Rooty Hill Regional Distribution
Centre (RDC)
CONSTRUCTION ENVIRONMENTAL
MANAGEMENT PLAN
Final (Version 0)
September 2011
2. Conte
1 Intro
1.1
1.2
1.3
1.4
1.5
1.6
2 Proj
2.1
2.2
2.3
3 CEM
3.1
3.2
3.3
3.4
4 Env
4.1
4.2
4.3
5 Env
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
6 Mon
36
6.1
6.2
6.3
6.4
6.5
nts
oduction
CEMP P
CEMP O
Prepara
Project
Overview
Integrat
ject Descr
Project
Constru
Plant an
MP Inputs
Statutor
Legislat
Approva
Complia
ironmenta
Constru
Consult
Roles an
ironmenta
Overview
Environ
Constru
Complia
Procure
Commu
Training
Incident
nitoring, In
Environ
Environ
Environ
Environ
Plan con
Purpose an
Objectives
tion of this
Environme
w Project E
ion with ot
ription and
Overview
uction Work
nd Equipme
ry Requirem
tion
als, Permits
ance Stand
al Manage
uction Envi
tation and A
nd Respon
al Issues a
w
mental Asp
uction Envi
ance Manag
ement Proc
nication an
g awarenes
t and Emer
nspection,
mental Mo
mental Ins
mental Au
mental No
ntrol and R
Rooty H
d Scope
s CEMP and
ental Policy
Environme
ther Projec
d Initiative
ks and Stag
ent
ments
s, Licences
dards and G
ement Deli
ronmental
Approval R
nsibilities
and Contr
pects and
ronmental
gement
cesses
nd Consult
ss and com
rgency Plan
, Auditing
onitoring
spections
dits
n-Complia
Records Ma
Hill Regional Di
Sinclai
d Issue Sp
y
ental Asses
ct Plans and
es
ging
s
Guidelines
ivery
Managem
Requiremen
rols
Impacts
Objectives
tation
mpetence
nning, Prep
, Environm
nce
anagement
istribution Cen
r Knight Merz | Con
pecific Plan
ssment and
d Procedur
ent System
nts
s and Targ
paredness
mental Pe
t
ntre
nstruction Environm
ns
d Approval
res
m
ets
and Respo
rformance
mental Managemen
1
1
1
2
2
2
3
5
5
9
11
12
12
16
16
16
17
17
20
22
26
26
26
28
29
29
29
32
onse 35
e and Rep
36
37
38
39
39
nt Plan i
porting
3. 7 Rev
7.1
7.2
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
iew and Im
Environ
Continu
x A Envir
x B Holci
x C Envir
x D Envir
x E Envir
x F Sens
x G Envir
x H Envir
x I Enviro
x J Envir
x K Exam
x L Emer
x M Envi
x N Com
x O Envir
x P Exam
mproveme
mental Ma
al Improve
ronmenta
im Enviro
ronmenta
ronmenta
ronmental
itive Area
ronmenta
ronmenta
onmental
ronmental
mple Envir
rgency Co
ronmenta
pliance Tr
ronmenta
mple Inqui
Rooty H
ent of the
nagement
ement
l Control P
nmental P
l Legal Re
l Aspects,
l Objective
as Diagram
l Training
l Monitori
Inspectio
Auditing
ronmental
ontacts
al Incident
racking Re
l Action R
ries Form
Hill Regional Di
Sinclai
CEMP
Review
Plans for
Policy
egister
, Impacts
es and Ta
ms (SADs)
Program
ng Progra
n Program
Program
l Site Insp
Report Fo
egister
Register
m and Com
istribution Cen
r Knight Merz | Con
Non-Key I
and Risk
argets
)
am
m
pection Ch
orms
mplaints Re
ntre
nstruction Environm
Issues
register
hecklist
egister
mental Managemen
41
41
41
nt Plan ii
4. Docum
Revision
Initial Draft
Final Draft
Final Draft V
Final Draft V
Final Draft V
Final Draft V
Final V0
Distrib
Revision
Initial Draft
Final Draft
Final Draft V
Final Draft V
Final Draft V
Final Draft V
Final V0
Printed:
Last saved:
File name:
Author:
Project man
Name of org
Name of pro
Name of doc
Document v
Project num
ment h
Date
issued
22/03/11
2/06/11
V1 20/06/11
V2 29/06/11
V3 09/09/11
V4 26/09/11
2809/11
bution
Copy no
Via ema
Via ema
V1 Via ema
V2 Via ema
V3 Via ema
V4 Via ema
Via Ema
nager:
ganisation:
oject:
cument:
version:
mber:
istory
Review
1 L Monte
J Ball
1 R Savag
1 L Monte
1 L Monte
1 L Monte
L Monte
of cop
o
ail
ail
ail
ail
ail
ail
ail/Post
29 Septemb
28 Septemb
skmconsu
RDCConst
Lisa Monte
Claire O’Ke
Holcim
Rooty Hill R
Constructio
Final Versio
EN02782.4
Rooty H
and sta
ed by App
esin L Mo
J Ba
ge L Mo
esin L Mo
esin L Mo
esin L Mo
esin L Mo
pies
Quantity
1
1
1
1
1
1
1
ber 2011
ber 2011 05:10
ulting.comSYDP
truction Environ
sin/ Alice Busby
eefe / Lisa Mont
Regional Distrib
on Environment
on 0
400
Hill Regional Di
Sinclai
atus
proved by
ontesin
all
ontesin
ontesin
ontesin
ontesin
ontesin
Is
R
R
D
Is
D
D
D
0 PM
ProjectsENVR
nmental Manage
y-Smith
tesin
ution Centre
Management P
istribution Cen
r Knight Merz | Con
Date approved
22/03/11
16/06/11
21/06/11
21/06/11
09/09/11
09/09/11
2809/11
ssued to
R Savage and D
R Savage and D
DoPI for review
ssued for tender
DoPI
DoPI
DoPI / R Savage
ProjectsEN028
ement PlansCE
Plan
ntre
nstruction Environm
d Revision ty
For initial re
For final rev
DoPI for rev
Issued for T
Address Do
Address Do
DoPI Appro
Elliot
Elliot
r
e
872TechnicalR
EMPEN02782.4
mental Managemen
ype
eview
view
view
Tender
oPI comments
oPI comments
oved
Rooty Hill
400_Constuctio
nt Plan iii
n
5. Glossa
Term
CDMP
CEMP
CNMP
CMS
CRM
CTMP
CSWMP
CVMP
CWMP
DSEWPaC
DoPI
DTI
EA
EAR
ECP
EMS
EO
EP&A Act
EPBC Act
EPL
ESCP
ER
EWP
JSEA
MCoA
NOW
NPWS
OEH
POEO Act
SADs
SoCs
The Projec
TSC Act
ary
Defin
Cons
Cons
Cons
Cons
Com
Cons
Cons
Cons
Cons
C Depa
NSW
Depa
Envir
Envir
Envir
Envir
Envir
Envir
Com
Envir
Eros
Envir
Envir
Job S
Minis
NSW
Natio
Office
t Prote
Sens
State
ct The p
Threa
nition
struction Dus
struction Env
struction Nois
struction Met
munity Relat
struction Traf
struction Soil
struction Veg
struction Was
artment of Su
W Departmen
artment of Tr
ronmental As
ronmental As
ronmental Co
ronmental M
ronmental Of
ronmental Pl
monwealth E
ronment Prot
ion and Sedi
ronmental Re
ronmental W
Safety and E
ster’s Conditi
W Office Of W
onal Parks an
e of Environm
ection of the
sitive Area D
ement of Com
proposed Ro
atened Spec
Rooty H
st Manageme
vironmental M
se Managem
thod Stateme
tions Manage
ffic Managem
and Water M
getation Man
ste Managem
ustainability,
t of Planning
rade and Inve
ssessment
ssessment R
ontrol Plan
anagementS
fficer
lanning and A
Environment
tection Licen
imentation C
epresentative
Work Procedu
Environmenta
ions of Appro
Water
nd Wildlife S
ment and He
Environmen
iagrams
mmitments
ooty Hill Reg
cies Conserv
Hill Regional Di
Sinclai
ent Plan
Management
ment Plan
ent
er
ment Plan
Managemen
agement Pla
ment Plan
Environmen
g and Infrastr
estment
Report
System
Assessment
t Protection a
nce
Control Plan
e
ures
al Analysis
oval
ervices
eritage (prev
nt Operations
ional Distribu
vation Act 19
istribution Cen
r Knight Merz | Con
t Plan
t Plan
an
nt, Water, Po
ructure
t Act 1979
and Biodivers
iously DECC
s Act 1997
ution Centre
995
ntre
nstruction Environm
pulation and
sity Conserva
CW)
mental Managemen
d Communitie
vation Act 199
nt Plan iv
es
99
6. 1 Intr
1.1 C
This Constru
environmen
Rooty Hill R
The primary
manage and
used as a w
Assessment
the final Mi
to all staff (
The CEMP c
14001 – 200
of EMP’s (D
to reflect ne
The followin
for construc
“With the a
monitoring
program is
prepared an
Approval fo
the Directo
Stage 2 wor
detail on th
the Directo
The CEMP,
key issues a
Project.
1.2 C
The objectiv
Min
All e
des
The
Hol
roducti
EMP Purpo
uction Enviro
ntal controls
Regional Dist
y purpose of
d control env
working docu
t Report (EAR
nister’s Cond
including co
contains core
04. This CEM
Department o
ew processe
ng MCoA allo
ction of the P
approval of th
program req
required bef
nd submitted
or the progre
r‐General in
rks. The CEM
e proposed
r‐General of
including the
and procedur
EMP Objec
ves of this CE
nimise impac
environment
sign and cons
e project env
cim’s EMS.
on
ose and Sc
onmental M
required du
ribution Cen
f the CEMP is
vironmental
ment to ens
R), Submissio
ditions of Ap
ntractors) an
e Environme
MP has been
of Planning a
s, controls a
ows for the p
Project:
he Director‐G
quired by this
fore carrying
d in relation
essive submis
August 2011
MP will be rev
staging of co
the DoPI pri
e issue speci
res will be ap
ctives
EMP are that
cts on the en
tal requirem
struction are
vironmental
Rooty H
cope
anagement P
uring site pre
tre Project (
s to provide a
aspects of t
ure that obli
ons Report, M
pproval (MCo
nd implemen
ntal Manage
developed to
and Infrastru
nd procedur
progressive s
General, the
s approval o
out the proj
to either disc
ssion of man
1 and accord
vised at a lat
onstruction a
ior to the co
fic environm
pplicable to a
t:
nvironment.
ments contain
e clearly defi
managemen
Hill Regional Di
Sincla
Plan (CEMP)
eparation and
the Project).
a framework
he Project d
igations and
Modification
oA) and othe
nted effectiv
ement System
o satisfy the
cture (DoPI)
res.
submission o
Proponent m
on a progress
ject, or any s
crete compo
nagement pla
dingly the firs
ter date to ad
activities. To
mmenceme
mental manag
all staff and
ned in statut
ned and mec
nt system is e
istribution Cen
air Knight Merz | C
has been pr
d constructio
.
k reference d
uring the con
commitmen
n Report, fina
er licences, p
ely as an int
m (EMS) elem
requiremen
2004). The C
of managem
may prepare
sive basis. W
stage of proje
onents of the
ans and/or m
st submissio
ddress Stage
satisfy MCo
nt of any wo
gement plan
contractors
ory approva
chanisms for
established t
ntre
onstruction Environ
repared to do
on works ass
document to
nstruction ph
nts provided
al Statement
permits and a
egral part of
ments and fo
ts of the Gui
CEMP will be
ent plans an
and submit
Where a mana
ect, the plan
project or fo
monitoring pr
n of the CEM
e 3 works. Se
A 5.2 this CE
orks on site.
ns, environm
during the co
ls and other
r implementa
hat meets an
nment Managemen
ocument the
sociated with
o guide how
hase. The CE
in the Enviro
t of Commitm
approvals are
f project con
ollows the pr
idelines for t
e reviewed w
d/or monito
any manage
agement pla
ns/programs
or a specified
rograms was
MP will addre
ection 2.2 pro
EMP will be a
ental contro
onstruction
legal contro
ation identif
nd the requi
nt Plan 1
e actions and
h the propos
Holcim will
EMP will be
onmental
ments (SoC),
e made know
struction.
rinciples of IS
the Preparati
when necessa
oring program
ement plan o
n or monitor
may be
d time period
s granted by
ess Stage 1 a
ovides furthe
approved by
ol plans for n
phase of the
ols relevant t
fied.
rements of
d
sed
wn
SO
ion
ary
ms
or
ring
d.”
nd
er
on‐
e
o
7. Pro
Pro
def
Oth
Project env
Appendix E
1.3 Pr
All environm
been consid
Environmen
This CEMP d
managemen
Holcim’s ex
with the Do
authorities
subsequent
The require
are discusse
In accordan
the project
1.4 Pr
Holcim’s En
revised and
1.5 O
The Project
was subseq
Report (EAR
2005) for th
the final pro
impact miti
(SoC). The S
Further to t
operational
Environmen
Consultants
benefits inc
ocesses for re
ocesses for au
ined.
her objective
ironmental o
E. These are b
reparation
mental mana
dered and ad
nt (SHE) Man
draws on the
nt of multipl
pectations a
oPI will be un
and stakeho
t revisions of
ements for co
ed in Section
nce with MCo
website.
roject Envi
nvironmental
d approved th
verview Pr
was assesse
uently appro
R) and Subm
his assessme
oject approv
gation and m
SoC formed t
the 2006 app
l, capital and
ntal Assessm
s (October 20
cluding impro
esourcing an
uditing, mon
es identified w
objectives an
based on env
of this CE
agement req
ddressed in p
nagement Sy
e extensive k
e and varied
and requirem
ndertaken fo
olders will be
f this CEMP.
onsultation w
n 4.2.
oA 4.1, the C
ironmental
l Policy is inc
hroughout th
roject Envi
ed under Par
oved by the
issions Repo
nt process. T
val dated 5 D
management
the basis for
proval, Holcim
d environmen
ment (EA) for
010). The EA
ovements to
Rooty H
d implement
nitoring and r
within enviro
nd targets ha
vironmental
MP and Iss
uirements in
preparing thi
ystem.
knowledge H
d projects in
ments, and ad
r the develo
e undertaken
with these ag
CEMP and ass
l Policy
cluded as Ap
he Project if
ronmental
rt 5 of the En
Minister for
ort was prepa
The project a
ecember 200
t requiremen
the MCoA.
m reviewed t
ntal benefits
these minor
A noted modi
the visual a
Hill Regional Di
Sinclai
ting this plan
reporting on
onmental do
ave been dev
aspects, imp
sue Specifi
ncluding tho
is CEMP, as h
Holcim has ac
a range of lo
dequately ad
pment of th
n, where req
gencies and
sociated issu
pendix A. Th
needed.
Assessme
nvironment P
Planning on
ared by Natio
approval was
06. The EA a
nts for the Pr
the plans for
s in modifyin
r modificatio
ifications are
menity of th
istribution Cen
r Knight Merz | Con
n are set to p
n performanc
ocuments are
veloped and
pacts and ris
ic Plans
se stipulated
have require
cquired from
ocations. This
ddress risks a
is CEMP. Fur
uired, for the
incorporatio
ue specific m
his policy has
ent and Ap
Planning and
26 April 200
onal Environ
s referred to
and Submissi
roject and pr
r the Rooty H
g the approv
ons was prod
e expected to
he facility and
ntre
nstruction Environm
provide certa
ce and effect
e met.
are describe
k as identifie
d in the envir
ments of Ho
m successful e
s CEMP has b
and stakehol
rther consult
e issue speci
on of require
anagement
s been forma
proval
d Assessment
06. An Enviro
nmental Cons
the Land an
ons Report i
rovide a Stat
Hill RDC and
ved Rooty Hi
uced by Um
o result in so
d a reduction
mental Managemen
ainty of deliv
tiveness of th
ed in Section
ed in Append
ronmental d
olcim’s Safety
environment
been design
lder concern
tation with o
ific plans and
ements wher
plans will be
ally approved
t Act 1979 (E
onmental As
sulting Servi
nd Environme
identify envi
tement of Co
identified a
ill RDC layou
welt Environ
ome environ
n in noise an
nt Plan 2
very.
he CEMP are
n 5.3 and
dix D.
ocuments ha
y Health and
tal
ed to addres
s. Consultati
other
d for
e appropriat
e available on
d and will be
P&A Act) an
sessment
ces (October
ent Court wi
ronmental
ommitments
number of
t. An
nmental
mental
nd air quality
e
ave
d
ss
ion
te,
n
e
d
r
th
s
8. impacts of t
and Infrastr
1.6 In
This CEMP f
overarching
as a whole.
the Project.
ructure on 23
ntegration w
forms part o
g framework
The set of m
The modific
3 February 2
with other
f an integrat
k document i
management
Rooty H
ation to the
2011.
Project Pla
ted set of ma
s the Project
plans is illus
Hill Regional Di
Sinclai
approved pr
ans and Pro
anagement p
t Manageme
strated in the
istribution Cen
r Knight Merz | Con
roject was ap
ocedures
plans develo
ent Plan whic
e manageme
ntre
nstruction Environm
pproved by t
ped for all ke
ch outlines h
ent plan stru
mental Managemen
the Minister
ey areas of t
how the struc
ucture in Figu
nt Plan 3
for Planning
he project. T
cture functio
ure 1‐1.
g
The
ons
10. 2
2.1
Th
Go
the
ma
agg
a v
ma
de
Th
the
An
the
Ra
On
ha
Sp
lay
Reg
qua
labo
Rai
unlo
On-
Bin
Proje
1 Proje
e Rooty Hill
overnment A
e Sydney Bas
arket. The co
gregates and
variety of oth
aterials throu
pleted and t
e site is 15 h
e East, the O
ngus Creek, a
e Site Localit
ilway) and ro
nce operation
ndling up to
ecific elemen
yout plan.
Table 2‐1E
Aspe
gional office b
arry and concr
oratory
il siding with a
oading facility
-ground Conc
s and Load ou
ect Des
ect Overvie
Regional Dis
Area (LGA) wi
sin, blend th
onstruction m
d natural/ma
her uses in th
ugh the Penr
the facility w
hectares and
OneSteel Min
a tributary of
ty Plan). The
oad (M7 Mo
nal, the Root
four (4) mill
nts of the Pr
Elements of t
ect
building and
rete testing
aggregate
y
crete Storage
ut facility
scriptio
ew
stribution Ce
ill allow Holc
e materials t
materials rec
anufactured
he civil and c
rith Lakes De
will wind dow
is bound by
ni Mill and ot
f the Eastern
site was cho
torway).
ty Hill RDC w
ion tonnes p
roject are de
the Rooty Hi
A four (4)
laboratory
Parking w
Rail siding
(3) rail trac
Line. Und
sidings wi
with a cap
located ap
The Proje
chosen as
The storag
with a cap
approxima
Load out f
loading po
conveyor
Rooty Hill R
on and
ntre (RDC) lo
cim to receiv
to meet cust
ceived will in
sand, typica
construction
evelopment C
n to closure
the Main W
her industria
Creek, flow
osen due to t
will operate 2
per annum o
scribed in Ta
ll RDC
storey admini
y will be constr
will be provides
gs 1,100 metre
cks running pa
der this option
ll cater for two
pacity of 77.5 t
pproximately in
ct has approv
s the preferred
ge area will co
pacity of 2,500
ately 60,000to
facilities will co
oints. Loads w
and diverter c
Regional Distri
Sincla
Initiati
ocated at Ke
ve constructio
tomer specif
clude single
lly used for t
industries. H
Corporation
by early to m
Western Railw
al developm
s through th
the unique a
24 hours a da
of product.
able 2‐1 belo
istrative office
ructed on an e
s for 189 cars.
es in length w
arallel to and o
rail sidings w
o (2) trains at a
tonnes of qua
n the middle o
val to handle u
d option based
onsist of two (2
0tonnes. The t
onnes. These b
onsist of two (
would be transf
chute. Materia
bution Centre
air Knight Merz | Co
ives
llogg Road, R
on material
ications and
size crushed
the manufac
Holcim curre
(PLDC), how
mid 2014.
way Line to th
ents to the w
e southern p
ccess opport
ay, seven (7)
ow and Figur
Descriptio
plus parking a
existing car pa
ill be construc
on the norther
ill commence
any one time,
rry product pe
of the 1,100 m
p to four (4) m
d on the ability
2) rows of 12
otal storage c
bins will stand
(2) truck loadin
ferred from th
l would be tran
onstruction Environ
Rooty Hill wit
by rail from q
distribute th
d aggregate,
ture of conc
ntly supplies
wever the res
he south, the
west and ind
portion of th
tunities that
days a week
e 2‐2 provid
on
and a single s
ark area on the
cted. These sid
rn side of the M
to the east of
each with app
er wagon. The
etre rail siding
million tonnes p
y to achieve th
on-ground con
apacity of the
d approximatel
ng stations, ea
e main storag
nsferred to a t
nment Managemen
thin the Blac
quarries loca
hese by road
blended cru
crete and asp
s the bulk of
source at thi
e Nurragingy
ustrial land t
he site (Refer
t include rail
k and will be
es the assoc
storey materia
e adjacent Hu
dings will com
Main Western
the M7 under
proximately 36
unloading fac
g.
per annum. O
his handling ca
ncrete storage
area is to be
ly 23 metres h
ach containing
ge bins to a loa
truck via a tele
t Plan 5
cktown Loca
ated outside
d to the Sydn
shed
phalt as well
these
s site is near
y Reserve to
to the North
r Figure 2‐1 f
(Main Weste
capable of
ciated site
ls testing
mes site.
mprise of three
n Railway
rpass. These
6 wagons,
cility will be
Option 1 was
apacity.
e bins, each
high.
g two (2) truck
ading bin via a
escopic chute.
l
of
ney
as
rly
.
for
ern
k
a
.
11. Rad
Ble
Con
unlo
stor
Wo
truc
refu
par
Con
Brid
Aspe
dial stacker
nding plant/pu
nveyor system
oading station
rage and truck
orkshop, stores
ck wash down
uelling, weighb
rking
ncrete batchin
dge over Angu
ect
ug mill (future)
m, linking the
n to the
k facilities
s, site offices,
, truck
bridges and
ng plant
us Creek
The radial
unloaded
main stora
of a loadin
stockpiled
have a ca
) The blend
of 400tonn
storage si
The conve
station to t
and enclo
storage bi
The works
used for m
house the
activities.
an additio
The truck
refuelling f
bowsers a
The concr
silos (23 m
parking fo
and office
A road/con
Rooty Hill R
stacker is con
and returned
age system, o
ng malfunction
and sprayed
pacity of 7,500
ing plant/pug
nes per hour.
los via an enc
eyor system in
the storage bi
sed on three s
ns the materia
shop and store
maintenance ta
site managem
Amenities, lun
nal building.
wash bay will
facility will hav
and an oil store
rete batching p
metres tall) an
r agitators, ho
and amenity f
nveyor bridge
Regional Distri
Sinclair
ntingency mec
to the rail syst
r if materials a
n, quarry prod
with water as
0 tonnes.
mill will mix ro
Cement or lim
closed convey
ncludes a serie
ins. The conve
sides, and all
al will be depo
es building wil
asks and to st
ment team, we
nch room, trai
be located to
ve a 100,000
e. There will b
plant will have
d will store 12
olding bins, ag
facilities.
to link the no
bution Centre
r Knight Merz | Con
Descriptio
chanism and w
tem if there is
at the unloadin
uct will be dive
s a dust suppre
oad base with
me would be tr
or system.
es of conveyo
eyors outside
transfer points
osited in the cl
ll include office
tore spare par
eighbridge ope
ning room and
o the north of t
litre capacity a
be parking for
e a capacity of
20 tonnes of p
ggregate stora
rthern and sou
struction Environm
on
will be used to
a malfunction
ng station are
erted to the ra
ession measu
cement or lim
ansferred from
rs to move ma
of buildings o
s will be locate
osed top facili
e space for ma
ts and chemic
erators and co
d transport are
he concrete b
and would incl
38 trucks.
f 200,000m
3
a
roduct. This fa
ge bins, wash
uthern section
mental Managemen
o allow trains t
n with the ope
contaminated
adial stacker w
re. The radial
me and water a
m 100 tonne c
aterial from th
r tunnels will b
ed in buildings
ity by a shuttle
aintenance st
cals. An office
omputer syste
ea office will b
batching plant.
lude two (2) re
and would con
acility will also
hout pits, truck
ns of the site.
t Plan 6
to be
ration of the
d. In the case
where it will be
stacker will
at a capacity
capacity
e unloading
be covered
s. At the
e conveyor.
aff and will be
building will
em controlling
be housed in
The truck
efuelling
sist of four (4)
o include
k wash bays
e
e
)
12. PLAN TITLE
PROJECT TITLE
PROJECT REF
LOCALITY LEGEND DATA
SOURCE
MAP SCALE
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
ROOTY
HILL
DOONSIDE
Blacktown
Olympic Centre
Nurragingy
Reserve
One Steel
Mini Mill
HOLCIM REGIONAL
DISTRIBUTION CENTRE
Rooty Hill
Station
EASTERN
ROAD
WOODSTOCK AVENUE
MAIN EASTERN RAILWAY LINE
Colebee
Centre
KNOXROAD
M7MOTORWAY
Aquilina
Reserve
Rooty Hill
Town Centre
KELLOGG ROAD
ANG U
SCRE
EK
!(9
!(8
!(7
!(6
!(5
!(4
!(3
!(2
!(1
!(14
!(13
!(13
!(12
!(11
!(10
FIGURE 2.1: SITE LOCALITY PLAN GCS GDA 1994 | MGA Zone 56 UTM
Rooty Hill - Regional Distribution Centre
HOLCIM
°
0 200
Metres
1:6,500
! ! Site boundary
Site layout
Creek line
Indicative noise wall
SKM does not warrant that this document is
definitive nor free of error and does not
accept liability for any loss caused or arising
from reliance upon information provided herein.
A3
Sydney Spatial Team - Prepared by : JC
Checked by : JH
I:ENVRProjectsEN02872TechnicalGISSpatial_DirectoryArcGIS
EN02872_001.mxd
SYDNEY
2
1 Site main entrance
2 Car parking
3 Office buildings and workshops
4 Weigh bridge and office
5 Truck parking and driver amenities
6 Truck refuelling station
7 On-ground concrete storage bins
8 Blending plant/pugmill
9 Aggregate stockpiles
10 Concrete batching plant (future)
11 Unloading conveyor and Angus Creek bridge
12 Rail unloader
13 Proposed rail track sidings
14 Regional office building and materials testing laboratory
13. !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
HOLCIM REGIONAL
DISTRIBUTION CENTRE
Blacktown
Olympic Centre
Nurragingy
Reserve
One Steel
Mini Mill
WOODSTOCK AVENUE
Aquilina
Reserve
KELLOGG ROAD
ANGUS C R E
EK
M
7
M
OTORW
AY
!(9
!(8
!(7
!(6
!(5
!(4
!(3
!(2
!(1
!(14
!(13
!(13
!(12
!(11
!(10
FIGURE 2.2: SITE LAYOUT PLAN
GCS GDA 1994 | MGA Zone 56 UTM
Rooty Hill - Regional Distribution Centre
HOLCIM
°
0 120
Metres
1:5,500
! ! Site boundary
Site layout
Creek line
Indicative noise wall
Sinclair Knight Merz does not warrant that this document
is definitive nor free of error and does not accept liability
for any loss caused or arising from reliance upon
information provided herein.
A4
I:ENVRProjectsEN02872TechnicalGISSpatial_DirectoryArcGISEN02872_003.mxd
Sydney Spatial Team - Prepared by : JC
Checked by : JH
SYDNEY
1 Site main entrance
2 Car parking
3 Office buildings and workshops
4 Weigh bridge and office
5 Truck parking and driver amenities
6 Truck refuelling station
7 On-ground concrete storage bins
8 Blending plant/pugmill
9 Aggregate stockpiles
10 Concrete batching plant (future)
11 Unloading conveyor and Angus Creek bridge
12 Rail unloader
13 Proposed rail track sidings
14 Regional office building and materials testing laboratory
14.
2.2
2.2
Co
in S
Ta
on
Stage
1a
1b
2
2.2
Ta
Stage
Stage
Prepa
Cree
North
Zone
Stage
(Angu
Corrid
South
2 Cons
2.1 Stag
nstruction o
September 2
ble 2‐2 below
ly and is sub
Table 2‐2
e
Site Prepar
Corridor, No
Zone)
Early Works
Northern an
Constructio
(Angus Cre
Southern Zo
2.2 Desc
ble 2‐3 prov
Table 2‐3
e
e 1a: Site
aration (Angu
k Corridor,
hern and Sout
e)
e 1b: Early W
us Creek
dor, Northern
hern Zone)
struction W
ging and Tim
of the Project
2011.
w provides t
bject to chan
Project Stag
Description
ation (Angus C
orthern and So
s (Angus Cree
nd Southern Z
on: Remainder
eek Corridor, N
one)
cription of P
ides further
Description
Descr
us
hern
Works
and
Works and
ming
t is expected
he proposed
ge pending t
ging
Creek
outhern
ek Corridor,
Zone)
r of Works
Northern and
Proposed St
details on th
of the Proje
ription
Surveys
Fencing (p
Drilling/test
Minor clear
Ecological
be impacte
Establishm
offices, me
phone , wa
Identificatio
(if required
Drainage w
basins and
Topsoil stri
of EEC’s i
Vegetation
Earthworks
access ont
Noise mitig
north)
Rooty Hill R
Staging
d to take app
d staging of c
the outcome
1 2 3 4
taging
he proposed
ct Staging
erimeter and v
t excavations
ring and grubb
Communities
ed)
ment of site fac
ess rooms, par
ater and any w
on of existing s
)
works (includin
d installation of
ipping and sto
n the develop
Management
s for construct
to the Angus C
gation measur
Regional Distri
Sincla
proximately t
construction
e of the deta
4 5 6 7 8
staging of co
vegetation)
bing (except w
(EEC) or thre
cilities (includin
rking, sanitary
workshops)
services and r
ng the constru
f erosion and
ockpiling (inclu
ment footprint
t Plan)
tion of the nort
Creek Bridge
res (i.e. constr
bution Centre
air Knight Merz | Co
two (2) years
works for th
iled design a
Mo
8 9 10 1
onstruction w
where Endang
eatened flora a
ng access roa
y facilities, first
relocation of t
ction of sedim
sediment fenc
uding clearing
t as specified
thern noise wa
ruction of nois
onstruction Environ
s, with works
he Project. T
and construct
onth
11 12 13 1
works for the
ered
and fauna will
ads, site
t aid, power,
hese services
mentation
cing)
and grubbing
in the
all and for the
e walls in the
nment Managemen
s anticipated
his staging is
ction plannin
14 15 16
e Project.
Estimated
Duration
s
August 20
approxima
weeks
e
August 20
approxima
months
t Plan 9
d to commen
s indicative
g process.
17 18 19- 2
d Start date /
011 for
ately 3 to 4
011 for
ately 3 to 4
nce
24
15. Stage
Stage
(Angu
Corrid
South
Stage
(Nort
Office
Zone
Bl
clo
It s
2.2
the
•
•
•
e
e 2: Construct
us Creek
dor, Northern
hern Zone)
e 3: Construct
hern Zone an
e and Laborat
e)
acktown Cou
osed Holcim w
should be no
2 of this CEM
e October 20
As indicate
office facili
include the
Stage 2 wo
materials h
half the on
2.2 – 2.4M
time into t
4Mtpa will
being desig
facilities w
Figure 1.3
November
between F
parking wa
Descr
tion
and
tion
nd
tory
uncil has ele
will purchase
oted that the
MP appears d
010 Environm
ed in Table 2
ity at a later
ese elements
orks for the R
handling faci
n ground con
tpa which is
he future. Th
be built wh
gned in a wa
ith minimal
in the Octob
2005 EAR st
igure 2.1 an
as shown on
ription
Constructio
Bulk earth
Completion
Constructio
Noise mitig
south)
Constructio
connecting
Constructio
comprising
Constructio
facility for q
Constructio
Constructio
to the stora
Constructio
down, truck
system, an
Connection
communica
Installation
upgrades i
Constructio
laboratory
Constructio
Constructio
cted to close
e the land oc
e current site
different to th
mental Asses
.3 of the CEM
date as part
s prior to wo
Rooty Hill RD
lities. Two o
ncrete storag
sufficient to
he additiona
en the mark
ay that allow
disruption to
ber 2010 EAR
tates that pa
d Figure 2.2
Figure 1.3. T
Rooty Hill R
on of road and
works in the N
n of bulk earth
on of site drain
gation measur
on of the rail s
g into the exist
on of a single
g two bins
on of on-groun
quarry materia
on of the radia
on of the conv
age and truck
on of the work
k refuelling, w
nd site paving
n to services in
ations
of traffic light
n the vicinity o
on of a Region
along with a c
on of the Blend
on of a concre
e North Para
ccupied by N
e layout spec
hose approv
ssment Repo
MP, Holcim p
t of Stage 3 w
orks commen
DC will involv
f the three a
ge bins. The i
o meet the fo
l facilities to
et demand j
s constructio
o the operat
R does not sh
arking will be
in this repor
The truck par
Regional Distri
Sincla
d conveyor bri
Northern Zone
hworks
nage system
res (i.e. constr
siding (includin
ting RailCorp R
rail aggregate
nd concrete st
als
al stacker
veyor system l
facilities
kshop, stores,
weighbridges, p
ncluding sewe
ts on Kellogg R
of the Project
nal Office Buil
car park
ding Plant/Pug
ete batching pl
de which run
North Parade
cifically for St
ved in the Ma
ort (EAR)) du
propose to co
works. Hence
ncing.
ve the constr
approved rai
nfrastructur
orecast dem
o increase the
ustifies the i
on of the add
ion of the sit
how any truc
e provided on
rt and Figure
rking area sh
bution Centre
air Knight Merz | Co
dge over Ang
e
ruction of nois
ng signalling s
Railway syste
e unloading fac
torage and the
inking the unlo
site offices, tr
parking, dust c
er, water, elec
Road and loca
site
ding and conc
g Mill
lant and amen
ns parallel to
e.
tages 1a, 1b,
arch 2011 co
e to the follo
onstruct the
e, Figure 2.1
uction of the
l sidings, one
re planned fo
and upon co
e capacity of
ncrease in si
ditional sidin
te.
ck parking on
n site for 50
e 1.3 in the O
hown on Figu
onstruction Environ
us Creek
e walls in the
ystem)
m
cility,
e load out
oading station
ruck wash
control
tricity and
al road
crete testing
nities building
o the Main W
, and 2, show
onsent modif
owing reason
concrete ba
and Figure 2
e first stage o
e of the two
or Stage 2 wi
ommissioning
f the site to t
ite capacity.
g, un‐loader
n the site wh
road deliver
October 2010
ure 2.1 and F
nment Managemen
Estimated
Duration
n
January 2
approxima
months
Holcim ha
immediate
commenc
constructi
Western Railw
wn in Figure
fication (refe
ns:
atch plant an
2.2 will be up
of the rail sid
train un‐loa
ill provide a c
g of the site
the maximum
The Stage 2
r, and mater
hile Section 5
ry trucks. The
0 EAR is that
Figure 2.2 wa
t Plan 10
d Start date /
2012 for
ately 18
ave no
e plans to
e Stage 3
on works
way Line. On
2.1 and Figu
er figure 1.3
nd the region
pdated to
ding and
ders, and
capacity of
and for som
m approved
works are
ials storage
5.4.3 of the
e difference
no truck
as left vacan
nce
ure
in
nal
e
t
17. 3
3.1
Th
Pro
en
3.1
Th
pre
Th
req
tim
Th
wit
Ta
MC
1.8
2.3
2.3
2.2
5.2
CEMP
1 Statu
ere are a nu
oject Contrac
vironmental
1.1 Minis
e Minister’s
eparation an
e Complianc
quirement is
ming (i.e. pre
e complianc
th a referenc
ble 3‐1 MCo
CoA Re
8
Wi
ma
ba
the
rel
37
Sh
co
De
so
res
38
All
im
wit
req
Bu
28A
Th
the
a)
tha
b)
Nu
c)
EA
d)
2
Th
Pla
du
P Input
utory Requ
mber of stat
ct will specif
requiremen
ster’s Condi
Conditions o
nd constructi
ce Tracking R
s addressed i
‐constructio
e obligations
ce to where
oA Obligation
equirement
ith the approv
anagement pla
asis. Where a m
e project, or an
ation to either
hould any Abo
nstruction wor
epartment of E
on as practica
spect to the tre
chemicals, fu
pervious floor
thin the bund.
quirements of
unding and Sp
he Proponent s
e Statement o
ensure that b
an six months
include monit
urragingy Rese
not include th
AR) as a monit
make provisio
he Proponent s
an to outline e
ring the site p
ts
uirements
tutory inputs
fy where the
nts. The follo
ditions of Ap
of Approval (
ion and phas
Register (refe
n this plan a
on, construct
s set out in t
they are add
ns for the Co
al of the Direc
an or monitori
management
ny stage of pr
r discrete com
original relics b
rk in the vicini
Environment a
able. The Prop
eatment, man
uels and oils s
ring and suffic
The bund(s) s
the DECCW’s
pill Manageme
shall monitor a
of Commitmen
aseline data Is
before comm
toring of water
erve;
e site sampled
toring site, bu
on for monitor
shall prepare a
environmental
preparation an
Rooty Hill R
s to the Proje
Design and
owing section
proval
(MCoA) spec
ses.
er Appendix
nd related d
ion, operatio
he MCoA tha
dressed.
onstruction E
ctor-General, t
ng program re
plan or monito
oject, the plan
mponents of the
be uncovered d
ty of the relic s
nd Conservat
ponent shall m
agement and/
hall be stored
ient capacity t
shall be desig
s Environmen
nt.
aquatic ecolog
ts, and shall e
s collected, in
mencement of c
r quality and a
d on Eastern C
t use at least t
ing in relation
and implemen
management
d construction
Regional Distri
Sincla
ect that are t
Construct (D
ns take into a
cify a numbe
N) tabulates
documents. T
on), respons
at this CEMP
Environment
the Proponent
equired by this
oring program
ns/programs m
e project or fo
during any of
shall cease an
tion and the Lo
meet the requir
/or preservatio
in appropriate
to contain 110
gned and insta
tal Protection
gy In Angus an
expand this mo
cluding comm
construction a
aquatic ecolog
Creak ("E01"
two other loca
to wet and dr
nt a Construct
t practices and
n activities dur
bution Centre
air Knight Merz | Co
the responsi
D&C) Contrac
account this
r of measure
s all MCoA re
The register
ibility, comp
P addresses a
tal Managem
t may prepare
s approval on
m is required be
may be prepar
or a specified t
the constructi
nd the Propon
ocal Aborigina
rements of the
on of any such
ely bunded ar
0% of the large
alled in accord
Manual Tech
nd Eastern Cr
onitoring prog
mencement of
and the use of
y at four locat
- In Technical
ations; and
ry periods.
ion Environme
d procedures t
ring each stag
onstruction Environ
bility of Holc
ctor is respo
allocation of
es for implem
equirements
records the c
liance status
are indicated
ment Plan
and submit a
a progressive
efore carrying
red and submi
ime period.
on activities, a
nent shall cont
al Land Counc
e DECCW with
h relic.
eas, with
est container s
ance the
nical Bulletin
reeks as outlin
ram to:
sampling not
control sites;
ions within
Report 4 of th
ental Managem
to be followed
e of the projec
nment Managemen
cim to imple
nsible for co
f responsibil
mentation du
s and where e
compliance
s (i.e. open, c
d in Table 3‐1
Doc
Refe
any
e
g out
itted in
Sect
all
tact
cil as
h
App
stored
App
ned In
less
he
Sect
App
ment
d
ct.
This
t Plan 12
ment. The
ompliance wi
ity.
uring site
each
requirement
closed) etc.
1, together
ument
erence
tion1.1
endix A.3
endix A.5
tion 6.1
endix H
Document
ith
t,
18. MC
3.1
Th
co
req
Th
ref
Ta
So
7.5
9
10.
10.
CoA Re
Th
En
be
a)
b)
su
we
De
c)
1.2 State
e Statement
nstruction an
quirements a
e complianc
ference to w
ble 3‐2 SoC f
C Re
5
In
Cr
Mo
Wa
Vis
Ma
Du
to
ce
if n
.1
Pr
En
.2
Th
pro
(a)
(b)
(c)
(d)
equirement
he Plan shall b
nvironmental M
e limited to:
the Managem
the environme
pporting inform
ell as the final
epartment on 1
complaints ha
ement of Co
t of Commitm
nd operation
and where e
e obligations
where they ar
for the Envir
equirement
addition the fo
reek corridor:
onitoring to be
ater quality mo
sual site asses
acroinvertebra
uring the cons
be informed.
ase until it is a
necessary.
ior to commen
nvironmental M
he EMP will ide
oposed ROC s
) Angus Creek
) Southern Zo
) Northern Zon
) Office and La
be consistent w
Management P
ment Plans liste
ental manage
mation submit
Statement of
17 March 200
andling proced
ommitments
ments (SoC) s
n phases. The
ach requirem
s set out in t
re addressed
ronmental M
ollowing meas
e undertaken w
onitoring ever
ssment of hab
ate monitoring
truction phase
In the event th
assessed for s
ncement of co
Management P
entify mitigatio
site:
k Corridor Zon
ne;
ne;
aboratory Zon
Rooty Hill R
with the Depar
Plans (DIPNR
ed under cond
ment and miti
tted to the Dep
Commitments
6; and
dures during c
s
specify a num
e Complianc
ment is addr
he SoC that
d.
Management
sures shall be
would include:
y quarter;
bitat condition
would be und
e if any Aborig
hat a site or re
significance an
onstruction of t
Plan (EMP) an
on and manag
ne;
ne.
Regional Distri
Sincla
rtment’s Guide
R 2004) and sh
dition 5.3 of th
gation measu
partment (as r
s submitted by
construction.
mber of mea
ce Tracking R
essed in this
this CEMP a
t Plan
undertaken to
:
and aquatic v
dertaken in sp
ginal sites or re
elic is found th
nd an appropr
the proposed
nd submit this
gement of imp
bution Centre
air Knight Merz | Co
eline for the P
hall include, bu
his approval;
ures outlined in
referenced in c
y the Propone
asures for im
Register (refe
s plan and re
ddresses are
o protect the e
vegetation (qu
ring and autum
elics are unco
en work in the
riate managem
ROC Readym
plan to DOP
acts in the foll
onstruction Environ
Preparation of
ut not necessa
n the EAR and
condition 1.1),
nt to the
mplementatio
er Appendix
lated docum
e indicated in
environment of
arterly);
mn
vered the NSW
e area of such
ment strategy
mix will prepare
for approval.
owing zones w
nment Managemen
Doc
Refe
arily
CSM
CNM
CTM
CDM
d
, as
CSM
CNM
CTM
CDM
App
Sect
on during site
N) tabulates
ments.
n Table 3‐2, t
f the Angus
W NPWS is
h a find will
is devised
e a
within the
t Plan 13
ument
erence
MP
MP
MP
MP
MP
MP
MP
MP
endix AECP
tion 5.6.2
e preparatio
s all SoC
together wit
Document
Reference
Section 6.1
Appendix H
Appendix A
This Plan
CSMP
CNMP
CTMP
CDMP
CWMP
Appendix A
ECP
on,
th a
.3
19. So
10.
10.
10.
10.
15.
15.
15.
C Re
.3
Th
pro
• A
• N
• W
• V
• W
• T
• F
• C
• S
• C
.4
Th
mo
• L
• A
• W
• A
• N
• T
.5
Re
wh
• T
• E
• U
• S
• R
• R
• S
.6
Th
im
.1
Th
ac
an
mo
EP
.2
Th
en
ph
.3 Co
equirement
he EMP will ad
oposed RDC:
Air Quality;
Noise;
Water;
Visual Amenity
Waste;
Traffic;
Flora and Faun
Cultural Herita
Site Security;
Community Co
he EMP will inc
onitoring of the
Local Meteoro
Angus Creek C
Water Quality;
Air Quality;
Noise;
Traffic.
eadymix will pr
hich will focus
The EMP;
Environment P
Understanding
Specific Enviro
Readymix Safe
Reporting and
Site environme
he RDC Site M
plementing th
he Site Manag
cordance with
d relevant sta
onitoring requi
PL and Condit
he monitoring r
vironmental m
ysical, social
omponents of
ddress the follo
y;
na;
ge;
onsultation and
clude a compr
e following:
logical Condit
Corridor Aquat
repare and im
on the followi
Protection legis
g Due Diligenc
onmental Impa
ety Health Env
recording env
ental managem
Manager or his
e EMP.
er will be resp
h the requirem
andards. Imple
irements whic
ions of approv
requirements
monitoring prog
and economic
the monitoring
Rooty Hill R
owing specific
d Complaint M
rehensive env
ions;
tic Ecology;
mplement an E
ng matters:
slation;
ce;
acts of constru
vironmental Po
vironmental in
ment
s/her nominee
ponsible for en
ments specified
ementation of t
ch are to be re
val.
identified in th
gramme, to en
c environment
g programme
Regional Distri
Sincla
c issues for bo
Management.
vironmental mo
nvironmental
uction and ope
olicy;
cidents;
shall be resp
nsuring that an
d by the site E
the Site EMP
eported to the
he EAR are to
nsure that the
ts.
shall include:
bution Centre
air Knight Merz | Co
oth constructio
onitoring prog
Due Diligence
eration of the R
onsible for
ny monitoring
Environment P
will be the ba
relevant agen
be incorporat
project has m
onstruction Environ
on and operatio
ram which wil
e Training Pro
RDC;
carried out is
rotection Licen
sis for complia
cies as requir
ted into the
minimal impact
nment Managemen
on of the
ll include
ogram
done so in
nce (EPL)
ance with
red by the
t on the
t Plan 14
Document
Reference
CDMP
CNMP
CSWMP
ECP for Visu
Amenity (Ref
Appendix A
CWMP
CTMP
VMP
ECP for Cult
Heritage (Re
Appendix A
ECP for Gen
Site Issues
(Refer
Appendix A
CCS
CSMP
CNMP
CTMP
Summary
provided as
Appendix H
Section 0
Section 4.3
Section 6.1
Appendix H
Section 6.1
Appendix H
Section 6.1
ual
fer
)
ural
efer
)
neral
)
20. So
3.1
A r
the
Gre
de
En
3.1
C Re
• L
da
co
es
• A
qu
im
wo
• W
as
Te
ma
ba
• A
inc
• N
ac
• T
de
co
the
1.3 Com
referral unde
e Departmen
evilleajunipe
termined to
vironment, W
1.4 Envir
The ap
numbe
from th
Enviro
prepar
Respon
Road, R
Modifi
Propos
prepar
Respon
Centre
equirement
Local Meteoro
aily air tempera
ntinuous wind
tablished mon
Angus Creek
ality, habitat a
plemented ov
ould occur if ne
Water Quality
a result of sit
emperature, C
aintenance of
asis (All sampl
Air Quality - M
clude installati
Noise - Monito
oustic consult
Traffic - All tra
elivery and raw
ncrete agitato
e Site Manage
mmonwealth
er the Comm
nt of Sustain
erina subsp. j
not be a ‘co
Water, Popu
ronmental A
pproved Envi
er of measur
he following
nmental Ass
red by Nation
nse to Issues
Rooty Hill, R
cation Appli
sed Minor M
red by Umwe
nse to Subm
e (RDC), Root
ological Cond
ature, solar ra
d speed and d
nitoring station
Corridor - Aq
and vegetation
ver the constru
ecessary;
y - Monitoring o
e operations.
onductivity, Tu
diversion drai
es will be ana
Monitoring to m
on of dust gau
oring would be
tant would con
affic entering th
w materials tru
ors to the Conc
er.
Approval
monwealth En
ability, Envir
juniperina, C
ontrolled acti
lation and C
Assessmen
ronmental A
res to be imp
g documents
essment Rep
nal Environm
s Raised in Su
inker Austra
cation 05_00
Modification t
elt Environm
issions Repo
ty Hill, NSW,
Rooty Hill R
ditions - Mete
diation, daylig
irection. This i
ns;
quatic Ecology
n conditions, a
uction and reha
of water qualit
Parameters to
urbidity, Total
ns, basins and
lysed at a NA
meet DECCW
uges during co
e conducted to
nduct the mon
he site would
cks to the wei
crete Batching
nvironment P
ronment, Wa
Cumberland P
ion’. Hence,
ommunities
t and Relat
Assessment R
plemented du
:
port (EAR), P
mental Consu
ubmissions t
lia Pty Ltd.
051 Mod 1, a
to the Holcim
mental Consu
ort – For Prop
dated 9 Dec
Regional Distri
Sincla
eorological con
ght hours, daily
information is
y, water quality
and fauna mon
abilitation pha
ty would be un
o be monitore
Nitrogen and
d sediment tra
ATA registered
requirements
onstruction an
o meet DECCW
nitoring; and
be directed to
ighbridge, staf
g Plant. Any tr
Protection an
ater, Populat
Plain Woodl
approval is
for the Proj
ted Docume
Report (EAR)
uring design
Proposed Reg
ulting Service
to the EAR fo
accompanied
m Regional D
ltants.
posed Minor
cember 2010
bution Centre
air Knight Merz | Co
nditions to be
y rainfall, daily
currently ava
y, flora and fa
nitoring progra
ases. Reviews
ndertaken to e
d include pH,
Total Phosph
aps would be
laboratory);
s. This would
nd as required
W requiremen
o the appropria
ff and visitors
raffic incidents
nd Biodiversi
tion and Com
and and imp
not required
ect.
ents
) and subseq
and constru
gional Distrib
es.
or Proposed
d by the Env
Distribution C
r Modificatio
0.
onstruction Environ
monitored wo
y evaporation
ilable from loc
una. Monitorin
ams would be
s and improvem
ensure no con
Dissolved Oxy
horus. Inspecti
undertaken on
for operation;
nts. A suitably
ate area for ex
to the car par
s would be rep
ity Conservat
mmunities. T
pacts to Latha
d from the M
uent modific
uction phases
bution Centr
Regional Dist
ironmental A
Centre (RDC),
on to Holcim
nment Managemen
ould include
and
cal
ng of water
ments
ntamination
xygen,
ion and
n a regular
;
qualified
xample
rk and
ported to
tion Act 199
The removal
ams Snipe w
Minister for S
cation docum
s. This includ
re, Rooty Hill
tribution Ce
Assessment f
, Rooty Hill,
Regional Dis
t Plan 15
Document
Reference
Appendix H
9 was made
of
were
ustainability
ment specify
des measure
, October 20
ntre, Kellogg
for the
October 201
stribution
to
y,
y a
s
005
g
10
21. 3.2
A c
Ap
pro
the
3.3
Th
pe
ap
3.4
Co
ma
acc
Me
2 Legi
comprehens
ppendix C. Th
oject and me
e Project. If t
3 Appr
roughout th
rmits and lic
provals man
License
Project
Compl
The En
require
CTR.
4 Com
mpliance sta
anagement p
count in the
ethod Statem
slation
ive register o
he register p
echanisms fo
this occurs it
rovals, Per
e site prepar
censes and w
nagement pro
es, permits a
t, and the m
iance Trackin
nvironmenta
ed authority
mpliance St
andards, pol
plan and/or e
preparation
ments (CMS)
of environme
rovides key
or complianc
t will be nece
rmits, Licen
ration and co
will be the ho
ocess involve
and approval
anagement o
ng Register (
l Representa
approvals a
tandards an
icies and gui
environment
of the CEMP
and proced
Rooty Hill R
ental legislat
requirement
e. Changes m
essary for Ap
nces
onstruction p
olders of thos
es:
ls as required
of the specif
CTR) (refer A
ative (ER) wil
re obtained
nd Guidelin
delines relev
tal control pl
P and will be
ures.
Regional Distri
Sincla
tion and regu
ts of relevan
may occur to
ppendix C to
phase, Holcim
se licenses, p
d will be pro
fic conditions
Appendix N)
l be respons
and reviewe
nes
vant to the P
lan. The requ
e considered
bution Centre
air Knight Merz | Co
ulations rele
t legislation
o some existi
be reviewed
m may be re
permits or ap
ogressively ob
s of each app
).
sible for man
ed in accorda
Project are d
uirements of
during the p
onstruction Environ
vant to Root
and regulati
ng legislatio
d and amend
equired to ob
pprovals. Th
btained and
proval will be
aging this pr
ance with the
etailed in the
f these stand
preparation o
nment Managemen
ty Hill RDC is
on, relevanc
on prior to co
ded as appro
btain further
he licenses, p
updated du
e via through
rocess, ensu
e frequency
e respective
dards have b
of any Const
t Plan 16
attached as
ce to the
ompletion of
opriate.
approvals,
permits and
ring the
h the
ring all the
noted in the
issue specif
been taken in
truction
s
f
e
ic
nto
23. 4.1
Th
co
an
co
for
Th
req
pro
Th
4.1
De
Pro
en
im
rel
Th
4‐1
sub
a V
En
cu
Th
As
Off
co
Co
2.2
Iss
Ap
Co
1.1 Cons
e CEMP is th
nstruction p
d Holcim’s sy
nstruction p
r approval by
e CEMP is a
quired, chan
ocedures and
e CEMP has
Guidel
ISO 14
ISO 19
1.2 Issue
etailed, issue
oject. They d
vironmental
plementatio
ation to eac
e MCoA defi
1 notes whic
bmitted for a
Vegetation M
vironmental
ltural heritag
ese ECPs are
noted in Tab
fice of Wate
nstruction ac
mmunities (
27 has been f
Table 4‐1
sue Specific M
pproved as pa
nstruction Soi
struction En
he key manag
hases. The C
ystem for m
hase of the P
y the Directo
dynamic doc
ges to the pr
d methodolo
been prepar
ine for the P
001:2004 – E
011:2003 – G
e Specific M
specific env
document th
element, no
on. The issue
h element.
ine the conte
ch supplemen
approval by
Management
Control Plan
ge (Aborigina
e contained i
ble 4‐1, a Ve
r (NOW) and
ctivities. It s
EEC’s)) is no
finalised.
Issue Specifi
Management
art of CEMP
il and Water M
nvironmenta
gement tool
CEMP describ
inimising and
Project. As n
or‐ General o
cument that
roject team,
ogies develo
red in accord
Preparation o
Environment
Guidelines fo
Managemen
vironmental m
e aspects, im
ominate who
e specific ma
ent and issue
ntary plans t
the Director
t Plan and Co
ns (ECP’s) ha
al and Europ
in Appendix
egetation Ma
d the Office o
should be no
t permitted
ic Managem
Plan
Management P
Rooty Hill R
al Managem
in relation t
bes the const
d managing
noted in Sect
on a progress
will be revie
organisation
p (refer Sect
dance with a
of Environme
tal Managem
or Quality an
nt Plans and
managemen
mpacts, safeg
o is responsib
nagement p
es to be addr
to the CEMP
‐General of D
ommunity Co
ave also been
pean), visual
A.
anagement P
of Environme
ted that clea
until the VM
ent Plans fo
Respo
Plan Holcim
Regional Distri
Sincla
ment Plan (C
to environme
truction env
environmen
tion 1.1 this
sive basis.
ewed and am
nal structure
tion 7 Review
number of g
ental Manag
ments System
nd/or Environ
d Environme
nt plans will b
guards and m
ble for imple
plans also inc
ressed in mo
have been p
DoPI. Other
ommunicatio
n prepared f
amenity and
Plan (VMP) w
ent and Heri
aring of sens
MP and Comp
or the Rooty
onsibility S
m
P
p
bution Centre
air Knight Merz | Co
CEMP)
ental perform
ironmental m
tal risks asso
CEMP will b
mended to in
e and respon
w and Improv
guidelines in
ement Plans
ms.
nmental Man
ental Contro
be prepared
monitoring re
ementing con
clude checkli
ost of the iss
prepared and
r environmen
ons Strategy
or non‐key is
d hazardous g
will be prepar
tage (OEH) p
itive vegetat
pensatory Ha
y Hill RDC
Submission
Prior to comme
reparation and
onstruction Environ
mance during
management
ociated with
e developed
corporate ad
sibilities or a
vement of th
cluding:
s (DoP, 2004)
nagement Sy
ol Plans
on key envir
equirements
ntrols and no
sts of obligat
ue specific m
d when these
ntal managem
in Table 4‐1
ssues includi
goods and d
red to the sa
prior to the c
tion (i.e. End
abitat Packag
encement of S
d Construction
nment Managemen
g the design
t framework
the site prep
d and submit
dditional req
as improvem
he CEMP).
).
ystems Audit
ronmental e
s for each ke
ote the frequ
tions and saf
management
e are require
ment docum
are also req
ing general s
angerous su
atisfaction of
commencem
dangered Eco
ge required u
MCo
Site
n
t Plan 18
and
k for the Proj
paration and
ted to the D
quirements a
ments to
ting.
lements for t
y
uency/timing
feguards in
t plans. Table
ed to be
ments includi
quired.
site issues,
bstances.
f the NSW
ment of
ological
under MCoA
oA Reference
5.3(a)
ject
d
oPI
as
the
g of
e
ng
A
e
24. Iss
Co
Co
Co
Co
Em
Oth
Ve
Co
Co
Fin
Lan
Co
Env
4.1
Co
en
wo
4.1
A n
CM
mi
Wh
ea
Th
co
CM
sue Specific M
nstruction No
nstruction Tra
nstruction Dus
nstruction Wa
mergency Resp
her Relevant
getation Mana
mpensatory H
mmunity Com
nal Hazard Ana
ndscape Plan
nstruction Acc
vironmental D
1.3 Cons
nstruction C
vironmental
orks commen
1.4 Cons
number of Co
MSs will docu
tigation mea
here practica
sier to use b
e preparatio
nstruction ac
MS are develo
Management
ise Managem
affic Managem
st Manageme
aste Managem
ponse Plan
Documents a
agement Plan
Habitat Packag
mmunication S
alysis
cess Managem
Due Diligence
struction Co
Contractors w
manageme
ncing.
struction Me
onstruction
ument action
asures detail
able, the info
y Project pe
on of each CM
ctivities to e
oped for ma
Plan
ent Plan
ment Plan
nt Plan
ment Plan
and Issue Sp
ge
trategy
ment Program
Training
ontractors E
will prepare a
nt plans and
ethod State
Method Stat
ns to be unde
ed in the spe
ormation con
rsonnel.
MS involves a
nsure site an
jor construct
Rooty Hill R
Respo
Holcim
Holcim
Holcim
Holcim
Holcim
pecific Manag
Holcim
Holcim
Holcim
Holcim
Holcim
m Holcim
Holcim
EMP
an EMP whic
environmen
ments (CM
tements (CM
ertaken to en
ecific issue s
ntained in th
a detailed as
nd activity sp
tion method
Regional Distri
Sincla
onsibility S
m
P
p
m
P
p
m
P
p
m
N
th
m
N
th
gement Plans
m
P
co
m
P
w
C
R
m
P
w
m
P
co
m
P
p
m
P
/
m
N
th
ch will be con
ntal control p
MS)
MS) will be de
nsure compl
pecific mana
he CMSs will
ssessment of
pecific enviro
ds i.e. Clearin
bution Centre
air Knight Merz | Co
Submission
Prior to comme
reparation and
Prior to comme
reparation and
Prior to comme
reparation and
No submission
he MCoA
No submission
he MCoA
s (outside the
Prior to the com
onstruction ac
Prior to the com
works that will
Cumberland Pl
River-flat Euca
Prior to comme
works associat
Prior to comme
onstruction
Prior to the com
reparation act
Prior to the use
Nurragingy Re
No submission
he MCoA
nsistent with
plans. This E
eveloped by
iance with th
agement pla
be presente
f environmen
onmental iss
ng and Grubb
onstruction Environ
encement of S
d Construction
encement of S
d Construction
encement of S
d Construction
requirement u
requirement u
CEMP)
mmencement
ctivities
mmencement
remove
ain Woodland
lypt Forest.
encement of a
ed with the pr
encement of
mmencement
tivities
e of the Knox R
eserve access
requirement u
h this plan an
MP will be re
the construc
he CEMP and
ns and envir
d in A3 and A
nt and comm
ues are man
bing and will
nment Managemen
MCo
Site
n
Site
n
Site
n
under
under
of
of any
d or
any
roject
of site
Road
s point
under
nd the issue
eviewed by H
ction Contra
d will draw o
ronmental co
A1 formats t
munity risks f
naged during
incorporate
t Plan 19
oA Reference
5.3(b)
5.3(c)
5.3(d)
N/A
N/A
2.24
2.27
4.4
1.12
2.34
2.18
N/A
specific
Holcim prior
ctor. These
on the
ontrol plans.
to make them
for proposed
constructio
e references
e
to
m
d
n.
for
25. spe
co
4.1
Th
4.2
4.2
Th
A),
co
Th
an
ma
co
Pla
Co
Co
Co
Co
Co
Co
Ve
Lan
ecific tasks r
ntrols.
1.5 Sens
e Sensitive A
Enviro
Sensiti
Other t
Th
2 Cons
2.1 CEM
is CEMP, all
, have been d
ncerns.
e MCoA’s re
d the issue s
anagement p
nsultation (C
Table 4‐2 C
an
nstruction Env
nstruction Soi
nstruction No
nstruction Tra
nstruction Dus
mmunity Com
getation Mana
ndscape Plan
elating to en
sitive Area D
Area Diagram
nmental sen
ve receivers
temporary p
he SAD for St
sultation a
MP Consulta
issue specifi
designed to
quires Holci
specific envir
plans with ap
C) is required
Consultation
vironment Ma
il and Water M
ise Managem
affic Managem
st Manageme
mmunication S
agement Plan
nvironmenta
Diagrams (S
ms (SADs) wil
nsitive areas;
; and
protection m
tage 1 and 2
nd Approv
ation
c environme
address stak
m to consult
ronmental m
pproval and c
d by the MCo
n Required f
nagement Pla
Management P
ent Plan
ment Plan
nt Plan
trategy
Rooty Hill R
l controls su
SADs)
ll be prepare
easures such
is included a
val Require
ental manage
keholder exp
t with specifi
management
consultation
oA for each p
or the CEMP
Prim
Req
an M
Plan MC
MC
MC
MC
M
Regional Distri
Sincla
ch as installa
ed and will in
h as fencing.
as Appendix
ements
ement plans
pectations an
ic authorities
plans. Table
n requiremen
plan.
P and Relate
marily
quired by
MCoA 5.2
CoA 5.3(a)
CoA 5.3(b)
CoA 5.3(c)
CoA 5.3(d)
MCoA 4.4
2.24
2.34
bution Centre
air Knight Merz | Co
ation and/ o
nclude inform
x F.
and environ
nd requireme
s and stakeh
e 4‐2 lists the
nts and indic
ed Document
DoPI
OEH
A
A
A
A
A
A
A
A
onstruction Environ
r maintenan
mation on:
nmental cont
ents, and ade
olders in the
e issue specif
ates where,
ts
DII
A
nment Managemen
ce of sedime
trol plans (re
equately add
e preparation
fic environm
approval (A)
t Plan 20
ent and eros
efer Appendi
dress risks an
n of this plan
ental
) and
ion
ix
nd
n
26. Pla
Fin
Co
Co
Re
As
sub
pro
4.2
Th
an
Aft
ma
do
for
Do
fin
Ho
fro
As
rev
an
nal Hazard Ana
mpensatory H
nstruction Acc
quired)
noted in Sec
bmitted to th
oject.
2.2 CEM
e final draft
d the Compe
ter comment
anagement p
cumented a
r approval.
ocumentation
al CEMP will
olcim will not
om have bee
noted in Sec
viewed for th
alysis
Habitat Packag
cess Managem
ction 1.1, the
he DoPI for a
MP Submiss
CEMP will be
ensatory Hab
ts from thes
plans will be
ppropriately
n as to how
l be publicall
t commence
n approved
ction 1.1, thi
he other con
ge
ment Program
e CEMP and
approval by t
sion
e submitted
bitat Package
e organisatio
updated to a
y. The final C
Holcim has a
ly available o
site prepara
by DoPI.
is CEMP has
nstruction ph
Rooty Hill R
Prim
Req
m (if
issue specifi
the Director‐
to DoPI for c
e will be dev
ons have bee
account for c
EMP and rel
addressed st
on the projec
ation and/or
been develo
hases of the P
Regional Distri
Sincla
marily
quired by
1.12
2.27
2.18
ic environme
‐General on
comment. Th
veloped in co
en received,
comments. T
evant issue s
akeholder co
ct website as
construction
oped for 1a /
Project.
bution Centre
air Knight Merz | Co
DoPI
OEH
A
C
A
ental manage
a progressiv
he VMP will
onsultation w
the draft fin
The response
specific man
omments du
s per MCoA 4
n works unti
/1b site prep
onstruction Environ
DII
ement plans
ve basis for sp
be submitte
with OEH.
al CEMP and
es to the com
agement pla
ring consulta
4.1.
l the CEMP a
aration and
nment Managemen
s will be prep
pecific stage
ed to the OEH
d issue specif
mments rece
ans will be is
ation will be
and related d
early works
t Plan 21
pared and
es of the
H and NOW
fic
eived will be
sued to DoP
e available. T
documents
and will be
he
27. 4.3
4.3
Fig
4.3
Ap
Pro
de
res
off
Ro
Env
Re
3 Role
3.1 Envir
gure 4‐2 show
Figure 4‐2
3.2 Holci
ppropriate re
oject. The re
scribed in Ta
sponsibilities
f on their res
Table 4‐3H
ole
vironmental
presentative
es and Res
ronmental M
ws the gener
General Env
im Rooty H
esponsibilitie
sponsibility
able 4‐3 belo
s will be prep
sponsibilities
Holcim Rooty
Respo
The ER
Enviro
prepar
In acco
ponsibilitie
Managemen
ral environm
vironment M
Hill RDC Proj
es are provide
and authorit
ow. For all ke
pared and th
s.
y Hill RDC Te
onsibility
R is accounta
onmental Offic
ration and con
ordance with M
Manage th
programs r
Consider a
related to t
Receiving a
Strategy.
Recommen
Rooty Hill R
es
nt Structure
mental manag
Management
oject Team
ed to ensure
ty for environ
ey managem
he individual
eam Constru
ble for environ
er (EO) mana
nstruction phas
MCoA 5.1 the
e developmen
required under
and advise on
he Project.
and respondin
nd steps to av
Regional Distri
Sincla
e
gement stru
t Structure
e effective en
nmental per
ment position
appointed t
uction Phase
nmental perfo
ages all issues
se of the proje
primary respo
nt and implem
r the approval
matters speci
ng to complain
void unintende
bution Centre
air Knight Merz | Co
cture for the
nvironmenta
rformance of
ns, a position
o the positio
e Roles and R
rmance and c
s associated w
ect.
onsibilities of t
entation of all
l.
fied in the MC
nts in accorda
ed environmen
onstruction Environ
e Rooty Hill R
al manageme
f key personn
n description
on will be req
Responsibilit
ompliance of t
with environme
the ER are:
management
CoA, SoC and
nce with the C
ntal impacts an
nment Managemen
RDC
ent for the d
nel in the pro
n containing
quired to rev
ties
the Project an
ent during the
t plans and mo
any other lice
Community Co
nd failing the e
t Plan 22
uration of th
oject team is
environmen
view and sign
nd will ensure
design, site
onitoring
ence or approv
onsultation
effectiveness o
he
s
tal
n‐
the
val
of
28. Ro
Env
Off
Pro
(PD
Pro
(PM
Ass
Ma
PM
ole
vironmental
ficer (EO)
oject Director
D)
oject Manager
M)
sistant Project
anager (Assist
M)
Respo
The EO
constr
r The PM
minimi
t
tant
Assista
factore
contra
this CE
The ro
depen
are inc
onsibility
such steps
O will be base
uction phase.
Ensure all
developed
when requi
Provide ad
licence or a
when requi
Assist the E
Project’s co
Identifying
Provide en
correct met
In consulta
environmen
Implement
Identify and
Liaise with
Manage en
Conduct in
Monitor the
Ensure mo
corridor, wa
environmen
Ensure mo
Review and
Respond to
and reporti
The PD ha
To ensure
Support the
Provide ad
developme
environmen
contractual
Actively pro
M is responsib
ised and that t
Ensure the
the issue s
Ensure all
requiremen
ant PM report
ed into decisio
ctor on behalf
EMP are imple
ole and respon
ding on the ac
cluded in each
Rooty Hill R
, recommendi
ed on the Proje
Their respons
management
prior to constr
ired.
vice to constru
approval relate
ired.
ER in resolvin
ommunity and
and obtaining
vironmental in
thodology ado
ation with the E
ntal impacts is
the Project en
d prepare env
government a
nvironmental s
ternal environ
e landscaping
onitoring of loc
ater quality, ai
ntal monitoring
onitoring requir
d update the e
o environment
ng any inciden
s the following
environmenta
e Environmen
equate resour
ent, implement
ntal managem
l requirements
omoting enviro
ble for delivery
the Project de
e D&C Contrac
pecific environ
project staff h
nts relevant to
s to the PM an
on making for a
f of the PM to
emented.
nsibility for the
ctivity being un
h of the plans.
Regional Distri
Sincla
ing the releva
ect site and w
sibilities includ
plans and mo
ruction works
uction person
ed to the Proje
ng and respond
d stakeholder
g license and p
nput and revie
opted to avoid
ER recommen
s ceased as so
nvironmental m
vironmental ind
agencies and
sub-consultan
nmental audits
activities with
cal meteorolog
ir quality, nois
g program pro
rements spec
environmental
tal incidents, f
nts to the ER.
g environment
al requirement
nt Policy in Ap
rces (personn
tation and ma
ment plans and
s.
onmental man
y of the constr
elivers the app
ctor complies
nmental mana
ave a clear un
o their area/sco
nd is responsi
all constructio
ensure that th
e Assistant PM
ndertaken. Sp
bution Centre
air Knight Merz | Co
nt activities be
will provide sup
de the followin
onitoring progr
commencing
nel on matters
ect and seek a
ding to compla
management
permit require
ew Constructio
unintended e
nd that any act
oon as practic
management
duction and tra
relevant stake
ts.
s.
hin the project
gical conditions
se and traffic is
ovided in Appe
ified in the app
l compliance r
filling out chec
tal accountabi
s are not seco
pendix B.
el, financial an
intenance of t
d to ensure tha
nagement.
ruction phase
proved environ
with and imple
agement plans
nderstanding o
ope of work.
ible for ensurin
on activities. T
he environmen
M with respect
pecific details o
onstruction Environ
e ceased as so
pport to the ER
ng:
rams required
and regularly
s specified in t
assistance fro
aints and inqu
system.
ments for the
on Method Sta
environmental
tivity which thr
cable.
system.
aining materia
eholders.
site.
s, aquatic eco
s undertaken i
endix H.
provals are co
register.
cklists and othe
ilities:
ondary to othe
nd technologic
his plan and t
at work is und
of the Project
nmental outcom
ements the req
s.
of the environm
ng that enviro
The Assistant
ntal controls a
to environmen
on particular e
nment Managemen
oon as practic
R during site p
under the app
review and u
the MCoA, So
om the ER on t
uiries in accord
Project.
atements (CMS
impacts.
reatens or cau
als.
ology in the An
in accordance
ompleted.
er functions w
er construction
cal) to ensure
the issue spec
dertaken in line
t to ensure tha
mes. Specifica
quirements of
mental manag
nmental cons
PM will liaise
nd procedures
ntal matters w
environmental
t Plan 23
cable.
preparation an
proval are
pdate these
oC and any oth
these matters
dance with the
Ss) to ensure
uses unintend
ngus Creek
e with the
where required
n requirements
effective
cific
e with legal an
at impacts are
ally, the PM w
f this plan and
gement
iderations
with the
s contained in
will differ
responsibilitie
d
her
e
ed
d
s.
nd
will
n
es
29. Ro
En
Ma
Ad
Co
Env
Sp
4.3
Ho
Pro
co
Ho
sub
the
co
Co
pre
pri
Co
ma
Ap
inc
site
ole
gineering
anager (EM)
min/QA
nstruction Tea
vironmental
ecialists
3.3 Cont
olcim recogni
Their d
commu
The nu
Contra
oject specific
ntractors wo
olcim acknow
b‐contractor
eir employee
ntrol plans, C
ntractors wi
epared by Ho
ior to works
ntractor per
anagement a
ppropriate re
cluded in the
e induction p
Respo
The EM
outcom
the Pro
Provid
Projec
am With re
constr
consul
for env
Consu
enviro
enviro
tractors
ises that ofte
detachment f
unication reg
umber of con
actors operat
c environme
orking on site
wledges it is u
rs and their e
es are requir
CMS and rele
ll be require
olcim and ap
commencing
rsonnel are c
and control,
eferences to
e contract do
process.
onsibility
M will ensure
mes and will lia
oject have bee
e administrati
ct’s quality man
espect to envi
uction workers
ltants, ecology
vironmental pe
Attend all e
covered in
Undertake
Ensure tha
Ensure tha
Report any
ultants will be c
nmental matte
nmental repor
en contracto
from the ma
garding envi
ntractors on
ting under a
ntal manage
e and will be
ultimately re
employees co
red to compl
evant SADs.
ed to prepare
pproved by t
g.
considered e
and their res
environmen
ocumentatio
Rooty Hill R
that the detail
aise with the E
en appropriate
ve support to
nagement sys
ronmental ma
s, personnel in
y consultants a
erformance of
environmental
the training se
all activities in
at they are awa
at any clearanc
y activity that h
commissioned
ers, undertake
rts.
ors present a
ain construct
ronmental ri
site.
different ma
ement requir
included in
esponsible to
omply with t
y in full with
e and implem
he DoPI. As n
quivalent to
sponsibilities
tal managem
n. All contrac
Regional Distri
Sincla
led design of t
EO as require
ely accommod
environmenta
stem.
anagement, al
nvolved in pre
and any other
f the project. T
training requi
ession(s).
n accordance
are of the con
ces are obtain
has resulted, o
d by Holcim (a
e surveys and
n environme
tion delivery
isks.
anagement s
rements will
the contract
o ensure that
the relevant
h the CEMP, i
ment environ
noted in Sec
the Holcim
s in this resp
ment and con
ctor and sub
bution Centre
air Knight Merz | Co
the Project is c
d to ensure th
dated in the de
al and constru
l staff working
eparatory work
r persons unde
The responsibi
ired and adhe
with agreed p
tact person fo
ned from the e
or has the pote
as required) to
inspections, i
ental risk to
teams, and
system.
be included
t documents
t all persons
environmen
issue specific
nmental man
ction 4.1.3 th
project pers
ect mirrors t
ntrol reflecti
b‐contractor
onstruction Environ
consistent with
he environmen
esign.
ctions teams a
g on the projec
ks for construc
ertaking inves
ility of all these
re and remain
procedures and
r environment
nvironmental
ential to result
provide spec
mplement mo
a project due
therefore th
in the select
for the wor
on the Proje
ntal requirem
c manageme
nagement pla
his EMP will b
onnel in all a
those of Holc
ng the Holci
personnel w
nment Managemen
h the approve
ntal aspects an
and develop a
ct including bu
ction, surveyo
stigations have
e personnel in
n familiar with
d work metho
tal matters.
team where r
t in an environ
cialist input and
onitoring progr
e to:
he potential f
tion and man
rks.
ect including
ments. Contr
ent plans, en
ans consiste
be reviewed
aspects of en
cim personn
m’s requirem
will be include
t Plan 24
ed environmen
nd constraints
and maintain t
ut not limited to
rs, geotechnic
e responsibility
nclude:
the principles
ds.
equired.
nmental incide
d advice on
ams or prepar
for poor
nagement of
g contractors
ractors and
vironmental
nt with thos
by Holcim
nvironmenta
el.
ments will be
ed in the on‐
ntal
s of
he
o
cal
y
ent.
re
f
s,
e
l
e
‐
31. 5
5.1
Th
spe
an
the
Mo
A n
Sta
iss
ref
of
wo
5.2
5.2
Th
we
the
en
Re
req
Th
pre
Th
en
ide
As
Th
pro
co
on
En
1 Over
is plan is the
ecific environ
d detailed en
e Project as r
odification R
number of is
atements (CM
ue specific e
ferences to e
sediment co
ork and upda
2 Envi
2.1 Envir
e EAR (Natio
ere prepared
e EAR and M
vironmental
port relating
quired to add
e identificat
eparation an
e environme
vironmental
entifying imp
pects and im
Have t
Impact
Have t
Genera
e ongoing de
ocess, which
rresponding
the followin
vironm
rview
e overarching
nmental ma
nvironmenta
required by t
Report (Umw
sue specific
MS) and inst
environment
environment
ontrol device
ated as need
ironmental
ronmental R
onal Environm
d to assess th
Modification R
protection m
g to the work
dress any ne
tion of the
nd constructi
ental aspects
impact. The
pacts is one o
mpacts will be
he potential
t on flora, fa
he potential
ate wastes.
etermination
h results in th
risk mitigati
ng:
mental
g plan for en
nagement pl
al manageme
the Environm
welt 2010) or
environmen
ructions sup
al managem
tal procedure
es and spill m
ed as the wo
Aspects a
Risk Assess
mental Cons
he potential e
Report, a pre
measures to
ks is containe
ew aspects an
significant
ion of the Pr
s are those a
e relationship
of progressiv
e identified f
to cause the
una or herita
to create ch
n of environm
he developm
on strategy
Rooty Hill R
Issues
vironmental
lans have be
ent, or to ad
mental Asses
design/cons
tal managem
pport the CEM
ent plans ar
es for specifi
management.
orks progress
and Impacts
sment Proc
ultancy Serv
environment
eliminary risk
mitigate the
ed in Append
nd impacts a
environmen
oject is cent
ctivities that
p of aspects
vely breaking
for all site pr
e discharge o
age.
hange to the
mental aspec
ment of a list o
and risk rank
Regional Distri
Sincla
s and C
l manageme
een develope
dress specifi
ssment (Nati
struction issu
ment plans, e
MP. CMSs ar
e addressed
ic tasks relat
. The CMSs w
s.
s
cess
vices 2005) a
tal impacts a
k assessmen
e impacts an
dix D. This ri
associated w
ntal aspects
ral to the se
t could intera
and impacts
g down each
reparation an
or release of
environmen
cts and impa
of environm
king for each
bution Centre
air Knight Merz | Co
Control
nt during co
ed where an
ic significant
onal Environ
ues.
environment
re the means
at an opera
ting to enviro
will be prepa
nd subseque
and risks asso
t detailing o
nd risks ident
isk assessme
with Stage 2 a
s and impa
lection of ap
act with the
s is one of ca
activity into
nd construct
f pollutants t
nt, including
acts will be a
ental risks (a
h risk. Each e
onstruction Environ
s
nstruction. U
environmen
environmen
nmental Con
tal control pl
s by which sp
tional level.
onmental co
red by the C
ent Modifica
ociated with
perating pro
tified in the E
ent will be re
and 3 constru
cts that co
ppropriate en
environmen
use and effe
o its environm
tion activities
o water, air,
air and noise
chieved thro
aspects and i
nvironmenta
nment Managemen
Under this pl
ntal issue req
ntal issues as
sultancy Ser
lans, Constru
pecific requir
CMSs incorp
ntrol, such a
Contractor pr
ation Report
h the Project.
ocedures and
EAR and Mod
eviewed and
uction works
uld eventua
nvironmenta
nt and result
ect. The proc
mental aspec
s that:
, or land.
e.
ough the risk
impacts), an
al risk is cate
t Plan 26
lan, issue
quires compl
ssociated wit
rvices 2005),
uction Metho
rements from
porate
as installation
rior to startin
(Umwelt 201
. Based upon
d temporary
dification
updated if
s.
ate during s
al safeguards
in an
cess of
cts.
k manageme
d a
egorised, bas
ex
th
od
m
n
ng
10)
n
site
s.
nt
sed
32. Ho
de
spe
an
Me
Ta
Ta
The en
Relativ
Type o
Likeliho
olcim’s Safety
finitions (ref
ecific manag
d/or commu
edium or Low
ble 5‐1 Pred
ble 5‐2Likeli
Likeli
Certa
Likely
Possi
Unlike
nvironmenta
ve scale of th
of potential im
ood of occur
y, Health and
fer Table 5‐1
gement plans
unity conseq
w.
dicted Level o
ihood and Co
ihood Defin
in
Expe
inevit
y
Will o
circum
surpr
95%)
ble
Might
circum
ely
Could
circum
it hap
l aspect.
he potential i
mpact.
rrence.
d Environme
1 and Table 5
s to evaluate
uences or im
of Risk
onsequence
nition
cted to occur;
table (95%+)
occur in most
mstances; not
rised if it happe
)
t occur in som
mstances (11-
d occur in som
mstances; sur
ppens (1-10%)
Rooty Hill R
impact.
ent risk score
5‐2 respectiv
e the level of
mpacts, and t
Definitions
C
almost
Di
t
ens (51-
Se
me
-50%).
Se
me
rprised if
)
Sig
Regional Distri
Sincla
e matrix and
vely) was use
f risk of const
the likelihood
Consequence
saster
evere
erious
gnificant
bution Centre
air Knight Merz | Co
the respecti
ed in the dev
truction acti
d of an incid
e
Delays to
external to
clean up c
media cov
Construct
release, p
costs ove
coverage
Limited co
detriment
expected,
regional-w
Potential
contained
assistanc
authorities
onstruction Environ
ve likelihood
elopment of
vities. The p
ent of the ac
Defin
construction (
oxic release, p
costs over $2.
verage
tion delays (we
prosecution ex
r $250,000, st
onstruction de
al release, pos
, clean up cos
wide media co
Construction d
d release requ
e for clean up
s or a minor fi
nment Managemen
d and conseq
f the CEMP a
potential env
ctivity are ra
nition
(months), maj
prosecution ex
.5m, national-w
eeks), externa
xpected, clean
tate-wide med
elays (days), e
ssible prosecu
sts to $250,000
overage.
delays, A site
iring external
p, Contact from
ne, clean up c
t Plan 27
quence
and issue
vironmental
ted as High,
jor
xpected,
wide
al toxic
n up
dia
external
ution
0,
m local
costs in
33. 5.2
Th
site
An
SA
act
int
wi
co
In
do
As
pe
an
5.3
Th
Pro
the
Th
ma
im
an
Th
Ho
co
ob
Ap
Th
iss
spe
Likeli
Rare
2.2 Ongo
e environme
e preparatio
If a sig
If activ
n assessment
Ds/CMS for
tivity and the
to the Job Sa
ll be incorpo
ntrol plans a
addition, all
cuments. Ba
part of their
rmits for the
d capability
3 Cons
e Environme
oject. All env
e Policy. The
e Environme
anner to effe
provement e
d to learn fro
e environme
olcim corpora
ntractual req
jectives. The
ppendix E.
e overall stra
ue specific m
ecific constru
ihood Defin
May o
excep
highly
oing Risk A
ental risk ass
on and constr
nificant incid
vities or the p
t of potentia
specific activ
e impact of a
fety and Env
orated into th
and/or CMS a
contractors
ased on a risk
r contract, al
e project. All
(including m
struction E
ental Policy i
vironmental
e Environmen
ental Policy
ectively mana
environment
om experien
ental objectiv
ate objective
quirements,
e environme
ategies for a
management
uction site o
nition
occur but only
ptional circum
y unexpected
ssessment
sessment wil
ruction, the
dent or impa
project chang
l risk to the e
vities or wor
any incident
vironmental
he appropria
as amendme
are required
k assessmen
ll contractors
contractors
management
Environmen
s the driver f
managemen
ntal Policy ha
includes a co
age any risks
tal performa
nce.
ves and targ
es and have b
legal require
ntal objectiv
chieving the
t plans, envir
r activity.
Rooty Hill R
C
y in
stances;
(<1%)
Mi
l be reviewe
environmen
act occurs.
ges.
environment
ks in specific
that could re
Analysis (JSE
ate CEMP, iss
ents to those
d to operate
t, a contract
s will be requ
will be requ
systems).
ntal Object
for impleme
nt activities a
as been prov
ommitment t
s that may le
ance, commu
ets set for th
been develo
ements, sign
ves and targe
se environm
ronmental co
Regional Distri
Sincla
Consequence
inor
ed regularly t
tal risk asses
t will also be
c areas. This
esult from th
EA) (or simila
sue specific e
e documents
within the r
tor may be re
uired to com
uired to demo
tives and T
nting and im
are to be car
vided in Appe
to undertake
ead to an imp
unicate and r
he project ar
ped based o
ificant envir
ets for design
mental object
ontrol plan a
bution Centre
air Knight Merz | Co
e
the order
No Const
clean up r
costs in th
coverage
to ensure the
ssment will b
e undertaken
should inclu
he activity. R
ar). Outcome
environment
.
equirements
equired to de
mply with this
onstrate the
Targets
mproving env
ried out in a
endix A.
e activities in
pact on the e
raise awaren
re consistent
on the requir
onmental as
n and constr
tives and tar
and will be sp
onstruction Environ
Defin
of $25,000, lo
ruction delays
release, public
he order of $5
e risk registe
be updated:
n as part of th
de both the
Risk informat
es from the o
tal managem
s of the CEM
evelop a Wo
s CEMP, MCo
ir environme
vironmental p
ccordance w
n an environm
environment
ness, report e
with the En
ements for s
pects and im
uction of the
gets have be
pecifically de
nment Managemen
nition
ocal media cov
s, site containe
c complaint, c
5,000, no medi
ers remains c
he developm
direct impac
tion will be in
ongoing risk
ment plans, e
MP and assoc
ork Method S
oA, and all li
ental perform
performance
with the requ
mentally res
t, continuous
environment
vironmental
statutory app
mpacts and H
e Project are
een incorpor
etailed in the
t Plan 28
verage.
ed and
lean up
ia
current. Duri
ment of
ct of the
ncorporated
assessments
environment
iated
Statement.
censes and
mance histor
e across the
uirements of
sponsible
sly
tal incidents
l Policy and
provals,
Holcim’s Proj
e provided in
rated into the
e CMSs for ea
ng
s
al
ry
ject
e
ach
34. A s
Th
pe
5.4
Co
thr
wit
Th
Pro
A p
Co
lin
ER
5.5
All
req
5.6
5.6
Co
wi
systematic re
Change
Change
Action
Change
Releva
Yearly
is is to ensur
rformance.
4 Com
mpliance ma
rough a syste
th environm
Non‐co
Enviro
The Co
EMS A
e Complianc
oject. This CT
paper based
mpliance do
king the elec
each month
5 Proc
procuremen
quirements o
Procur
applica
Produc
require
6 Com
6.1 Exter
nsultation w
ll include but
eview of obje
es in environ
es in relevan
by an enfor
es in environ
nt environm
review (min
re that objec
mpliance Ma
anagement f
em of monit
ental docum
onformance
nmental Site
ompliance Tr
udit Reports
ce Tracking R
TR will be rev
documentat
ocumentatio
ctronic and p
h.
curement P
nt for the pro
of this policy
rement and c
able to the p
cts, suppliers
ements for t
mmunicatio
rnal Stakeh
with a range o
t will not be
ectives and t
nmental polic
nt legislation
cement auth
nmental risk.
mental object
imum freque
ctives and ta
anagement
for the site e
oring, inspec
ments, and lic
Reports.
e Inspection
racking Regis
s.
Register (CTR
viewed and
tion system w
n (e.g. corres
paper system
Processes
oject will be
y are:
contract doc
product or se
s and contrac
he project.
n and Con
holders
of non‐comm
limited to re
Rooty Hill R
targets will b
cy.
that impact
hority.
tives have be
ency of revie
rgets are rea
t
establishmen
ction, auditin
cence and pe
Checklists.
ster for MCoA
R) (refer Appe
updated by t
will also be k
spondence,
ms. Details of
conducted i
umentation
rvice. Where
ctors are eva
sultation
munity, exter
elevant regul
Regional Distri
Sincla
be carried ou
on environm
een met or re
ew).
alistic and re
nt and constr
ng and repor
ermit require
A, SoC and a
endix N) inco
the EO on a
kept by the P
records etc)
f the key issu
n accordanc
include envi
e relevant, p
aluated as to
rnal stakeho
latory agenc
bution Centre
air Knight Merz | Co
ut when one
mental contr
epeatedly no
levant for m
ruction stage
rting, as set o
ements are m
any other app
orporates al
monthly bas
Project Mana
will be kept
ues arising fr
ce with Holci
ironmental m
product or se
o their capab
lders will be
cies. With reg
onstruction Environ
of the follow
rol limits.
ot achieved.
aintaining or
es of the Proj
out in this CE
managed usi
proval requir
l the environ
sis.
ager with ass
in folders th
om the revie
m’s procurem
management
rvice guaran
bility to meet
required thr
gards to regu
nment Managemen
wing occurs:
r improving
ject will be m
EMP. Holcim
ng:
rements.
nmental oblig
sistance from
hat include c
ews will be p
ment policy.
t requiremen
ntees are obt
t specified en
roughout the
ulatory agen
t Plan 29
environmen
managed
’s complianc
gations for t
m the EO.
ross‐referen
provided to t
The key
nts as
tained.
nvironmenta
e Project. Th
cies, Holcim
tal
ce
he
ces
he
al
his
37. 5.7
5.7
Th
Figure 5‐1
7 Train
7.1 Gene
ree main for
Site ind
Enviro
“Toolb
Overview o
ning aware
eral
rms of trainin
duction.
nmental ma
box” training
of the Inquiry
eness and c
ng will be pro
nagement tr
.
Rooty Hill R
y and Compl
competenc
ovided on sit
raining.
Regional Distri
Sincla
laint Respon
ce
te:
bution Centre
air Knight Merz | Co
nse Procedur
onstruction Environ
re
nment Managemen
t Plan 32
38. Re
tra
an
An
pro
5.7
Pri
en
inc
Th
5.7
Ta
au
en
ap
Th
cords of indu
ainer details.
d that they u
n Environmen
ogram is rev
7.2 Site
ior to workin
vironmental
cluding, but n
The CE
Holcim
Legal r
Enviro
Condit
Signific
and co
sensitiv
and eq
Enviro
Inciden
Report
Protec
e training wi
7.3 Envir
rgeted envir
thority or re
vironmental
propriate to
e target grou
uction and tr
Inductees w
understand t
ntal Training
iewed for ad
Induction (E
ng on site all
due diligenc
not limited t
EMP and CM
m’s Safety, He
requirements
nmental resp
tions of licen
cant environ
onstruction w
ve parts of t
quipment.
nmental ma
nt managem
ting process
tion and ma
ill generally b
ronmental A
onmental m
sponsibility f
impact. Thi
their assign
ups and sugg
raining will b
will be requir
their respons
Program is p
dequacy in th
Environmen
personnel a
ce training.
o:
S.
ealth and Env
s including d
ponsibilities.
ces, approva
mental issue
work, sedime
he site, locat
nagement te
ent (i.e. repo
for environm
intenance of
be prepared
Awareness
anagement
for environm
is environme
ed activities
gested topics
Rooty Hill R
be kept on fil
red to sign‐o
sibilities.
presented in
he audit prog
ntal OH&S)
nd contracto
The inductio
vironment P
ue diligence
.
als and perm
es and areas
ent control a
tion of rubbi
echniques fo
orting and re
mental harm
f environme
by the EO a
Training
training will
mental mana
ental training
.
s for this trai
Regional Distri
Sincla
le including t
off that they
n Appendix G
gram.
ors will unde
on will addre
Policy.
e, duty of car
mits.
of the site in
reas of prote
ish bins, was
or key enviro
ecording) an
/incidents.
ntal controls
nd will be re
be provided
agement or t
g will aim to
ining are sho
bution Centre
air Knight Merz | Co
the type of t
have been in
G. The progra
ertake a site i
ss a range of
re and poten
ncluding iden
ected flora a
shing, refuell
nmental elem
d emergency
s.
eviewed and
d to individua
hose undert
achieve a le
own in Table
onstruction Environ
raining carrie
nformed of t
am is facilita
induction wh
f environme
tial consequ
ntification of
nd fauna and
ing and main
ments.
y plans.
approved by
als or groups
aking an acti
vel of aware
5‐3.
nment Managemen
ed out, date
the environm
ted by the E
hich incorpo
ntal awaren
uences of infr
f boundaries
d any “no go
ntenance of
y the ER.
s of workers
ivity with a h
eness and co
t Plan 33
s, names and
mental issues
O. The
rates
ess issues
ringements;
s for clearing
o” areas in
vehicles, pla
with a specif
high risk of
mpetence
d
s
g
ant
fic