a) Sawing is the bottleneck. b) The bottleneck time is 30.00 minutes per unit (round your response to two decimal places). c) The throughput time of the overall system is 151.55 minutes (round your response to two decimal places). d) If the firm operates 11 hours per day, 20 days per month, the monthly capacity of the manufacturing process is 440 units (enter your response as a whole number). A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel)..