Personal Information
Organização/Local de trabalho
Cairo, Giza Egypt
Cargo
Country Director
Site
www.procert.ch
Sobre
Membership of professional bodies
Member in American Society for Quality (ASQ), Food and Quality Divisions
Member in Egyptian Society for Quality.
Associate member at Institute of Management Consultants -UK.
1. A professional skills in managing projects in area's of TQM, I SO 9000, ISO 22000, 18001, QS 9000, EMS, and Food Safety (HACCP, GMP, and GAP).
2. High project management planning skills including diagnostic assessment and prepare reports on status found, raise recommendations tailored in business action plan.
3. Maintaining and follow-ups for projects progress. Perform business process re-engineering, establishment of tailored made systems, buildi
Marcadores
egypt
trace-ability system
q.a
food
training
Ver mais
Apresentações
(4)Documentos
(5)Gostaram
(9)Brc atp dr amr rizkana
Amr Rizkana
•
Há 13 anos
Esq membership
Amr Rizkana
•
Há 13 anos
Rizkana, amr team building
Amr Rizkana
•
Há 9 anos
8 steps for Effective Management of National Projects
Amr Rizkana
•
Há 9 anos
Amr rizkana biography-2009
Amr Rizkana
•
Há 13 anos
مواصفات التصنيع و التعبئة وفقاً لمعايير اتحاد تجار التجزئة البريطاني
Amr Rizkana
•
Há 13 anos
إدارة التتبع فى سلاسل الغذاء عمرو رزقانة نوفمبر 2007
Amr Rizkana
•
Há 9 anos
Digest july 2015
Samir El-Gammal
•
Há 8 anos
الهيئة المصرية لسلامة المواد الغذائية (منظومة العمل للدكتور عمرو رزقانة)
Amr Rizkana
•
Há 14 anos
Personal Information
Organização/Local de trabalho
Cairo, Giza Egypt
Cargo
Country Director
Site
www.procert.ch
Sobre
Membership of professional bodies
Member in American Society for Quality (ASQ), Food and Quality Divisions
Member in Egyptian Society for Quality.
Associate member at Institute of Management Consultants -UK.
1. A professional skills in managing projects in area's of TQM, I SO 9000, ISO 22000, 18001, QS 9000, EMS, and Food Safety (HACCP, GMP, and GAP).
2. High project management planning skills including diagnostic assessment and prepare reports on status found, raise recommendations tailored in business action plan.
3. Maintaining and follow-ups for projects progress. Perform business process re-engineering, establishment of tailored made systems, buildi
Marcadores
egypt
trace-ability system
q.a
food
training
Ver mais