"The Station comes to You" with the 5 revenues generating Express A-B MetaLoop transit network, shared as an attendee at the Australia Institute Revenue and Climate Integrity Summits 2022-3, Parliament House Canberra, Australia
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
MetaLoop_MoonShot2030-LNG-REV-290822.pdf
1. Doughnut Social Contract - Recycling the Revenue Surpluses for – Social Cohesion:
Child Care-Early Learning-TAFE-Seniors Care-Homeless-Housing-NDIS-Health
3. MetaLoop via Maxwell: Down!
A Vertical Z-Axis - Adjacent Possible Niche
The London Underground addressed:
• Rapid growth
• Massive congestion
• Urban sprawl
• Lack of space to expand horizontally
4. MetaLoop via Bejan: Up!
A Transport-Renewable Energy - Adjacent Possible Niche
• Solar & Wind power-Rain Collection
• MetaPod: Zero-Emissions - Zero-Pollution
• Greenery – Heat Island Cooling - Biomes
• Active Pedestrian Transit in Safety
• Active Bike & E-Bike Transit in Safety
• “Next Level” Express A-B Personal Rapid Transit
• The Station comes to You, via Door-to-Door links
8. MetaLoop SynPlexity
Simultaneously DeCongesting and DeCarbonsing our Cites with Placemaking,
while also Powering, Feeding, Cooling & Cleaning them
Seamless Mobility - Filling An Urban Transit Evolutionary Niche:
Fully Utilising the vacant 3rd Dimension above existing Road, Tram & Rail
9. • Biomimicry
• Vascularising
• Community
MetaLoop PPPs are Biomimetic:
Recycling The Surpluses & Synergising Best Value by making our
existing Roads & Rail lines work Harder for us – just like our Bodies
carry multiple flow systems, so should our Cities.
Arm: Nerves, Veins-Arteries (Blood-Endocrine-Immune), Lymph channels,
Muscles, Tendons-Ligaments, Skeleton, Skin (Single Platform/Multi-Modes)
22. • Melbourne: Time & Money – Business As Usual: Longer Trips, Higher Costs
The MetaLoop Opportunity
Road
Rail
Car Congestion
23. Key Decision Points
• What problems are we solving?
1. City deCarbonisation
2. City deCongestion
3. Revenue deFunding (government revenues bolstered
after relatively short CAPEX ROI period due to high, multi-mode OPERATING
REVENUE, Macquarie bank open to co-investment as a Public Private Partnership)
• Cartels & Vested Interests – Incumbent Stakeholders impeded prior
development – eg: LNP blocking Future Cities-UNSW CRC
1. Transurban
2. Uber
• Only Government can Lead to synergise these rentier silos with a PPP model
• Creates an Australian Cleantech Industrial Manufacturing Base to service
our populous Indo-Pac region with numerous high-demand mega-Cities
• Creates a Clean Energy-Transit Export Industry with licensed technology
• Productivity increased, CBDs revived, Jobs & Growth regenerated
• Fastest Possible Express A–B, saving commuters precious Time, the most
valuable commodity of all (& optimally reducing City Carbon footprints)
• The Station Comes to You – hyper convenience and safety
24. High Five Revenue Stream:
Rapid Transit – Rapid ROI
Transit-Delivery Energy Big Data
Urban Farming Advertising
Green New Deal CAPEX Financing and OPREV Surpluses
25. Green Bond & Air Rights
PPP-Financed
• Power Purchasing Agreements Slash Prices
• Green New Deal Platform
• Public Private Operation & Revenue Share
41. RMIT-Mentored DEAKIN Case Study:
Proof of Concept – ROI in < 20 years,
Future Cities-UNSW CRC – Low Carbon Living Bid – Multi PhD program
(Fares only, 1 revenue - not the actual 5 MetaLoop revenue streams, so ML rapidly pays for itself, while providing surplus revenues)
• Next: DoT/Energy-commissioned Feasibility Study For Fishermans Bend?
42. FUTURE CITIES CRC – UNSW+RMIT
DESIGN THINKERS GROUP:
UN Sustainable Development Goal metrics
• Next: Stakeholder Solution Consulting – Brief Writing – Problem Statements
44. • Optimisation - REZs: New Renewables Grid Poles & Wires – add storage, to
electrify Melbourne & Victoria most Easily, end Curtailment, DeCarbonise ASAP
45. A Darwinian Evolution
• Radial vrs Fractal: 4th Industrial Revolution Multi-Modal Distribution
46. MetaLoop Structure
Simultaneously DeCongesting and DeCarbonsing our Cites,
while also Powering, Feeding, Cooling, Speeding and Cleaning them
Seamless Mobility – Because The Station Comes To You
with the Fastest Possible A-B Trip Times
47. MetaLoop Structure Inspiration
HK Spin - A Benchmarking Prototype for DeCarbonising our Cities
more Rapidly and Sustainably
Hong Kong Spin for West Kowloon Cultural District