SlideShare uma empresa Scribd logo
1 de 21
Surveying
     Primary divisions of surveying:
             1. Plane Surveying
             2. Geodetic Surveying

Plane surveying does not take into account the curvature of
the earth’s surface, and the surface of the earth is treated as a
plane surface.

If the area to be surveyed is more than 1000 km2, the angles
measured on the surface of the earth can not be in a plane
surface, but are in a curved surface.
Therefore, Geodetic surveying (which consider curvature of
earth) is used for achieving high precision for large areas.
Classification of Surveying

 Classification of surveying broadly based on:

               1. The function of survey
               2. Instruments employed

Classification based on
                               Classification based on
function of survey:
                               Instruments Employed:
Land surveying
                               Chain survey
City surveys
                               Compass survey
Route surveys
                               Plane-table survey
Mine surveys
                               Levelling survey
Geological surveys
                               Photogrammetric survey
Military surveys etc.
                               EDM survey
Principles of surveying


1. Fixing a point in relation to points
   already fixed


3. Working from the whole to the part
Definitions of some basic terms

Level surface: is the equipotential surface of the earth’s gravity field.
- A body of still water provides the best example of a level surface.
Horizontal line: A line tangent to a level surface is a horizontal line.
Horizontal plane: is a plane which is tangential to a level surface at a
particular point.
Horizontal angle: An angle measured between two intersecting lines
in a horizontal plane.
Vertical Line: is a line perpendicular to the horizontal plane
Vertical Plane: A plane containing a vertical line
Vertical Angle: Angle between two intersecting lines in a vertical
plane
Elevation: The vertical distance of a point from an assumed datum or
mean sea level.
Difference between a PLAN and a MAP

The distinction between plan and map is arbitrary. It is difficult
to say exactly when a plan becomes map.


In general a PLAN is ORTHOGRAPHIC REPRESENTATION of
features on or near earth on a horizontal plane. The earth’s
curvature is not taken into account. Therefore preferable for
smaller areas to avoid distortions due to curvature of the earth.


A MAP is also a graphical representation of features but differs
from a PLAN when the scale is small and is constructed usinga
projection system other than ORTHOGRAPHIC. In general MAPS
will give some additional information such as about the
topography with the help of contours.
Land Surveying
Need:-
  To secure necessary data of a part of land for the purpose of
  demarcating its boundaries, determining its area, preparing its plan
  or map, execution of engineering project etc.
Collection of Data:-
Collection of data can be done by any one or combination of surveying
  methods.
Ex;- Chain surveying, compass surveying, theodolite surveying,
  remote sensing etc.
Factors controlling the type of surveying:-
7. Depending on accuracy required
8. Extent and type of the area to be surveyed
9. Time available for the survey work
10.Economic aspects
Execution of surveying

Surveyor has to choose the best approach so
that work can be completed
      within given time-frame
and
      available funds.
Measurement of Horizontal Distances

The commonly used techniques in the basic
engineering are:
  Pacing
  Measuring Wheel
  Taping and/or Chaining
  Electronic distance measuring devices
  Optical devices
Pacing
   A pace is defined as ONE STEP
   A stride is consider TWO steps
   The ability to pace distance is very useful
   A person can determine their pace by counting the number
    of paces necessary to walk a distance that has been
    previously measured.
Measuring Wheels
Tape and Chain
Electronic Distance Measurement (EDM) Systems



EDMs are very useful in measuring distances that
   are difficult to access or long distances
Chain Surveying
Chain surveying the simplest method of surveying in which only linear
measurements are made and no angular measurements are taken.


The area to be surveyed is divided into a number of triangles and the sides
of the triangles are directly measured in the field.


Since the triangle is a simple plane geometrical figure, it can be plotted
from the measured length of its sides alone.


In chain surveying, a NETWORK of TRIANGLES is preferred.
Preferably all the sides of a triangle should be nearly equal having each
angle nearly 60o to ensure minimum distortion due to errors in
measurement of sides and plotting.
Generally such an ideal condition is not practical always.
Usually attempt should be made to have WELL CONDITIONED TRIANGLES
in which no angle is smaller than 30 o and no angle is greater than 120o.
Chain Surveying

The arrangement of triangles to be adopted in the field depends
on the shape, topography and the natural or artificial
OBSTACLES met with.

Chain surveying is suitable for the following cases:
2. Ground fairly level and open with simple details
3. Large scale plans (1 cm = 10 m)
4. Extent of the area comparatively small


Chain surveying is unsuitable for the following cases:
7. Area crowded with many details
8. Wooded countries
9. Undulating areas
10. Extent of large area
Chain Surveying
Definitions:
Main survey stations
-Is a point where TWO SIDES OF A TRIANGLE MEET.
- THESE ARE THE POINTS AT THE BEGINNING AND AT THE END OF
THE CHAIN LINE.
Tie stations (or) subsidiary stations:
-These are the points selected on the main survey lines for running
auxiliary lines.
Main survey lines:
- These are chain lines joining the main survey stations
Tie or subsidiary lines
-The chain lines joining the tie stations or subsidiary stations are
called as tie or subsidiary lines.
-These lines help in locating the interior details which are far away
from the main survey lines.
Chain Surveying
Definitions:
Base Line
- the longest of the main survey line
- various survey stations are plotted w.r.t. this line.
Check Lines:
-Those lines which are run to check the accuracy of the field work are called
as check lines or proof lines.
-The length of the check line in the plan must agree with its measured length
in the field.
- each triangle must be provided with a check line.
Offsets:
- Offsets are lateral distances measured from survey lines
-Offsets are taken from survey lines to determine the locations of details.
-Perpendicular offsets are called as simply “OFFSETS”
-Oblique offsets are called as oblique offsets.
Chain Surveying



        Tape and Chain
Chain Surveying


Metric surveying chains:
Length of chain: 20 m or 30 m
Number of links per meter length : 5
Length of each link : 20 cm
Tallies are provided at every 5 m
Small brass rings are provided at every meter except where
tallies are provided.
Metallic tape:
Length of tape: 20 m or 30 m
The linen tape is reinforced with fine brass or copper wires
to prevent stretching or twisting of fibres and is then called
as a metallic tape.
Chain Surveying


Arrows:
These are also called as marking or chaining pins
10 arrows are provided along with each chain.
Used to mark end of the chain during the process of
chaining.


Cross Staff: - used to make perpendicular lines
Basic Trignometry


    C        a           A2 + B2 = C2
                 B

b            c         a+ b+ c = 180o
        A



            sin b = B / C
            cos b = A / C
            tan b = B / A

Mais conteúdo relacionado

Mais procurados

Surveying theodolite basics
Surveying  theodolite basicsSurveying  theodolite basics
Surveying theodolite basics
Savitha Pradeep
 

Mais procurados (20)

Chain surveying
Chain surveyingChain surveying
Chain surveying
 
chain surveying
chain surveyingchain surveying
chain surveying
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging
 
Surveying theodolite basics
Surveying  theodolite basicsSurveying  theodolite basics
Surveying theodolite basics
 
Levelling
LevellingLevelling
Levelling
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
levelling and contouring
levelling and contouringlevelling and contouring
levelling and contouring
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
 
Linear measurement
Linear measurement Linear measurement
Linear measurement
 
Theodolite Traversing
Theodolite TraversingTheodolite Traversing
Theodolite Traversing
 
Chain surveying and offset
Chain surveying and offsetChain surveying and offset
Chain surveying and offset
 
Contouring
ContouringContouring
Contouring
 
Levelling
LevellingLevelling
Levelling
 
Levelling
LevellingLevelling
Levelling
 
Theodolite
TheodoliteTheodolite
Theodolite
 
Levelling
LevellingLevelling
Levelling
 
Surveying ppt : COMPONENETS OF TRANSIT THEODOLITE
Surveying ppt : COMPONENETS OF TRANSIT  THEODOLITESurveying ppt : COMPONENETS OF TRANSIT  THEODOLITE
Surveying ppt : COMPONENETS OF TRANSIT THEODOLITE
 
Chain Surveying 2020.ppt
 Chain Surveying 2020.ppt Chain Surveying 2020.ppt
Chain Surveying 2020.ppt
 
Theodolite
TheodoliteTheodolite
Theodolite
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 

Destaque (9)

Plane table surveying
Plane table surveyingPlane table surveying
Plane table surveying
 
Surveying instruments
Surveying instrumentsSurveying instruments
Surveying instruments
 
Presentation of surveying
Presentation of surveyingPresentation of surveying
Presentation of surveying
 
Modern surveying instruments - Assignment
Modern surveying instruments - AssignmentModern surveying instruments - Assignment
Modern surveying instruments - Assignment
 
Plane table survey
Plane table surveyPlane table survey
Plane table survey
 
Plane Table Survey
Plane Table SurveyPlane Table Survey
Plane Table Survey
 
Compass Surveying
Compass Surveying Compass Surveying
Compass Surveying
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
 
Surveying
Surveying Surveying
Surveying
 

Semelhante a 30838893 chain-survey

1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx
Janak82
 
Distance Measurement & Chain Surveying
Distance Measurement & Chain SurveyingDistance Measurement & Chain Surveying
Distance Measurement & Chain Surveying
Bahzad5
 

Semelhante a 30838893 chain-survey (20)

Surveying i
Surveying iSurveying i
Surveying i
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx
 
INTRODUCTION TO SURVEYING
INTRODUCTION TO SURVEYINGINTRODUCTION TO SURVEYING
INTRODUCTION TO SURVEYING
 
Basics of surveying
Basics of surveyingBasics of surveying
Basics of surveying
 
Unit 1
Unit 1Unit 1
Unit 1
 
Surveying pdf
Surveying pdfSurveying pdf
Surveying pdf
 
handbook of civil engineering
handbook of civil engineeringhandbook of civil engineering
handbook of civil engineering
 
Distance Measurement & Chain Surveying
Distance Measurement & Chain SurveyingDistance Measurement & Chain Surveying
Distance Measurement & Chain Surveying
 
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYINGDEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
 
Surveying (introduction)
Surveying (introduction)Surveying (introduction)
Surveying (introduction)
 
Fundamentals of surveying
Fundamentals of surveyingFundamentals of surveying
Fundamentals of surveying
 
Basic civil
Basic civilBasic civil
Basic civil
 
Basic Civil and Mechanical Engineering
Basic Civil and Mechanical EngineeringBasic Civil and Mechanical Engineering
Basic Civil and Mechanical Engineering
 
Triangulation
Triangulation Triangulation
Triangulation
 
SURVEYING UNIT-1 31033
SURVEYING UNIT-1 31033SURVEYING UNIT-1 31033
SURVEYING UNIT-1 31033
 
overview and clasification of surveying ppt.pptx
overview and clasification of surveying ppt.pptxoverview and clasification of surveying ppt.pptx
overview and clasification of surveying ppt.pptx
 
Surveying
Surveying Surveying
Surveying
 
fundamentals_of_surveying (2).pdf
fundamentals_of_surveying (2).pdffundamentals_of_surveying (2).pdf
fundamentals_of_surveying (2).pdf
 

Último

Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Último (20)

Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 

30838893 chain-survey

  • 1.
  • 2. Surveying Primary divisions of surveying: 1. Plane Surveying 2. Geodetic Surveying Plane surveying does not take into account the curvature of the earth’s surface, and the surface of the earth is treated as a plane surface. If the area to be surveyed is more than 1000 km2, the angles measured on the surface of the earth can not be in a plane surface, but are in a curved surface. Therefore, Geodetic surveying (which consider curvature of earth) is used for achieving high precision for large areas.
  • 3. Classification of Surveying Classification of surveying broadly based on: 1. The function of survey 2. Instruments employed Classification based on Classification based on function of survey: Instruments Employed: Land surveying Chain survey City surveys Compass survey Route surveys Plane-table survey Mine surveys Levelling survey Geological surveys Photogrammetric survey Military surveys etc. EDM survey
  • 4. Principles of surveying 1. Fixing a point in relation to points already fixed 3. Working from the whole to the part
  • 5. Definitions of some basic terms Level surface: is the equipotential surface of the earth’s gravity field. - A body of still water provides the best example of a level surface. Horizontal line: A line tangent to a level surface is a horizontal line. Horizontal plane: is a plane which is tangential to a level surface at a particular point. Horizontal angle: An angle measured between two intersecting lines in a horizontal plane. Vertical Line: is a line perpendicular to the horizontal plane Vertical Plane: A plane containing a vertical line Vertical Angle: Angle between two intersecting lines in a vertical plane Elevation: The vertical distance of a point from an assumed datum or mean sea level.
  • 6. Difference between a PLAN and a MAP The distinction between plan and map is arbitrary. It is difficult to say exactly when a plan becomes map. In general a PLAN is ORTHOGRAPHIC REPRESENTATION of features on or near earth on a horizontal plane. The earth’s curvature is not taken into account. Therefore preferable for smaller areas to avoid distortions due to curvature of the earth. A MAP is also a graphical representation of features but differs from a PLAN when the scale is small and is constructed usinga projection system other than ORTHOGRAPHIC. In general MAPS will give some additional information such as about the topography with the help of contours.
  • 7. Land Surveying Need:- To secure necessary data of a part of land for the purpose of demarcating its boundaries, determining its area, preparing its plan or map, execution of engineering project etc. Collection of Data:- Collection of data can be done by any one or combination of surveying methods. Ex;- Chain surveying, compass surveying, theodolite surveying, remote sensing etc. Factors controlling the type of surveying:- 7. Depending on accuracy required 8. Extent and type of the area to be surveyed 9. Time available for the survey work 10.Economic aspects
  • 8. Execution of surveying Surveyor has to choose the best approach so that work can be completed within given time-frame and available funds.
  • 9. Measurement of Horizontal Distances The commonly used techniques in the basic engineering are: Pacing Measuring Wheel Taping and/or Chaining Electronic distance measuring devices Optical devices
  • 10. Pacing  A pace is defined as ONE STEP  A stride is consider TWO steps  The ability to pace distance is very useful  A person can determine their pace by counting the number of paces necessary to walk a distance that has been previously measured.
  • 13. Electronic Distance Measurement (EDM) Systems EDMs are very useful in measuring distances that are difficult to access or long distances
  • 14. Chain Surveying Chain surveying the simplest method of surveying in which only linear measurements are made and no angular measurements are taken. The area to be surveyed is divided into a number of triangles and the sides of the triangles are directly measured in the field. Since the triangle is a simple plane geometrical figure, it can be plotted from the measured length of its sides alone. In chain surveying, a NETWORK of TRIANGLES is preferred. Preferably all the sides of a triangle should be nearly equal having each angle nearly 60o to ensure minimum distortion due to errors in measurement of sides and plotting. Generally such an ideal condition is not practical always. Usually attempt should be made to have WELL CONDITIONED TRIANGLES in which no angle is smaller than 30 o and no angle is greater than 120o.
  • 15. Chain Surveying The arrangement of triangles to be adopted in the field depends on the shape, topography and the natural or artificial OBSTACLES met with. Chain surveying is suitable for the following cases: 2. Ground fairly level and open with simple details 3. Large scale plans (1 cm = 10 m) 4. Extent of the area comparatively small Chain surveying is unsuitable for the following cases: 7. Area crowded with many details 8. Wooded countries 9. Undulating areas 10. Extent of large area
  • 16. Chain Surveying Definitions: Main survey stations -Is a point where TWO SIDES OF A TRIANGLE MEET. - THESE ARE THE POINTS AT THE BEGINNING AND AT THE END OF THE CHAIN LINE. Tie stations (or) subsidiary stations: -These are the points selected on the main survey lines for running auxiliary lines. Main survey lines: - These are chain lines joining the main survey stations Tie or subsidiary lines -The chain lines joining the tie stations or subsidiary stations are called as tie or subsidiary lines. -These lines help in locating the interior details which are far away from the main survey lines.
  • 17. Chain Surveying Definitions: Base Line - the longest of the main survey line - various survey stations are plotted w.r.t. this line. Check Lines: -Those lines which are run to check the accuracy of the field work are called as check lines or proof lines. -The length of the check line in the plan must agree with its measured length in the field. - each triangle must be provided with a check line. Offsets: - Offsets are lateral distances measured from survey lines -Offsets are taken from survey lines to determine the locations of details. -Perpendicular offsets are called as simply “OFFSETS” -Oblique offsets are called as oblique offsets.
  • 18. Chain Surveying Tape and Chain
  • 19. Chain Surveying Metric surveying chains: Length of chain: 20 m or 30 m Number of links per meter length : 5 Length of each link : 20 cm Tallies are provided at every 5 m Small brass rings are provided at every meter except where tallies are provided. Metallic tape: Length of tape: 20 m or 30 m The linen tape is reinforced with fine brass or copper wires to prevent stretching or twisting of fibres and is then called as a metallic tape.
  • 20. Chain Surveying Arrows: These are also called as marking or chaining pins 10 arrows are provided along with each chain. Used to mark end of the chain during the process of chaining. Cross Staff: - used to make perpendicular lines
  • 21. Basic Trignometry C a A2 + B2 = C2 B b c a+ b+ c = 180o A sin b = B / C cos b = A / C tan b = B / A