BLACKSTONE SOUTH OFFICE
BUILDING
46 Blackstone Street, Cambridge, MA 02139
Presented by: A.A
• Harvard University consolidated several administrative
offices, which resulted in a need for space for 800
employees. The university chose to convert three
historic industrial buildings into sustainable offices.
• Harvard University has steadily built on a series of
“sustainability principles that dictate sweeping
changes aimed at reducing waste and conserving
energy across all of its campuses and schools.
• Adaptive re-use and restoration of a pre-1900 building
into a LEED Platinum Certified facility.
• Scope included a total interior renovation, extensive
structural modifications, installation of new M/E/P
systems, and restoration of historic façade, all while
upholding sustainable requirements including over
90% jobsite recycling, use of locally-sourced and
rapidly renewable materials, and installation of a
geothermal well.
But why this building is interesting for me?
Double LEED Platinum certification!
• 40,000-square-foot renovation
• Completed in May 2006
• Being awarded LEED_NC in April 2007
• Went through an energy audit in 2008
• Went through another energy audit in 2011
• Received LEED_EB in 2012
Let’s have a brief review over LEED
Certifications…
What is LEED EB O&M?
• Re-Certify a building that was LEED NC Certified
previously
• Certify Existing Whole Buildings (Not for individual
tenant spaces or parts of existing buildings)
• Campuses can be Certified with EB O&M (Utility
metering to individual building level is required for
BTU/SF/Yr. assessment)
• Quantify the Sustainability of a building (Use LEED
EB O&M as the M&V metric)
Minimum Project Requirements for LEED EB O&M
• Building must be occupied for at least 12 months with 75%
occupancy rate or greater per industry standards for building type
• 90%+ of the building SF must be included in LEED Certification (Up to
10% SF exclusion allowed but only for areas with separate
use/management practices)
• Must meet all regulatory requirements for hazardous material
management (PCB/Asbestos/Mercury in lamps) & waste water
discharge
• Min. 3 month performance period required for all credits pursued
(One year minimum for Energy)
What Happened up to 2006?
LEED for New Construction Platinum
Certification
2006
History of the Building:
• In 1888, the newly-formed Cambridge Electric Light Company
constructed the Blackstone electric station in order to provide
electricity for the city’s growing number of street lamps. The plant
has provided steam to Harvard’s campus since 1930.
• UOS purchased the steam plant and adjoining buildings in 2003.
• The site was renovated to provide new office space for UOS, and to
demonstrate cost effective, sustainable design.
Location:
A 40,000 square foot complex,
located along the Charles River,
in Cambridge.
Structural Renovations:
• New steel studs were installed two inches inside the
exterior walls and the walls insulated with open cell
spray polyurethane foam. New windows and rigid
foam on the roof completed the new thermal
enclosure.
SITE AND LANDSCAPE
• Redevelopment of a brownfield - impervious
asphalt parking lot converted to green space.
• No irrigation required by the use of native plants
and no-mow grass.
• Eliminated all stormwater runoff to municipal
sewer system.
• Bioswale filters stormwater before
releasing to the Charles; permeable
paving allows groundwater recharge.
• Erosion and sedimentation controls in
place during construction – silt fences,
hay bales, filter fabric.
• The cut off angle of
exterior lighting prevents
light pollution or light
trespass!
ENERGY EFFICIENCY
• Blackstone is designed to be 45% more efficient than code.
• Geothermal/ground source heat pumps: 4 in. diameter wells,
1500 feet deep provide cooling.
• Enthalpy wheel: Energy recovery system from exhaust air for
heat and humidity.
• Valance units distribute heating and cooling in multiple zones,
without blowers.
• Ventilation circulates fresh air only; CO2 monitors adjust
ventilation based on room occupancy.
• Lighting fixtures use daylight dimming and occupant sensors,
energy efficient fluorescent bulbs; LED exit signs.
• EcoSpace elevator is up to 60%
more efficient than conventional
elevators; gearless technology
requires no oil.
• Energy Star appliances.
Envelope
• Applied Icynene® foam
insulation to reduce
energy consumption and
allow for smaller
mechanical systems.
• Energy Star roof reduces
heat island effect and
cooling load; provides
additional insulation.
WATER USE REDUCTION
• Occupant water use is reduced by 43% compared to Energy Policy Act
of 1992-compliant plumbing fixtures. Water reduction is achieved by
using dual-flush toilets, waterless urinals, and low-flow sinks.
INDOOR ENVIRONMENTAL QUALITY
• Extensive daylighting to the building’s
interior and views provided for 90%
of occupants.
• Interior design with new skylight and
light slot allows light infiltration deep
into the core.
• Direct/indirect lighting reduces glare
by reflecting off the white ceiling.
• Operable windows provide access to
additional fresh air.
• The central communicating
stair encourages occupant
interaction while increasing
daylight to interior spaces.
MATERIAL
• Waste diversion: Blackstone reused or recycled 99% of construction waste.
• Unpainted wood was ground into mulch. Removed plumbing fixtures were given
to a small town in Guatemala for a village water shelter built by a volunteer team
from Shawmut Construction Co. Windows were sent to Jamaica, to help those
whose homes suffered damage in summer hurricanes.
• Over 10% of the non-MEP (mechanical, electrical, and plumbing)
materials’ value came from recycled content, including structural
steel, TPO roof membrane, synthetic gypsum wall board, concrete
with fly ash, aluminum window frames, carpet tiles, Ecostone pavers,
metal door frames, and building insulation
• Rapidly renewable materials: Bamboo flooring; linoleum is made with
linseed oil rather than petroleum products.
• FSC-certified, sustainably-
harvested wood used in doors,
sills and casework.
• Low-emitting materials: Low-
or no- volatile organic
compound (VOC) adhesives,
sealants, paints, carpets and
fabrics; all composite wood is
added urea formaldehyde free.
The Rest of the story from 2006 to 2012
LEED for Existing Building : Operations and
Maintenance Platinum Certifications
2012
• After construction was completed in 2006, the Campus Services department was
particularly interested in ensuring that the building was performing to its rigorous
design specifications, most specifically the energy consumption targets as
predicted in the building’s energy model. A 40% reduction in summer energy use
compared to an ASHRAE 90.1 baseline was specified in the original design. When
the building was first occupied the facility was consuming 30% more energy than
the model predicted, but an ongoing commissioning and management process
has improved it to the point that the facility is now consuming 20% less than the
original model predicted. Once the energy consumption of Blackstone was
reconciled to levels below the energy model predictions, a decision was made to
pursue LEED-EB certification.
• In addition to energy use, the LEED-EB rating system evaluates the full profile of
environmental impacts from a wide range of building programs including the
scheduled maintenance of mechanical equipment, recycling and composting,
purchasing of sustainable office supplies and paper products, and elimination of
chemicals for cleaning and landscaping. During the project’s performance period,
Harvard reviewed each operational practice of the building, ranging from
commuting practices to the source and recycled content of the printer cartridges
purchased for the facility. As a result a number of important changes occurred,
including updates to the preventive maintenance routines and adjustments to the
source of ongoing consumables.
Building Systems
• Heating: Hot water from steam
• Cooling: Ground source heat pumps (GSHP)
• Ventilation: Decoupled from heating and cooling and equipped
• with an energy recovery wheel
• Special systems: Dedicated Liebert cooling unit for the Operations
• Center with 5 months of free cooling (operates 24/7/365)
• Energy Model: A building’s energy model requires careful scrutiny
both during design and operations. After the first two years of
occupancy, the building was performing 30% worse than the energy
model predicted (which predicted a 40% energy use reduction in
summer compared to an ASHRAE baseline). The energy model
undervalued the electric consumption of the Operations Center by
62,000 kWh annually. After this measurement and verification
process, the building is now performing 20% better than predicted in
the model
• This graph shows the annual electrical consumption at 46 Blackstone
since 2007.
• As part of the 2008 energy audit process, a capital renovation project was
implemented to further improve efficiency. The upgrade removed the
Operations Center, which includes its own data center, from the base
building cooling system in order to allow the building’s ventilation system
and geothermal heat pumps to shut down during nighttime hours when
the rest of the building was unoccupied. Building management installed an
air-side economizer cooling system that provides free cooling five months
of the year. Removing this space from the base building cooling system
significantly reduced the load on the well heat rejection system, and as a
result 46 Blackstone did not have to bleed their well system any longer. This
helped to both stabilize the temperature profiles of the wells and ease
issues with permitting. As a result of implementing this change, the
building’s energy consumption was reduced significantly and improved
Blackstone’s performance to levels predicted in its energy model.
• A plate and frame heat exchanger was added to isolate brackish
water and consequently eliminate corrosion in heat pump
equipment. A slight reduction in overall efficiency was offset by
large savings in maintenance expenses.
• 2008 Energy Audit Process
a. Plug Loads
b. Lighting Systems
c. Mechanical Systems
d. In 2011, Blackstone conducted another energy audit that identified
seven measures with the potential to further reduce the building’s
energy consumption by 3%, with a simple payback period of 1.4
years. These measures were implemented as part of the LEED-EB
process. As a result of these audits, the building is now operating at
levels even lower than those predicted in the energy model.
After receiving LEED_EB Platinum
Full LEED EBOM Platinum scorecard, at page 6 and 7:
• http://www.energyandfacilities.harvard.edu/sites/energyandfacilities.
harvard.edu/files/CS%20Blackstone%20EB%20-
%20Case%20Study.pdf
“From the earliest design stages of the initial renovation
project in 2006, we established an objective to make
Blackstone a living laboratory for sustainability and the
optimization of building operations,”
Director of Facilities Maintenance Operations, Jeffrey Smith
Resources:
• http://www.greenprof.org/wp-content/uploads/2012/03/LEED-Existing-Building-Overview.pdf
• http://www.consigli.com/ny/project/blackstone-offices-harvard-university/
• https://green.harvard.edu/news/harvard-building-goes-double-leed-platinum
• http://harvardmagazine.com/2007/11/growing-green.html
• http://www.consigli.com/portfolio/private-colleges-universities/harvard-university-blackstone/
• http://www.concretethinker.com/solutions/LEED-Certification.aspx
• https://www.igbc.ie/certification/leed/
• http://hbsgreenliving.blogspot.it/
• https://green.harvard.edu/news/harvard-building-goes-double-leed-platinum
• http://www.energysmiths.com/clients/blackstone.php
• isites.harvard.edu/fs/docs/icb.topic212493.files/BlackstoneFactSheet-Platinum.pdf/
• http://www.energyandfacilities.harvard.edu/sites/energyandfacilities.harvard.edu/files/CS%20Blackstone%20EB%20-
%20Case%20Study.pdf
• https://www.google.it/maps/place/Environmental+Health+%26+Safety/@42.3639644,-
71.117796,17z/data=!3m1!4b1!4m5!3m4!1s0x89e37758cbf161e3:0x3d1af627e99e45ec!8m2!3d42.3639644!4d-71.1156073

Mais conteúdo relacionado

Mais procurados

Introduction to Working with Cob
Introduction to Working with CobIntroduction to Working with Cob
Introduction to Working with CobEdward Marshall
 
Earthquake resistant building in mexico
Earthquake resistant building in  mexicoEarthquake resistant building in  mexico
Earthquake resistant building in mexicoVeera Veer
 
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS Mohammed Naeem Darwish
 
High rise structure
High rise structureHigh rise structure
High rise structureAnuj Singhal
 
Earthbag Construction
Earthbag Construction Earthbag Construction
Earthbag Construction Shourya Puri
 
The druk white lotus school presentation
The druk white lotus school presentationThe druk white lotus school presentation
The druk white lotus school presentationRajdeep Dhar
 
ALTERNATE BUILDING MATERIALS & TECHNOLOGICAL ALTERNATIVES IN CONSTRUCTION
ALTERNATE BUILDING MATERIALS  & TECHNOLOGICAL ALTERNATIVES IN  CONSTRUCTIONALTERNATE BUILDING MATERIALS  & TECHNOLOGICAL ALTERNATIVES IN  CONSTRUCTION
ALTERNATE BUILDING MATERIALS & TECHNOLOGICAL ALTERNATIVES IN CONSTRUCTIONRajesh Kolli
 
Aluminium composite panels(acp)
Aluminium composite panels(acp)Aluminium composite panels(acp)
Aluminium composite panels(acp)Parivesh Sharma
 
Eart soil as building material
Eart soil as building materialEart soil as building material
Eart soil as building materialprathee94
 
Report on foundation
Report on foundationReport on foundation
Report on foundationAkshay Singh
 
Heating & Cooling of Building
Heating & Cooling of BuildingHeating & Cooling of Building
Heating & Cooling of BuildingMudasSir Rahim
 
Vernacular architecture in cold climate
Vernacular architecture in cold climateVernacular architecture in cold climate
Vernacular architecture in cold climateSaksham Goyal
 
IMI International Management Institute Kolkata Case Study
IMI International Management Institute Kolkata Case StudyIMI International Management Institute Kolkata Case Study
IMI International Management Institute Kolkata Case StudyDhanveersinh Chavda
 
Roofs and truss
Roofs and trussRoofs and truss
Roofs and trusskaiwan1996
 
climate analysis all climatic zones of india
climate analysis all climatic zones of indiaclimate analysis all climatic zones of india
climate analysis all climatic zones of indiaAmanKhan319
 
High rise building design
High rise building design High rise building design
High rise building design Somesh Siddharth
 

Mais procurados (20)

Introduction to Working with Cob
Introduction to Working with CobIntroduction to Working with Cob
Introduction to Working with Cob
 
Earthquake resistant building in mexico
Earthquake resistant building in  mexicoEarthquake resistant building in  mexico
Earthquake resistant building in mexico
 
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
 
Domes
DomesDomes
Domes
 
High rise structure
High rise structureHigh rise structure
High rise structure
 
Earthbag Construction
Earthbag Construction Earthbag Construction
Earthbag Construction
 
The druk white lotus school presentation
The druk white lotus school presentationThe druk white lotus school presentation
The druk white lotus school presentation
 
ALTERNATE BUILDING MATERIALS & TECHNOLOGICAL ALTERNATIVES IN CONSTRUCTION
ALTERNATE BUILDING MATERIALS  & TECHNOLOGICAL ALTERNATIVES IN  CONSTRUCTIONALTERNATE BUILDING MATERIALS  & TECHNOLOGICAL ALTERNATIVES IN  CONSTRUCTION
ALTERNATE BUILDING MATERIALS & TECHNOLOGICAL ALTERNATIVES IN CONSTRUCTION
 
Aluminium composite panels(acp)
Aluminium composite panels(acp)Aluminium composite panels(acp)
Aluminium composite panels(acp)
 
Eart soil as building material
Eart soil as building materialEart soil as building material
Eart soil as building material
 
Report on foundation
Report on foundationReport on foundation
Report on foundation
 
Heating & Cooling of Building
Heating & Cooling of BuildingHeating & Cooling of Building
Heating & Cooling of Building
 
Vernacular architecture in cold climate
Vernacular architecture in cold climateVernacular architecture in cold climate
Vernacular architecture in cold climate
 
IMI International Management Institute Kolkata Case Study
IMI International Management Institute Kolkata Case StudyIMI International Management Institute Kolkata Case Study
IMI International Management Institute Kolkata Case Study
 
Roofs and truss
Roofs and trussRoofs and truss
Roofs and truss
 
Deep foundation ppt my final tos work
Deep foundation ppt  my final tos workDeep foundation ppt  my final tos work
Deep foundation ppt my final tos work
 
Kanchanjunga apartments
Kanchanjunga apartmentsKanchanjunga apartments
Kanchanjunga apartments
 
Artist house
Artist houseArtist house
Artist house
 
climate analysis all climatic zones of india
climate analysis all climatic zones of indiaclimate analysis all climatic zones of india
climate analysis all climatic zones of india
 
High rise building design
High rise building design High rise building design
High rise building design
 

Semelhante a LEED_NC and LEED_EB

IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research PresentationSerra's Art Studio
 
Osquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECTOsquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECTAnthony Osibajo
 
Building services-i (2)
Building services-i (2)Building services-i (2)
Building services-i (2)Lwj Welson
 
Green Needham - Better by design 2012-11-26
Green Needham - Better by design 2012-11-26Green Needham - Better by design 2012-11-26
Green Needham - Better by design 2012-11-26Green Needham
 
Net Zero Energy in Very Cold Climates by Peter Amerongen
Net Zero Energy in Very Cold Climates by Peter AmerongenNet Zero Energy in Very Cold Climates by Peter Amerongen
Net Zero Energy in Very Cold Climates by Peter AmerongenMBHomeBuilders
 
Green building concepts and good building practices
Green building concepts and good building practicesGreen building concepts and good building practices
Green building concepts and good building practicesManohar Tatwawadi
 
Life cycle cost-efficient near zero-energy construction
Life cycle cost-efficient near zero-energy constructionLife cycle cost-efficient near zero-energy construction
Life cycle cost-efficient near zero-energy constructionRuukki
 
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017Rod Yeoh
 
Hero to Zero: Understand and meet Vancouver's new energy and emission require...
Hero to Zero: Understand and meet Vancouver's new energy and emission require...Hero to Zero: Understand and meet Vancouver's new energy and emission require...
Hero to Zero: Understand and meet Vancouver's new energy and emission require...Lauren-Lee Camp
 
Case study -4 Mort Street
Case study -4 Mort StreetCase study -4 Mort Street
Case study -4 Mort StreetShamitha Reddy
 
Hestia Energy - Levin Igloo Retrofit
Hestia Energy - Levin Igloo Retrofit Hestia Energy - Levin Igloo Retrofit
Hestia Energy - Levin Igloo Retrofit Peter Zhou
 
Energy efficiency in Green Building
Energy efficiency in Green BuildingEnergy efficiency in Green Building
Energy efficiency in Green Buildingshiva prakash
 
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...Blake Morgan
 
BULLITT CENTER, SEATTLE, WASHINGTON.pptx
BULLITT CENTER, SEATTLE, WASHINGTON.pptxBULLITT CENTER, SEATTLE, WASHINGTON.pptx
BULLITT CENTER, SEATTLE, WASHINGTON.pptxPushpaHarshitha05
 
Green Building in India with Case Study
Green Building in India with Case StudyGreen Building in India with Case Study
Green Building in India with Case StudyAjayashKekan
 

Semelhante a LEED_NC and LEED_EB (20)

IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research Presentation
 
Osquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECTOsquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECT
 
BREEAM
BREEAMBREEAM
BREEAM
 
Building services-i (2)
Building services-i (2)Building services-i (2)
Building services-i (2)
 
Green Needham - Better by design 2012-11-26
Green Needham - Better by design 2012-11-26Green Needham - Better by design 2012-11-26
Green Needham - Better by design 2012-11-26
 
A4 Presentation
A4 PresentationA4 Presentation
A4 Presentation
 
Net Zero Energy in Very Cold Climates by Peter Amerongen
Net Zero Energy in Very Cold Climates by Peter AmerongenNet Zero Energy in Very Cold Climates by Peter Amerongen
Net Zero Energy in Very Cold Climates by Peter Amerongen
 
Bahniuk Utility Job
Bahniuk Utility JobBahniuk Utility Job
Bahniuk Utility Job
 
Green building concepts and good building practices
Green building concepts and good building practicesGreen building concepts and good building practices
Green building concepts and good building practices
 
SERVE-ING Tipperary Results & Lessons
SERVE-ING Tipperary Results & LessonsSERVE-ING Tipperary Results & Lessons
SERVE-ING Tipperary Results & Lessons
 
Final Poster
Final PosterFinal Poster
Final Poster
 
Life cycle cost-efficient near zero-energy construction
Life cycle cost-efficient near zero-energy constructionLife cycle cost-efficient near zero-energy construction
Life cycle cost-efficient near zero-energy construction
 
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017
 
Hero to Zero: Understand and meet Vancouver's new energy and emission require...
Hero to Zero: Understand and meet Vancouver's new energy and emission require...Hero to Zero: Understand and meet Vancouver's new energy and emission require...
Hero to Zero: Understand and meet Vancouver's new energy and emission require...
 
Case study -4 Mort Street
Case study -4 Mort StreetCase study -4 Mort Street
Case study -4 Mort Street
 
Hestia Energy - Levin Igloo Retrofit
Hestia Energy - Levin Igloo Retrofit Hestia Energy - Levin Igloo Retrofit
Hestia Energy - Levin Igloo Retrofit
 
Energy efficiency in Green Building
Energy efficiency in Green BuildingEnergy efficiency in Green Building
Energy efficiency in Green Building
 
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
 
BULLITT CENTER, SEATTLE, WASHINGTON.pptx
BULLITT CENTER, SEATTLE, WASHINGTON.pptxBULLITT CENTER, SEATTLE, WASHINGTON.pptx
BULLITT CENTER, SEATTLE, WASHINGTON.pptx
 
Green Building in India with Case Study
Green Building in India with Case StudyGreen Building in India with Case Study
Green Building in India with Case Study
 

Mais de Arn Akbarieh

Rammed Earth Wall دیوار خاک کوبیده
Rammed Earth Wall   دیوار خاک کوبیدهRammed Earth Wall   دیوار خاک کوبیده
Rammed Earth Wall دیوار خاک کوبیدهArn Akbarieh
 
انواع انرژی های تجدید پذیر در یک نگاه Versatile Renewable Energies at One...
انواع انرژی های تجدید پذیر در یک نگاه   Versatile  Renewable Energies  at One...انواع انرژی های تجدید پذیر در یک نگاه   Versatile  Renewable Energies  at One...
انواع انرژی های تجدید پذیر در یک نگاه Versatile Renewable Energies at One...Arn Akbarieh
 
انواع سرریز سدها - Dam's Spillways
انواع سرریز سدها - Dam's Spillwaysانواع سرریز سدها - Dam's Spillways
انواع سرریز سدها - Dam's SpillwaysArn Akbarieh
 
تونل هیملریش از احداث دهانه کاوشی تا اتمام تونل
تونل هیملریش  از احداث دهانه کاوشی  تا اتمام تونلتونل هیملریش  از احداث دهانه کاوشی  تا اتمام تونل
تونل هیملریش از احداث دهانه کاوشی تا اتمام تونلArn Akbarieh
 
تحلیل طیفی یا تحلیل دینامیکی به همراه آموزش همپایه کردن در ایتبس - Dynamic An...
تحلیل طیفی یا تحلیل دینامیکی به همراه آموزش همپایه کردن در ایتبس - Dynamic An...تحلیل طیفی یا تحلیل دینامیکی به همراه آموزش همپایه کردن در ایتبس - Dynamic An...
تحلیل طیفی یا تحلیل دینامیکی به همراه آموزش همپایه کردن در ایتبس - Dynamic An...Arn Akbarieh
 
طیف پاسخ زلزله Spectrum response
طیف پاسخ زلزله  Spectrum responseطیف پاسخ زلزله  Spectrum response
طیف پاسخ زلزله Spectrum responseArn Akbarieh
 
تفاوت ضریب مانینگ و شزی- Chézy formula and Manning formula
تفاوت ضریب مانینگ و شزی- Chézy formula and Manning formulaتفاوت ضریب مانینگ و شزی- Chézy formula and Manning formula
تفاوت ضریب مانینگ و شزی- Chézy formula and Manning formulaArn Akbarieh
 
امواج زلزله Seismic waves
امواج زلزله Seismic wavesامواج زلزله Seismic waves
امواج زلزله Seismic wavesArn Akbarieh
 
آرماتوربندی های جالب 2- Interesting Rebar Cages
آرماتوربندی های جالب 2- Interesting Rebar Cagesآرماتوربندی های جالب 2- Interesting Rebar Cages
آرماتوربندی های جالب 2- Interesting Rebar CagesArn Akbarieh
 
Zero Energy Homes خانه انرژی صفر
Zero Energy Homes خانه انرژی صفرZero Energy Homes خانه انرژی صفر
Zero Energy Homes خانه انرژی صفرArn Akbarieh
 
اتمسفر هیدرولوژی Introduction to the atmosphere
اتمسفر  هیدرولوژی Introduction to  the atmosphereاتمسفر  هیدرولوژی Introduction to  the atmosphere
اتمسفر هیدرولوژی Introduction to the atmosphereArn Akbarieh
 
پروژه ایتبس سازه بتنی
پروژه ایتبس سازه بتنیپروژه ایتبس سازه بتنی
پروژه ایتبس سازه بتنیArn Akbarieh
 
Piles انواع شمع ها
Piles انواع شمع هاPiles انواع شمع ها
Piles انواع شمع هاArn Akbarieh
 
Underwater concrete Casting _ بتن ریزی زیر آب
Underwater concrete Casting _ بتن ریزی زیر آبUnderwater concrete Casting _ بتن ریزی زیر آب
Underwater concrete Casting _ بتن ریزی زیر آبArn Akbarieh
 
Scc concrete بتن خودمتراکم
Scc concrete بتن خودمتراکمScc concrete بتن خودمتراکم
Scc concrete بتن خودمتراکمArn Akbarieh
 

Mais de Arn Akbarieh (16)

Rammed Earth Wall دیوار خاک کوبیده
Rammed Earth Wall   دیوار خاک کوبیدهRammed Earth Wall   دیوار خاک کوبیده
Rammed Earth Wall دیوار خاک کوبیده
 
انواع انرژی های تجدید پذیر در یک نگاه Versatile Renewable Energies at One...
انواع انرژی های تجدید پذیر در یک نگاه   Versatile  Renewable Energies  at One...انواع انرژی های تجدید پذیر در یک نگاه   Versatile  Renewable Energies  at One...
انواع انرژی های تجدید پذیر در یک نگاه Versatile Renewable Energies at One...
 
انواع سرریز سدها - Dam's Spillways
انواع سرریز سدها - Dam's Spillwaysانواع سرریز سدها - Dam's Spillways
انواع سرریز سدها - Dam's Spillways
 
تونل هیملریش از احداث دهانه کاوشی تا اتمام تونل
تونل هیملریش  از احداث دهانه کاوشی  تا اتمام تونلتونل هیملریش  از احداث دهانه کاوشی  تا اتمام تونل
تونل هیملریش از احداث دهانه کاوشی تا اتمام تونل
 
تحلیل طیفی یا تحلیل دینامیکی به همراه آموزش همپایه کردن در ایتبس - Dynamic An...
تحلیل طیفی یا تحلیل دینامیکی به همراه آموزش همپایه کردن در ایتبس - Dynamic An...تحلیل طیفی یا تحلیل دینامیکی به همراه آموزش همپایه کردن در ایتبس - Dynamic An...
تحلیل طیفی یا تحلیل دینامیکی به همراه آموزش همپایه کردن در ایتبس - Dynamic An...
 
طیف پاسخ زلزله Spectrum response
طیف پاسخ زلزله  Spectrum responseطیف پاسخ زلزله  Spectrum response
طیف پاسخ زلزله Spectrum response
 
تفاوت ضریب مانینگ و شزی- Chézy formula and Manning formula
تفاوت ضریب مانینگ و شزی- Chézy formula and Manning formulaتفاوت ضریب مانینگ و شزی- Chézy formula and Manning formula
تفاوت ضریب مانینگ و شزی- Chézy formula and Manning formula
 
امواج زلزله Seismic waves
امواج زلزله Seismic wavesامواج زلزله Seismic waves
امواج زلزله Seismic waves
 
آرماتوربندی های جالب 2- Interesting Rebar Cages
آرماتوربندی های جالب 2- Interesting Rebar Cagesآرماتوربندی های جالب 2- Interesting Rebar Cages
آرماتوربندی های جالب 2- Interesting Rebar Cages
 
Zero Energy Homes خانه انرژی صفر
Zero Energy Homes خانه انرژی صفرZero Energy Homes خانه انرژی صفر
Zero Energy Homes خانه انرژی صفر
 
اتمسفر هیدرولوژی Introduction to the atmosphere
اتمسفر  هیدرولوژی Introduction to  the atmosphereاتمسفر  هیدرولوژی Introduction to  the atmosphere
اتمسفر هیدرولوژی Introduction to the atmosphere
 
پروژه ایتبس سازه بتنی
پروژه ایتبس سازه بتنیپروژه ایتبس سازه بتنی
پروژه ایتبس سازه بتنی
 
Piles انواع شمع ها
Piles انواع شمع هاPiles انواع شمع ها
Piles انواع شمع ها
 
Chipping 2013
Chipping 2013Chipping 2013
Chipping 2013
 
Underwater concrete Casting _ بتن ریزی زیر آب
Underwater concrete Casting _ بتن ریزی زیر آبUnderwater concrete Casting _ بتن ریزی زیر آب
Underwater concrete Casting _ بتن ریزی زیر آب
 
Scc concrete بتن خودمتراکم
Scc concrete بتن خودمتراکمScc concrete بتن خودمتراکم
Scc concrete بتن خودمتراکم
 

Último

Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxShobhayan Kirtania
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 

Último (20)

Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 

LEED_NC and LEED_EB

  • 1. BLACKSTONE SOUTH OFFICE BUILDING 46 Blackstone Street, Cambridge, MA 02139 Presented by: A.A
  • 2. • Harvard University consolidated several administrative offices, which resulted in a need for space for 800 employees. The university chose to convert three historic industrial buildings into sustainable offices. • Harvard University has steadily built on a series of “sustainability principles that dictate sweeping changes aimed at reducing waste and conserving energy across all of its campuses and schools. • Adaptive re-use and restoration of a pre-1900 building into a LEED Platinum Certified facility. • Scope included a total interior renovation, extensive structural modifications, installation of new M/E/P systems, and restoration of historic façade, all while upholding sustainable requirements including over 90% jobsite recycling, use of locally-sourced and rapidly renewable materials, and installation of a geothermal well.
  • 3. But why this building is interesting for me?
  • 4. Double LEED Platinum certification!
  • 5. • 40,000-square-foot renovation • Completed in May 2006 • Being awarded LEED_NC in April 2007 • Went through an energy audit in 2008 • Went through another energy audit in 2011 • Received LEED_EB in 2012
  • 6. Let’s have a brief review over LEED Certifications…
  • 7.
  • 8. What is LEED EB O&M? • Re-Certify a building that was LEED NC Certified previously • Certify Existing Whole Buildings (Not for individual tenant spaces or parts of existing buildings) • Campuses can be Certified with EB O&M (Utility metering to individual building level is required for BTU/SF/Yr. assessment) • Quantify the Sustainability of a building (Use LEED EB O&M as the M&V metric)
  • 9. Minimum Project Requirements for LEED EB O&M • Building must be occupied for at least 12 months with 75% occupancy rate or greater per industry standards for building type • 90%+ of the building SF must be included in LEED Certification (Up to 10% SF exclusion allowed but only for areas with separate use/management practices) • Must meet all regulatory requirements for hazardous material management (PCB/Asbestos/Mercury in lamps) & waste water discharge • Min. 3 month performance period required for all credits pursued (One year minimum for Energy)
  • 10.
  • 11.
  • 12. What Happened up to 2006?
  • 13. LEED for New Construction Platinum Certification 2006
  • 14. History of the Building: • In 1888, the newly-formed Cambridge Electric Light Company constructed the Blackstone electric station in order to provide electricity for the city’s growing number of street lamps. The plant has provided steam to Harvard’s campus since 1930.
  • 15. • UOS purchased the steam plant and adjoining buildings in 2003. • The site was renovated to provide new office space for UOS, and to demonstrate cost effective, sustainable design.
  • 16. Location: A 40,000 square foot complex, located along the Charles River, in Cambridge.
  • 17. Structural Renovations: • New steel studs were installed two inches inside the exterior walls and the walls insulated with open cell spray polyurethane foam. New windows and rigid foam on the roof completed the new thermal enclosure.
  • 18. SITE AND LANDSCAPE • Redevelopment of a brownfield - impervious asphalt parking lot converted to green space. • No irrigation required by the use of native plants and no-mow grass. • Eliminated all stormwater runoff to municipal sewer system.
  • 19. • Bioswale filters stormwater before releasing to the Charles; permeable paving allows groundwater recharge. • Erosion and sedimentation controls in place during construction – silt fences, hay bales, filter fabric.
  • 20. • The cut off angle of exterior lighting prevents light pollution or light trespass!
  • 21. ENERGY EFFICIENCY • Blackstone is designed to be 45% more efficient than code. • Geothermal/ground source heat pumps: 4 in. diameter wells, 1500 feet deep provide cooling. • Enthalpy wheel: Energy recovery system from exhaust air for heat and humidity. • Valance units distribute heating and cooling in multiple zones, without blowers. • Ventilation circulates fresh air only; CO2 monitors adjust ventilation based on room occupancy. • Lighting fixtures use daylight dimming and occupant sensors, energy efficient fluorescent bulbs; LED exit signs.
  • 22. • EcoSpace elevator is up to 60% more efficient than conventional elevators; gearless technology requires no oil. • Energy Star appliances.
  • 23. Envelope • Applied Icynene® foam insulation to reduce energy consumption and allow for smaller mechanical systems. • Energy Star roof reduces heat island effect and cooling load; provides additional insulation.
  • 24. WATER USE REDUCTION • Occupant water use is reduced by 43% compared to Energy Policy Act of 1992-compliant plumbing fixtures. Water reduction is achieved by using dual-flush toilets, waterless urinals, and low-flow sinks.
  • 25. INDOOR ENVIRONMENTAL QUALITY • Extensive daylighting to the building’s interior and views provided for 90% of occupants. • Interior design with new skylight and light slot allows light infiltration deep into the core. • Direct/indirect lighting reduces glare by reflecting off the white ceiling. • Operable windows provide access to additional fresh air.
  • 26. • The central communicating stair encourages occupant interaction while increasing daylight to interior spaces.
  • 27. MATERIAL • Waste diversion: Blackstone reused or recycled 99% of construction waste. • Unpainted wood was ground into mulch. Removed plumbing fixtures were given to a small town in Guatemala for a village water shelter built by a volunteer team from Shawmut Construction Co. Windows were sent to Jamaica, to help those whose homes suffered damage in summer hurricanes.
  • 28. • Over 10% of the non-MEP (mechanical, electrical, and plumbing) materials’ value came from recycled content, including structural steel, TPO roof membrane, synthetic gypsum wall board, concrete with fly ash, aluminum window frames, carpet tiles, Ecostone pavers, metal door frames, and building insulation • Rapidly renewable materials: Bamboo flooring; linoleum is made with linseed oil rather than petroleum products.
  • 29. • FSC-certified, sustainably- harvested wood used in doors, sills and casework. • Low-emitting materials: Low- or no- volatile organic compound (VOC) adhesives, sealants, paints, carpets and fabrics; all composite wood is added urea formaldehyde free.
  • 30.
  • 31. The Rest of the story from 2006 to 2012
  • 32. LEED for Existing Building : Operations and Maintenance Platinum Certifications 2012
  • 33. • After construction was completed in 2006, the Campus Services department was particularly interested in ensuring that the building was performing to its rigorous design specifications, most specifically the energy consumption targets as predicted in the building’s energy model. A 40% reduction in summer energy use compared to an ASHRAE 90.1 baseline was specified in the original design. When the building was first occupied the facility was consuming 30% more energy than the model predicted, but an ongoing commissioning and management process has improved it to the point that the facility is now consuming 20% less than the original model predicted. Once the energy consumption of Blackstone was reconciled to levels below the energy model predictions, a decision was made to pursue LEED-EB certification. • In addition to energy use, the LEED-EB rating system evaluates the full profile of environmental impacts from a wide range of building programs including the scheduled maintenance of mechanical equipment, recycling and composting, purchasing of sustainable office supplies and paper products, and elimination of chemicals for cleaning and landscaping. During the project’s performance period, Harvard reviewed each operational practice of the building, ranging from commuting practices to the source and recycled content of the printer cartridges purchased for the facility. As a result a number of important changes occurred, including updates to the preventive maintenance routines and adjustments to the source of ongoing consumables.
  • 34. Building Systems • Heating: Hot water from steam • Cooling: Ground source heat pumps (GSHP) • Ventilation: Decoupled from heating and cooling and equipped • with an energy recovery wheel • Special systems: Dedicated Liebert cooling unit for the Operations • Center with 5 months of free cooling (operates 24/7/365)
  • 35. • Energy Model: A building’s energy model requires careful scrutiny both during design and operations. After the first two years of occupancy, the building was performing 30% worse than the energy model predicted (which predicted a 40% energy use reduction in summer compared to an ASHRAE baseline). The energy model undervalued the electric consumption of the Operations Center by 62,000 kWh annually. After this measurement and verification process, the building is now performing 20% better than predicted in the model
  • 36. • This graph shows the annual electrical consumption at 46 Blackstone since 2007.
  • 37. • As part of the 2008 energy audit process, a capital renovation project was implemented to further improve efficiency. The upgrade removed the Operations Center, which includes its own data center, from the base building cooling system in order to allow the building’s ventilation system and geothermal heat pumps to shut down during nighttime hours when the rest of the building was unoccupied. Building management installed an air-side economizer cooling system that provides free cooling five months of the year. Removing this space from the base building cooling system significantly reduced the load on the well heat rejection system, and as a result 46 Blackstone did not have to bleed their well system any longer. This helped to both stabilize the temperature profiles of the wells and ease issues with permitting. As a result of implementing this change, the building’s energy consumption was reduced significantly and improved Blackstone’s performance to levels predicted in its energy model.
  • 38. • A plate and frame heat exchanger was added to isolate brackish water and consequently eliminate corrosion in heat pump equipment. A slight reduction in overall efficiency was offset by large savings in maintenance expenses.
  • 39. • 2008 Energy Audit Process a. Plug Loads b. Lighting Systems c. Mechanical Systems d. In 2011, Blackstone conducted another energy audit that identified seven measures with the potential to further reduce the building’s energy consumption by 3%, with a simple payback period of 1.4 years. These measures were implemented as part of the LEED-EB process. As a result of these audits, the building is now operating at levels even lower than those predicted in the energy model.
  • 41. Full LEED EBOM Platinum scorecard, at page 6 and 7: • http://www.energyandfacilities.harvard.edu/sites/energyandfacilities. harvard.edu/files/CS%20Blackstone%20EB%20- %20Case%20Study.pdf
  • 42. “From the earliest design stages of the initial renovation project in 2006, we established an objective to make Blackstone a living laboratory for sustainability and the optimization of building operations,” Director of Facilities Maintenance Operations, Jeffrey Smith
  • 43. Resources: • http://www.greenprof.org/wp-content/uploads/2012/03/LEED-Existing-Building-Overview.pdf • http://www.consigli.com/ny/project/blackstone-offices-harvard-university/ • https://green.harvard.edu/news/harvard-building-goes-double-leed-platinum • http://harvardmagazine.com/2007/11/growing-green.html • http://www.consigli.com/portfolio/private-colleges-universities/harvard-university-blackstone/ • http://www.concretethinker.com/solutions/LEED-Certification.aspx • https://www.igbc.ie/certification/leed/ • http://hbsgreenliving.blogspot.it/ • https://green.harvard.edu/news/harvard-building-goes-double-leed-platinum • http://www.energysmiths.com/clients/blackstone.php • isites.harvard.edu/fs/docs/icb.topic212493.files/BlackstoneFactSheet-Platinum.pdf/ • http://www.energyandfacilities.harvard.edu/sites/energyandfacilities.harvard.edu/files/CS%20Blackstone%20EB%20- %20Case%20Study.pdf • https://www.google.it/maps/place/Environmental+Health+%26+Safety/@42.3639644,- 71.117796,17z/data=!3m1!4b1!4m5!3m4!1s0x89e37758cbf161e3:0x3d1af627e99e45ec!8m2!3d42.3639644!4d-71.1156073