30. 100%
Knowledge
transfer to
fabricator
50%
Time saving due
to knowledge
transfer
£10k
Saving on
drawings for
footbridge
75%
Reuse of the
design model for
fabrication
4 week
Programme saving
£1m +
Savings due to
collaborative
behaviours
Enhancing the site team’s knowledge by
providing models and encouraging the use
of viewing software on site
1st
Design delivered
without
traditional
design drawings
Providing a lasting legacy by training
technicians and apprentices to work in BIM
and work in a collaborative manner
Benefit of Change
Digital Collaboration
32. It must be considered that there is nothing more
difficult to carry out, nor more doubtful of
success, nor more dangerous to handle, than to
initiate a new order of things. For the reformer
has enemies in all those who profit by the old
order, and only lukewarm defenders in all those
who would profit by the new order…
2004 saw the launch of facebook. With flip phones still going through the flip-phase, iPads still only existed in StarTrek.
In fact, the first iPad wasn’t released until 2010! That’s only nine years ago.
2007 – French High Speed Train – reaches a top speed of 574km/h
Oh, and HS1 opened in London.
In the same time frame, a magnitude 6.7 earthquake hit Nagaoka Japan.
Cyclone Sidr hit Bangladesh.
And a magnitude 7.1 earthquake hit Christ Church and caused c.$40 billion worth of damage.
Intergovernmental Panel of Climate Change
Global warming doesn’t exist.
Oh, and apparently the world is flat.
We produce 2.5 times the amount of data estimated to be held by the big four (Google, Amazon, Microsoft & Facebook) every day!
And there’s only going to be more.
So, what’s an exaflop. One exaflop is roughly equivalent to every human on earth doing one calculation per second, for four years.