Building America
         Quality Process
Goal:
Make widely available to
builders/remodelers processes, tools, and
methods to build and retrofit high
performance homes on a repeatable scale

   Economics of Quality
   HPH Scopes of Work
   Hotspot Inspection Process
   HPH Quality Management System

                                            p. 2
Economics of Quality

   Goals:
       Quantify benefits of
        implementing quality
        practices
       Validate performance
        improvements achieved
        through quality practices


                                    p. 3
Hypothetical Cost of Quality
                         (Cokins, 2006)




   PC=prevention cost              IFC=internal failure cost
   AC=appraisal cost               EFC=external failure cost   p. 4
Malcolm Baldrige National Quality (MBNQ)
   Award Winners Over 8 Year Study
                             (Wrolstad & Krueger, 2001)



                                                          Matched, Non-Winning
                                MBNQA Winners
                                                              Companies,
                                  1988-1996
                                                               1988-1996

   Return on equity                 +18.73%                      -5.91%

   Return on assets                 +10.28%                      -5.5%

   Operating profit margin          +46.77%                     +2.69%

   Operating margin                   +1.12                      -1.71

                                                                +16.2%
   Return on investment              +18.1%
                                                            (S&P500 Index, +13%)

                                                                                   p. 5
Opportunities for Builders
                  (Professional Builder Magazine, May 2009)




Do Builders See a Need for
  Improvement?
 Operational Efficiencies
       60%
   Better Product
    Marketing & Services
       29%


                                                              p. 6
National Housing Quality Award
                     (NHQA) Results 1993-2009


                                           NHQA Winning Builder
Category
                                             Benefit from Quality
Profits (Gross Margins)                           12-20%
Revenue                                     15-100% increase/yr
Construction Costs vs. Budget                     +/- 1%
Customer Satisfaction                             93-97%
Referral Rates
                                                    29%
    (Sales made through referral)
Cycle Time Reductions                             15-50%
Zero Defects at Closing                             98%
Defect Reductions                                 11-75%
Employee Satisfaction                               94%
Trade Satisfaction                                  95%
Customer Endorsements/ Thank You Letters            73%
Warranty Requests                          1 per every 15.5 homes
                                                                    p. 7
How to Measure Quality?
              Performance Metrics

   Construction schedules
   On-time delivery
   Energy performance
   Cost
   Training
   Satisfaction
   Referral
   Productivity
   Warranty/Defects

                                    p. 8
Challenges of Performance
                  Metrics

   Comparing
    “apples to apples”
   Defining them so
    all builders can
    use them as
    benchmarks



                                     p. 9
Quality Impacts at
                     Veridian Homes
   Construction Costs
       -/+1% Budget vs. Actual
   Customer Satisfaction
       95% +
   Veridian Homebuyers
       76% only looked at Veridian
   Zero Defects
       90% of homes at home
        orientation
   HERS Index
       58-61


                                         p. 10
Veridian Results
       Reduced Defects
            50% in 1 yr
            Cut inspections in half
       Reduced Warranty Costs & Defects
            30% - 75%
       Reduced Construction Cycle Time
            18 days
       Reduced Material Variance
            20% lumber, 24% siding, & 38% trim

       Their Secret?
            Commitment to quality management
            Use of tools, principles and resources, including
             a HPH quality management system




                                                         p. 11
Economics of Quality
   Existing Homes

         Define remodeling industry
          quality management needs
         Create industry-specific
          quality tools & techniques
         Identify industry role model
          remodelers with QMS to
          create case studies


                                    p. 12
Economics of Quality for
       Existing Homes Next Steps
   Determine type of
    remodeling contractor(s)
   Research quality
    management impact data for
    remodeling
   Prioritize performance issues
    in the remodeling industry
   Define remodeling
    performance metrics
                                    p. 13
High Performance Homes (HPH)
     Scopes of Work (SOW)
      Completed New Home Construction

   HVAC
   Framing
   Foundations
   Vented & Unvented
    Crawlspaces
   Excavation
   Grading
   Vinyl Siding
   WRB
   Rigid Insulating Sheathing
                                        p. 14
Planned New HPH SOW

            Envelope sealing
            Ventilation
            Insulation
             (wall, ceiling, and floor)
            PV roof installation
            Window Installation
            Door installation


                                      p. 15
HPH Remodeling SOW Considerations

New Home Elements             Proposed Remodel
2) Design and Specification   2) Re-design, Specifications,
   Prerequisites                 & Statement of job limits
3) Details                    3) Details

4) Jobsite conditions         4) Jobsite conditions

5) Order of work              5) Order of work

6) SOW Contract language      6) SOW Contract language

7) SOW QA Inspection          7) SOW QA Inspection/
   checklists (Job ready,        Assessment checklists
   phase, and final)
                                                              p. 16
HPH Remodeling SOW Considerations

   Customizing SOW for Remodeling (every time?)
   Other considerations for remodeling
       Health and safety
       Demolition, crew type, materials, etc
       Quality performance criteria for remodeling
   Remodeling SOW Quality Assurance (QA) Process
       Need to define types of QA
       QA timing
       QA criteria
       QA documentation


                                                      p. 17
High Performance Home
        Hotspot Process


A Hotspot is a Problem that is:
 Current

 Widespread or recurring

 A significantly important challenge




                                        p. 18
Why Do Hotspots Work?

Hotspots work because they are:
 Focused on a prioritized topic
 Well-trained to all workers
 Inspected and tracked for all jobs



Which educates workers and
 creates accountability


                                       p. 19
Hotspot Process




                  p. 20
Hotspot Examples

Jobsite Installation or                                    Personnel Or Company
                          Office Operations
Supply                                                     Culture

High air infiltration     Too many backordered items       Culture of finger-pointing

Poor performing           Difficulty locating records or
                                                           Lack of accountability
ducts                     documents
Squeaky floors
                          Errors on take-offs              High employee turnover

Late or incomplete        Not responding in a timely
                                                           Lack of pride
deliveries                manner to customer requests




                                                                                        p. 21
Choose Hotspot Using Data
                                    HOTSPOT/INSPECTION LOG

   Builder/Lot                Inspection Items from Job Complete Forms

                  Hotspot Item Item 1 Item 2 Item 3 Item 4 Item 5 Item 6 Item 7 Item 8
 Smith Building                          2
    Elders 23                            1                                         1
    Elders 24          1
    Elders 25                            1                    1
    Elders 26
 The Meadows 12
 The Meadows 13
 The Meadows 14        1
 The Meadows 15
 The Meadows 16                         1
 The Meadows 17
                                                             1
R&R Custom Homes
 1002 Peaceful Way              1              1
 1004 Peaceful Way                      1
 1006 Peaceful Way     1                                                   1
 1008 Peaceful Way                      1

      Total            3        1       5      1      0      1      0      1      1

                                                                                      p. 22
Determine The Root Cause




                           p. 23
Develop Hotspot Training Sheet
Install mechanical dampers on supply-air duct lines off the plenum

 Instale válvulas mecánicas en las líneas de conducción de aire del pleno




                                                                            p. 24
Sign Hotspot Training Log

All crew members and all crew leaders must attend session.
•Lead man explains the problem and the proposed solution.
•Everyone examines both pictures and all notes.
•Lead man answers any questions.
•All crew members and crew leaders sign below.
•Lead man signs and dates bottom of page.
TIME MEETING STARTED: __________________a.m./p.m.______
ATTENDEES:
_____(PRINT NAME)________ _________(SIGNATURE)______________
___________________________ ____________________________________
___________________________ ____________________________________
___________________________ ____________________________________
___________________________ ____________________________________




                                                                   p. 25
Conduct Hotspot Training




                           p. 26
Inspect Hotspot On All Jobs
                                                                                            Subdivision:
                                                                 Lot:
                                                                                            Date of initial inspection:
Builder:

Builder Supervisor Name:                                                                    Crew Leader Name:

               Instructions: Check box if OK, circle box if correction is needed. Note specific correction action required.
                                                     When corrected, then check box.
                                                                  Trade          Trade                    Explain Needed Corrections
                                                                                             Builder
                                                                 Foreman         Super                    List Date Corrected

                                                                    OK            OK          OK/NA




                    Lap and tape
Describe Current Hotspot:
                                                                                              
all horizontal house wrap seams
      The house wrap is installed continuously with no
1.    tears or rips, or all rips or tears are properly                                        
      repaired. [BCQC-23]


2.    The house wrap is lapped as specified. [BCQC-23]                                        

      The house wrap is fastened with manufacturer’s
3.
      specified fasteners.
                                                                                              

      The house wrap joints are taped with
4.
      manufacturer’s specified product. [BCQC-16]
                                                                                              

      The house wrap covers the sill plate, rim joist, and
5.
      top plates.
                                                                                              
                                                                                                                                       p. 27
Evaluate Inspection Data
                                    HOTSPOT/INSPECTION LOG

   Builder/Lot                Inspection Items from Job Complete Forms

                  Hotspot Item Item 1 Item 2 Item 3 Item 4 Item 5 Item 6 Item 7 Item 8
 Smith Building                          2
    Elders 23                            1                                         1
    Elders 24          1
    Elders 25                            1                    1
    Elders 26
 The Meadows 12
 The Meadows 13
 The Meadows 14        1
 The Meadows 15
 The Meadows 16                         1
 The Meadows 17
                                                             1
R&R Custom Homes
 1002 Peaceful Way              1              1
 1004 Peaceful Way                      1
 1006 Peaceful Way     1                                                   1
 1008 Peaceful Way                      1

      Total            3        1       5      1      0      1      0      1      1

                                                                                      p. 28
Repeat the Process, If Needed

   If hotspot is not
    successful
       Return to the root cause
        analysis stage
       Reevaluate other
        possible causes
       Repeat the process with
        the next most probably
        cause
                                   Courtesy of www.khov.com

                                                              p. 29
Complete And Celebrate A Hotspot

   If hotspot is successful, close-out the
    hotspot and recognize the contributors
   Remove / demote successful hotspot
    items on inspection forms
   Repeat process with new hotspot




                                              p. 30
Quality Research & Next Steps

   Develop & implement
    HPH Quality
    Management Systems
    and tools for
       Existing Homes
       New Homes




                                        p. 31
Questions?


        Amber Wood
Program Manager, Energy Efficiency
      NAHB Research Center
         301-430-6309
       awood@nahbrc.com




                                     p. 32

Mais conteúdo relacionado

Mais procurados

6 sigma rollators update for my blog
6 sigma rollators update for my blog6 sigma rollators update for my blog
6 sigma rollators update for my blog
Mario Ruiz Felix
 
Bug deBug Chennai 2012 Talk - Business value articulation in software project...
Bug deBug Chennai 2012 Talk - Business value articulation in software project...Bug deBug Chennai 2012 Talk - Business value articulation in software project...
Bug deBug Chennai 2012 Talk - Business value articulation in software project...
RIA RUI Society
 
Heizer 06
Heizer 06Heizer 06
Heizer 06
shagitu
 
Candidate Profile DW 2015
Candidate Profile DW 2015Candidate Profile DW 2015
Candidate Profile DW 2015
Daryl Wirges
 
Six Sigma Final PPT - Revised
Six Sigma Final PPT - RevisedSix Sigma Final PPT - Revised
Six Sigma Final PPT - Revised
Somrita Ghatak
 
Customer needs -_kano-garvin-&-qfd
Customer needs -_kano-garvin-&-qfdCustomer needs -_kano-garvin-&-qfd
Customer needs -_kano-garvin-&-qfd
mogambo
 
Observation report 20070720
Observation report 20070720Observation report 20070720
Observation report 20070720
營松 林
 

Mais procurados (20)

Aero project 2013- Herve CALMELLY
Aero project 2013- Herve CALMELLYAero project 2013- Herve CALMELLY
Aero project 2013- Herve CALMELLY
 
[QUATIC 2012] A Multi-Model Case Study: High Maturity in Development + Servic...
[QUATIC 2012] A Multi-Model Case Study: High Maturity in Development + Servic...[QUATIC 2012] A Multi-Model Case Study: High Maturity in Development + Servic...
[QUATIC 2012] A Multi-Model Case Study: High Maturity in Development + Servic...
 
Quality - Insurance Company Case Study
Quality - Insurance Company Case StudyQuality - Insurance Company Case Study
Quality - Insurance Company Case Study
 
6 sigma rollators update for my blog
6 sigma rollators update for my blog6 sigma rollators update for my blog
6 sigma rollators update for my blog
 
Heizer 06
Heizer 06Heizer 06
Heizer 06
 
Qfd
QfdQfd
Qfd
 
Business Value Articulation In Software Projects
Business Value Articulation In Software ProjectsBusiness Value Articulation In Software Projects
Business Value Articulation In Software Projects
 
Bug deBug Chennai 2012 Talk - Business value articulation in software project...
Bug deBug Chennai 2012 Talk - Business value articulation in software project...Bug deBug Chennai 2012 Talk - Business value articulation in software project...
Bug deBug Chennai 2012 Talk - Business value articulation in software project...
 
Heizer 06
Heizer 06Heizer 06
Heizer 06
 
AdvaMed Panel J Fraser Beyond Tradeoffs
AdvaMed Panel J Fraser Beyond TradeoffsAdvaMed Panel J Fraser Beyond Tradeoffs
AdvaMed Panel J Fraser Beyond Tradeoffs
 
Lean sytems lecture ayub jake salik 2012
Lean sytems lecture ayub jake salik 2012Lean sytems lecture ayub jake salik 2012
Lean sytems lecture ayub jake salik 2012
 
CT CV (6)
CT CV (6)CT CV (6)
CT CV (6)
 
JAYANT KUMAR
JAYANT KUMARJAYANT KUMAR
JAYANT KUMAR
 
Candidate Profile DW 2015
Candidate Profile DW 2015Candidate Profile DW 2015
Candidate Profile DW 2015
 
Qap White Paper
Qap White PaperQap White Paper
Qap White Paper
 
Six Sigma Final PPT - Revised
Six Sigma Final PPT - RevisedSix Sigma Final PPT - Revised
Six Sigma Final PPT - Revised
 
Customer needs -_kano-garvin-&-qfd
Customer needs -_kano-garvin-&-qfdCustomer needs -_kano-garvin-&-qfd
Customer needs -_kano-garvin-&-qfd
 
QFD
QFDQFD
QFD
 
Observation report 20070720
Observation report 20070720Observation report 20070720
Observation report 20070720
 
C04
C04C04
C04
 

Destaque

2013 04 - sipa nexus energy homes
2013 04 - sipa nexus energy homes2013 04 - sipa nexus energy homes
2013 04 - sipa nexus energy homes
Amber Joan Wood
 
توصيف مقرر حاجات الموهوبين
توصيف مقرر حاجات الموهوبينتوصيف مقرر حاجات الموهوبين
توصيف مقرر حاجات الموهوبين
د.سميرة أبكر
 
2010 10-20 nahbrc greening midwest
2010 10-20 nahbrc greening midwest2010 10-20 nahbrc greening midwest
2010 10-20 nahbrc greening midwest
Amber Joan Wood
 
النشاط اللامنهجي لمقرر تشخيص الموهوبين
النشاط اللامنهجي لمقرر تشخيص الموهوبينالنشاط اللامنهجي لمقرر تشخيص الموهوبين
النشاط اللامنهجي لمقرر تشخيص الموهوبين
د.سميرة أبكر
 
توصيف مقرر حاجات الموهوبين
توصيف مقرر حاجات الموهوبينتوصيف مقرر حاجات الموهوبين
توصيف مقرر حاجات الموهوبين
د.سميرة أبكر
 
توصيف مقرر تقييم وتشخيص الموهوبين والمتفوقين
توصيف مقرر تقييم وتشخيص الموهوبين والمتفوقينتوصيف مقرر تقييم وتشخيص الموهوبين والمتفوقين
توصيف مقرر تقييم وتشخيص الموهوبين والمتفوقين
د.سميرة أبكر
 
توصيف مقرر تقييم وتشخيص الموهوبين والمتفوقين
توصيف مقرر تقييم وتشخيص الموهوبين والمتفوقينتوصيف مقرر تقييم وتشخيص الموهوبين والمتفوقين
توصيف مقرر تقييم وتشخيص الموهوبين والمتفوقين
د.سميرة أبكر
 
2012 06-07 nahb leading suppliers council - zeh final
2012 06-07 nahb leading suppliers council - zeh final2012 06-07 nahb leading suppliers council - zeh final
2012 06-07 nahb leading suppliers council - zeh final
Amber Joan Wood
 
Teaching and learning achieving quality for all
Teaching and learning   achieving quality for allTeaching and learning   achieving quality for all
Teaching and learning achieving quality for all
KenyaSchoolReport.com
 
2010 10-14 eeba 2010 ngbs-bc
2010 10-14 eeba 2010 ngbs-bc2010 10-14 eeba 2010 ngbs-bc
2010 10-14 eeba 2010 ngbs-bc
Amber Joan Wood
 
2011 09-14 eeba - nahbrc building america high performance retrofits
2011 09-14 eeba - nahbrc building america high performance retrofits2011 09-14 eeba - nahbrc building america high performance retrofits
2011 09-14 eeba - nahbrc building america high performance retrofits
Amber Joan Wood
 
النشاط اللامنهجي لمقرر تشخيص الموهوبين
النشاط اللامنهجي لمقرر تشخيص الموهوبينالنشاط اللامنهجي لمقرر تشخيص الموهوبين
النشاط اللامنهجي لمقرر تشخيص الموهوبين
د.سميرة أبكر
 

Destaque (18)

2013 04 - sipa nexus energy homes
2013 04 - sipa nexus energy homes2013 04 - sipa nexus energy homes
2013 04 - sipa nexus energy homes
 
توصيف مقرر حاجات الموهوبين
توصيف مقرر حاجات الموهوبينتوصيف مقرر حاجات الموهوبين
توصيف مقرر حاجات الموهوبين
 
Chermistry
ChermistryChermistry
Chermistry
 
2010 10-20 nahbrc greening midwest
2010 10-20 nahbrc greening midwest2010 10-20 nahbrc greening midwest
2010 10-20 nahbrc greening midwest
 
النشاط اللامنهجي لمقرر تشخيص الموهوبين
النشاط اللامنهجي لمقرر تشخيص الموهوبينالنشاط اللامنهجي لمقرر تشخيص الموهوبين
النشاط اللامنهجي لمقرر تشخيص الموهوبين
 
توصيف مقرر حاجات الموهوبين
توصيف مقرر حاجات الموهوبينتوصيف مقرر حاجات الموهوبين
توصيف مقرر حاجات الموهوبين
 
توصيف مقرر تقييم وتشخيص الموهوبين والمتفوقين
توصيف مقرر تقييم وتشخيص الموهوبين والمتفوقينتوصيف مقرر تقييم وتشخيص الموهوبين والمتفوقين
توصيف مقرر تقييم وتشخيص الموهوبين والمتفوقين
 
توصيف مقرر تقييم وتشخيص الموهوبين والمتفوقين
توصيف مقرر تقييم وتشخيص الموهوبين والمتفوقينتوصيف مقرر تقييم وتشخيص الموهوبين والمتفوقين
توصيف مقرر تقييم وتشخيص الموهوبين والمتفوقين
 
2012 06-07 nahb leading suppliers council - zeh final
2012 06-07 nahb leading suppliers council - zeh final2012 06-07 nahb leading suppliers council - zeh final
2012 06-07 nahb leading suppliers council - zeh final
 
ورشة أطلقي موهبتك 2
ورشة أطلقي موهبتك 2ورشة أطلقي موهبتك 2
ورشة أطلقي موهبتك 2
 
Teaching and learning achieving quality for all
Teaching and learning   achieving quality for allTeaching and learning   achieving quality for all
Teaching and learning achieving quality for all
 
2010 10-14 eeba 2010 ngbs-bc
2010 10-14 eeba 2010 ngbs-bc2010 10-14 eeba 2010 ngbs-bc
2010 10-14 eeba 2010 ngbs-bc
 
2011 09-14 eeba - nahbrc building america high performance retrofits
2011 09-14 eeba - nahbrc building america high performance retrofits2011 09-14 eeba - nahbrc building america high performance retrofits
2011 09-14 eeba - nahbrc building america high performance retrofits
 
النشاط اللامنهجي لمقرر تشخيص الموهوبين
النشاط اللامنهجي لمقرر تشخيص الموهوبينالنشاط اللامنهجي لمقرر تشخيص الموهوبين
النشاط اللامنهجي لمقرر تشخيص الموهوبين
 
Communicative Leanguage Teaching
Communicative Leanguage Teaching Communicative Leanguage Teaching
Communicative Leanguage Teaching
 
2013 KCPE Examination Orders of Merit - Kenya
2013 KCPE Examination Orders of Merit - Kenya2013 KCPE Examination Orders of Merit - Kenya
2013 KCPE Examination Orders of Merit - Kenya
 
Top+candidates
Top+candidatesTop+candidates
Top+candidates
 
ورشة أطلقي موهبتك 2
ورشة أطلقي موهبتك 2ورشة أطلقي موهبتك 2
ورشة أطلقي موهبتك 2
 

Semelhante a 2010 07-15 rbeem nahbrc quality management

Key performance indicators 2010
Key performance indicators 2010Key performance indicators 2010
Key performance indicators 2010
Hj Arriffin Mansor
 
Costof quality
Costof qualityCostof quality
Costof quality
Omnex Inc.
 
Total quality management
Total quality managementTotal quality management
Total quality management
Sorab Sadri
 
Baldrige Quality 09c
Baldrige Quality 09cBaldrige Quality 09c
Baldrige Quality 09c
Britt Watwood
 
Quality Management System
Quality Management SystemQuality Management System
Quality Management System
Dwi Anita
 

Semelhante a 2010 07-15 rbeem nahbrc quality management (20)

AS9103_2001.pdf
AS9103_2001.pdfAS9103_2001.pdf
AS9103_2001.pdf
 
EPPM Presentation_Final
EPPM Presentation_FinalEPPM Presentation_Final
EPPM Presentation_Final
 
Key performance indicators 2010
Key performance indicators 2010Key performance indicators 2010
Key performance indicators 2010
 
Costof quality
Costof qualityCostof quality
Costof quality
 
lean manufacturing.pdf
lean manufacturing.pdflean manufacturing.pdf
lean manufacturing.pdf
 
039 integrating constructability-short
039 integrating constructability-short039 integrating constructability-short
039 integrating constructability-short
 
039 Integrating Constructability-short
039 Integrating Constructability-short039 Integrating Constructability-short
039 Integrating Constructability-short
 
NHQA presentation
NHQA presentationNHQA presentation
NHQA presentation
 
Business Value of Lean Thinking
Business Value of Lean ThinkingBusiness Value of Lean Thinking
Business Value of Lean Thinking
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
Facilities management opportunities post COVID-19 Jan-2021
Facilities management opportunities post COVID-19 Jan-2021Facilities management opportunities post COVID-19 Jan-2021
Facilities management opportunities post COVID-19 Jan-2021
 
Chapter 15 Quality Costs and Productivity : Measurement, Reporting, and Control
Chapter 15 Quality Costs and Productivity : Measurement, Reporting, and Control Chapter 15 Quality Costs and Productivity : Measurement, Reporting, and Control
Chapter 15 Quality Costs and Productivity : Measurement, Reporting, and Control
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
Baldrige Quality 09c
Baldrige Quality 09cBaldrige Quality 09c
Baldrige Quality 09c
 
039 integrating construct-ability
039 integrating construct-ability039 integrating construct-ability
039 integrating construct-ability
 
039 Integrating Constructability
039 Integrating Constructability039 Integrating Constructability
039 Integrating Constructability
 
Lean Culture Introduction
Lean Culture IntroductionLean Culture Introduction
Lean Culture Introduction
 
Introduction to TQM
Introduction to TQMIntroduction to TQM
Introduction to TQM
 
Quality Management System
Quality Management SystemQuality Management System
Quality Management System
 
New Product Launch Failure Avoidance
New Product Launch Failure AvoidanceNew Product Launch Failure Avoidance
New Product Launch Failure Avoidance
 

Mais de Amber Joan Wood

2012 09 - eeba nahbrcip-prod_bldr struct design
2012 09 - eeba nahbrcip-prod_bldr struct design2012 09 - eeba nahbrcip-prod_bldr struct design
2012 09 - eeba nahbrcip-prod_bldr struct design
Amber Joan Wood
 
2012 06-07 nahb leading suppliers council - start-up kit
2012 06-07 nahb leading suppliers council - start-up kit2012 06-07 nahb leading suppliers council - start-up kit
2012 06-07 nahb leading suppliers council - start-up kit
Amber Joan Wood
 
2011 09-16 eeba - nahbrc national green bld std overview
2011 09-16 eeba - nahbrc national green bld std overview2011 09-16 eeba - nahbrc national green bld std overview
2011 09-16 eeba - nahbrc national green bld std overview
Amber Joan Wood
 
2010 05-17 performing as designed - amber wood
2010 05-17 performing as designed - amber wood2010 05-17 performing as designed - amber wood
2010 05-17 performing as designed - amber wood
Amber Joan Wood
 
2010 07-15 rbeem nahbrc industry partnership 07-15-10
2010 07-15 rbeem nahbrc industry partnership 07-15-102010 07-15 rbeem nahbrc industry partnership 07-15-10
2010 07-15 rbeem nahbrc industry partnership 07-15-10
Amber Joan Wood
 
2010 07-15 rbeem nahbrc marine miranda 07-15-10
2010 07-15 rbeem nahbrc marine miranda 07-15-102010 07-15 rbeem nahbrc marine miranda 07-15-10
2010 07-15 rbeem nahbrc marine miranda 07-15-10
Amber Joan Wood
 
2010 07-15 rbeem nahbrc mixed humid hfh
2010 07-15 rbeem nahbrc mixed humid hfh2010 07-15 rbeem nahbrc mixed humid hfh
2010 07-15 rbeem nahbrc mixed humid hfh
Amber Joan Wood
 
2011 01-15 nahbrc - whole-house energy retrofits
2011 01-15 nahbrc - whole-house energy retrofits2011 01-15 nahbrc - whole-house energy retrofits
2011 01-15 nahbrc - whole-house energy retrofits
Amber Joan Wood
 
2011 03-14 nahbrc-greenprints afford-housingefficiency
2011 03-14 nahbrc-greenprints afford-housingefficiency2011 03-14 nahbrc-greenprints afford-housingefficiency
2011 03-14 nahbrc-greenprints afford-housingefficiency
Amber Joan Wood
 
2011 06-21 green365 nahbrc - hph reoccuring issues
2011 06-21 green365 nahbrc - hph reoccuring issues2011 06-21 green365 nahbrc - hph reoccuring issues
2011 06-21 green365 nahbrc - hph reoccuring issues
Amber Joan Wood
 
2011 08-09 nahbrc-ip - reetum business start-up kit
2011 08-09 nahbrc-ip - reetum business start-up kit2011 08-09 nahbrc-ip - reetum business start-up kit
2011 08-09 nahbrc-ip - reetum business start-up kit
Amber Joan Wood
 
2011 08-09 nahbrc-ip - reetum test houses ghi
2011 08-09 nahbrc-ip - reetum test houses ghi2011 08-09 nahbrc-ip - reetum test houses ghi
2011 08-09 nahbrc-ip - reetum test houses ghi
Amber Joan Wood
 
2011 09-16 eeba - nahbrc-ip zeh
2011 09-16 eeba - nahbrc-ip zeh2011 09-16 eeba - nahbrc-ip zeh
2011 09-16 eeba - nahbrc-ip zeh
Amber Joan Wood
 
2012 02-11 ibs nahbrc - changing with the times
2012 02-11 ibs nahbrc - changing with the times2012 02-11 ibs nahbrc - changing with the times
2012 02-11 ibs nahbrc - changing with the times
Amber Joan Wood
 

Mais de Amber Joan Wood (14)

2012 09 - eeba nahbrcip-prod_bldr struct design
2012 09 - eeba nahbrcip-prod_bldr struct design2012 09 - eeba nahbrcip-prod_bldr struct design
2012 09 - eeba nahbrcip-prod_bldr struct design
 
2012 06-07 nahb leading suppliers council - start-up kit
2012 06-07 nahb leading suppliers council - start-up kit2012 06-07 nahb leading suppliers council - start-up kit
2012 06-07 nahb leading suppliers council - start-up kit
 
2011 09-16 eeba - nahbrc national green bld std overview
2011 09-16 eeba - nahbrc national green bld std overview2011 09-16 eeba - nahbrc national green bld std overview
2011 09-16 eeba - nahbrc national green bld std overview
 
2010 05-17 performing as designed - amber wood
2010 05-17 performing as designed - amber wood2010 05-17 performing as designed - amber wood
2010 05-17 performing as designed - amber wood
 
2010 07-15 rbeem nahbrc industry partnership 07-15-10
2010 07-15 rbeem nahbrc industry partnership 07-15-102010 07-15 rbeem nahbrc industry partnership 07-15-10
2010 07-15 rbeem nahbrc industry partnership 07-15-10
 
2010 07-15 rbeem nahbrc marine miranda 07-15-10
2010 07-15 rbeem nahbrc marine miranda 07-15-102010 07-15 rbeem nahbrc marine miranda 07-15-10
2010 07-15 rbeem nahbrc marine miranda 07-15-10
 
2010 07-15 rbeem nahbrc mixed humid hfh
2010 07-15 rbeem nahbrc mixed humid hfh2010 07-15 rbeem nahbrc mixed humid hfh
2010 07-15 rbeem nahbrc mixed humid hfh
 
2011 01-15 nahbrc - whole-house energy retrofits
2011 01-15 nahbrc - whole-house energy retrofits2011 01-15 nahbrc - whole-house energy retrofits
2011 01-15 nahbrc - whole-house energy retrofits
 
2011 03-14 nahbrc-greenprints afford-housingefficiency
2011 03-14 nahbrc-greenprints afford-housingefficiency2011 03-14 nahbrc-greenprints afford-housingefficiency
2011 03-14 nahbrc-greenprints afford-housingefficiency
 
2011 06-21 green365 nahbrc - hph reoccuring issues
2011 06-21 green365 nahbrc - hph reoccuring issues2011 06-21 green365 nahbrc - hph reoccuring issues
2011 06-21 green365 nahbrc - hph reoccuring issues
 
2011 08-09 nahbrc-ip - reetum business start-up kit
2011 08-09 nahbrc-ip - reetum business start-up kit2011 08-09 nahbrc-ip - reetum business start-up kit
2011 08-09 nahbrc-ip - reetum business start-up kit
 
2011 08-09 nahbrc-ip - reetum test houses ghi
2011 08-09 nahbrc-ip - reetum test houses ghi2011 08-09 nahbrc-ip - reetum test houses ghi
2011 08-09 nahbrc-ip - reetum test houses ghi
 
2011 09-16 eeba - nahbrc-ip zeh
2011 09-16 eeba - nahbrc-ip zeh2011 09-16 eeba - nahbrc-ip zeh
2011 09-16 eeba - nahbrc-ip zeh
 
2012 02-11 ibs nahbrc - changing with the times
2012 02-11 ibs nahbrc - changing with the times2012 02-11 ibs nahbrc - changing with the times
2012 02-11 ibs nahbrc - changing with the times
 

Último

Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
amitlee9823
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 

Último (20)

Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 

2010 07-15 rbeem nahbrc quality management

  • 1. Quality Systems Research for New and Existing Homes NAHB Research Center Residential Building Energy Efficiency Meeting July 2010
  • 2. Building America Quality Process Goal: Make widely available to builders/remodelers processes, tools, and methods to build and retrofit high performance homes on a repeatable scale  Economics of Quality  HPH Scopes of Work  Hotspot Inspection Process  HPH Quality Management System p. 2
  • 3. Economics of Quality  Goals:  Quantify benefits of implementing quality practices  Validate performance improvements achieved through quality practices p. 3
  • 4. Hypothetical Cost of Quality (Cokins, 2006)  PC=prevention cost  IFC=internal failure cost  AC=appraisal cost  EFC=external failure cost p. 4
  • 5. Malcolm Baldrige National Quality (MBNQ) Award Winners Over 8 Year Study (Wrolstad & Krueger, 2001) Matched, Non-Winning MBNQA Winners Companies, 1988-1996 1988-1996 Return on equity +18.73% -5.91% Return on assets +10.28% -5.5% Operating profit margin +46.77% +2.69% Operating margin +1.12 -1.71 +16.2% Return on investment +18.1% (S&P500 Index, +13%) p. 5
  • 6. Opportunities for Builders (Professional Builder Magazine, May 2009) Do Builders See a Need for Improvement?  Operational Efficiencies  60%  Better Product Marketing & Services  29% p. 6
  • 7. National Housing Quality Award (NHQA) Results 1993-2009 NHQA Winning Builder Category Benefit from Quality Profits (Gross Margins) 12-20% Revenue 15-100% increase/yr Construction Costs vs. Budget +/- 1% Customer Satisfaction 93-97% Referral Rates 29% (Sales made through referral) Cycle Time Reductions 15-50% Zero Defects at Closing 98% Defect Reductions 11-75% Employee Satisfaction 94% Trade Satisfaction 95% Customer Endorsements/ Thank You Letters 73% Warranty Requests 1 per every 15.5 homes p. 7
  • 8. How to Measure Quality? Performance Metrics  Construction schedules  On-time delivery  Energy performance  Cost  Training  Satisfaction  Referral  Productivity  Warranty/Defects p. 8
  • 9. Challenges of Performance Metrics  Comparing “apples to apples”  Defining them so all builders can use them as benchmarks p. 9
  • 10. Quality Impacts at Veridian Homes  Construction Costs  -/+1% Budget vs. Actual  Customer Satisfaction  95% +  Veridian Homebuyers  76% only looked at Veridian  Zero Defects  90% of homes at home orientation  HERS Index  58-61 p. 10
  • 11. Veridian Results  Reduced Defects  50% in 1 yr  Cut inspections in half  Reduced Warranty Costs & Defects  30% - 75%  Reduced Construction Cycle Time  18 days  Reduced Material Variance  20% lumber, 24% siding, & 38% trim  Their Secret?  Commitment to quality management  Use of tools, principles and resources, including a HPH quality management system p. 11
  • 12. Economics of Quality Existing Homes  Define remodeling industry quality management needs  Create industry-specific quality tools & techniques  Identify industry role model remodelers with QMS to create case studies p. 12
  • 13. Economics of Quality for Existing Homes Next Steps  Determine type of remodeling contractor(s)  Research quality management impact data for remodeling  Prioritize performance issues in the remodeling industry  Define remodeling performance metrics p. 13
  • 14. High Performance Homes (HPH) Scopes of Work (SOW) Completed New Home Construction  HVAC  Framing  Foundations  Vented & Unvented Crawlspaces  Excavation  Grading  Vinyl Siding  WRB  Rigid Insulating Sheathing p. 14
  • 15. Planned New HPH SOW  Envelope sealing  Ventilation  Insulation (wall, ceiling, and floor)  PV roof installation  Window Installation  Door installation p. 15
  • 16. HPH Remodeling SOW Considerations New Home Elements Proposed Remodel 2) Design and Specification 2) Re-design, Specifications, Prerequisites & Statement of job limits 3) Details 3) Details 4) Jobsite conditions 4) Jobsite conditions 5) Order of work 5) Order of work 6) SOW Contract language 6) SOW Contract language 7) SOW QA Inspection 7) SOW QA Inspection/ checklists (Job ready, Assessment checklists phase, and final) p. 16
  • 17. HPH Remodeling SOW Considerations  Customizing SOW for Remodeling (every time?)  Other considerations for remodeling  Health and safety  Demolition, crew type, materials, etc  Quality performance criteria for remodeling  Remodeling SOW Quality Assurance (QA) Process  Need to define types of QA  QA timing  QA criteria  QA documentation p. 17
  • 18. High Performance Home Hotspot Process A Hotspot is a Problem that is:  Current  Widespread or recurring  A significantly important challenge p. 18
  • 19. Why Do Hotspots Work? Hotspots work because they are:  Focused on a prioritized topic  Well-trained to all workers  Inspected and tracked for all jobs Which educates workers and creates accountability p. 19
  • 21. Hotspot Examples Jobsite Installation or Personnel Or Company Office Operations Supply Culture High air infiltration Too many backordered items Culture of finger-pointing Poor performing Difficulty locating records or Lack of accountability ducts documents Squeaky floors Errors on take-offs High employee turnover Late or incomplete Not responding in a timely Lack of pride deliveries manner to customer requests p. 21
  • 22. Choose Hotspot Using Data HOTSPOT/INSPECTION LOG Builder/Lot Inspection Items from Job Complete Forms Hotspot Item Item 1 Item 2 Item 3 Item 4 Item 5 Item 6 Item 7 Item 8 Smith Building 2 Elders 23 1 1 Elders 24 1 Elders 25 1 1 Elders 26 The Meadows 12 The Meadows 13 The Meadows 14 1 The Meadows 15 The Meadows 16 1 The Meadows 17 1 R&R Custom Homes 1002 Peaceful Way 1 1 1004 Peaceful Way 1 1006 Peaceful Way 1 1 1008 Peaceful Way 1 Total 3 1 5 1 0 1 0 1 1 p. 22
  • 23. Determine The Root Cause p. 23
  • 24. Develop Hotspot Training Sheet Install mechanical dampers on supply-air duct lines off the plenum Instale válvulas mecánicas en las líneas de conducción de aire del pleno p. 24
  • 25. Sign Hotspot Training Log All crew members and all crew leaders must attend session. •Lead man explains the problem and the proposed solution. •Everyone examines both pictures and all notes. •Lead man answers any questions. •All crew members and crew leaders sign below. •Lead man signs and dates bottom of page. TIME MEETING STARTED: __________________a.m./p.m.______ ATTENDEES: _____(PRINT NAME)________ _________(SIGNATURE)______________ ___________________________ ____________________________________ ___________________________ ____________________________________ ___________________________ ____________________________________ ___________________________ ____________________________________ p. 25
  • 27. Inspect Hotspot On All Jobs Subdivision: Lot: Date of initial inspection: Builder: Builder Supervisor Name: Crew Leader Name: Instructions: Check box if OK, circle box if correction is needed. Note specific correction action required. When corrected, then check box. Trade Trade Explain Needed Corrections Builder Foreman Super List Date Corrected OK OK OK/NA Lap and tape Describe Current Hotspot:    all horizontal house wrap seams The house wrap is installed continuously with no 1. tears or rips, or all rips or tears are properly    repaired. [BCQC-23] 2. The house wrap is lapped as specified. [BCQC-23]    The house wrap is fastened with manufacturer’s 3. specified fasteners.    The house wrap joints are taped with 4. manufacturer’s specified product. [BCQC-16]    The house wrap covers the sill plate, rim joist, and 5. top plates.    p. 27
  • 28. Evaluate Inspection Data HOTSPOT/INSPECTION LOG Builder/Lot Inspection Items from Job Complete Forms Hotspot Item Item 1 Item 2 Item 3 Item 4 Item 5 Item 6 Item 7 Item 8 Smith Building 2 Elders 23 1 1 Elders 24 1 Elders 25 1 1 Elders 26 The Meadows 12 The Meadows 13 The Meadows 14 1 The Meadows 15 The Meadows 16 1 The Meadows 17 1 R&R Custom Homes 1002 Peaceful Way 1 1 1004 Peaceful Way 1 1006 Peaceful Way 1 1 1008 Peaceful Way 1 Total 3 1 5 1 0 1 0 1 1 p. 28
  • 29. Repeat the Process, If Needed  If hotspot is not successful  Return to the root cause analysis stage  Reevaluate other possible causes  Repeat the process with the next most probably cause Courtesy of www.khov.com p. 29
  • 30. Complete And Celebrate A Hotspot  If hotspot is successful, close-out the hotspot and recognize the contributors  Remove / demote successful hotspot items on inspection forms  Repeat process with new hotspot p. 30
  • 31. Quality Research & Next Steps  Develop & implement HPH Quality Management Systems and tools for  Existing Homes  New Homes p. 31
  • 32. Questions? Amber Wood Program Manager, Energy Efficiency NAHB Research Center 301-430-6309 awood@nahbrc.com p. 32

Notas do Editor

  1. Often invest more on correcting failures Quality companies invest More on preventing and appraising quality Less on correcting defects Prevention is inexpensive compared to repairs or replacement
  2. Companies that “get” quality are rewarded not just in improved quality of their products and services, but in their business results
  3. Economics of quality specifically for builders - Do builders see a need for improvements? Can we expect similar results for builders who implement effective quality management practices?
  4. Note: this is a compilation of data from award winners but each statistical result only represents those companies for which data was available. Judging on Leadership, Strategic Planning, Performance Management, Customer Satisfaction, Human Resources, Construction Management, Trade Partnerships, Business Results
  5. Warranty costs as a % of gross sales/revenue Warranty cost per home Warranty costs per year per home sold
  6. 100% homes Green Built Home certified and ENERGY STAR labeled and over 50% of construction waste recycled
  7. material variance (difference between ordered and required quantities)
  8. Design and Specification Prerequisites Details Jobsite conditions Assumed order of work SOW Inspection checklists (Job ready, phase, and final)
  9. Inspection Process - Will vary from some degree based on the type of remodeler and remodeling activities - Will be further developed based on the BA remodeling target audience and experience gained from greater work with remodelers and existing homes
  10. Inspecting specifically for that hotspot on every job Documenting
  11. Panelized walls with gasketed SIS panels providing an additional R-5.5, WRB, and external air barrier
  12. Panelized walls with gasketed SIS panels providing an additional R-5.5, WRB, and external air barrier
  13. Biggest challenge – implementation