SlideShare uma empresa Scribd logo
1 de 4
Transformerless Inverters with Thin Film Technology


Is it possible to use only one Technology of Inverters capable of using any module technology either thin film or
crystalline without causing the modules to decay or causing TCO corrosion / PID .

All TLX versions of the manufacturer Danfoss can handle back ( rear) contacted modules or thin film modules
without causing PID or other issues.




1PID:


There are 3 possibilities - TCO corrosion

                          -Polarisationfr. rear contacted modules

                          -siliconbased shifting of “standard “ modules

All in common is the polarity and the leakage current ( caused from the potential @cell level, modules
compared to the soil, and the Insulation of the modules)

Furtherone is the cell structure , the AR coating as spoken from many companies like Solon, Sun Power.

With some rear contacted cells the PID effect starts almost in the beginning ( immediate 30% loss )others may
take month , even years.

This is one reason why module manufacturers are storing “black listed inverter topologies” or give green light.
Depending on which technology are implemented on module level , either + or – pole should be grounded.




2. Earth Concept/Bonding vsSafety :


Even though + or – polegrounding seems to be a easy task, practically it can cause a lot of headache. The
Maintenance team mostly is not aware of a “groundedsystem”. As most of the time Maintenance work is done
during operation, and the modules are always “under full load” it is wise to make the Persons in charge
sensitive regard this matter.

Especially in Europe it is not needed to ground systems by law, with the only exception of thin film
modules.Theres also lot of differences regards Spanish, French and German legislation regards grounding
methods ( some Arab countries and Israel e.g use “german settings regards inverter set ups )

The next problem is to ground the system via a circuit breaker capable of switching off according Voltage and
Current ( in Europe up to 1000V DC is possible since 2012 theres talks even about 1500 V DC systems ).

Always a DC Main switch should be included to easily remove the earth connection. ( during scheduled
maintenance work )
Also should be thought of how the system can detect wether the circuit breaker went off or how easily the
inverter can recognize that the system is online again to not cause the modules to decay unrecognized.

( if the circuit breaker is still not replaced – so no grounding occures)




2.1Performance Issues:


Not only safety features also a lot of inverters cannot handle the recommendations. Out of physical reasons a
transformerless inverter cannot be choosenanymore.Some central Grid Inverters are capable via transformer
kit with galvanic isolation to run with a pole ( + or - ) earthed ( without trouble ).

There are several Central grid Inverters ( transformerless ) which have their own Medium Voltage transformer
or similar a isolated integrated transformer included.

Otherwise those systems cannot handle the full potential of the PV Plant in comparison to transformerless
inverters.( cause is the bonding towards Earth )

So with the already minimized efficiency of thin film modules, and transformer based inverters this solution
gives also less performance , so the already “weaker system “ will loose even more PR.

Since years ( transformerless inverter topologies ) the manufacturing companies trying to find a way to not
bond via Earth but rather via the Neutral to ground “ much smoother “.

With different topologies been used like:

Balance Mode, Quiet Rail or Flying Inductor topology thin film modules only work in a tiny little window of the
MPPT range , or/and to much components desperately needed will increase the price of the unit , by that
again will not give you lot of cost advantages.

Other solutions prefer Earthing via a high resistance ( Suntechnics/ Conergy ) so called Drain Technology or
active driven boxes which try to solve the issues (arising) again called Performer Unit @ Night.

In Germany ( VDE 0100/712 ) e.gdoesn `t allow to separate AC/DC only with a simple separation ( when using a
high resistor ), it has to be electrically isolated.




3 Solution ( GVC ):Ground Voltage Control
With the patented Topology ( GVC ) Danfoss set a new standard using thin film modules , poly or mono
crystalline modules , even rear contacted cells can be used with a single module of inverter ( TLX ).

The big advantages in that is that the topology is making use of the technology that AC and DC are not
separated ( galvanically ).A IT Network.See picture 1

Therefore any grounding wether on DC or AC side supplied will affect the other Part of the installation ( as not
usually with galvanically isolated inverters ) The inverters built into the PV Plant ( IT Network ) will only be
separated at the Medium or Low Voltage side of the transformer Station.see picture 2
It can be a Transformerstation “as usual” only that the Low Voltage side shouldn t be earthed at all. With the
AC supply towards the Distribution Boards, the only thing to worry about is that the cabling has to be done via
a 5 core cabling , separating Earth and Neutral from the supply line at the beginning already.



So a Neutral / 3 Phase / Earth supply line is mandatory , the GVC unit has to be placed inside the
transformerstation once, and the 5 core cabling will supply the inverters , the GVC will “introduce” some
Voltage in between Neutral and Earth. ( soit s not equal anymore ).

The cause of this virtually grounding method will shift the potential arising also between Phases and Soil /Earth
because theres no separation between AC and DC side ( no galvanic isolation ) the shift at the DC side will be
similar. That s the big advantage about this solution ( compared to transformer based inverters this would have
been impossible to implement) the only solution is to earth via the Soil / Earth.

Voltage but also Current can be individually adjusted ( according module specification ) , with the change in
polarity inside the device the module technology been used doesn t count anymore.

Anything wether plus or minus related problems can be “healed” , that s absolutely georgious as this can be
achieved with one single inverter.

To be fully balanced all the leakage currents , cables , modules and inverters must be ZEROED OUT.Not only the
installation or modules itself , also components , rain and Insulation as well degradation must be cancelled out.

A 18 month old system with a leakage current of 17mA will easily reach during a rainy period 34mA (double the
amount ).Those datas are publically available and several times discussed . With one unit ( a GVC unit ) you can
handle up to 100 inverters max, another good reason as with transformer based units each single inverter has
to be checked during maintenance work.( here only 1 item )

And also the grounding must be done ( in this case 100 times ) traditionally while here with grounding solution
The power been “used” is determined from the total leakage current from the whole PV Plant.

In this case when the 30mA will be reached it would accumulate to 20 W ( only ! ) roughly 175kWh been used
/lost per anno.

With a total production Northern Europe of 950 kWh/kWp 142 5000 kWh can be achieved that s 0,012% so
very less compared to loose constantly 2-3 % with transformerbased inverters instead.




3.2 System Safety/Security:
After All ( VDE confirmed ) solutions also security and safety issues regards maintenance workers were
implemented , several tests in Denmark, Germany and Spain were conducted. ( Hardware )

Also different sizes of testsites were choosen ranging from 60kW towards 1 MW in a 18 month durabilityTest
different configurations were tested and datas collected will be shared in the near future with module
suppliers.
PICTURE 4:Shows a testsite with 1 MW installed modules with a sampling rate of 20 periods per 30 seconds.

Picture 5 :Shows the Voltage levels picking up from 4am to 10 pm with a sampling rate of 30 seconds.

The whole concept was finalized and tested from ( BGETM ) and it s according VDE for Photovoltaic Systems.

The only thing which has to be implemented is a Neutral bar which is completely sealed and can t be touched
As the floating in between Earth and Neutral is according GVC Off Set Voltage and not Zero anymore.



The other safety issue the Danfoss ( TLX ) will take care of , in case of an Earth fault he will shutdown
immediately.( DC side will remain open and no leakage current will flow )

Having an Earth Fault online with any of the Strings involved will cause the device to reduce the Voltage and
current involved, further one the inverters will shut down.Thats another reason why no Earth Fault could
damage ( or further damage ) modules in the DC String involved ( high leakage current ).

During ground or stray currents/ or faults with the GVC Box the inverters will automatically shut down. During
an Earth fault the current monitoring will detect a fault minimize the current and also Voltage will be reduced
in this case it doesn t matter if it s related towards Plus or Minuspole. ( also a shortcut GVC Voltage is possible )




4 Results :


Thanks to the TLX inverter and the GVC solution also big PV Plants can be built with decentralized
invertertechnology , so that means theres a solution to use small , compact inverter systems instead of Central
Grid inverters with their problematic tracking capability.



The Central Grid MPPT Tracker is never the best choice regards kWh/kWp produced as he will go for the global
instead of locally based MPPT values , therefore loose out if compared with a inverter based with 3 trackers e.g

3 x 6 kW tracked individually compared to a Central inverter “draw” which has to work from 1 kW towards
100kW , by that in between he will loose out on performance compared to single tracked 6kW units in the
whole PV Plant.

The possibility to relate towards temperature/ Voltage and irradiation can t be beaten via centralized Inverters
also the price continuously went down and pricewise are PV Plants similar already.

This solution can also solve PID issues with “standard” modules.




Written from Lars Fischer Technical PM from Danfoss Solar inverters EP Photovoltaic

Translated Andreas IliouTechn.Customer Engineer/ Lecturer Suntech Power Munich 2012

Mais conteúdo relacionado

Mais procurados

MICROPROCESSOR BASED SUN TRACKING SOLAR PANEL SYSTEM TO MAXIMIZE ENERGY GENER...
MICROPROCESSOR BASED SUN TRACKING SOLAR PANEL SYSTEM TO MAXIMIZE ENERGY GENER...MICROPROCESSOR BASED SUN TRACKING SOLAR PANEL SYSTEM TO MAXIMIZE ENERGY GENER...
MICROPROCESSOR BASED SUN TRACKING SOLAR PANEL SYSTEM TO MAXIMIZE ENERGY GENER...
moiz89
 
1.2 1231 control of inductive load switching transients
1.2 1231 control of inductive load switching transients1.2 1231 control of inductive load switching transients
1.2 1231 control of inductive load switching transients
Dutch Power
 
Pv grid connected inverter
Pv grid connected inverterPv grid connected inverter
Pv grid connected inverter
Jia Jason
 
Solar Panel Installations
Solar Panel InstallationsSolar Panel Installations
Solar Panel Installations
Chad Weiss
 
MPPT Based Optimal Charge Controller in PV system
MPPT Based Optimal Charge Controller in PV systemMPPT Based Optimal Charge Controller in PV system
MPPT Based Optimal Charge Controller in PV system
Malik Sameeullah
 
Minute lecture - Optimisation of PV installations for partial shadowing
Minute lecture - Optimisation of PV installations for partial shadowingMinute lecture - Optimisation of PV installations for partial shadowing
Minute lecture - Optimisation of PV installations for partial shadowing
Leonardo ENERGY
 

Mais procurados (20)

PWM SOLAR CHARGE CONTROLLER ARDUINO NANO
PWM SOLAR CHARGE CONTROLLER ARDUINO NANOPWM SOLAR CHARGE CONTROLLER ARDUINO NANO
PWM SOLAR CHARGE CONTROLLER ARDUINO NANO
 
Body Heat Powered Flashlight Using LTC3108
Body Heat Powered Flashlight Using LTC3108Body Heat Powered Flashlight Using LTC3108
Body Heat Powered Flashlight Using LTC3108
 
PV inverter's instruction by thinkpower
PV inverter's instruction by thinkpowerPV inverter's instruction by thinkpower
PV inverter's instruction by thinkpower
 
MICROPROCESSOR BASED SUN TRACKING SOLAR PANEL SYSTEM TO MAXIMIZE ENERGY GENER...
MICROPROCESSOR BASED SUN TRACKING SOLAR PANEL SYSTEM TO MAXIMIZE ENERGY GENER...MICROPROCESSOR BASED SUN TRACKING SOLAR PANEL SYSTEM TO MAXIMIZE ENERGY GENER...
MICROPROCESSOR BASED SUN TRACKING SOLAR PANEL SYSTEM TO MAXIMIZE ENERGY GENER...
 
#Solar #Design #TOOL PV System Design Calculations Report at Neotia Universit...
#Solar #Design #TOOL PV System Design Calculations Report at Neotia Universit...#Solar #Design #TOOL PV System Design Calculations Report at Neotia Universit...
#Solar #Design #TOOL PV System Design Calculations Report at Neotia Universit...
 
1.2 1231 control of inductive load switching transients
1.2 1231 control of inductive load switching transients1.2 1231 control of inductive load switching transients
1.2 1231 control of inductive load switching transients
 
Elektrisch vervoer van de toekomst
Elektrisch vervoer van de toekomstElektrisch vervoer van de toekomst
Elektrisch vervoer van de toekomst
 
Solar ppt
Solar pptSolar ppt
Solar ppt
 
Pv grid connected inverter
Pv grid connected inverterPv grid connected inverter
Pv grid connected inverter
 
Smart Solar Power Conversion System - Final Defense Presentation
Smart Solar Power Conversion System - Final Defense PresentationSmart Solar Power Conversion System - Final Defense Presentation
Smart Solar Power Conversion System - Final Defense Presentation
 
Generator protection system by nicholas naing
Generator protection system by nicholas naingGenerator protection system by nicholas naing
Generator protection system by nicholas naing
 
Solar Panel Installations
Solar Panel InstallationsSolar Panel Installations
Solar Panel Installations
 
MPPT Based Optimal Charge Controller in PV system
MPPT Based Optimal Charge Controller in PV systemMPPT Based Optimal Charge Controller in PV system
MPPT Based Optimal Charge Controller in PV system
 
Automatic Solar night lamp
Automatic Solar night lampAutomatic Solar night lamp
Automatic Solar night lamp
 
SOLAR LED STREET LIGHT
SOLAR LED STREET LIGHT SOLAR LED STREET LIGHT
SOLAR LED STREET LIGHT
 
Analysis and Modeling of Transformerless Photovoltaic Inverter Systems
Analysis and Modeling of Transformerless Photovoltaic Inverter SystemsAnalysis and Modeling of Transformerless Photovoltaic Inverter Systems
Analysis and Modeling of Transformerless Photovoltaic Inverter Systems
 
Minute lecture - Optimisation of PV installations for partial shadowing
Minute lecture - Optimisation of PV installations for partial shadowingMinute lecture - Optimisation of PV installations for partial shadowing
Minute lecture - Optimisation of PV installations for partial shadowing
 
eTracer Network MPPT Solar Charge Controller ET2415N,ET3415N,ET4415N,ET6415N
eTracer Network MPPT Solar Charge Controller ET2415N,ET3415N,ET4415N,ET6415NeTracer Network MPPT Solar Charge Controller ET2415N,ET3415N,ET4415N,ET6415N
eTracer Network MPPT Solar Charge Controller ET2415N,ET3415N,ET4415N,ET6415N
 
Generator rotor earth fault protection
Generator rotor earth fault protectionGenerator rotor earth fault protection
Generator rotor earth fault protection
 
Photovoltaic Training - Session 2 - Construction and Start-Up
Photovoltaic Training - Session 2 - Construction and Start-UpPhotovoltaic Training - Session 2 - Construction and Start-Up
Photovoltaic Training - Session 2 - Construction and Start-Up
 

Semelhante a Transformerless inverters with thin film technology-Danfoss thin film and pid related topic

Presentation gamatronic
Presentation gamatronicPresentation gamatronic
Presentation gamatronic
hoanv
 

Semelhante a Transformerless inverters with thin film technology-Danfoss thin film and pid related topic (20)

Report uk pv plants part 1
Report  uk pv plants part 1Report  uk pv plants part 1
Report uk pv plants part 1
 
Photovoltaic Training Course - Module 1.2 choosing components
Photovoltaic Training Course - Module 1.2 choosing componentsPhotovoltaic Training Course - Module 1.2 choosing components
Photovoltaic Training Course - Module 1.2 choosing components
 
Redundant Low Voltage PV System
Redundant Low Voltage PV SystemRedundant Low Voltage PV System
Redundant Low Voltage PV System
 
Nabeelpbm1998@gmail.com
Nabeelpbm1998@gmail.comNabeelpbm1998@gmail.com
Nabeelpbm1998@gmail.com
 
ISLANDING DETECTION TECHNIQUE FOR DISTRIBUTED GENERATION SYSTEM
ISLANDING DETECTION TECHNIQUE FOR DISTRIBUTED GENERATION SYSTEMISLANDING DETECTION TECHNIQUE FOR DISTRIBUTED GENERATION SYSTEM
ISLANDING DETECTION TECHNIQUE FOR DISTRIBUTED GENERATION SYSTEM
 
Solar junction boxes jmv lps ltd
Solar junction boxes   jmv lps ltdSolar junction boxes   jmv lps ltd
Solar junction boxes jmv lps ltd
 
Solar junction boxes jmv lps ltd
Solar junction boxes   jmv lps ltdSolar junction boxes   jmv lps ltd
Solar junction boxes jmv lps ltd
 
RELINK - benefit of micro inverters
RELINK - benefit of micro invertersRELINK - benefit of micro inverters
RELINK - benefit of micro inverters
 
Module Level Power Regulation
Module Level Power RegulationModule Level Power Regulation
Module Level Power Regulation
 
Delta RPI M10A Three Phase Commercial Inverter
Delta RPI M10A Three Phase Commercial InverterDelta RPI M10A Three Phase Commercial Inverter
Delta RPI M10A Three Phase Commercial Inverter
 
Applying Digital Isolators in Motor Control
Applying Digital Isolators in Motor ControlApplying Digital Isolators in Motor Control
Applying Digital Isolators in Motor Control
 
Presentation gamatronic
Presentation gamatronicPresentation gamatronic
Presentation gamatronic
 
Fire fighting robot
Fire fighting robotFire fighting robot
Fire fighting robot
 
Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...
Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...
Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...
 
project report on plc based load sharing
project report on plc based load sharingproject report on plc based load sharing
project report on plc based load sharing
 
Ba33301306
Ba33301306Ba33301306
Ba33301306
 
Ba33301306
Ba33301306Ba33301306
Ba33301306
 
Aasరాజకీయ ఆలోచన లేదు
Aasరాజకీయ ఆలోచన లేదుAasరాజకీయ ఆలోచన లేదు
Aasరాజకీయ ఆలోచన లేదు
 
బాలీవుడ్‌కు తెలుగు యంగ్ హీరో
బాలీవుడ్‌కు తెలుగు యంగ్ హీరోబాలీవుడ్‌కు తెలుగు యంగ్ హీరో
బాలీవుడ్‌కు తెలుగు యంగ్ హీరో
 
Solar ppt
Solar pptSolar ppt
Solar ppt
 

Mais de Andreas ILIOU - Elektro- Solar

Mais de Andreas ILIOU - Elektro- Solar (13)

Report earthing grounding pv with shielded, armoured dc cabling (worldwide)
Report earthing grounding pv with shielded, armoured dc cabling (worldwide)Report earthing grounding pv with shielded, armoured dc cabling (worldwide)
Report earthing grounding pv with shielded, armoured dc cabling (worldwide)
 
Uwe linder reference
Uwe linder referenceUwe linder reference
Uwe linder reference
 
Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentation
 
Energy audit on site v02 andreas iliou
Energy audit on site v02 andreas iliouEnergy audit on site v02 andreas iliou
Energy audit on site v02 andreas iliou
 
Leakage current per inverter recorded
Leakage current per inverter recordedLeakage current per inverter recorded
Leakage current per inverter recorded
 
20110711 blitzschutz spezifikationen
20110711 blitzschutz spezifikationen20110711 blitzschutz spezifikationen
20110711 blitzschutz spezifikationen
 
Pid-degradation of solarcells- solon in englisch
 Pid-degradation of solarcells- solon  in englisch Pid-degradation of solarcells- solon  in englisch
Pid-degradation of solarcells- solon in englisch
 
80 MW Stringwechselrichter Lösung
80 MW Stringwechselrichter Lösung80 MW Stringwechselrichter Lösung
80 MW Stringwechselrichter Lösung
 
Danfoss thin film and pid related topic
Danfoss thin film and pid related topicDanfoss thin film and pid related topic
Danfoss thin film and pid related topic
 
Shading v02
Shading v02Shading v02
Shading v02
 
Energy Audits 2011....2018
Energy Audits 2011....2018Energy Audits 2011....2018
Energy Audits 2011....2018
 
Suntech ppt 2011 new vi template.ppt1.ppt.engl
Suntech ppt 2011 new vi template.ppt1.ppt.englSuntech ppt 2011 new vi template.ppt1.ppt.engl
Suntech ppt 2011 new vi template.ppt1.ppt.engl
 
Site visit as discussed
Site visit  as discussedSite visit  as discussed
Site visit as discussed
 

Último

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
Earley Information Science
 

Último (20)

presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 

Transformerless inverters with thin film technology-Danfoss thin film and pid related topic

  • 1. Transformerless Inverters with Thin Film Technology Is it possible to use only one Technology of Inverters capable of using any module technology either thin film or crystalline without causing the modules to decay or causing TCO corrosion / PID . All TLX versions of the manufacturer Danfoss can handle back ( rear) contacted modules or thin film modules without causing PID or other issues. 1PID: There are 3 possibilities - TCO corrosion -Polarisationfr. rear contacted modules -siliconbased shifting of “standard “ modules All in common is the polarity and the leakage current ( caused from the potential @cell level, modules compared to the soil, and the Insulation of the modules) Furtherone is the cell structure , the AR coating as spoken from many companies like Solon, Sun Power. With some rear contacted cells the PID effect starts almost in the beginning ( immediate 30% loss )others may take month , even years. This is one reason why module manufacturers are storing “black listed inverter topologies” or give green light. Depending on which technology are implemented on module level , either + or – pole should be grounded. 2. Earth Concept/Bonding vsSafety : Even though + or – polegrounding seems to be a easy task, practically it can cause a lot of headache. The Maintenance team mostly is not aware of a “groundedsystem”. As most of the time Maintenance work is done during operation, and the modules are always “under full load” it is wise to make the Persons in charge sensitive regard this matter. Especially in Europe it is not needed to ground systems by law, with the only exception of thin film modules.Theres also lot of differences regards Spanish, French and German legislation regards grounding methods ( some Arab countries and Israel e.g use “german settings regards inverter set ups ) The next problem is to ground the system via a circuit breaker capable of switching off according Voltage and Current ( in Europe up to 1000V DC is possible since 2012 theres talks even about 1500 V DC systems ). Always a DC Main switch should be included to easily remove the earth connection. ( during scheduled maintenance work )
  • 2. Also should be thought of how the system can detect wether the circuit breaker went off or how easily the inverter can recognize that the system is online again to not cause the modules to decay unrecognized. ( if the circuit breaker is still not replaced – so no grounding occures) 2.1Performance Issues: Not only safety features also a lot of inverters cannot handle the recommendations. Out of physical reasons a transformerless inverter cannot be choosenanymore.Some central Grid Inverters are capable via transformer kit with galvanic isolation to run with a pole ( + or - ) earthed ( without trouble ). There are several Central grid Inverters ( transformerless ) which have their own Medium Voltage transformer or similar a isolated integrated transformer included. Otherwise those systems cannot handle the full potential of the PV Plant in comparison to transformerless inverters.( cause is the bonding towards Earth ) So with the already minimized efficiency of thin film modules, and transformer based inverters this solution gives also less performance , so the already “weaker system “ will loose even more PR. Since years ( transformerless inverter topologies ) the manufacturing companies trying to find a way to not bond via Earth but rather via the Neutral to ground “ much smoother “. With different topologies been used like: Balance Mode, Quiet Rail or Flying Inductor topology thin film modules only work in a tiny little window of the MPPT range , or/and to much components desperately needed will increase the price of the unit , by that again will not give you lot of cost advantages. Other solutions prefer Earthing via a high resistance ( Suntechnics/ Conergy ) so called Drain Technology or active driven boxes which try to solve the issues (arising) again called Performer Unit @ Night. In Germany ( VDE 0100/712 ) e.gdoesn `t allow to separate AC/DC only with a simple separation ( when using a high resistor ), it has to be electrically isolated. 3 Solution ( GVC ):Ground Voltage Control With the patented Topology ( GVC ) Danfoss set a new standard using thin film modules , poly or mono crystalline modules , even rear contacted cells can be used with a single module of inverter ( TLX ). The big advantages in that is that the topology is making use of the technology that AC and DC are not separated ( galvanically ).A IT Network.See picture 1 Therefore any grounding wether on DC or AC side supplied will affect the other Part of the installation ( as not usually with galvanically isolated inverters ) The inverters built into the PV Plant ( IT Network ) will only be separated at the Medium or Low Voltage side of the transformer Station.see picture 2
  • 3. It can be a Transformerstation “as usual” only that the Low Voltage side shouldn t be earthed at all. With the AC supply towards the Distribution Boards, the only thing to worry about is that the cabling has to be done via a 5 core cabling , separating Earth and Neutral from the supply line at the beginning already. So a Neutral / 3 Phase / Earth supply line is mandatory , the GVC unit has to be placed inside the transformerstation once, and the 5 core cabling will supply the inverters , the GVC will “introduce” some Voltage in between Neutral and Earth. ( soit s not equal anymore ). The cause of this virtually grounding method will shift the potential arising also between Phases and Soil /Earth because theres no separation between AC and DC side ( no galvanic isolation ) the shift at the DC side will be similar. That s the big advantage about this solution ( compared to transformer based inverters this would have been impossible to implement) the only solution is to earth via the Soil / Earth. Voltage but also Current can be individually adjusted ( according module specification ) , with the change in polarity inside the device the module technology been used doesn t count anymore. Anything wether plus or minus related problems can be “healed” , that s absolutely georgious as this can be achieved with one single inverter. To be fully balanced all the leakage currents , cables , modules and inverters must be ZEROED OUT.Not only the installation or modules itself , also components , rain and Insulation as well degradation must be cancelled out. A 18 month old system with a leakage current of 17mA will easily reach during a rainy period 34mA (double the amount ).Those datas are publically available and several times discussed . With one unit ( a GVC unit ) you can handle up to 100 inverters max, another good reason as with transformer based units each single inverter has to be checked during maintenance work.( here only 1 item ) And also the grounding must be done ( in this case 100 times ) traditionally while here with grounding solution The power been “used” is determined from the total leakage current from the whole PV Plant. In this case when the 30mA will be reached it would accumulate to 20 W ( only ! ) roughly 175kWh been used /lost per anno. With a total production Northern Europe of 950 kWh/kWp 142 5000 kWh can be achieved that s 0,012% so very less compared to loose constantly 2-3 % with transformerbased inverters instead. 3.2 System Safety/Security: After All ( VDE confirmed ) solutions also security and safety issues regards maintenance workers were implemented , several tests in Denmark, Germany and Spain were conducted. ( Hardware ) Also different sizes of testsites were choosen ranging from 60kW towards 1 MW in a 18 month durabilityTest different configurations were tested and datas collected will be shared in the near future with module suppliers. PICTURE 4:Shows a testsite with 1 MW installed modules with a sampling rate of 20 periods per 30 seconds. Picture 5 :Shows the Voltage levels picking up from 4am to 10 pm with a sampling rate of 30 seconds. The whole concept was finalized and tested from ( BGETM ) and it s according VDE for Photovoltaic Systems. The only thing which has to be implemented is a Neutral bar which is completely sealed and can t be touched
  • 4. As the floating in between Earth and Neutral is according GVC Off Set Voltage and not Zero anymore. The other safety issue the Danfoss ( TLX ) will take care of , in case of an Earth fault he will shutdown immediately.( DC side will remain open and no leakage current will flow ) Having an Earth Fault online with any of the Strings involved will cause the device to reduce the Voltage and current involved, further one the inverters will shut down.Thats another reason why no Earth Fault could damage ( or further damage ) modules in the DC String involved ( high leakage current ). During ground or stray currents/ or faults with the GVC Box the inverters will automatically shut down. During an Earth fault the current monitoring will detect a fault minimize the current and also Voltage will be reduced in this case it doesn t matter if it s related towards Plus or Minuspole. ( also a shortcut GVC Voltage is possible ) 4 Results : Thanks to the TLX inverter and the GVC solution also big PV Plants can be built with decentralized invertertechnology , so that means theres a solution to use small , compact inverter systems instead of Central Grid inverters with their problematic tracking capability. The Central Grid MPPT Tracker is never the best choice regards kWh/kWp produced as he will go for the global instead of locally based MPPT values , therefore loose out if compared with a inverter based with 3 trackers e.g 3 x 6 kW tracked individually compared to a Central inverter “draw” which has to work from 1 kW towards 100kW , by that in between he will loose out on performance compared to single tracked 6kW units in the whole PV Plant. The possibility to relate towards temperature/ Voltage and irradiation can t be beaten via centralized Inverters also the price continuously went down and pricewise are PV Plants similar already. This solution can also solve PID issues with “standard” modules. Written from Lars Fischer Technical PM from Danfoss Solar inverters EP Photovoltaic Translated Andreas IliouTechn.Customer Engineer/ Lecturer Suntech Power Munich 2012