SlideShare uma empresa Scribd logo
1 de 32
OMA - AMO TOPICS OMA - REM KOOLHAAS CASA DA MUSICA - PORTUGAL SEATTLE CENTRAL LIBRARY - USA CCTV HEADQUARTERS - CHINA  AMO - THINK TANK PRESENTED BY  ARTHUR MAKHNEVICH
OMA – OFFICE for METROPOLITAN ARCHITECTURE Was founded in 1975 by Rem Koolhaas and Elia Zenghelis with Madelon Vriesendorp and Zoe Zengelis.Leading International partnership practicing contemporary architecture, urbanism, and cultural analysis. With offices in Europe, North America & Asia, OMA/AMO employs a staff of around 220 and more than 35 nationalities: architects, researchers, designers, model makers, industrial designers and graphic designers. REM KOOLHAAS - ARCHITECT Born :  11/17/1944 Rotterdam, NetherlandsStudied scriptwriting and journalism before becoming an architect. Studied architecture in Cornell University, NY.Became famous after winning a number of international competitions.Harvard University Professor.Published influential books about architecture and his design approach.Won Pritzker Prize in year 2000. This book gives an insight into the restless, ingenuities thinking of the office through an era when architecture became a mere bystander to the explosion of the market economy and globalization. (1995) Documents the symbiotic relationship between its mutant metropolitan culture and the unique architecture to which it gave rise.
With every project OMA goes to the roots of the ideaWhat is a library, what is a shop, what is an office building, why does it have to be this way, why can't it be that way?  LOGIC IS THE KEY
CASA DA MUSICA – PORTO, PORTUGAL Completed: 2005 Program: 22,000 m2 including grand auditorium with 1,200 seats, small auditorium with space for 350 seats, rehearsal rooms with recording facilities, music shop, computer and educational facilities, VIP room, restaurant, roof terrace and parking (600 cars)
RE-INVENTING CONCERT HALL The idea was to create a very public building, where public will be engaged both outside and inside of the building. Throughout architectural history, the enclosed shoe-box concert hall has been the ideal acoustic shape, but rather than to struggle with this shape, OMA decided to excavate / eliminate the show box from the building (as illustrated), by doing so, they opened up the relationship of the concert hall interior to the exterior of the building.  To further strengthen this relationship, they put a window in the opening created by the excavation, this window has view of the city while you listen to the concert.
Redefining the relationship between the hallowed interior and the general public outside.
Grand Auditorium has corrugated glass facades at either end that open the hall to the city, and offer Porto itself as a dramatic backdrop for performances.
A distinctive faceted form, made of white concrete, which remains solid and believable in an age of too many icons.
There is deliberately no large central foyer; instead a continuous public route connects the spaces around the Grand Auditorium by means of stairs, platforms and escalators: the building becomes an architectural adventure.
SEATTLE CENTRAL LIBRARY – SEATTLE, WA Completed: 2004Program: Total 38,300m2, including 33,700m2 reading room, book spiral, mixing chamber, meeting platform, living room, staff floor, children's collection, auditorium, and 4,600m2 of parking Budget: $111.9 million
ANALYZING THE PROGRAM In this design, OMA tried to create a library that is no longer exclusively dedicated to the books, but rather as an information store where all potent forms of media, new and old, are presented equally and legibly.They analyzed the program given to them by the librarians and the client, then they identified which parts of the program are stable (safe for the future), and parts that are unstable (books in the future?), it’s a logical process. The building in a way is a diagram, vigorous planning was applied to fixed stable areas first, such as parking, staff, meeting, book spiral and the headquarters.  After that, public areas were integrated into the diagram, such as the kids, living room, mixing chamber and the reading room.
The fixed platforms are wrapped with a curtain wall, creating activity areas in between.
An open public space, where people can do other activities besides reading books.
THE BOOK SPIRAL OMA wanted to create a continues experience, where library’s  ever expending collection of books will be uninterrupted by  floors.  By creating slopped ramps, from level 6 to 9, they were able to achieve that experience.
STAIRCASES - ESCALATORS The experience elaborated for the travelers on the escalators attempts to actively engage with our current mode of perception by offering several views of artworks during their ascent and descent, as well as some glimpses into the crossed spaces.
CCTV HEADQUARTERS – BEIJING, CHINA Completed: 2004Program:CCTV: total 473,000m2: administration 64,800m2, multi-purpose: 54,900m2, news broadcasting 65,000m2, broadcasting 31,800m2, production 105,400m2, loop 11,100m2, services (canteens, gym) 22,500m2, parking 59,700m2. Budget: 5 billion RMB (€850 million)
RE-INVENTING THE SKYSCRAPER OMA’S Largest project to date, combines the entire process of TV-making, administration, production, broadcasting, into a single loop of interconnected activity. This project was commissioned at the moment of serious dilemma, right after 9/11, this played a big role on this design. "How can you make a high-rise building that's not about height? How can you make a high-rise building that can define a place rather than simply occupy it?"
EVERYTHING IS IN THE LOOP All the function CCTV China Central Television Headquarters are contained within a loop.  From film-making to broadcasting, administration and to creative activities, there is a continues sense of direction. Where the workers are able to interact with each other.  The main point of the loop is that there is no separate organization, all the parts of the media are connected together in a loop of activity.
ENGINEERING MASTERPIECE The ambition was also to engineer a complex structure in China, paving a way for the future of construction.The physical model shows stress points in red, the more stress the more structure was put into the façade, the less stress the more open spaces.   The construction of this tower is an engineering masterpiece of the 21st century.
CCTV HEADQUARTERS – BEIJING, CHINA Completed: 2004Program:CCTV: total 473,000m2: administration 64,800m2, multi-purpose: 54,900m2, news broadcasting 65,000m2, broadcasting 31,800m2, production 105,400m2, loop 11,100m2, services (canteens, gym) 22,500m2, parking 59,700m2. Budget: 5 billion RMB (€850 million)
The structure "breaks every single building code in China," a beaming Scheeren says, but still won the official go-ahead for construction. "The approval authorities were not able to judge if it could function, so the government formed an expert group of the 13 most senior structural engineers — the people who wrote the codes!"
CCTV HEADQUARTERS – BEIJING, CHINA Completed: 2004Program:CCTV: total 473,000m2: administration 64,800m2, multi-purpose: 54,900m2, news broadcasting 65,000m2, broadcasting 31,800m2, production 105,400m2, loop 11,100m2, services (canteens, gym) 22,500m2, parking 59,700m2. Budget: 5 billion RMB (€850 million) At 750 feet it seems comparatively puny, but "You can only lose that race," says Ole Scheeren, the German architect-in-charge of the new CCTV headquarters. Instead, Scheeren, a partner with Dutch architect Rem Koolhaas, says they reinvented the traditional skyscraper by turning it into "a tube folded in space."
"The project is one of the most visionary since modernism and beyond. It pushes the limits of architecture, not just formally but, more importantly, socially, culturally, and technologically through the reinvention of the tall building. The various functions of buildings, their spatial articulation and organization, have been completely rethought to provoke a new kind of collective construct with the potential for social and urban change."– Tina did Carlo, assistant curator of architecture and design at the Museum for Modern Art (MoMA) CCTV HEADQUARTERS – BEIJING, CHINA Completed: 2004Program:CCTV: total 473,000m2: administration 64,800m2, multi-purpose: 54,900m2, news broadcasting 65,000m2, broadcasting 31,800m2, production 105,400m2, loop 11,100m2, services (canteens, gym) 22,500m2, parking 59,700m2. Budget: 5 billion RMB (€850 million)
In 1999, Koolhaas founded AMO, a think tank within OMA dedicated to producing non-architectural work including exhibitions. The formation of AMO was the result of Koolhaas and OMA’s realization that knowledge and expertise accumulated in the development of large-scale architectural projects, even uncompleted ones, was the valuable resource worth developing AMO has become one of the most visible and original knowledge based design practices in the world today
INVESTIGATION AMO tries to investigate and analyze current issues in architecture and the world, by looking at many different variables such as the economy, political and social events. In  a way, through this research and knowledge they are trying to almost predict the future architectural career, and also integrate their research into their projects.They are mostly about research and investigation, an architectural think-tank of the office.
RE-INVENTING THE EUROPEAN FLAG The barcode elongates and merges the flags of current EU member states into a single colorful symbol. It intends to represent the essence of the European project, showing Europe as the common effort of different nation states, with each state retaining its own cultural identity while sharing the advantages of acting together.
PRADA CATWALK 2012 The audience is organized in a perfect field. 600 visitors sit on individual blue foam blocks distributed over a 1.5 x 1.5 meter grid spread through the entire hall. Models flow through the highly-organized audience, following multiple choreographed routes that allow maximum visibility. The field is a commentary on the audience, transformed from indeterminate crowd to regimented, possibly anxious, isolated individuals. Each guest becomes a challenge for the new fashion; each confrontation becomes highly personal…
TRANSFORM AMO designed this mobile exhibition space for Prada, which requested the space to be used for four different events.  Koolhaas explains that they tried to combine those four events into one fixed space, but it didn’t work.  Instead they re-thought the idea where they would put all those events into one structure, which could be turned and flipped by the construction cranes to change an event from fashion show to a movie theater, and so on.
THE END STARCHITECT IS BAD Rem Koolhaas is deeply uncomfortable by the title of "starchitect", he says, that an architect has become less important due to this title, he hopes this title will disappear soon.

Mais conteúdo relacionado

Mais procurados

Santiago calatrava and his turning building
Santiago calatrava and his turning buildingSantiago calatrava and his turning building
Santiago calatrava and his turning building
Battula Choudary
 
Expressionist Architecture
Expressionist ArchitectureExpressionist Architecture
Expressionist Architecture
Parmanand Sinha
 

Mais procurados (20)

Minimalism in architecture
Minimalism in architectureMinimalism in architecture
Minimalism in architecture
 
Santiago calatrava and his turning building
Santiago calatrava and his turning buildingSantiago calatrava and his turning building
Santiago calatrava and his turning building
 
Rem koolhas
Rem koolhasRem koolhas
Rem koolhas
 
Rem koolhaas
Rem koolhaasRem koolhaas
Rem koolhaas
 
The Milwaukee Art Museum
The Milwaukee Art MuseumThe Milwaukee Art Museum
The Milwaukee Art Museum
 
Zaha hadid
Zaha hadidZaha hadid
Zaha hadid
 
Indian Architect Raj rewal
Indian Architect Raj rewalIndian Architect Raj rewal
Indian Architect Raj rewal
 
Antonio sant'elia
Antonio sant'eliaAntonio sant'elia
Antonio sant'elia
 
PETER EISENMAN
PETER EISENMANPETER EISENMAN
PETER EISENMAN
 
I.M. Pei
I.M. PeiI.M. Pei
I.M. Pei
 
Centre of pompidou
Centre of pompidouCentre of pompidou
Centre of pompidou
 
FREI OTTO
FREI OTTOFREI OTTO
FREI OTTO
 
An Architect
An ArchitectAn Architect
An Architect
 
Frank gehry
Frank gehry Frank gehry
Frank gehry
 
Richard Rogers
Richard RogersRichard Rogers
Richard Rogers
 
Late modern architecture and post modern architecture
Late modern architecture and post modern architectureLate modern architecture and post modern architecture
Late modern architecture and post modern architecture
 
Expressionist Architecture
Expressionist ArchitectureExpressionist Architecture
Expressionist Architecture
 
Desktop study international (architectural college) 1
Desktop study  international (architectural college) 1Desktop study  international (architectural college) 1
Desktop study international (architectural college) 1
 
Zaha hadid
Zaha hadidZaha hadid
Zaha hadid
 
Norman foster
Norman foster Norman foster
Norman foster
 

Semelhante a oma-amo presentation

Architectural Profiles_AGO
Architectural Profiles_AGOArchitectural Profiles_AGO
Architectural Profiles_AGO
keith francis
 
Nana Ayisi Portfolio
Nana Ayisi PortfolioNana Ayisi Portfolio
Nana Ayisi Portfolio
nana ayisi
 

Semelhante a oma-amo presentation (20)

%100
%100%100
%100
 
Filip Winiewicz Pfs
Filip Winiewicz PfsFilip Winiewicz Pfs
Filip Winiewicz Pfs
 
Matteo's portfolio
Matteo's portfolioMatteo's portfolio
Matteo's portfolio
 
HELMUT JAHN.pptx
HELMUT JAHN.pptxHELMUT JAHN.pptx
HELMUT JAHN.pptx
 
081202 Gzt Vtow4
081202 Gzt Vtow4081202 Gzt Vtow4
081202 Gzt Vtow4
 
Riccardo Rabbiolo cv+porfolio_2020
Riccardo Rabbiolo cv+porfolio_2020Riccardo Rabbiolo cv+porfolio_2020
Riccardo Rabbiolo cv+porfolio_2020
 
A M Portfolio
A M PortfolioA M Portfolio
A M Portfolio
 
Osama abd elmohsen
Osama abd elmohsenOsama abd elmohsen
Osama abd elmohsen
 
Museum of the future..pptx
Museum of the future..pptxMuseum of the future..pptx
Museum of the future..pptx
 
Architectural Profiles_AGO
Architectural Profiles_AGOArchitectural Profiles_AGO
Architectural Profiles_AGO
 
Introduction 2013
Introduction 2013Introduction 2013
Introduction 2013
 
Academic Portfolio
Academic PortfolioAcademic Portfolio
Academic Portfolio
 
Portfolio WK Cheung
Portfolio WK CheungPortfolio WK Cheung
Portfolio WK Cheung
 
Manuel Projects_Book
Manuel Projects_BookManuel Projects_Book
Manuel Projects_Book
 
ART + ARCHITECTURE
ART + ARCHITECTURE ART + ARCHITECTURE
ART + ARCHITECTURE
 
Barnabei Simone Architect Portfolio
Barnabei Simone Architect PortfolioBarnabei Simone Architect Portfolio
Barnabei Simone Architect Portfolio
 
PEÑA Architecture - redevelopment of brownfield locations, training in Vršac
PEÑA Architecture - redevelopment of brownfield locations, training in VršacPEÑA Architecture - redevelopment of brownfield locations, training in Vršac
PEÑA Architecture - redevelopment of brownfield locations, training in Vršac
 
CCDS Design Report
CCDS Design ReportCCDS Design Report
CCDS Design Report
 
Portfolio Alessandro Aceri
Portfolio Alessandro AceriPortfolio Alessandro Aceri
Portfolio Alessandro Aceri
 
Nana Ayisi Portfolio
Nana Ayisi PortfolioNana Ayisi Portfolio
Nana Ayisi Portfolio
 

Último

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Último (20)

FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 

oma-amo presentation

  • 1. OMA - AMO TOPICS OMA - REM KOOLHAAS CASA DA MUSICA - PORTUGAL SEATTLE CENTRAL LIBRARY - USA CCTV HEADQUARTERS - CHINA AMO - THINK TANK PRESENTED BY ARTHUR MAKHNEVICH
  • 2. OMA – OFFICE for METROPOLITAN ARCHITECTURE Was founded in 1975 by Rem Koolhaas and Elia Zenghelis with Madelon Vriesendorp and Zoe Zengelis.Leading International partnership practicing contemporary architecture, urbanism, and cultural analysis. With offices in Europe, North America & Asia, OMA/AMO employs a staff of around 220 and more than 35 nationalities: architects, researchers, designers, model makers, industrial designers and graphic designers. REM KOOLHAAS - ARCHITECT Born : 11/17/1944 Rotterdam, NetherlandsStudied scriptwriting and journalism before becoming an architect. Studied architecture in Cornell University, NY.Became famous after winning a number of international competitions.Harvard University Professor.Published influential books about architecture and his design approach.Won Pritzker Prize in year 2000. This book gives an insight into the restless, ingenuities thinking of the office through an era when architecture became a mere bystander to the explosion of the market economy and globalization. (1995) Documents the symbiotic relationship between its mutant metropolitan culture and the unique architecture to which it gave rise.
  • 3. With every project OMA goes to the roots of the ideaWhat is a library, what is a shop, what is an office building, why does it have to be this way, why can't it be that way? LOGIC IS THE KEY
  • 4. CASA DA MUSICA – PORTO, PORTUGAL Completed: 2005 Program: 22,000 m2 including grand auditorium with 1,200 seats, small auditorium with space for 350 seats, rehearsal rooms with recording facilities, music shop, computer and educational facilities, VIP room, restaurant, roof terrace and parking (600 cars)
  • 5. RE-INVENTING CONCERT HALL The idea was to create a very public building, where public will be engaged both outside and inside of the building. Throughout architectural history, the enclosed shoe-box concert hall has been the ideal acoustic shape, but rather than to struggle with this shape, OMA decided to excavate / eliminate the show box from the building (as illustrated), by doing so, they opened up the relationship of the concert hall interior to the exterior of the building. To further strengthen this relationship, they put a window in the opening created by the excavation, this window has view of the city while you listen to the concert.
  • 6. Redefining the relationship between the hallowed interior and the general public outside.
  • 7. Grand Auditorium has corrugated glass facades at either end that open the hall to the city, and offer Porto itself as a dramatic backdrop for performances.
  • 8. A distinctive faceted form, made of white concrete, which remains solid and believable in an age of too many icons.
  • 9. There is deliberately no large central foyer; instead a continuous public route connects the spaces around the Grand Auditorium by means of stairs, platforms and escalators: the building becomes an architectural adventure.
  • 10.
  • 11. SEATTLE CENTRAL LIBRARY – SEATTLE, WA Completed: 2004Program: Total 38,300m2, including 33,700m2 reading room, book spiral, mixing chamber, meeting platform, living room, staff floor, children's collection, auditorium, and 4,600m2 of parking Budget: $111.9 million
  • 12. ANALYZING THE PROGRAM In this design, OMA tried to create a library that is no longer exclusively dedicated to the books, but rather as an information store where all potent forms of media, new and old, are presented equally and legibly.They analyzed the program given to them by the librarians and the client, then they identified which parts of the program are stable (safe for the future), and parts that are unstable (books in the future?), it’s a logical process. The building in a way is a diagram, vigorous planning was applied to fixed stable areas first, such as parking, staff, meeting, book spiral and the headquarters. After that, public areas were integrated into the diagram, such as the kids, living room, mixing chamber and the reading room.
  • 13. The fixed platforms are wrapped with a curtain wall, creating activity areas in between.
  • 14.
  • 15. An open public space, where people can do other activities besides reading books.
  • 16.
  • 17. THE BOOK SPIRAL OMA wanted to create a continues experience, where library’s ever expending collection of books will be uninterrupted by floors. By creating slopped ramps, from level 6 to 9, they were able to achieve that experience.
  • 18. STAIRCASES - ESCALATORS The experience elaborated for the travelers on the escalators attempts to actively engage with our current mode of perception by offering several views of artworks during their ascent and descent, as well as some glimpses into the crossed spaces.
  • 19. CCTV HEADQUARTERS – BEIJING, CHINA Completed: 2004Program:CCTV: total 473,000m2: administration 64,800m2, multi-purpose: 54,900m2, news broadcasting 65,000m2, broadcasting 31,800m2, production 105,400m2, loop 11,100m2, services (canteens, gym) 22,500m2, parking 59,700m2. Budget: 5 billion RMB (€850 million)
  • 20. RE-INVENTING THE SKYSCRAPER OMA’S Largest project to date, combines the entire process of TV-making, administration, production, broadcasting, into a single loop of interconnected activity. This project was commissioned at the moment of serious dilemma, right after 9/11, this played a big role on this design. "How can you make a high-rise building that's not about height? How can you make a high-rise building that can define a place rather than simply occupy it?"
  • 21. EVERYTHING IS IN THE LOOP All the function CCTV China Central Television Headquarters are contained within a loop. From film-making to broadcasting, administration and to creative activities, there is a continues sense of direction. Where the workers are able to interact with each other. The main point of the loop is that there is no separate organization, all the parts of the media are connected together in a loop of activity.
  • 22. ENGINEERING MASTERPIECE The ambition was also to engineer a complex structure in China, paving a way for the future of construction.The physical model shows stress points in red, the more stress the more structure was put into the façade, the less stress the more open spaces. The construction of this tower is an engineering masterpiece of the 21st century.
  • 23. CCTV HEADQUARTERS – BEIJING, CHINA Completed: 2004Program:CCTV: total 473,000m2: administration 64,800m2, multi-purpose: 54,900m2, news broadcasting 65,000m2, broadcasting 31,800m2, production 105,400m2, loop 11,100m2, services (canteens, gym) 22,500m2, parking 59,700m2. Budget: 5 billion RMB (€850 million)
  • 24. The structure "breaks every single building code in China," a beaming Scheeren says, but still won the official go-ahead for construction. "The approval authorities were not able to judge if it could function, so the government formed an expert group of the 13 most senior structural engineers — the people who wrote the codes!"
  • 25. CCTV HEADQUARTERS – BEIJING, CHINA Completed: 2004Program:CCTV: total 473,000m2: administration 64,800m2, multi-purpose: 54,900m2, news broadcasting 65,000m2, broadcasting 31,800m2, production 105,400m2, loop 11,100m2, services (canteens, gym) 22,500m2, parking 59,700m2. Budget: 5 billion RMB (€850 million) At 750 feet it seems comparatively puny, but "You can only lose that race," says Ole Scheeren, the German architect-in-charge of the new CCTV headquarters. Instead, Scheeren, a partner with Dutch architect Rem Koolhaas, says they reinvented the traditional skyscraper by turning it into "a tube folded in space."
  • 26. "The project is one of the most visionary since modernism and beyond. It pushes the limits of architecture, not just formally but, more importantly, socially, culturally, and technologically through the reinvention of the tall building. The various functions of buildings, their spatial articulation and organization, have been completely rethought to provoke a new kind of collective construct with the potential for social and urban change."– Tina did Carlo, assistant curator of architecture and design at the Museum for Modern Art (MoMA) CCTV HEADQUARTERS – BEIJING, CHINA Completed: 2004Program:CCTV: total 473,000m2: administration 64,800m2, multi-purpose: 54,900m2, news broadcasting 65,000m2, broadcasting 31,800m2, production 105,400m2, loop 11,100m2, services (canteens, gym) 22,500m2, parking 59,700m2. Budget: 5 billion RMB (€850 million)
  • 27. In 1999, Koolhaas founded AMO, a think tank within OMA dedicated to producing non-architectural work including exhibitions. The formation of AMO was the result of Koolhaas and OMA’s realization that knowledge and expertise accumulated in the development of large-scale architectural projects, even uncompleted ones, was the valuable resource worth developing AMO has become one of the most visible and original knowledge based design practices in the world today
  • 28. INVESTIGATION AMO tries to investigate and analyze current issues in architecture and the world, by looking at many different variables such as the economy, political and social events. In a way, through this research and knowledge they are trying to almost predict the future architectural career, and also integrate their research into their projects.They are mostly about research and investigation, an architectural think-tank of the office.
  • 29. RE-INVENTING THE EUROPEAN FLAG The barcode elongates and merges the flags of current EU member states into a single colorful symbol. It intends to represent the essence of the European project, showing Europe as the common effort of different nation states, with each state retaining its own cultural identity while sharing the advantages of acting together.
  • 30. PRADA CATWALK 2012 The audience is organized in a perfect field. 600 visitors sit on individual blue foam blocks distributed over a 1.5 x 1.5 meter grid spread through the entire hall. Models flow through the highly-organized audience, following multiple choreographed routes that allow maximum visibility. The field is a commentary on the audience, transformed from indeterminate crowd to regimented, possibly anxious, isolated individuals. Each guest becomes a challenge for the new fashion; each confrontation becomes highly personal…
  • 31. TRANSFORM AMO designed this mobile exhibition space for Prada, which requested the space to be used for four different events. Koolhaas explains that they tried to combine those four events into one fixed space, but it didn’t work. Instead they re-thought the idea where they would put all those events into one structure, which could be turned and flipped by the construction cranes to change an event from fashion show to a movie theater, and so on.
  • 32. THE END STARCHITECT IS BAD Rem Koolhaas is deeply uncomfortable by the title of "starchitect", he says, that an architect has become less important due to this title, he hopes this title will disappear soon.