SlideShare uma empresa Scribd logo
1 de 31
Prepared By
Syed Najaf Ali
STORE
5S SYSTEM HPT
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.)
STORE DEPARTMENT HPT
Date:-12.03.2015
BLUE HILLS RED-EYES
Review team has decided that the “BLUE HILLS TEAM “now going
to present the HPT of store.
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.)
STORE DEPARTMENT HPT
Date:-12.03.2015
Key Performance indicators-”BLUE HILL”
Sl Particulars KEY Performance Target
(Time)
Target
Mark
Achie
ved
1 Material Unloading
Light Equipment:-We have taken 2:29 Hour for Light
Materials vehicles (Maintain 3 Hour)
8 Hour 10 10
Heavy Equipment:-9:20 Hours taken for Heavy equipment
vehicles & we also find out the Main Gate has taken on an
average 10:51 Hours for Out the vehicle.
2 MRN user Inspection
for QC.
63.27% MRN are inspected by the user with in 5 Days out
of 226. Now 83 MRN Pending for QC as on dated-
21.03.2015
5 Days 10 8
3 Scrap Disposal &
Costing
161.720MT MS scrap Collected with in 7 days in totally of
229.96 MT , saving Rs.47.80@Per MT on total Rs.9460/- &
Rs.1,19,860 of Jumbo Bas sold in this week.
Month 10 10
4 House Keeping Proper stacking & clean the central store as well as sub store. Daily 10 8
5 RGP Out Standing No RGP settlement in this period. Weekly 10 __
6 Non Moving Material Civil has issued Rs.3,93000/- of sanitary material but as per HPT
team interferences these material are not issued due they
issued for reduced the non-moving not for use.
Weekly 10 10
7 Indent Control. We are saved Rs.2,33,054/-against new created Indent. Weekly 10 10
8 Job Rotation Policy Skill identification & Measurement Month 10 10
9 Knowledge Sharing Material Receiving procedure. Daily ____ ____
10 Safety No single accident is Happening in store. Daily 10 10
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.) back
STORE DEPARTMENT HPT
Date:-12.03.2015
REDUCED THE TIME OF VEHICLE UNLOADING
Months
Total
Vehicle
Average
Time for /
Vehicle
With in
3Hour
Within 5
Hours
Within
8 Hour
More than
8 Hour
Average
Target
/Vehicle
Achieved
Oct-14 301 9:75 Hour 121 62 31 87 8 Hour
Nov-14 119 6:43 Hour 42 32 45 ___ 8 Hour
Dec-14 140 5:15 Hour 83 28 23 6 8 Hour
Jan-15 170 5:67 Hour 88 31 26 25 8 Hour
FEB-15 206 8:04 Hour 112 26 25 43 8 Hour
5th March 49 4:01Hour 27 14 3 2 8 Hour
12th March 40 5:17Hour 22 9 8 2 8 Hour
21th March 150 9:20 Hour 19 13 38 80 8 Hours
Particulars Vehicle Average Gate
Time for 1 vehicle
Average Store Time
5.17 Hour
Differential
Time
8 Hour 53 %
SPARES 13 4:02 Hours 2:29 Hours 1.33 Hour
RAW/REFRACT
ORIES
16 10:25 Hours 7:15 Hours 3.10 Hour
FULE GASES 121
(oxy-
114 & 7
FO
19:22 Hours 16:09 Hours 3.13 Hour
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.) back
STORE DEPARTMENT HPT
Date:-12.03.2015
Main Gate
Manual
security Entry
ERP Entry at
Gate.
Gross Wt.
Store
User
Information
Po & Document
Check
DMR Maintain
Vehicle
Placing
Target time
Fixed
Tare wt
3 Hour
6 Hour
Receiving at
Store
5
0
M
I
N
U
T
E
S 10-20
MINUTES
Target to fixed with the HPT and
labour
5minutes
are taken
for
Receiving
After U/L net weight time 1-2Hour
taken
8 Hour
Main gate
out
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.)
back
STORE DEPARTMENT HPT
Date:-12/03/2015
Month MRN QC
in same
Day
MRN QC in
1 Day
MRN QC in
2 Day
MRN QC
in 3 Day
MRN QC
in 4 Day
MRN QC
in 5 Day
MRN QC
More than
5 Days
Total
MRN
10/02/15 -
15/2/15
25 43 31 40 22 20 101 282
8.86% 15.24% 10.99% 14.18% 7.80% 7.09% 35.81%
15.02.2015-
25.02.2015
16 39 41 26 15 35 63 231
6.92% 16.88% 17.74% 11.25% 6.49% 15.15% 27.27%
26.02.2015-
05.03.2015
14 21 8 3 12 8 67 140
10% 15% 5.75% 2.14% 8.57% 5.75% 47.85%
06.3.2015-
12.03.2015
10 12 12 10 11 8 21 84
11.90% 14.28% 14.28% 11.90% 13.09% 09.52% 25%
13.3.2015-
21.03.2015
13 46 48 10 15 11 83 226
5.75% 20.35% 21.23% 4.42% 6.63% 4.86% 36.72%
MRN PENDING FOR USER INSPECTION
Note:- 63.27%MRN ARE CLEARED IN 5 DAYS OUT OF 226 MRN.
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.)
back
STORE DEPARTMENT HPT
Date:-21/03/2015
MRN PENDING FOR USER INSPECTION
Department
More than 2 days
Power Sponge Bar
Mill
Blast
Furnace
Pallet Plate Mill SMS C/W OXY Bricks Total
MECHANICAL 3 5 7 4 2 5 1 27
ELECTRICAL 1 6 4 1 2 6 2 22
PROCESS 4 1 2 1 7 9 24
Central
Maintenance
1 1
P& A 0
Automobile 2 2
CIVIL 1 1 2
Logistic 2 2
EDP 0
SAFETY/ENV 2 1 2
PURCHASE 1 1
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.)
back
STORE DEPARTMENT HPT
Date:-12.03.2015
MRN PENDING FOR USER INSPECTION
GRAPH REPORT
209
192
146
131
84
106
121
91
136
82 78
103
84 83
0
50
100
150
200
250
Note:-73.22 % (227)MRN ARE CLEARED IN 21DAYS AGAINST 310 MRN.
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.)
back
STORE DEPARTMENT HPT
Date:-12.03.2015
Summery of Internal Scrap Cutting & Shifting By store
Costing Report
Sr.No Months
MS Scrap
(0101110001
)
Total
Expenditure
Coting @
MT
Target
Given in
Mt
Achieved
1 October-14 174.100 149540.650 858.935 200.000 87% Achieved
2 November-14 387.7 251945.95 730.236 200.000
(i)170.920mt Excess Collected
(ii) Rs.44404/-Reduced the Costing
(iii)Reduced 4 nos LPG Cylinder in
Consumption against LPG .
(iv)128.7 reduced the costing MT.
3 December-14 306.440 222296.30 725.420 200.000
(i) 106.440 Mt Excess Collected
(ii)Rs.4.820 Reduced the Costing per MT.
(iii)Rs.14789/- Cost Saving In the Month Of
Dec-14
4 January-15 303.030 200064.00 658.78 200MT
(i) 166.030 Mt Excess Collected as collectively.
(ii)Rs.67.236 Reduced the Costing per MT.
(iii)Rs.22848.3/- Cost Saving In the Month Of Jan-
15
5 February-15 295.410 169912.5 575.175 200MT
i)67.37Mt Excess Collected as collectively.
(ii)Rs. 83.Reduced the Costing per MT.
(iii)Rs.24,520/- Cost Saving as in Feb
6 March 197.860 104345 527.360 200MT
(i) Rs.47.80 Reduced the Costing @mt
(ii) Rs.9,460/- cost saving as on
21.03.2015
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.)
back
STORE DEPARTMENT HPT
Date:-12.03.2015
174.1
387.7
306.44
303.69
295.41
197.86
858.935
730.236
725.42
658.78
575.18
527.37
0
100
200
300
400
500
600
700
800
900
000
Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Maech-1
SCRAP QTY COSTING
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.)
back
STORE DEPARTMENT HPT
Date:-12.03.2015
Sl No Scrap Material Qty Value in (Rs)
Scrap Disposal in DEC-2014 (A)
1 Scrap Alum-Cable 41.15 Rs.22,63,816/-
2 Scrap Ash Vessels 3.910 Rs.75,072/-
3 Ms. Scrap 246.380 Rs.55,68,188/-
Total Rs.79,07,076 /-
Scrap Disposal in Jan-2015 ( B)
1 Ms. Scrap 205.690 Rs.46,48,594 /-
Scrap Disposal as on 12/03/2015 ( C )
1 Ms. Scrap 61.840MT Rs.13,97,584/-
2 End Cutting (Billet) 517MT Rs.1,13,74,000/-
Scrap Disposal as on 21/03/2015 ( D ) TOTAL (A)+(B)+C= Rs.1,27,71,584/-
3 Jumbo bags 6840KG Rs.1,19,860/-
Total (D)
TOTAL (A)+(B)+(C)+(D)= Rs.2,54,47,114/-
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.)
back
STORE DEPARTMENT HPT
Date:-12.03.2015
Saving By Re-use of LPG Cylinder
Date
Gas
Available in
(KG)
No Of
Cylinder Staff Canteen Store
Hotel
Madhuban Grand Total
Feb-last
week 328.60 44 Rs 11470 Rs12090 Rs.22,483 Rs.22,483
1st week 190.8 22 Rs.5446.23 Rs5968.27 Rs.1635.23 Rs.13049.00
05.03.15-
12.03.2015 553.7 63 Rs.22951.48 Rs.13855.05 Rs.1077.61 Rs.37884.15
13.03.2015-
21.03.2015 143.25 17 Rs.366.312 6133.85 0 Rs.9801.165
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.)
back
STORE DEPARTMENT HPT
Date:-12.03.2015
JAMBO BAG KEEPING
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.)
back
STORE DEPARTMENT HPT
Date:-12.03.2015
Pellet Plant Area
BEFORE
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.)
back
STORE DEPARTMENT HPT
Date:-12.03.2015
Pellet Plant Area
AFTER
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.)
back
STORE DEPARTMENT HPT
Date:-12.03.2015
Pellet plant Scrap yard
Before
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.)
back
STORE DEPARTMENT HPT
Date:-12.03.2015
Pellet plant Scrap yard
AFTER
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.)
back
STORE DEPARTMENT HPT
Date:-12.03.2015
BAR MILL SUB STORE
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.) back
STORE DEPARTMENT HPT
Date:-12.03.2015
BAR MILL SUB STORE
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.) back
STORE DEPARTMENT HPT
Date:-12.03.2015
BAR MILL SUB STORE OPEN SHED
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.) back
STORE DEPARTMENT HPT
Date:-15.03.2015
SMS SUB STORE
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.) back
STORE DEPARTMENT HPT
Date:-15.03.2015
NEW SMS SUB STORE PROCESS FOR
MATERIAL STACKING
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.) back
STORE DEPARTMENT HPT
Date:-15.03.2015
NEW SMS SUB STORE IN FRONT
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.)
back
STORE DEPARTMENT HPT
Date:-21.03.2015
RGP OUT STANDING 21/03/2015
Division 2010-
2011
2011-
2012
2012-
2013
Total Concern
User
Received
Power 1 1 Ajay Gupta
5 GATE PASS WILL BE
CLEARED IN THIS
WEEK
Sponge 0 B.C.Barman
Bar Mill 0 C.Tewari
Blast Furnace 4
(2-U/P)
1
(U/P)
5 M. Dante
Pellet M.P.Ahuja
Plate Mill X 0 R.K.Upadhay
a
SMS 5 1-
u/p
1(u/p) 6 L.Mandis
Coal Washery JD.Choubey
Total 4 7 1 12
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.)
back
STORE DEPARTMENT HPT
Date:-12.03.2015
DATE Value
29/12/2014 Rs.2,02,488/-
05/01/2015 Rs.42,810/
20/01/2015 Rs.1,14,606/-
25/01/2015 Rs.1,75,968/-
31/01/2015 Rs.3,27,197/-
10/02/2015 Rs.1,28,475/-
15/02/2015 Rs.238854/-
25/02/2015 RS.75208/-
05.03.2015 Rs.215365/-
12.03.2015 Rs.3,55,524/-
21.03.2015 Rs.2,33,059/-
293806
57146
202488
42810
114606
175968
327197
128475
238854
75208
215365
355524
233059
0
100000
200000
300000
400000
INDENT VALUE
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.)
back
STORE DEPARTMENT HPT
Date:-12.03.2015
S
R
Indent No Date Division Indenter
Material Details UOM
QTY Value in
Rs.
Indent received-
1 NIN14-07317 12/03/2014 Power Ajay Gupta Red oxide & thinner Ltr 80 5040.00
2 NIN14-07336 12.03.2015 BF B.T.RAJU Pyrometer Nos 01 4380.00
Exhaust Fan NOS 04 12400.00
3 NIN14-07524 14/03/2015 BF P.K.GULVADY EN-ROUND-120MM kg 950 61750.00
4 NIN14-07514 14/03/2015 SMS Vijay Agarwal Locktite-406 Nos 20 5245.00
Bearing 6308 zz Nos 2 814.60
5 NIN14-07463 16/03/2015 SMS Vijay Agarwal Butter FLY Valve-200 Nos 02 4500.00
Wear ring Nos 10 18905.00
6
NIN14-07298
17/03/2018
5 BF B.T.RAJU
Unbalance Motor
2.3kw NOS 1 64750.00
7
Nin14-07525 12.03.2015 Pallet H.B.Padhi
Straight Joint kit-
3cx240 Nos 4 45212.00
8 NIN14-07586 14/03/2015 SMS S.SUBASH Asbestos Rope 6mm KG 35 4550.00
TOTAL Rs.233059/-
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.) back
STORE DEPARTMENT HPT
Date:-12/03/2015
SMS,
Rs.83927203
Power (90kw),
Rs.26194886
Sponge,
Rs28293653
Power (80kw),
Rs,26369670
Blast Furnace,
Rs.24486827
Bar Mill,
Rs.14562054
Service Dept,
Rs.13254415
Sponge Projects,
Rs.6335290
P-Projects
(90kw),
Rs.2339310
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.) back
STORE DEPARTMENT HPT
Date:-12/03/2015
NON MOVING MATERIALS ARE IN STORE
Divisions
Non Moving
Materials as on
31/03/2014
Non Moving
Materials as on
31/12/2014
Reduced
Nonmoving items
From 15/12/2014
to as on Date
25/02/2015
Reduced
Nonmoving with
in 7 Days
Non Moving
Materials as on
12/03/2015
SPONGE 6,51,23,164/- 3,08,26,814/- 2,36,555/- Rs.3,93,000/- of
civil (Sanitary
Items) are to
Given the issue
slip to store for
Reduced the Non-
Moving but as
per the
interference of
HPT Team store
has not issued.
2,82,93,653/-
SPONGE PROJECTS 1,72,38,850/- 89,35,593/- 26,00,303/- 63,35,290/-
POWER-(90MW) 4,29,62,697/- 3,05,99,126/- 43,35,064/- 2,61,94,886/-/-
P- PROJECTS-
(90MW) 24,38,104/- 23,39,310/-
0
23,39,310/-
POWER (80MW) 2,26,32,501/- 2,65,21,401 1,51,725/- 2,63,69,676/-
BAR MILL 2,65,04,533/- 1,91,20,166/- 42,50,712/- 1,45,62,054/-
SMS 8,98,55,604/- 8,55,69,973/- 90,40,98/- 8,39,27,203/-
BLAST FURNACE
3,94,18,781/- 2,62,35,504/-
22,666/- 2,44,86,827/-
SERVICE DEPT NON
MOVING MATERIALS
1,92,28,842/- 1,35,28,529/- 1,57,002/- 1,32,54,415/-
TOTAL Rs.32,54,03,075 Rs.24,36,76,416 Rs.1,26,58,125/- Rs.22,57,63,314
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.) back
STORE DEPARTMENT HPT
Date:-12/03/2015
SERVICE DEPT. NON MOVING MATERIAL
Departments
Non Moving
Material
Value(Rs.)
As on 31.03.14
Sum of Value(Rs.)
Pur. during July14
to Dec.14 but not
lifted till 31.12.14
Reduced
Nonmoving
Date
25/02/2015
Reduced
Nonmoving
with in 7 Days
Non Moving
Materials as on
05/03/2015
P&A 5,811,378 24,45,865 23012 2,445,865
S & D 5,547,807 21,76,928 26450 2,150,478
AUTOMOBILE 3,456,283 31,79,576 9573 0.00 30,66,729
STORE 2,157,430 44,99,574 76053 4,423,521
WORKSHOP 1,064,759 629,601 4690 624,911
EDP 886,650 4,39,114 17224 421,890
COMMERCIAL 159,269 1,40,810 0 140,810
ENVIRONMENT 28,460 0 0 0
F&A 11,764 7,068 0 7068
ENGG 10,206 0 0 0
CSR 10,074.8 9,993.8 0 9993.8
Total Rs.1,92,28,842 Rs.1,35,28,529 Rs.1,57,002/- 0.00 Rs. 1,32,54,415/-
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.)
back
STORE DEPARTMENT HPT
Date:-12.03.2015
JOB TOTAION
Receiving
Section
Issue Section
Rupen
Rathia
Dillip
Kamati
Billing
Process
Issue
Counter
MONNET ISPAT & ENERGY LTD.
NAHARPALI, RAIGARH (C.G.)
back
STORE DEPARTMENT HPT
Date:-12.03.2015
SAFETY
SAFETY IN STORE
• No single accident is happening in store from Dec-2014 to Till Date.
• Regular follow-up the Safety SOP.

Mais conteúdo relacionado

Semelhante a Japanese 5 S System for Store of Power & Steel Plant

Rebecca Batty Presentation
Rebecca Batty PresentationRebecca Batty Presentation
Rebecca Batty PresentationRebecca Batty
 
Analysis of Safety Stock
Analysis of Safety StockAnalysis of Safety Stock
Analysis of Safety StockIRJET Journal
 
Work Plan 2023 Final @ 14-03-2023.pptx
Work Plan 2023 Final @ 14-03-2023.pptxWork Plan 2023 Final @ 14-03-2023.pptx
Work Plan 2023 Final @ 14-03-2023.pptxsonutyagi20
 
Ingersoll rand, hiten, mba operations
Ingersoll rand, hiten, mba operationsIngersoll rand, hiten, mba operations
Ingersoll rand, hiten, mba operationsHiten Gupta
 
RECONFIGURING THE SUPPLY CHAIN AT XTRA POWER ENERGY SYSTEMS
RECONFIGURING THE SUPPLY CHAIN AT XTRA POWER ENERGY SYSTEMSRECONFIGURING THE SUPPLY CHAIN AT XTRA POWER ENERGY SYSTEMS
RECONFIGURING THE SUPPLY CHAIN AT XTRA POWER ENERGY SYSTEMSAKSHIT JAIN
 
Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakharMohammad IFTAKHAR
 
Du pont analysis
Du pont analysisDu pont analysis
Du pont analysisSiddhi Modi
 
Gurnoor Technical Trainee Review 2011-2012 Final
Gurnoor Technical Trainee Review 2011-2012 FinalGurnoor Technical Trainee Review 2011-2012 Final
Gurnoor Technical Trainee Review 2011-2012 FinalGurnoor Singh Kakkar
 
Saral Gyan Hidden Gem - August 2015
Saral Gyan Hidden Gem - August 2015Saral Gyan Hidden Gem - August 2015
Saral Gyan Hidden Gem - August 2015SaralGyanTeam
 
Presentasi Final FGDP Fix - Adji.pptx
Presentasi Final FGDP Fix - Adji.pptxPresentasi Final FGDP Fix - Adji.pptx
Presentasi Final FGDP Fix - Adji.pptxRyanSeptiawan1
 
TPM Salalah - Progress
TPM Salalah - ProgressTPM Salalah - Progress
TPM Salalah - ProgressIssa Alshaikh
 
Caselet 1_A cable manufacturer_case study
Caselet 1_A cable manufacturer_case studyCaselet 1_A cable manufacturer_case study
Caselet 1_A cable manufacturer_case studyAurumCapital
 
Three wheeler market - Kerala
Three wheeler market - KeralaThree wheeler market - Kerala
Three wheeler market - KeralaShaiju Kumar
 
Wind mills audit report copy
Wind mills audit report   copyWind mills audit report   copy
Wind mills audit report copylakshminaran
 
Road map to 24 hrs service by kun
Road map to 24 hrs service  by kunRoad map to 24 hrs service  by kun
Road map to 24 hrs service by kunSadagopanMagesh
 

Semelhante a Japanese 5 S System for Store of Power & Steel Plant (20)

Rebecca Batty Presentation
Rebecca Batty PresentationRebecca Batty Presentation
Rebecca Batty Presentation
 
Analysis of Safety Stock
Analysis of Safety StockAnalysis of Safety Stock
Analysis of Safety Stock
 
Work Plan 2023 Final @ 14-03-2023.pptx
Work Plan 2023 Final @ 14-03-2023.pptxWork Plan 2023 Final @ 14-03-2023.pptx
Work Plan 2023 Final @ 14-03-2023.pptx
 
PAT scheme.pdf
PAT scheme.pdfPAT scheme.pdf
PAT scheme.pdf
 
Ingersoll rand, hiten, mba operations
Ingersoll rand, hiten, mba operationsIngersoll rand, hiten, mba operations
Ingersoll rand, hiten, mba operations
 
Quotation 09.04.2015
Quotation 09.04.2015Quotation 09.04.2015
Quotation 09.04.2015
 
CPM
CPMCPM
CPM
 
RECONFIGURING THE SUPPLY CHAIN AT XTRA POWER ENERGY SYSTEMS
RECONFIGURING THE SUPPLY CHAIN AT XTRA POWER ENERGY SYSTEMSRECONFIGURING THE SUPPLY CHAIN AT XTRA POWER ENERGY SYSTEMS
RECONFIGURING THE SUPPLY CHAIN AT XTRA POWER ENERGY SYSTEMS
 
Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakhar
 
Du pont analysis
Du pont analysisDu pont analysis
Du pont analysis
 
Gurnoor Technical Trainee Review 2011-2012 Final
Gurnoor Technical Trainee Review 2011-2012 FinalGurnoor Technical Trainee Review 2011-2012 Final
Gurnoor Technical Trainee Review 2011-2012 Final
 
Manish Engineering Works
Manish Engineering WorksManish Engineering Works
Manish Engineering Works
 
Saral Gyan Hidden Gem - August 2015
Saral Gyan Hidden Gem - August 2015Saral Gyan Hidden Gem - August 2015
Saral Gyan Hidden Gem - August 2015
 
NSG FMP energy excellence
NSG FMP energy excellenceNSG FMP energy excellence
NSG FMP energy excellence
 
Presentasi Final FGDP Fix - Adji.pptx
Presentasi Final FGDP Fix - Adji.pptxPresentasi Final FGDP Fix - Adji.pptx
Presentasi Final FGDP Fix - Adji.pptx
 
TPM Salalah - Progress
TPM Salalah - ProgressTPM Salalah - Progress
TPM Salalah - Progress
 
Caselet 1_A cable manufacturer_case study
Caselet 1_A cable manufacturer_case studyCaselet 1_A cable manufacturer_case study
Caselet 1_A cable manufacturer_case study
 
Three wheeler market - Kerala
Three wheeler market - KeralaThree wheeler market - Kerala
Three wheeler market - Kerala
 
Wind mills audit report copy
Wind mills audit report   copyWind mills audit report   copy
Wind mills audit report copy
 
Road map to 24 hrs service by kun
Road map to 24 hrs service  by kunRoad map to 24 hrs service  by kun
Road map to 24 hrs service by kun
 

Mais de Er. EHS & Fire Syed Ali

The employee's provident fund act, 1952 (2)
The employee's provident fund act, 1952 (2)The employee's provident fund act, 1952 (2)
The employee's provident fund act, 1952 (2)Er. EHS & Fire Syed Ali
 
Falcon internal forces & fire services pvt feb,14
Falcon internal forces & fire services pvt feb,14Falcon internal forces & fire services pvt feb,14
Falcon internal forces & fire services pvt feb,14Er. EHS & Fire Syed Ali
 
Monthly Admin tracker (MIS) april'14 All admin Operations
Monthly Admin tracker (MIS) april'14 All admin Operations Monthly Admin tracker (MIS) april'14 All admin Operations
Monthly Admin tracker (MIS) april'14 All admin Operations Er. EHS & Fire Syed Ali
 
Admin (Guest House) Include Mess, GET, MTT, VIP GH MIS
Admin (Guest House) Include Mess, GET, MTT, VIP GH MISAdmin (Guest House) Include Mess, GET, MTT, VIP GH MIS
Admin (Guest House) Include Mess, GET, MTT, VIP GH MISEr. EHS & Fire Syed Ali
 

Mais de Er. EHS & Fire Syed Ali (20)

fire safety training
 fire safety training fire safety training
fire safety training
 
Gas disaster in steel industries
Gas disaster in steel industriesGas disaster in steel industries
Gas disaster in steel industries
 
Noice polution
Noice polutionNoice polution
Noice polution
 
Safety while working at height
Safety while working at heightSafety while working at height
Safety while working at height
 
PPE
PPE PPE
PPE
 
Gas safety in hazardous industry
Gas safety in hazardous industryGas safety in hazardous industry
Gas safety in hazardous industry
 
Fire safety
Fire safetyFire safety
Fire safety
 
Factories act 1948
Factories act 1948Factories act 1948
Factories act 1948
 
Japanese 5 S system implementation
Japanese 5 S system implementationJapanese 5 S system implementation
Japanese 5 S system implementation
 
Employee movement mis
Employee movement misEmployee movement mis
Employee movement mis
 
Fire safety FM 200
Fire safety FM 200Fire safety FM 200
Fire safety FM 200
 
Bomb threat procedures
Bomb threat proceduresBomb threat procedures
Bomb threat procedures
 
A fire training hindi
A fire training   hindiA fire training   hindi
A fire training hindi
 
HR MIS
HR MIS HR MIS
HR MIS
 
HR ER IR tracker~april 14
HR ER IR tracker~april 14HR ER IR tracker~april 14
HR ER IR tracker~april 14
 
The esi act 1948 new
The esi act 1948 newThe esi act 1948 new
The esi act 1948 new
 
The employee's provident fund act, 1952 (2)
The employee's provident fund act, 1952 (2)The employee's provident fund act, 1952 (2)
The employee's provident fund act, 1952 (2)
 
Falcon internal forces & fire services pvt feb,14
Falcon internal forces & fire services pvt feb,14Falcon internal forces & fire services pvt feb,14
Falcon internal forces & fire services pvt feb,14
 
Monthly Admin tracker (MIS) april'14 All admin Operations
Monthly Admin tracker (MIS) april'14 All admin Operations Monthly Admin tracker (MIS) april'14 All admin Operations
Monthly Admin tracker (MIS) april'14 All admin Operations
 
Admin (Guest House) Include Mess, GET, MTT, VIP GH MIS
Admin (Guest House) Include Mess, GET, MTT, VIP GH MISAdmin (Guest House) Include Mess, GET, MTT, VIP GH MIS
Admin (Guest House) Include Mess, GET, MTT, VIP GH MIS
 

Último

GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxSaqib Mansoor Ahmed
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...Pooja Nehwal
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, MumbaiPooja Nehwal
 
Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningCIToolkit
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementTulsiDhidhi1
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 

Último (20)

Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote SpeakerLeadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
 
LoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner CircleLoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner Circle
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Empowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdfEmpowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdf
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptx
 
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg PartnershipUnlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for Learning
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing management
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Peak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian DugmorePeak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian Dugmore
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 

Japanese 5 S System for Store of Power & Steel Plant

  • 1. Prepared By Syed Najaf Ali STORE 5S SYSTEM HPT
  • 2. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) STORE DEPARTMENT HPT Date:-12.03.2015 BLUE HILLS RED-EYES Review team has decided that the “BLUE HILLS TEAM “now going to present the HPT of store.
  • 3. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) STORE DEPARTMENT HPT Date:-12.03.2015 Key Performance indicators-”BLUE HILL” Sl Particulars KEY Performance Target (Time) Target Mark Achie ved 1 Material Unloading Light Equipment:-We have taken 2:29 Hour for Light Materials vehicles (Maintain 3 Hour) 8 Hour 10 10 Heavy Equipment:-9:20 Hours taken for Heavy equipment vehicles & we also find out the Main Gate has taken on an average 10:51 Hours for Out the vehicle. 2 MRN user Inspection for QC. 63.27% MRN are inspected by the user with in 5 Days out of 226. Now 83 MRN Pending for QC as on dated- 21.03.2015 5 Days 10 8 3 Scrap Disposal & Costing 161.720MT MS scrap Collected with in 7 days in totally of 229.96 MT , saving Rs.47.80@Per MT on total Rs.9460/- & Rs.1,19,860 of Jumbo Bas sold in this week. Month 10 10 4 House Keeping Proper stacking & clean the central store as well as sub store. Daily 10 8 5 RGP Out Standing No RGP settlement in this period. Weekly 10 __ 6 Non Moving Material Civil has issued Rs.3,93000/- of sanitary material but as per HPT team interferences these material are not issued due they issued for reduced the non-moving not for use. Weekly 10 10 7 Indent Control. We are saved Rs.2,33,054/-against new created Indent. Weekly 10 10 8 Job Rotation Policy Skill identification & Measurement Month 10 10 9 Knowledge Sharing Material Receiving procedure. Daily ____ ____ 10 Safety No single accident is Happening in store. Daily 10 10
  • 4. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12.03.2015 REDUCED THE TIME OF VEHICLE UNLOADING Months Total Vehicle Average Time for / Vehicle With in 3Hour Within 5 Hours Within 8 Hour More than 8 Hour Average Target /Vehicle Achieved Oct-14 301 9:75 Hour 121 62 31 87 8 Hour Nov-14 119 6:43 Hour 42 32 45 ___ 8 Hour Dec-14 140 5:15 Hour 83 28 23 6 8 Hour Jan-15 170 5:67 Hour 88 31 26 25 8 Hour FEB-15 206 8:04 Hour 112 26 25 43 8 Hour 5th March 49 4:01Hour 27 14 3 2 8 Hour 12th March 40 5:17Hour 22 9 8 2 8 Hour 21th March 150 9:20 Hour 19 13 38 80 8 Hours Particulars Vehicle Average Gate Time for 1 vehicle Average Store Time 5.17 Hour Differential Time 8 Hour 53 % SPARES 13 4:02 Hours 2:29 Hours 1.33 Hour RAW/REFRACT ORIES 16 10:25 Hours 7:15 Hours 3.10 Hour FULE GASES 121 (oxy- 114 & 7 FO 19:22 Hours 16:09 Hours 3.13 Hour
  • 5. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12.03.2015 Main Gate Manual security Entry ERP Entry at Gate. Gross Wt. Store User Information Po & Document Check DMR Maintain Vehicle Placing Target time Fixed Tare wt 3 Hour 6 Hour Receiving at Store 5 0 M I N U T E S 10-20 MINUTES Target to fixed with the HPT and labour 5minutes are taken for Receiving After U/L net weight time 1-2Hour taken 8 Hour Main gate out
  • 6. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12/03/2015 Month MRN QC in same Day MRN QC in 1 Day MRN QC in 2 Day MRN QC in 3 Day MRN QC in 4 Day MRN QC in 5 Day MRN QC More than 5 Days Total MRN 10/02/15 - 15/2/15 25 43 31 40 22 20 101 282 8.86% 15.24% 10.99% 14.18% 7.80% 7.09% 35.81% 15.02.2015- 25.02.2015 16 39 41 26 15 35 63 231 6.92% 16.88% 17.74% 11.25% 6.49% 15.15% 27.27% 26.02.2015- 05.03.2015 14 21 8 3 12 8 67 140 10% 15% 5.75% 2.14% 8.57% 5.75% 47.85% 06.3.2015- 12.03.2015 10 12 12 10 11 8 21 84 11.90% 14.28% 14.28% 11.90% 13.09% 09.52% 25% 13.3.2015- 21.03.2015 13 46 48 10 15 11 83 226 5.75% 20.35% 21.23% 4.42% 6.63% 4.86% 36.72% MRN PENDING FOR USER INSPECTION Note:- 63.27%MRN ARE CLEARED IN 5 DAYS OUT OF 226 MRN.
  • 7. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-21/03/2015 MRN PENDING FOR USER INSPECTION Department More than 2 days Power Sponge Bar Mill Blast Furnace Pallet Plate Mill SMS C/W OXY Bricks Total MECHANICAL 3 5 7 4 2 5 1 27 ELECTRICAL 1 6 4 1 2 6 2 22 PROCESS 4 1 2 1 7 9 24 Central Maintenance 1 1 P& A 0 Automobile 2 2 CIVIL 1 1 2 Logistic 2 2 EDP 0 SAFETY/ENV 2 1 2 PURCHASE 1 1
  • 8. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12.03.2015 MRN PENDING FOR USER INSPECTION GRAPH REPORT 209 192 146 131 84 106 121 91 136 82 78 103 84 83 0 50 100 150 200 250 Note:-73.22 % (227)MRN ARE CLEARED IN 21DAYS AGAINST 310 MRN.
  • 9. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12.03.2015 Summery of Internal Scrap Cutting & Shifting By store Costing Report Sr.No Months MS Scrap (0101110001 ) Total Expenditure Coting @ MT Target Given in Mt Achieved 1 October-14 174.100 149540.650 858.935 200.000 87% Achieved 2 November-14 387.7 251945.95 730.236 200.000 (i)170.920mt Excess Collected (ii) Rs.44404/-Reduced the Costing (iii)Reduced 4 nos LPG Cylinder in Consumption against LPG . (iv)128.7 reduced the costing MT. 3 December-14 306.440 222296.30 725.420 200.000 (i) 106.440 Mt Excess Collected (ii)Rs.4.820 Reduced the Costing per MT. (iii)Rs.14789/- Cost Saving In the Month Of Dec-14 4 January-15 303.030 200064.00 658.78 200MT (i) 166.030 Mt Excess Collected as collectively. (ii)Rs.67.236 Reduced the Costing per MT. (iii)Rs.22848.3/- Cost Saving In the Month Of Jan- 15 5 February-15 295.410 169912.5 575.175 200MT i)67.37Mt Excess Collected as collectively. (ii)Rs. 83.Reduced the Costing per MT. (iii)Rs.24,520/- Cost Saving as in Feb 6 March 197.860 104345 527.360 200MT (i) Rs.47.80 Reduced the Costing @mt (ii) Rs.9,460/- cost saving as on 21.03.2015
  • 10. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12.03.2015 174.1 387.7 306.44 303.69 295.41 197.86 858.935 730.236 725.42 658.78 575.18 527.37 0 100 200 300 400 500 600 700 800 900 000 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Maech-1 SCRAP QTY COSTING
  • 11. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12.03.2015 Sl No Scrap Material Qty Value in (Rs) Scrap Disposal in DEC-2014 (A) 1 Scrap Alum-Cable 41.15 Rs.22,63,816/- 2 Scrap Ash Vessels 3.910 Rs.75,072/- 3 Ms. Scrap 246.380 Rs.55,68,188/- Total Rs.79,07,076 /- Scrap Disposal in Jan-2015 ( B) 1 Ms. Scrap 205.690 Rs.46,48,594 /- Scrap Disposal as on 12/03/2015 ( C ) 1 Ms. Scrap 61.840MT Rs.13,97,584/- 2 End Cutting (Billet) 517MT Rs.1,13,74,000/- Scrap Disposal as on 21/03/2015 ( D ) TOTAL (A)+(B)+C= Rs.1,27,71,584/- 3 Jumbo bags 6840KG Rs.1,19,860/- Total (D) TOTAL (A)+(B)+(C)+(D)= Rs.2,54,47,114/-
  • 12. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12.03.2015 Saving By Re-use of LPG Cylinder Date Gas Available in (KG) No Of Cylinder Staff Canteen Store Hotel Madhuban Grand Total Feb-last week 328.60 44 Rs 11470 Rs12090 Rs.22,483 Rs.22,483 1st week 190.8 22 Rs.5446.23 Rs5968.27 Rs.1635.23 Rs.13049.00 05.03.15- 12.03.2015 553.7 63 Rs.22951.48 Rs.13855.05 Rs.1077.61 Rs.37884.15 13.03.2015- 21.03.2015 143.25 17 Rs.366.312 6133.85 0 Rs.9801.165
  • 13. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12.03.2015 JAMBO BAG KEEPING
  • 14. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12.03.2015 Pellet Plant Area BEFORE
  • 15. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12.03.2015 Pellet Plant Area AFTER
  • 16. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12.03.2015 Pellet plant Scrap yard Before
  • 17. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12.03.2015 Pellet plant Scrap yard AFTER
  • 18. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12.03.2015 BAR MILL SUB STORE
  • 19. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12.03.2015 BAR MILL SUB STORE
  • 20. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12.03.2015 BAR MILL SUB STORE OPEN SHED
  • 21. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-15.03.2015 SMS SUB STORE
  • 22. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-15.03.2015 NEW SMS SUB STORE PROCESS FOR MATERIAL STACKING
  • 23. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-15.03.2015 NEW SMS SUB STORE IN FRONT
  • 24. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-21.03.2015 RGP OUT STANDING 21/03/2015 Division 2010- 2011 2011- 2012 2012- 2013 Total Concern User Received Power 1 1 Ajay Gupta 5 GATE PASS WILL BE CLEARED IN THIS WEEK Sponge 0 B.C.Barman Bar Mill 0 C.Tewari Blast Furnace 4 (2-U/P) 1 (U/P) 5 M. Dante Pellet M.P.Ahuja Plate Mill X 0 R.K.Upadhay a SMS 5 1- u/p 1(u/p) 6 L.Mandis Coal Washery JD.Choubey Total 4 7 1 12
  • 25. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12.03.2015 DATE Value 29/12/2014 Rs.2,02,488/- 05/01/2015 Rs.42,810/ 20/01/2015 Rs.1,14,606/- 25/01/2015 Rs.1,75,968/- 31/01/2015 Rs.3,27,197/- 10/02/2015 Rs.1,28,475/- 15/02/2015 Rs.238854/- 25/02/2015 RS.75208/- 05.03.2015 Rs.215365/- 12.03.2015 Rs.3,55,524/- 21.03.2015 Rs.2,33,059/- 293806 57146 202488 42810 114606 175968 327197 128475 238854 75208 215365 355524 233059 0 100000 200000 300000 400000 INDENT VALUE
  • 26. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12.03.2015 S R Indent No Date Division Indenter Material Details UOM QTY Value in Rs. Indent received- 1 NIN14-07317 12/03/2014 Power Ajay Gupta Red oxide & thinner Ltr 80 5040.00 2 NIN14-07336 12.03.2015 BF B.T.RAJU Pyrometer Nos 01 4380.00 Exhaust Fan NOS 04 12400.00 3 NIN14-07524 14/03/2015 BF P.K.GULVADY EN-ROUND-120MM kg 950 61750.00 4 NIN14-07514 14/03/2015 SMS Vijay Agarwal Locktite-406 Nos 20 5245.00 Bearing 6308 zz Nos 2 814.60 5 NIN14-07463 16/03/2015 SMS Vijay Agarwal Butter FLY Valve-200 Nos 02 4500.00 Wear ring Nos 10 18905.00 6 NIN14-07298 17/03/2018 5 BF B.T.RAJU Unbalance Motor 2.3kw NOS 1 64750.00 7 Nin14-07525 12.03.2015 Pallet H.B.Padhi Straight Joint kit- 3cx240 Nos 4 45212.00 8 NIN14-07586 14/03/2015 SMS S.SUBASH Asbestos Rope 6mm KG 35 4550.00 TOTAL Rs.233059/-
  • 27. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12/03/2015 SMS, Rs.83927203 Power (90kw), Rs.26194886 Sponge, Rs28293653 Power (80kw), Rs,26369670 Blast Furnace, Rs.24486827 Bar Mill, Rs.14562054 Service Dept, Rs.13254415 Sponge Projects, Rs.6335290 P-Projects (90kw), Rs.2339310
  • 28. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12/03/2015 NON MOVING MATERIALS ARE IN STORE Divisions Non Moving Materials as on 31/03/2014 Non Moving Materials as on 31/12/2014 Reduced Nonmoving items From 15/12/2014 to as on Date 25/02/2015 Reduced Nonmoving with in 7 Days Non Moving Materials as on 12/03/2015 SPONGE 6,51,23,164/- 3,08,26,814/- 2,36,555/- Rs.3,93,000/- of civil (Sanitary Items) are to Given the issue slip to store for Reduced the Non- Moving but as per the interference of HPT Team store has not issued. 2,82,93,653/- SPONGE PROJECTS 1,72,38,850/- 89,35,593/- 26,00,303/- 63,35,290/- POWER-(90MW) 4,29,62,697/- 3,05,99,126/- 43,35,064/- 2,61,94,886/-/- P- PROJECTS- (90MW) 24,38,104/- 23,39,310/- 0 23,39,310/- POWER (80MW) 2,26,32,501/- 2,65,21,401 1,51,725/- 2,63,69,676/- BAR MILL 2,65,04,533/- 1,91,20,166/- 42,50,712/- 1,45,62,054/- SMS 8,98,55,604/- 8,55,69,973/- 90,40,98/- 8,39,27,203/- BLAST FURNACE 3,94,18,781/- 2,62,35,504/- 22,666/- 2,44,86,827/- SERVICE DEPT NON MOVING MATERIALS 1,92,28,842/- 1,35,28,529/- 1,57,002/- 1,32,54,415/- TOTAL Rs.32,54,03,075 Rs.24,36,76,416 Rs.1,26,58,125/- Rs.22,57,63,314
  • 29. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12/03/2015 SERVICE DEPT. NON MOVING MATERIAL Departments Non Moving Material Value(Rs.) As on 31.03.14 Sum of Value(Rs.) Pur. during July14 to Dec.14 but not lifted till 31.12.14 Reduced Nonmoving Date 25/02/2015 Reduced Nonmoving with in 7 Days Non Moving Materials as on 05/03/2015 P&A 5,811,378 24,45,865 23012 2,445,865 S & D 5,547,807 21,76,928 26450 2,150,478 AUTOMOBILE 3,456,283 31,79,576 9573 0.00 30,66,729 STORE 2,157,430 44,99,574 76053 4,423,521 WORKSHOP 1,064,759 629,601 4690 624,911 EDP 886,650 4,39,114 17224 421,890 COMMERCIAL 159,269 1,40,810 0 140,810 ENVIRONMENT 28,460 0 0 0 F&A 11,764 7,068 0 7068 ENGG 10,206 0 0 0 CSR 10,074.8 9,993.8 0 9993.8 Total Rs.1,92,28,842 Rs.1,35,28,529 Rs.1,57,002/- 0.00 Rs. 1,32,54,415/-
  • 30. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12.03.2015 JOB TOTAION Receiving Section Issue Section Rupen Rathia Dillip Kamati Billing Process Issue Counter
  • 31. MONNET ISPAT & ENERGY LTD. NAHARPALI, RAIGARH (C.G.) back STORE DEPARTMENT HPT Date:-12.03.2015 SAFETY SAFETY IN STORE • No single accident is happening in store from Dec-2014 to Till Date. • Regular follow-up the Safety SOP.