"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
La rete dei sincrotroni/FEL europei:
1. Michele Bertolo
Sincrotrone Trieste
La rete dei sincrotroni/FEL europei:
successi e sostenibilità
I3: Integrated Infrastructure Initiative
IA-SFS: Integrating Activity on Synchrotron and
Free Electron Laser Science (FP6)
ELISA: European Light Sources Activites – Synchrotrons
and Free Electron Lasers (FP7)
http://www.elettra.trieste.it/i3/
2. IA-SFS (FP6)
Duration: March 1st, 2004 – February 28th, 2009
EC contribution: 27 million Euro
3. Types of Activities
Transnational Access Activities:
- access to 14 laboratories
Joint Research Activities:
- 5 initiatives
Networking Activities:
- support of Workshops, Conferences and Schools
- Transnational Exchanges of Scientists
4. European Round Table on Synchrotron
Radiation and Free Electron Lasers
For over ten years, there was the “Round Table”
5. This is how the Round Table worked:
Access
contract A Facility A
Instrumen-
tation
contract IX Access
contract B Facility B
European
Access
Round
Commission Facility C Table
contract C
Instrumen-
tation
contract IY
Access
contract Z Facility Z
Integrating activity contract
6. This is how the IA-SFS works:
Agreement Facility A
A
Agreement Facility B
Access,
B
European Instrumentation IA-SFS
Commission and integration I3
contract Agreement Facility C
C
Agreement Facility Z
Z
7. The FP6-I3s are successful
Our I3 (IA-SFS) is very successful
Kjhjjh As you know, the project IA-SFS for which you
are the scientific coordinator, is one of the
Selected 40 quot;success storiesquot; of the 6th
Framework Program to be included in a
publication edited by the European
Commission.
This booklet is going to be translated in four
languages and largely distributed to the general
public, National & Regional authorities,
European Parliament, Delegations and
Representation of the European Union all over
the world.
8. The FP7-I3s
Call FP7-INFRASTRUCTURES-2008-1 (February 29th, 2008)
Maximum EC contribution: 10 million Euro
ELISA
EC contribution: 10 million Euro
Duration: March 1st, 2009 – August 31st, 2011
9. What next ?
I would also like to invite you to check for
potential synergies of your project with
the research infrastructure measures
funded under Cohesion Policy. In this
respect you may wish to get in touch
with the Managing Authorities in your
region and those in charge of the cross-
border and trans-national operational
programmes.