2. Czech myths
Source: MPO, 2005
RES potential not sufficient in Czech republic
(partially true, but the potential by far not utilised yet)
Unless we build new NPPs, candles will be needed
3. Děkuji za
pozornost.
Source: IVD conference, Prague, 18.6.2013
MPO/CEZ 2013: Unless we build new power plants,
there will be lack of electricity in 2020
Forecast of demand and production (without new plants, SEK).
Other fuels
Other
gases
NG
RES
Nuclear
Hard coal
Lignite
Demand
TWh
4. History
1986 – DUKOVANY 4x440 MW
1991 – Ecological limits of coal mining (government decree)
2000 – TEMELIN 2x1000 MW (15 TWh/year)
2000 - 2015 – electricity export 13-17 TWh/year
2005 - Support for RES introduced (FITs)
2009 - 2010 – Solar tunel
2013 – up to now – FIT for RES substantially limited (PV, wind=0)
2014 - EEG Umlage reform – fix fee acc. to feeder size,max.0,2
ct/kWh
2014 – TEMELIN tender- cancelled
5. Solar tunel – The state was not capable(or not willing?) to effectively
react
History of FIT for FV up to 30 kW
Final price for households
6. Recent year (2015)
ASEK – above 50% electricity from nuclear until 2040
New Energy act – easier to build PV up to 10 kW
Limits in Bilina mine released (100 mil. t), decision about ČSA
mine limits (Horni Jiretin) postponed until 2020 (750 mil. t)
Action plan for nuclear energy (detailed, budget 1,3 bilion EUR)
State commitee for nuclear energy
Action plan for Smart grids – slow progress, planned up to 2035…
Action plan for RES – vague, weak targets, no support for wind
RES share on electricity production 12% (target for 2020 increased
from 13 to 15,3%)
NZU – subsidies for RES in housholds
OP PIK – subsidies for energy eff. in industry
7. Future
2016 – started preparation of „Reform“ of distribution fees
(high fixed fee - less motivation for savings and
selfproduction)
2016 – expected „unlimited“ life-extension permit for
DUKOVANY
2016-2025 – preparation phase of 1-2 blocks in TEMELIN
and 1-2 blocks in DUKOVANY (financing model, permitting,
selection of supplier)
2020 – re-evaluation of coal mining limits at ČSA mine
2025 – final decisions about investment into new NPPs
2033 – DUKOVANY commissioned?
2037 – TEMELIN commissioned?
10. Source: Dopady zvýšení energetické účinnosti na českou energetiku, Úřad vlády, listopad 2014
Czech economy is still very energy
intensive
Energy intensity of EU countries GJ/1000 EUR (equal sector base)
11. + 5 other
scenarios,
incl.green
one…
ASEK 2015– Update of Czech energy
strategy
„Optimised“ scenario:
Electricity consumption expected to grow
Up to 4 new nuclear reactors, above 50%
Electricity export continued
RES potential underestimated
Gross electricity production
RES
Gas
Nuke
Lignit
e
12. So called „green“ scenario:
Consumption of electricity still growing
No new nuclear reactors
Only moderate RES growth
Import of electricity needed - scenario refused
Lignit
e
Nuke
Gas
RES
Gross electricity production
13. Wind potential up to 16 TWh in 2040
(20% von Grossverbrauch)
Source: Study of Komora OZE, www.csve.cz/clanky/potencial-vetrne-energie-cr/495
Czech Republic - Wind energy potential
Optimistic
Conservative
ASEK-green
ASEK-optimised
14. RES potential is by 6-18 TWh higher than in „green“ scenario.
Wind
(TWh)
PV
(TWh)
Biomass
(TWh)
Water
(TWh)
Geo
(TWh)
Total RES
(TWh)
ASEK -
Optimised
Scenario
2,28 5,88 9,6 2,53 0,14 20
ASEK - Green
Scenario
4,53 7,6 10,2 2,53 0,14 24
Realistic green
scenario
8,34-16,08 8-10 11-13 2,53 0,14 30-42
Total RES electricity production in 2040
17. Milan Šimoník, Energy expert, Czech Greens
+420 725 628 034
simonik.milan@gmail.com
http://simonikmilan.wordpress.com
https://www.facebook.com/zeleni.energetika
Trust we each other? Energy Union?
Nordstream2?
Grid extension in Germany?
New design of electricity market? Market for nuclear energy?
Common responsibility for energy security?
RES potential in EU? Imports? Desertec?
Discussion
18. Abbreviations
MPO Ministry of industry and trade
SEK Czech energy strategy
ASEK Update of Czech energy strategy
OZE RES
Komora OZE Czech Chamber of RES
ERÚ Czech Energy regulatory office
ÚEL Ecological limits of coal mining