My INSURER PTE LTD - Insurtech Innovation Award 2024
14.networking and communications (apr 25)
1. Networking and
Communications (Apr 25)
STUDENT: WALTER HECTOR GONZALES ARNAO Fab academy 2012
UNIVERSIDAD NACIONAL DE INGENIERÍA
FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
2. summary
THIS COMMUNICATION IS WORKING TWO NODES
http://academy.cba.mit.edu/classes/networking_communications/index.html
Fab
CLASS 14: Networking and Communications (Apr 25)
academy
UNIVERSIDAD NACIONAL DE INGENIERÍA
FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
3. Fab
academy
FIRST STEP. TO BUILD THE BOART, BRIDGE AND NODE
CLASS 14: Networking and Communications (Apr 25)
UNIVERSIDAD NACIONAL DE INGENIERÍA
FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
4. Fab
academy
STEP 2. PREPARING THE NETWORK CABLE
CLASS 14: Networking and Communications (Apr 25)
UNIVERSIDAD NACIONAL DE INGENIERÍA
FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
5. STEP 3. PROGRAM IS THE BRIDGE AND NO
Fab academy
CLASS 14: Networking and Communications (Apr 25) 2012
UNIVERSIDAD NACIONAL DE INGENIERÍA
FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
6. Fab
academy
STEP 4. NETWORK CABLE IS INSTALLED ON THE BOARD
CLASS 14: Networking and Communications (Apr 25) 2012
UNIVERSIDAD NACIONAL DE INGENIERÍA
FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
7. UNIVERSIDAD NACIONAL DE INGENIERÍA
FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
Fab
academy
STEP 5. NODES THEN LISTS 1 AND 2
CLASS 14: Networking and Communications (Apr 25)
2012
8. Conclusions.
conclusions
1. Overheated THE BOARD FOR A BAD CONNECTION NETWORK CABLE
Fab
2. Programming is complicated by the INSTALLATION OF DRIVER
3. I asked for help to our colleagues, for the programming, the support was
Roberto.
4. Group work is coordinated with set times, THINKING IN THE FINAL WORK
academy
STEP 6. We worked with the group.
IN SPACE Coordinated with roberto, alejandro and Henrry CLASS
2012
UNIVERSIDAD NACIONAL DE INGENIERÍA
14: Networking and Communications (Apr 25) FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES