3. PAINT PROCESS INDUSTRY
MANUAL COLOR MATCHING
OPERATIONS
DOCUMENTATION
I WAS ASSISTANT WITH MANAGER FOR MANUAL COLOR MATCHING AND ASSIS-
TANCE IN PROVIDING THE HELP AND ADVICE FOR MANUAL COLOR MATCHING
I HAVE EXPERIENCE IN OPERATIONS, TESTING, QUALITY, CHEMICAL AND MATE-
RIAL ENGINEERING IN PAINT INDUSTRY-THE DAILY OPERATIONS ALSO INCLUDE
THE OPERATIONS OF PAINT PROCESSING MACHINARY.
COMPREHENSIVE EXPERIENCE IN WRITING REPORTS, PRESENTATIONS, CHECK
SHEETS MAKING , CHECK TABLES AND SOP’S etc
PAINT BATCHES CALCULATIONS-EXCEL SHEETS
THE PAINT BATCHES AND MASTER BATCHES ARE MADE USING THE CLCULATION SHEETS PRE-
PARED IN EXCEL.I HAD MADE AND WOKED ON THEM AS DAILY OPERATIONS.
FORMULATION
PAINT PROCESS INDUSTRY
PAINT BATCH CARD WRITING
BALL MILL-PILOT MACHINE OPERATIONS
The pilot ball mill I used in the industry lab for the testing and preparation
of the Paint formulas
The batch cards are written according to the paint formulas later they are
changed according to the size of batch. The writing batch experience is about 5
years.
The formulation is done using different chemicals, The formulas are
established according to customer requirements.
4. BASKET MILL OPERATIONS
PAINT PROCESSING EQUIPMENTS
CLEANING OF TANK
CLEANING MEDIA
MOTOR TEST
LOADING
LOADING OF RESIN
LOADING PIG-
MENTS
SLURRY MAKING
COOLANT CHECK
TEST RUNS
SIGNS CHECK
TABLE CHECK
SAFETY SIGNS
MIL SPEED ADJUST
DISPERSION TEST
VLAVE TEST
COOLANT TEST
MILL BASKET LEVELS
MILL LEVEL
CHECK SHEETS
TABLES FILL
SPEED
MILL SPEED
MEDIA LEKAGE
UNLOADING
MILL CLEANING
MEDIA CLEANING
VALVE CLEANING
MILL
PREPARATION
MILL
OPERATIONS
MILL
TROUBLE SHOOTINF
MILL
POST OPERATION
3 YEARS COMPREHENSIVE BASKET MILL LOADING, OPERATIONS AND POST OPERATION
EXPERIENCE
BALL MILL OPERATIONS
CLEANING OF MILL
TEST RUNS
VALVE TEST
MOTOR TEST
SHAFT TESTS
LUBRICATION
BALL DIA TEST
LOADING
LOADING OF RESIN
LOADING PIGMENTS
TEST RUNS
SIGNS CHECK
TABLE CHECK
SAFETY SIGNS
MILL RUNNING TEST
MILL LEVELS
DISPERSION TEST
TIME CALCULATIONS
CHECK SHEETS
SPEED
VALVE UNLOADING
MILL CLEANING
VALVE CLEANING
MILL
PREPARATION
MILL
OPERATIONS
MILL
TROUBLE SHOOTINF
MILL
POST OPERATION
6-7 YEARS COMPREHENSIVE PAINT BALL MILL LOADING, OPERATIONS AND POST OPERATION EXPERIENCE
PAINT PROCESSING EQUIPMENTS
5. MIXERS OPERATIONS
WALL SIDE MOUNTED MIXER
MOVING PARTS SAFE-
TY
SAFETY SIGNS CHECK
IMPELLER CHECK
SCREWS CHECK
MOTOR CHECK
PULLY CHECK
CHECK SHEETS
CLEANING OF MIXERS
MOTOR TEST
LOADING
LOADING OF RESIN
LOADING PIGMENTS
SLURRY MAKING
TEST RUNS
CHECK SHEETS
SPEED
CLEANING
LUBRICATION
TAG MANAGEMENT
PAINT HANDLING IN TANKS
SAFETY OPERATION
INDUSTRIAL TANKS
HANDLING
6-7 YEARS COMPREHENSIVE MIXERS OPERATIONS AND SAFETY EXPERIENCE
PAINT PROCESS INDUSTRY
MATERIAL HANDLING AND PROCESSING
SAFTY BY MSDS
PPE FOR EMPLOYEES
ARRANGING
CONTAINER MANAGE
MOIST PREVENTION
LABELING & CODING
ISOLATION
FIRST AID MSDS
FIRE SAFETY
AL PASTE SAFETY
CHECK SHEETS
SAFETY BY MSDS
FIRE SAFETY
PPE
CHECK SHEETS
DRUMS HANDLING
SAFETY SIGNS
MSDS MATERIAL SAFETY
PPE FOR WORK FORCE
SAFETY SIGNS
PROPER CARE
ISOLATION
PROPER CONTAINERS
FIRE SAFETY
VENTILATION
VAPOUR MIST SAFETY
PPE FOR EMPLOYEES
RACK DESIGN
STORAGE ROOM
CONTAINERS SAFETY
DRUMS HANDLING
ISOLATION
MSDS
CHECK SHEETS
PPE
PIGMENTS &
EXTENDERS
RESINS ADDATIVES SOLVENTS
NITROCELLULOSE
MSDS
FIRE SAFETY
WATER SUPPLY
PPE
COOLING BUILDING
CHECK SHEETS
DRUMS HANDLING
PPE
5-6-YEARS COMPREHENSIVE MATERIAL HANDLING EXPERIENCE
• FILLING OF IN/OUT
MATERIALS SHEETS
• FILLING OF STOCK REG-
ISTERS
• LABELING OF STOCK
• CODING
• SAFETY SIGNS ON
STOCK
STOCKS
WAREHOUSE
SAFETY SIGNS
FIRE EXTINGUSHERS
DRUMS ARRANGEMENT
PPE
TROLLY SOP’S
6. PAINT INDUSTRY LAB
PAINT TESTING
• VISCOSITY
• W/L CUP
• Elcometer/Dispersion
• cotton test
• Hiding power
• Stratch test
• Film thickness
• Spraying test
• Pannel test
• Dryig test
• Oven test
• Sampling
• Pilot machine
TEST FOR PAINTS
TYPES
• Stoving paints
• NC Paints
• Enamel Paints
• Varnishes & Lacquars
• Epoxy paints
• AutoShine
• Primers
• WATER BASED
LAB MANAGEMENT
• LABELING CHEMICALS
• ARRANGING CHEMICALS
• SORTING CHEMICALS
• CODING CHEMICALS
LAB SAFETY
• FIRE PROTECTION
• SAFTY SIGNS
• PPE
• CHECK SHEETS
2-3 YEARS COMPREHENSIVE EXPERIENCE OF LAB TESTING OF PAINTS
5 YEARS DISPERSION TEST COMPREHENSIVE EXPERIENCE
LAB TESTS
WORK FORCE MANAGEMENT
• LEADING
• ORGANIZING
• MOTIVATION
• CONTROLLING
• PLANNING
PLAN THE DAILY PRODUCTION OPERATIONS TARGET AND MANAGEMENT THE WORK FORCE ACCORDING TO
THEM, SETTING THE GOALS.
ORGANIZING THE AVALIABLE RESOURSES ACCORDING TO THE PLAN, BEST OPTIMIZE THEM ACCORDING TO
THE REQUIREMENTS
LEADING THE WORK FORCE ACCORDING TO THE COMPLETE TASKS AND MANAGING THEM, DECISION MAK-
ING AND PROPER COMMUNICATION.
CONTROLLING THE WORK FORCE EACH TASK ACCORDING TO THE REQUIREMENT BY USING THE SYSTEMIC
MOTIVATION IS AN IMPORTANT FACTOR TO ACHIVE THE DESIRED RESULTS, SO IT IS IMPORTANT FOR THE
LEADER TO MOTIVATE ITS TEAM. BY SYSTEMIC USING MOTIVATION THEORIES.
6 YEARS COMPREHENSIVE DIRECT WORK FORCE MANAGEMENT EXPERIENCE OF ~10 PEOPLE
• TRAINING
TO GIVE THE PROPER TRAINING TO THE EMPLOYEES AND KEEP THEM UP TO DATE OF NEW TECHNOLOGIES
• SAFETY OF WORK FORCE
THE SAFETY OF WORK FORCE IS KEPT AT TOP LEVEL, TRAIN THEM ABOUT SAFETY AND PPE
7. INDUSTRIAL WORK SHEETS & TABLES
PREPARATION & OPERATIONS
The daily production management is done by check
sheets and tables filling. I have comprehensive expe-
rience of making of tables and check sheets for the
daily operations, work force managemnt, equpment
performance, production and equpment operations
Preparation of tables and work sheets for the prop-
er quality check, operations and maintenance
of the equipments. I have comprehensive expe-
rience of making of tables and check sheets for
the daily operations and equpment performance.
PREPARATION
OPERATIONS
6 YEARS COMPREHENSIVE DIRECT PREPARATION, MAIN-
TAINING AND OPERATION OF WORK SHEETS AND
TABLES
INK GRINDING MILL- THREE ROLLER MILL
• PROCESSING
• TIME OF GRINDING MILL CALULATION
• OPTIMIZATION
• FILLING WORK SHEET DESIGNING
TIME CALCULATION- DIC
8. PACKAGING DESIGNING
• AVALIABLE SYSTEM
• HAZARDS
• SUPPLY CHAIN
• PROPERTIES REQUIRED
• PACKAGING AVALIABLE
• BASIC FORMULATIONS
• ITERATION
ENERGY FROM BIO GAS--PLANT DESIGN
• PLANT DESIGN
• MASS BALANCE
• COSTING
Vd = Sd × RT [ m3 = m3/day × number of days ]
Temperature: Mesophilic 20 c to 35 c
PH value Neutral PH 6.8 to 7.2
C/N ration Ranges from 20:1 to 30:1
Retention time 40 days
0
5
10
15
20
25
30
35
1
2
3
4
5
6
7
8
9
10
installed
cost(lack)
no of digesters
no of digester and installed cost
Series1
BIO GAS FROM WHEAT STRAW-PAPER PLANT
DESIGNING OF BIOGAS DIGESTERS
9. SOLAR GEYSER DESIGNING & FABRICATION
RENEWABLE ENERGY
SOLAR GEYSER -WATER HEATING USING LENES
• DESIGNING
• FABRICATION
• OPERATIONS
Designing initial design
using CORELDRAW software
MEMBRANE DESIGN LAB
FRUIT JUICES THROUGH MEMBRANES
• Designing and processing of synthetic membranes.
• Preparation of MOF like ZIF-8
• Solution casting of membranes
• Using of Dead End equipments
• Orientation report on membrane lab, Experiments procedures and equip-
ments.
• Preparation of membranes from plastic waste
• Literarure review on peparation of membrane from waste materials
• Conceptual study on the peparation of membrane from waste-polypropylene
waste and poly ethyle waste--polypropylene waste (plates and glass) and
poly ethyle waste ( shoping bags)
• Fruit juices through membranes literature review
CENTRIFUGE SOLUTION CASTING DEAD END
11. PROCESS ILLUSTRATION
DRAWING:-
EQUIPMENT CUTAWAYS 2D & 3D
EQUIPMENT PROCESS FLOW
EXPERIMENT PROCESS FLOW
DOCUMENTS
• THESIS
• REPORTS
• RESEARCH ARTICLE
• PRESENTAIONS
• PROJECTS
TECHANICAL POSTER DESIGN FOR SEMINAR
DESIGNING OF THE POSTERS & ILLUSTRATIONS FOR SEMINAR & PRESENTATIONS
12. SOFTWARES
SIMULATION SOFTWARES
MS OFFICE
PROJECT MANAGEMENT SOFTWARES
CAD SOFTWARES
ENGINEERING
WINDOW AND MAC
SOFTWARES
COMSOL MULTIPHYSICS
ANSYS
SIMULATION
COMSOL PROJECTS
MIND MAPPING SIMULATION
13. MULTIPHYSICS-V6
• HEAT TRANSPORT IN
SOLIDS
• HEAT TRANSPORT IN
FLUIDS
• BIO HEAT TRANSPORT
• HEAT TRANSPORT IN
TISSUES
• CREEP FLOWS
• LAMINAR FLOW
• TURBULANT FLOWS
• BUBBLE FLOW
• CONJUGATE FLUID & HEAT
TRANSPORT
• LEVEL SET
• REACTION ENGINEERING
• TRANSPORT OF DILUTE SPECIES
• TRANSPORT OF CONCENTRATED SPECIES
• REACTION FLOW
HEAT TRANSPORT
MODULE
FLUID FLOW
MODULE
MASS TRANSPORT
MODULE
REACTION
MODULE
PHYSICS COUPLING
ALL
PHYSICS
STRUCTURE
MODULE
• SOLID MECHANICS
• FLUID SOLID INTERACTION
• SPECIES
• REACTIONS
• CON GRAPHS
EXPERIENCE IN WORKING WITH PHYSICS AND DONE PROJECTS IN SIMULATUION
COMSOL PROJECTS
SIMULATING THE SPOT WELDING PROCESS WITH AN-
IMATION AND COMPARING WITH ACTAUL PROCESS
TO OPTIMZATION.
SPOT WELDING BUBBLE REACTOR
Physics used
• Mass transport
• Heat transport
• Fluid flow
• CRE
• level set
Physics used
• Heat transport
Simulate and optimize the
ethyl acetate production
in bubble reactor.
14. COMSOL PROJECTS
DIRECT IRON REDUCTION STOOL PROPERTIES
Design the museum stool to sustain maximum load
Physics used
• Mass transport
• Heat transport
• Fluid flow
• CRE
Physics used
• Structure Mechanics
Design the direct reduction of iron process
to get maximum yield
COMSOL PROJECTS
UPHILL TEEMING CASTING ROTATING DRUM
Physics used
• Mass transport
• Heat transport
• Fluid flow
Physics used
• Mass transport
• Fluid flow
Design the uphill teeming
process of molten metal
Design the mixing of fluid in
rotating drum.
15. COMSOL PROJECTS
TEETH COMPOSITE
SIMULATION
Nano composites Estelite Sigma quick
Multiphysics simulation , structure, heat and fluid
Physics used
• Mass transport
• Heat transport
• Fluid flow
• Structure mechanics
FLUIDS HEAT TRANSPORT
Physics used
• Heat transport
• Fluid flow
WATER in PRE-HEATING
CO-CURRENT COUNTER-CURRENT
COMSOL PROJECTS
DOUBLE GLAZED WINDOW
WINDOW PANEL SIMULATION
POLYMERIC MEMBRANE
DESIGN
• MASS TRANSPORT
• FLUID FLOW
• HEAT TRANSPORT
• FLUID FLOW
TO EXAMINE THE HEAT
TRANSPORT IN DOUBLE
GLAZED WINDOW.
HEAT TRANSPORT & MASS
TRAPORT IN MEMBRANE
SYSTEM
16. • FLUID FLOW IN PIPES &
EQUIPMENTS
• FLUID FLOW IN
• COMPLEX GEOMETRY
HEAT TRANSPORT IN SOLIDS
HEAT TRANSPORT IN
FLUIDS & SOLIDS
FLUENT HEAT
TRANSPORT
CONJUGATE
HEAT & FLUID
STRUCTURE
MULTIPHASE
FLOW
PROJECTS
SOLIDS MECHANICS
MIND MAPPING SIMULATION
• MIND MAPPING PROCESS
• MIND MAPPING EXPERIMENT SETUP
• MIND MAPPING SIMULATION SETUP
• MIND MAPPING COUPLING OF ALL PHYSICS
• MIND MAPPING VARIABLES
• MIND MAPPING VARIABLES MANUPULATION
• MIND MAPPING SIMULATION STUDY SCHEME
SOFTWARE CAD MODULE GEOMETRIES
• ANSYS- DESIGN MODULAR
• COMSOL - CAD MODULE
EXTERNAL CAD IMPORTS
• AUTOCAD
CAD GEOMETRIES FOR SIMULATION
MIND MAPPING SIMULATION
17. CAD
SOFTWARES
AUTO CAD
AUTOCAD PROJECTS
PROTOTYPING
AUTODESK DELCAM
AUTODESK INVENTOR
FACTORY DESIGN
PROTOTYPING
AUTOCAD DESIGNING
2D TEETH CAD FOR SIMULATION
AUTOCAD 3D
AUTOCAD 2D
DRAWING OF 2D AND 3D OBJECTS
AUTOCAD ARCHITECTURE & MECHANICAL. THESE MODELS
ARE ALSO USED IN THE SIMULATION PROJECTS.
AUTOCAD ARCHITECTURE
18. PROTOTYPING
SCALE MODELS MAKING
PROTOTYPING-THE ARCHITUCTURE SCALE MODELS, AIRCRAFT MODELS AND
OTHER MODELS ARE MADE USING THE PVC PLASTIC PIPES MATERIALS AND
CARD BOARD MATERIAL.THE MODELS HAVE THE FUNCTION OF MOVING PARTS
AND LIGHTENING SYSTEM.
PRODUCT DESIGN BASICS
• CONTEXT OF USE
• DEFINE DESIGN PROBLEM-CLEAN TEETH
• DEVELOPMENT OF ANOLOGY-BRUSH
• PROCESS TREE-3 MODELS
1. ORIGINATE
2. DISTRIBUTE
3. USE
4. DISCARD
• MATERIAL SELECTION
• MAKING AND TESTING
SOLAR LED PEN-DESIGNING
19. AUTOCAD PROTOTYPING
FIRST THE AUTOCAD
DRAWNING IS DRAWN USING
THE REQUIRED DIMENSIONS
OF THE COMPACT TOOTH
BRUSH, WHICH IS A PART OF-
DELF DESIGN COURSE PROJ-
ECT
AFTER DRAWING THE AU-
TOCAD DRAWING OF THE
OBJECT . THE PROTOTYPE
MODEL WAS MADE USING
PVC MATERIALS TO VALIDATE
THE DESIGN-
PROTOTYPING AND DESIGNING
COMPACT TOOTH BRUSH
AUTOCAD DRAWING
PROTOTYPING USING AU-
TOCAD DRAWING
AUTODESK FACTORY DESIGN
MAKING FACTORY DESIGN USING AU-
TODESK FACTORY DESIGN ARCHITUC-
TURE AND AUTODESK INVENTOR
• EQUIPMENTS
PROCESS EQUIPMENTS
SAFETY EQUIPMENTS
• FLOOR
• WALLS
• OFFICE DESIGN
• BUILDING DESIGN
EXPORT TO INVENTOR FOR 3D VIEW
20. AUTODESK INVENTOR-BASIC
INVENTOR 2D & 3D
INVENTOR NASTRAN BASICS
SOLIDS STRUCTURE MECHANISC
DEFINING SYSTEM
• LINEAR & NON LINEAR SYSTEM(SYSTEMS)
MATERIAL
CONTRAINTS
MESH
SOLVE
ANALYSIS
INVENTOR 2D
INVENTOR 3D
AUTODESK NASTRAN IS PART OF AUTODESK INVENTOR
USED FOR SIMULATION OF GEOMETRIES.
POWER-SHAPE POWER-MILL
DRAWING OF THE OBJECTS IN POWERSHAPE AND MILLING OPER-
ATION USING POWERMILL.I HAVE CERTIFIED TRAINING IN IT
AUTODEAK (BASIC )DELCAM
22. NC PAINTS PROCESS FLOW DIAGRAMS
MS POWER POINT
WAREHOUSE FLOOR DESIGN
• FLOW SHEETS
• FLOOR DESIGN
• ILLUSTRATIONS
• PROCESS FLOW
• FLOW DIAGRAM
ADVANCE PRESENTATION DESIGN & TRANSIONS
MS POWER POINT
23. MS EXCEL & PUBLISHER
• FORMULATIONS & FORMATTING
• GRAPHS
• TABLES
• EXCEL CELL MANAGEMENT
• DESIGNING COMPLEX SHEETS
• CELL FORMATING
• FORMULATIONS
• GRAPHS FROM CELL DATA
• CELL TABLES
• DATA ARRANGEMENTS
MS VISIO
FLOOR PLAN DIAGRAMS INDUSTRIAL FLOOR PLAN DIAGRAMS
FLOW CHARTS DIAGRAMS PROCESS FLOW DIAGRAMS
MS PUBLISHETRR
FLYERS
BROUCHERS
ADVERTISEMENT
SCIENTIFIC
MS EXCEL
26. LESSON LEARNT
LONGEST PATH
# Type Description of
change
Request
date
Identified
Requested
by
Priority Impact on
plan
Approved
/reject /date
Resolution/
Action/
Resolved
date
status
1 Team Introductionof
experienced
chemical engineer
8-6-21 Technical
manager
Medium Human
resources
Approved
10-6-21
Resolved/Hired
new chemical
engineer
7-7-21 Closed
2 Team Replace sick
member/employee
10-6-21 Technical
manager
Urgent Human
resource
Approved
14-6-21
Resolved/replace
dby healthy
person
14-6-21 closed
3 Equipment Change theouter
paint red
Color
23-6-21 Civil
engineer
Low resource Approved
24-6-21
Change thecolor
togrey
open
CHANGE LOG ISSUE LOG
PRODUCTION
SEQUENCING THE ORDERS
USING EXCEL SHHET
CHECKSHEETS & TABLES
METHODS
• CUSTOMER NEEDS
• SMALL ODER FIRST
• LARGE ORDER FIRST
• EXPENSIVE ORDER FIRST
• MACHINE PAINT COLOR
• FIRST IN FIRST OUT
• LAST IN LAST OUT
FOR BATCH ORDERS USING
• EXCEL GANETT CHARTS
TO SCHEDULE
• LEVELING-KANBAN
INTERMEDIATE AGGRIGATE
PLANNING
SEQUENCING SCHEDULING CAPACITY
PLANNING
5-6 YEARS COMPREHENSIVE EXPERIENCE IN SEQUENCING AND SCHEDULING PRODUCTION OF 40Ton/Month BATCHES PLANT
LOADING
PLANNING
• LOADING
• UNLOADING
• SAFETY
• CLEANING
• TESTING
• TABLE & CHECK SHEETS
• SOP’S
• SUPERVISION
• OPTIMIZING
27. NAIVE METHOD
MOVING AVERAGE METHOD
EXPONENTIAL SMOOTHING
TRENDS
SEASON VARAITION
ERRORS
FORECASTING
THE NC FORECASTING IS SHOWN IN THE T EXCEL TABLE
AND GRAPHS
TOOLS
SURVEY DESIGN
PROCESS IMPROVEMENT
QUALITY TOOLS
ANALYSIS TOOLS
LEAN TOOLS
DECISION TOOL
28. SURVEY DESIGN
0
2
4
6
8
10
12
14
16
18
20
SOP users
total employees
RESULTS REVISE & DESIGNS
SURVEY QUESTIONS DESIGN
• YES/NO QUESTIONS
• LEVEL QUESTIONS
• BEST CHOICE QUESTIONS
• PICTURAL QUESTIONS
• SUGGESSTION PARAGRAPH QUESTIONS
• TICK ALL THAT APPLY
survey CHECKED
BY
REPORTED
TO
MACHINE sop cleaning Check list performance Safety
signs
TOOL Drums
# of ticks # of Ticks # of Ticks
# of cross # of cross # of
CROSS
FINAL
RECOMENDATIONS
Final
ticks
Final
cross
Findings comments recommende
d
ADDITIOANL
FINAL
RECOMENDATIONS
SURVEY DATA- CHECK SHEET
• PROBLEM STATEMENT
• PROPER SURVERY DESIGN
• CHECK SHEETS
• QUESTIONS DESIGN
• REVISING THE RESULTS
• CONCLUSIONS
I HAVE INDUSTRIAL EXPERIENCE OF DESIGNING SURVEY FOR INDUSTRY
DECISION TOOL
• DECISION HIERARCHY
• FRAME
• CREATING ALTERNATIVES
• DECISION TREE
• ITTERATION
29. PDCA
8-WASTES-MUDA, MURI, MURA
• PLAN
• DO
• CHECK
• ACT
ITTERATION
CONTINUOUS PROCESS IMPROVEMENT
LEAN TOOL
KAIZEN
Poka-yoke mistake proofing
planning Quality
control Quality
improvement Quality
6 SIGMA - QUALITY
• DEFINE
• MEASURE
• ANALYSE
• IMPROVE
• CONTROL
I am using these tools in the industry for the better quality of the product and
improve the process
I HAVE INDUSTRIAL EXPERIENCE OF ANALYSIS AND QUALITY TOOLS IN INDUSTRY
CHECK SHEETS & TABLES
• WASTE CONTAINER
MANAGEMENT
• WASTE PRODUCT
MANAGENT
MANAGING 5S BOARD
DEVELOPING CHECKSHEETS
AND TABLES
RED TAG DESIGNING CLEANING MANAGEMENT
CHECK SHEETS &
TABLES
WASTE MANAGEMENT
TAPES & MARKINGS 5S BOARDS
RED TAG DESIGNING
RISK LEVELS
5S- MANAGEMENT
I HAVE INDUSTRIAL EXPERIENCE OF ANALYSIS AND QUALITY TOOLS IN INDUSTRY
30. LEAN TOOL
Hoshin Kanri-POLICY DEVELOPMENT
STEP-3
CREATE AN ANNUAL PLAN--CATCH BALL
STEP-4
IMPLEMENT THE CASECADE GOALS
STEP-5
IMPLEMENT OMP-OBJECTIVE MANAGEMENT PROCESS-PDCA
Use master schedule to check the progress of plans
Use control charts
Hoshin matrix
Step- 6 Diagnosis -identify good and bad points
Deployment and Action
Step-7 Reviews
Weekly, month and early
STEP- ESTABLISH MISION
STEP-2 ESTABILSH THE BREAKTHOUGH PROCESS
SWOT AND PESTAL ANALYSIS
CREATE AND STEERING COMMITTEE
DEFINE OBJECTIVE
UNDERSTAND THE CURRENT SITUATION
PROPOSE THE TARGET
SEE FOR GAPS
FISH BONE DIAGARM
KEY FACTORS
PARETO DIAGRAM
VSM-VALUE STREAM MAPPING 5-WHY ANALYSIS
• MEN
• MATERIAL
• MACHINE
• METHOD
• MANAGEMENT
• ENVIRONMENT
• EFFECTS
PRIMARY CAUSES
SECONDARY CAUSES
FISH BONE DIAGRAM
5WHY & 1H
I HAVE INDUSTRIAL EXPERIENCE OF ANALYSIS AND QUALITY TOOLS IN INDUSTRY
31. ANALYSIS TOOL
EVENT TREE ANALYSIS
FAULT TREE ANALYSIS
MIND MAPPING ANALYSIS
ROOT CAUSE ANALYSIS
FMEA
• 5 WHY
• FISH BONE DIAGRAM
• PARETO CHART
• FMEA
• Force field analysis
• Affinity doagram
• Tree Diagram
PESTLE ANALYSIS
I HAVE INDUSTRIAL EXPERIENCE OF ANALYSIS AND QUALITY TOOLS IN INDUSTRY
ANALYSIS TOOL
I HAVE INDUSTRIAL EXPERIENCE OF ANALYSIS AND QUALITY TOOLS IN INDUSTRY
SWOT
PORTER 5 FORCE MODEL
• The threat of new entrants [moderate/high]
• The threat of substitution [high]
• Competitive rivalry [intense]=
• Bargaining power of buyer [high]
• Bargaining power of the supplier [low]
• Strengths
• Weaknesses
• Opportunities
• Threats
32. SAFETY
HAZARD & RISK STUDY
PPE - PROGRAM
SAFTY SIGNS - PROGRAM
INTERMEDIATE FIRE PROTECTION
INDUSTRIAL PROTECTION
BASIC - DISASTER PREPARED
DOCUMENTATION PRESENTATIONS
SOP’S DEVELOPMENT
INTERNAL & EXTERNAL FACTOR ASSESSMENT OF
OF
ORGANIZATION
EXTERNAL FACTOR ASSESSMENT
INTERNAL FACTOR ASSESSMENT
• Economic factors
• RBV-Resource Based View
• Mnanagement
• Marketing
• R& D
• MIS
• Production
• Culture
• Finance
Auditing
IFEM evalution matrix
• Economic factors
• Technology
• Political
• Social, Culture, Demographic
• Political, Governmental, Legal
• Competitive Force Relation
Auditing
EFEM evalution matrix
Competitive Profile Matrix
STRENGTHS WEAKNESS
INTERNAL FACTORS
SWOT / TOWS
WT WO
ST SO
OPPORTUNI-
TIES
THREATS
EXTERNAL
FAC-
RESULTANT STRATEGY DEVELOPMENT
• PORTER 5 GENERIC STRATEGIES
• PRODUCT DEVELOPMENT
• MARKET DEVELOPMENT
• MARKET PENETRATION
• DIVERSIFICATION
• RERETRENCHMENT
• LIQUIDIFICATION
• DIVEITURE
BOSTON CONSULTANT GROUP MATRIX
QUANTITIVE PLANNING STRATEGY MATRIX
33. HAZARD & RISK STUDY
RISK MATRIX
HAZAOP STUDY
I HAVE INDUSTRIAL EXPERIENCE OF DESIGNING & IMPLEMENTING HAZARD PROGRAM FOR SAFETY
PPE - PROGRAM
The PPE program contains many steps, PPE types
and forms. The PPE program starts with hazard
study and proper selection of PPE equipments.
proper handling, storage , washing with inspec-
tion is done. The whole process is documented.
I HAVE INDUSTRIAL EXPERIENCE OF DESIGNING & IMPLEMENTING PPE PROGRAM FOR WORK FORCE SAFETY
34. SAFTY SIGNS - PROGRAM
PROCEDURE
IDENTIFY HAZARDS
SELECT THE SIGN
SELECT THE SENTENCES
SELECT THE WORDS
SELECT MATERIALS
DIPLOYMENT -PLACE-SIZE
TESTING OF SIGN
DOCUMENTATION
TRAINING
ISO 3864
WARNING SIGN =YELLOW TRIANGLE
MANDATORY SIGN=BLUE CIRCLE
PROHIBITION SIGN=RED CIRCLE
SAFE CONDITIONS=GREEN RECTANGLE
FIRE SAFETY=RED RECTANGLE
SIGN
REFERENT
FUNCTION
IMAGE CONTENT
FIELD OF APPLICATION
FORMATE
INFORMATION
ISO 7010 SAFETY SIGNS
NFPA DIAMOND-FOR CONTAINERS
I HAVE INDUSTRIAL EXPERIENCE OF IMPLEMENTING SAFETY SIGNS PROGRAM FOR SAFETY
INTERMEDIATE FIRE PROTECTION
Class extinguisher color material comment
A WATER WOOD,PAPER
B FOAM,DCP,HALOTRON FATS, OIL,FLAMABLE
LIQUIDS
C DCP GASES
D DCP METALS
E DCP,HALOTRON ELECTRIC
K=F DCP KITCHEN
TYPE OF FIRE
TYPES OF EXTINGUSHERS
FIRE PREVENTION PLANNING
SIGNS
BEFORE FIRE
IN PROCESS FIRE
AFTER FIRE
FIRE EXTINGUSHER PROCESS
PRACTICAL TRAINING-TO EXTINGUSH FIRE
PASS
• P-PULL
• A-AIM
• S-SQUEEZ
• S-SWEEP
SAFTY SIGNS
I HAVE INDUSTRIAL EXPERIENCE & TRAINING OF FIRE PROTECTION
35. INDUSTRIAL PROTECTION
PPE FOR EMPLOYEES
TRAINING
MOTIVATION
FIRST AID MSDS
CHECK SHEETS
SIGNS
HAZOP STUDY
RISK STUDY
OEE
LUBRICATION
OPTIMIZATION
CHECK SHEETS
OPERATIONAL STUDY
TEST DRIVES
TROUBLE SHOOTING
CLEANING
SIGNS
SAFTY BY MSDS
ARRANGING
CONTAINER MANAGE
MOIST PREVENTION
LABELING & CODING
ISOLATION
FIRE SAFETY
SIGNS
RACK DESIGN
STORAGE ROOM
CONTAINERS SAFETY
CHECK SHEETS
HAZARD STUDY
RISK STUDY
QUALITY CHECKS
VENTILATION CHECK
SIGNS
EXITS
FIRE SAFETY
CAMERAS
CHECK SHEETS
CLEANING
5S
HAZARD STUDY
RISK STUDY
VSM
EMPLOYEES
SAFETY
EQUIPMENT
SAFETY
MATERIAL
SAFETY
BUILDING
SAFETY
5 YEARS COMPREHENSIVE MATERIAL HANDLING EXPERIENCE
BASIC - DISASTER PREPARED
BACKGROUND PEOPLE
LOCATION & TYPE OF DISASTER
HOME & JUMP KIT PREP
CONTINGENCY PLAN
• WHAT GOING TO HAPPEN
• WHAT TO DO ABOUT IT
• PREPARATION
• FINANCIAL PLAN
• COMMUNICATION PLAN
• LOGISTICS PLAN
ESCAPE ROUTE PLAN
EMERGENCY COMMUNICATION PLAN
OUTSIDE
BETWEEN
I HAVE COURSE TRAINING ON DISASTER PREPARED
36. DOCUMENTATION PRESENTATIONS
• REPORT WRITING
• THESIS WRITING
• DOCUMENTS MANAGEMENT
• POWERPOINT PRESENTATION
• ADVANCE TRANSIONS AND PRESENTATION STYLES
• ADVANCE SLIDES LAYOUT
• 2D ANIMATIONS AND AVATARS/CARTOONS
• VIDEO EDITING FOR PRESENTAIONS
• ADVANCE ILLUSTRATIONS FOR PRESENTATION
• FLOW SHEETS
• PRESENTATION STYLES
DOCUMENTATION
PRESENTATION
• MOTIVATED
• CONFIDENT
• SEQUENCE
• VISUALS
PRESENTING SKILLS
8 YEARS COMPREHENSIVE DIRECT PREPARATION, MAINTAINING AND OPERATION OF WORK SHEETS AND TABLES
RECORD MANAGEMENT
• MANAGING THE FILES TABLES AND CHECKSHEETS.
• CODING OF THE FILES
• ARRANGING THE FILES
PROCESS FILES MANAGEMENT
TITLE
PROCEDUE TITLE
SOP IDENTIFICATION NUMBER
PUBLICATION DATE AND RE-
VISION DATE
ROLE, ORGANIZATION, DE-
PARTMENT, DICISION
CONTACT PERSON
PREPARED BY
APPROVED BY
1 YEARS COMPREHENSIVE DIRECT PREPARATION & MAINTAINING AND 6 YEARS OPERATION OF SOP’S
TABLE OF CONTENTS
PROCEDURE
SCOPE AND PURPOSE
LIMITATIONS OF SOP
DECISIONS
ROLES AND RESPONSIBILITIES
ENSURE STANDARDS ARE MET
ENVIRONEMNT STANDARDS ARE MET
SAFETY STANDARDS ARE MET
HEALTH & SAETY
EQUIPMENT
PROCEDURE BY EXPERTS
SHOWING THE PROCEDURE STEPS
INPUTS AND OUTPUTS
FORMATE IN CLEAR LANAGUAGE
TROUBLESHOOTING
CORRECTIVE ACTIONS
PREVENT FAILURE OF MACHINES
SPARE PARTS INFORMATION AND PLACE
PLACE
EASILY ACCESSIBLE BY OTHERS
COLOR
TRAINING
CAN BE TRAINED TO EMPLOYEES
INPUTS
SCHEDULES ARE MET
INFORMATIONS COLLECTIONS
WHAT INFORMATION
HOW INFORMATION
DAYS AND HOURS
TERMINOLOGIES AND GLOSSARY
REVIEWS, TESTS , EDITS AND RE-
PEATS
GARMMER ERRORS BY OTHERS
LANGUAGE
AUIDANCE
TEST FOR DESIRE OUTCOME
TEST THE NEW PROCEDURE
PROCEDURE CAN BE EASILY FOL-
LOWED AND COMPLETE
SUGGESTIONS TO IMPROVE
REPAET UNTIL DOCUMENT IS AP-
PROVED BY AUTHORITY
IMPLEMENT
REVIEW 6-12 MONTHS
SOP’S DEVELOPMENT