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy SectorMouhcine Benmeziane
 
India’s solar policies
India’s solar policiesIndia’s solar policies
India’s solar policiesNaresh Goud
 
Power of sun and solar energy (india power)
Power of sun and solar energy (india power)Power of sun and solar energy (india power)
Power of sun and solar energy (india power)Mahesh Chandra Manav
 
Solar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy CrisisSolar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy Crisissolarindia
 
Solar Rooftop Business in India
Solar Rooftop Business in IndiaSolar Rooftop Business in India
Solar Rooftop Business in IndiaAshish Rajendran
 
EERE’s FY2017 Renewable Power Budget Webinar
EERE’s FY2017 Renewable Power Budget WebinarEERE’s FY2017 Renewable Power Budget Webinar
EERE’s FY2017 Renewable Power Budget Webinarmaryvin
 
Solar Power Development Vietnam
Solar Power Development VietnamSolar Power Development Vietnam
Solar Power Development VietnamJAIDEEP MANN
 
finalpresentation2.pptx
finalpresentation2.pptxfinalpresentation2.pptx
finalpresentation2.pptxNiveditaJha38
 
Status of Distributed Solar Energy in Tamil Nadu – Challenges & Roadmap 2025
Status of Distributed Solar Energy in Tamil Nadu – Challenges & Roadmap 2025Status of Distributed Solar Energy in Tamil Nadu – Challenges & Roadmap 2025
Status of Distributed Solar Energy in Tamil Nadu – Challenges & Roadmap 2025AurovilleConsulting
 
Renewable energy industry jan 2016
Renewable energy industry jan 2016Renewable energy industry jan 2016
Renewable energy industry jan 2016arpitgoel075
 
Solar rooftop opportunities and challenges
Solar rooftop opportunities and challengesSolar rooftop opportunities and challenges
Solar rooftop opportunities and challengesJay Ranvir
 
3 energy sector mr sagar raj goutam
3 energy sector mr sagar raj goutam3 energy sector mr sagar raj goutam
3 energy sector mr sagar raj goutamNepalInvestment
 
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEF
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEFRenewable Energy status and road-map of Bangladesh and support of UNDP-GEF
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEFDr. Md. Taibur Rahman
 
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...libin paul
 
Route Green - Solar Solutions
Route Green - Solar SolutionsRoute Green - Solar Solutions
Route Green - Solar SolutionsVipin Verma
 

Semelhante a Overview of solar power generation in india (20)

Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentives
 
Mrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy SectorMrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy Sector
 
India’s solar policies
India’s solar policiesIndia’s solar policies
India’s solar policies
 
Power of sun and solar energy (india power)
Power of sun and solar energy (india power)Power of sun and solar energy (india power)
Power of sun and solar energy (india power)
 
Solar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy CrisisSolar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy Crisis
 
Solar Rooftop Business in India
Solar Rooftop Business in IndiaSolar Rooftop Business in India
Solar Rooftop Business in India
 
EERE’s FY2017 Renewable Power Budget Webinar
EERE’s FY2017 Renewable Power Budget WebinarEERE’s FY2017 Renewable Power Budget Webinar
EERE’s FY2017 Renewable Power Budget Webinar
 
Solar Power Development Vietnam
Solar Power Development VietnamSolar Power Development Vietnam
Solar Power Development Vietnam
 
finalpresentation2.pptx
finalpresentation2.pptxfinalpresentation2.pptx
finalpresentation2.pptx
 
Lobel corporate presentation
Lobel corporate presentationLobel corporate presentation
Lobel corporate presentation
 
Status of Distributed Solar Energy in Tamil Nadu – Challenges & Roadmap 2025
Status of Distributed Solar Energy in Tamil Nadu – Challenges & Roadmap 2025Status of Distributed Solar Energy in Tamil Nadu – Challenges & Roadmap 2025
Status of Distributed Solar Energy in Tamil Nadu – Challenges & Roadmap 2025
 
Renewable energy industry jan 2016
Renewable energy industry jan 2016Renewable energy industry jan 2016
Renewable energy industry jan 2016
 
Solar rooftop opportunities and challenges
Solar rooftop opportunities and challengesSolar rooftop opportunities and challenges
Solar rooftop opportunities and challenges
 
3 energy sector mr sagar raj goutam
3 energy sector mr sagar raj goutam3 energy sector mr sagar raj goutam
3 energy sector mr sagar raj goutam
 
Solar Presentation
Solar PresentationSolar Presentation
Solar Presentation
 
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEF
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEFRenewable Energy status and road-map of Bangladesh and support of UNDP-GEF
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEF
 
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
 
GE Challenge Energive 1st Runner Up 2014
GE Challenge Energive 1st Runner Up 2014GE Challenge Energive 1st Runner Up 2014
GE Challenge Energive 1st Runner Up 2014
 
Route Green - Solar Solutions
Route Green - Solar SolutionsRoute Green - Solar Solutions
Route Green - Solar Solutions
 

Último

Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Bhuvaneswari Subramani
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Zilliz
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Angeliki Cooney
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Victor Rentea
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...apidays
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 

Último (20)

Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 

Overview of solar power generation in india

  • 1. Overview of Solar Power Generation in India 5,137.91 MW 7,277.93 MW 2,948.37 MW 2,258.46 MW 1,801.8 MW 3,915.88 MW 3,610.02 MW 3,620.75 MW 1,095.1 MW 947.1 MW On Grid Installed Solar Capacity
  • 2. Catalyst for development of renewable energy (RE) sector India to improve the emissions intensity of its GDP by 33% to 35% by 2030 below 2005 level Increase the share of non-fossil fuels-based electricity to 40% by 2030 Nationally Determined Contributions (NDC) Electricity Act 2003 notified the State Electricity Regulatory Commissions (SERCs) to promote renewable energy by setting yearly RPO targets for obligated entities (utilities and consumers) Renewable Purchase Obligation (RPO) Targets 100 GW of solar capacity Mandates the SERCs to revise the solar RPO target to 8% National Tariff Policy 2016 Announcement of Jawaharlal Nehru National Solar Mission Scheme on Energy Efficient Solar / Green Buildings and Solar cities Establishment of International Solar Alliance A trans-national electricity grid supplying solar power across the globe - One Sun, One World, One Grid Major Government Initiatives Capital infusion of INR 1,000 Cr to Solar Energy Corporation of India and INR 1,500 Cr to Indian Renewable Energy Development Agency Duties on solar inverters and Solar lanterns have been increased from 5% to 20%, and 5% to 15% respectively, thus encouraging domestic manufacturing Union Budget 2021 Source: MNRE, SECI, GoI websites
  • 3. Targeted Solar capacity addition United States China Mainland Australia India Installed solar PV capacity in India has skyrocketed in the past few years, reaching more than 35 GW recently India gained 4th position in Renewable Energy Country Attractiveness Index (RECAI) in 2020 from 7th position in 2019 Source: MNRE, GoI RECAI, EY 2022 2030 60 GW – Ground Mounted Solar PV 40 GW – Rooftop Solar PV 300 GW – Ground Mounted + Rooftop Solar PV Economic attractiveness of Solar system has led to record low tariff bids, with India striving to reach its 450 GW target of installed renewables by 2030.
  • 4. Current progress in Solar Installations in India Street Lighting 6,59,218 Nos AJAY scheme Lanterns / Lamp 58,23,800 Nos UJALA Scheme Grid connected 35 GW Solar Parks and Ultra Mega Solar Power Projects Scheme Stand Alone 212 MW Saubhagya Scheme Scale-Up Of Access To Clean Energy Scheme Rooftop 5,953 MW Grid Connected Solar Rooftop Programme Solar Pumps 2,37,120 Nos PM KUSUM Scheme Source: MNRE, GoI As on Mar 2020 Home lighting System 17,15,214 Nos Microcredit scheme
  • 5. Indian Solar sector at a glance - 10,000 20,000 30,000 40,000 2016 2017 2018 2019 Solar Installed capacity (MW) On-grid Off-grid Concentrated 27,355 35,060 - 5,000 10,000 15,000 20,000 25,000 30,000 35,000 2015 2016 2017 2018 Solar Electricity Generation (GWh) On-grid Off-grid Concentrated 5,979 10,182 31,067 - 12.2% - 24.5% - 61.5% - 1.8% Thermal Large Hydro Renewable Nuclear - 29.3% - 27.3% - 35.4% - 8.0% Small Hydro Wind Solar Bio Energy India’s focus on RE stems from the fact that the country’s energy import bill of around USD 150 billion is expected to reach USD 300 billion by 20301 India’s solar power generation potential of 748 GW will utilize only 3% of the total waste land available2 The current installed capacity of solar power of 35 GW, is less than 5% of the estimated potential 9,879 18,152 18,128 Source: IRENA stats tool 1 GoI websites 2 NISE Energy Mix (%) 2020
  • 6. Competitive landscape in solar power generation 7.90 6.50 5.20 3.25 2.44 2.48 2.00 5.00 5.00 5.25 3.46 2.43 2.80 2.77 4.90 4.10 4.15 4.27 4.40 4.24 3.36 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 FY14 FY15 FY16 FY17 FY18 FY19 FY20 INR/kWh Renewable energy tariff achieving grid parity Solar Wind Thermal (Coal) Steep decline in solar tariff from INR 15/kWh in 2010 Solar tariff matching wind Fall in wind tariffs after bidding introduced for wind Solar and wind tariff achieve grid parity Source: GoI websites ▪ The renewable energy sector in India was operated under the Feed-in-Tariff regime till 2010. Till that time, the renewable energy capacity was mostly dominated by wind energy (accounting for more than 70% market share) ▪ The tariffs for solar energy have declined by around 86% since 2010. This steep drop has been facilitated by a combination of factors (Annexure 1) like: • Decline in photovoltaic (PV) module cost • Increase in scale of projects • Innovative project development models like solar parks developed by the Government agencies • Access to cheaper financing, and decline in return on equity expectation due to reduced risks, etc. Imposition of safeguard duty on PV modules in 2018 have trended upward the tariff
  • 7. Typical EPC supply chain for 50-100 MW solar project Material delivery on site Sl. No. Material details Tentative dispatch timeline 1 Module Mounting Structure 3 – 4 Weeks 2 PV Modules 5 – 8 Weeks 3 Solar Inverter 6 – 8 Weeks 4 Balance of Materials • Cables • HT & LT Panels • Transformers • String combiner box • SCADA, etc. 6 – 12 Weeks Source: Industry practice and site experience
  • 8. Key implementation risks faced by solar project developers Construction Risks Country and Macro-economic risk; and Political risk Operation & Maintenance Risks Contractual Risks ■ Off-Taker Risks ■ Legal Risks ■ Commercial general liability ■ Land Risk (including availability, permissibility and environmental and social aspects) ■ Procurement Risks ■ Legal Risks (Regulation, Arbitration and judicial) ■ Grid Risks (Connection) ■ Regulatory Risk ■ Warranty Coverages ■ Loss in generation ■ Professional Design Risks ■ Risk of breach of contract, ■ Expropriation, transfer restriction, currency inconvertibility, war and civil disturbance. Market Risk ■ Currency risk and interest rate risk Typical Solar Projects Risks Source: GCube Insurance Services
  • 9. Typical risk mitigation measures and key success factors 3 Insurance consortium to be formed with lead insurers, co-insurers and re-insurers to provide a comprehensive viable insurance policy and risk mitigation assurance instruments(examples IDA, MIGA, IFC, IBRD, etc.) 2 Shall conduct tripartite meeting with concerned authorities and lead insurer of the member country to prepare country specific detailed action plan Shall conduct detailed study to assess the market need and existing gaps in addressing risks associated with solar projects 1 Proper demand assessment Confirmed and agreed action plan Risk free implementation and operation Source: World Bank, IRENA
  • 10. Project timeline for 50-100 MW solar project 20 Days Kick-off Meeting I Inception Report 65 Days Site data collection and analysis Ɩ Evaluation of the technical options for solar plants Detailed Feasibility Report 30 Days Assessment of various business models Development business model and project structure 45 Days Preparation & Finalizing termsheets for PPA & land lease agreement & RFP/RFQ document Detailed Drafting of RFP, RFQ & PPA & land lease agreement 30 Days Development and circulation of flyers for invitation letter to investors Preparation & circulations of Project Information Memorandum 10 Days Signing of PPA and Implementation Agreement Project Inception Preparation of Detailed Feasibility Report Development of term sheets / Bid documents Project Information Memorandum / Investor Outreach Bid Process Management Financial Closure 68 Days Publish the Bid documents Ɩ Pre bid meeting Ɩ Amendments to the box documents Submission and Evaluation of Bids Ɩ Recommendation and feedback on the bid process Selection of developer(s) Ɩ Award of project (issuance of LOE) Commissioning of the project Development of Project Implementation Structure 270 Days The developer is expected to complete the project as per agreed timeline Source: Industry practice
  • 12. Annexure 1 Source: CEEW The breakdown of the tariff contains a modelling discrepancy of INR 0.05/kWh. ▪ Financing costs are the largest components of the tariff followed by the module costs and Solar park charges Breakdown of Solar Reverse Bidding Tariff