SlideShare uma empresa Scribd logo
1 de 39
Traxx Support
TraxxWorksurface Brackets Page 316 Important: Brackets must be specified separately and sold individually. 1 3/16” needs support every 48”. 1 9/16” needs support every 60”. Brackets have an anti-kick-out design that provides secure attachment. A variety of additional supports such as angel brackets and support panels are used from Footprint. Images taken from pricelist and installation instructions. .
Storage spacing with Traxx Brackets can easily be spaced any place along the traxx rails. Spacing is located behind the pedestal  to accommodate the worksurface brackets.
Traxx Overhead Mounting Brackets & Overhead Ganging Brackets Overhead Brackets Page 316 & 521 (Footprint) Ganging Brackets Page 523 (Footprint)
Traxx Square, Radius, and Curved Profile Overhead Brackets Page 521 & 523 (Footprint) Images taken from pricelist and installation instructions.
Traxx Flat and Bevel Profile Overhead Brackets Page 521 & 523 (Footprint) Images taken from the pricelist and installation instructions. .
Traxx Lunar Profile Overhead Brackets Page 288 & 499 (Footprint) Images taken from pricelist and installation instructions. .
Traxx Storage Cubby Brackets Page 521 (Footprint) Two are recommended to be ganged. Images taken from pricelist and installation instructions. .
Traxx Overhead Mounting Brackets & Overhead Ganging Brackets Spacer Page 522 (Footprint) Images taken from pricelist and installation instructions.
Cetra Support
CetraWorksurface Brackets Important: Brackets must be specified separately and sold individually. 1 3/16” needs support every 48”. 1 9/16” needs support every 60”.
Cetra Application and Support Page 328 & 329 (Footprint)
Cetra Edge Support Brackets Page 449 (Footprint) Edge brackets are handed depending on where you are standing, facing the panel. Edge brackets at corner locations are not specific to hand of bracket. Images taken from installation instructions.
Cetra Cantilever Page 450 (Footprint) Cantilevers are handed. Flat brackets are sold individually however must be used in pairs with a cantilever when located at the seam of two surfaces. Images taken from installation instructions.
Cetra Overhead Mounting Brackets & Overhead Ganging Brackets Overhead Brackets Page 519 (Footprint) Ganging Brackets Page 523 (Footprint)
Cetra Square, Radius, and Curved Profile Overhead Brackets Page 519 & 523 (Footprint) Images taken from pricelist and installation instructions.
Cetra Flat and Bevel Profile Overhead Brackets Page 519 & 523 (Footprint) Images taken from the pricelist and installation instructions. .
Cetra Lunar Profile Overhead Brackets Page 519 & 523 (Footprint) Images taken from pricelist and installation instructions. .
Cetra Flat Shelf Bracket Page 519 (Footprint) Images taken from the pricelist and installation instructions. .
Interworks EQ Support
Interworks EQ Worksurface Brackets Important: Brackets must be specified separately. 1 3/16” surfaces need support every 48” 1 9/16” surfaces need support every 60” Cantilevers are handed. Flat brackets are sold individually however must be used in pairs with a cantilever when located at the seam of two surfaces. Edge brackets at corner locations are not specific to hand of bracket.
Interworks EQ Application and Support Page 332 & 333 (Footprint)
Interworks EQ Cantilever Page 450 (Footprint) Important: Brackets must be specified separately. Cantilevers are handed. Flat brackets are sold individually however must be used in pairs with a cantilever when located at the seam of two surfaces. Consider placing pedestal fillers behind pedestals to fill gap.
Interworks EQ Edge Support Brackets Page 449 (Footprint) Important: Brackets must be specified separately. Edge brackets at corner locations are not specific to hand of bracket. It is not recommended to place edge brackets in the center of runs this image simply conveys all possible locations.
Interworks EQ Overhead Brackets Overview Wood/ Laminate overheads cannot be hung on Interworks EQ. Bevel profile overheads have a back bracket. Overhead Brackets Page 520 (Footprint) Ganging Brackets Page 523 (Footprint) .
Interworks EQ Flat and Bevel Profile Overhead Brackets Page 524 (Footprint) You will not find a bracket for this overhead is apart of the construction. Ganging brackets are sold  in a quantity of 4. .
Interworks EQ Lunar Profile Overhead Brackets Page 524 & 526 (Footprint) A set of overhead brackets is need for each overhead regardless of width. Ganging brackets are sold individually .
Xsite Support
Xsite  Worksurface Support  Page 446 All brackets are specified separately. Edge support brackets have the ability to adjust in ¼” increments up to ¾”. Top caps should be cut around transaction counter brackets. Mid-adjustable support can not be used as sole support at the end of the run. INTERWORKS
Xsite Page 330 Brackets are placed every 48” for  1 3/16” and 60” for 1 9/16”. INTERWORKS
XsiteOverhead Mounting Brackets & Overhead Ganging Brackets Overhead Brackets Page 518 (Footprint) Ganging Brackets Page 523 (Footprint)
XsiteSquare, Radius, and Curved Profile Overhead Brackets Page 518 & 523 (Footprint) Images taken from pricelist and installation instructions.
XsiteFlat and Bevel Profile Overhead Brackets Page 521 & 523 (Footprint) Images taken from the pricelist and installation instructions. .
XsiteLunar Profile Overhead Brackets Page 288 & 499 (Footprint) Images taken from pricelist and installation instructions. .
Xsite Storage Cubby Brackets Page 518 (Footprint) Two are recommended to be ganged. Images taken from pricelist and installation instructions. .
Kimball Office Resources Dealer Sales Manager Sales Specialist Customer Care/ By Design 800.482.1818  Product Technical Support 800.481.6696 Product Specifier Alibia de Vente Market Education 770.265.4006 or Alibia.devente@kimball.com
Brackets

Mais conteúdo relacionado

Destaque

How to install setup-use the aq performance monitor package dbms aq-monitor [...
How to install setup-use the aq performance monitor package dbms aq-monitor [...How to install setup-use the aq performance monitor package dbms aq-monitor [...
How to install setup-use the aq performance monitor package dbms aq-monitor [...
Jean-Christophe Dauchy
 
Orden Arquitectonico Q3
Orden Arquitectonico Q3Orden Arquitectonico Q3
Orden Arquitectonico Q3
wlado
 

Destaque (17)

Itec 214
Itec 214Itec 214
Itec 214
 
作品Ji
作品Ji作品Ji
作品Ji
 
2012 02 ecomTIM: Inbound Marketing- SEO is more than SEO
2012 02 ecomTIM: Inbound Marketing- SEO is more than SEO2012 02 ecomTIM: Inbound Marketing- SEO is more than SEO
2012 02 ecomTIM: Inbound Marketing- SEO is more than SEO
 
AIDS organizing, bureaucracy and state relations
AIDS organizing, bureaucracy and state relationsAIDS organizing, bureaucracy and state relations
AIDS organizing, bureaucracy and state relations
 
ACH 121 Lecture 13 (Special Construction)
ACH 121 Lecture 13 (Special Construction)ACH 121 Lecture 13 (Special Construction)
ACH 121 Lecture 13 (Special Construction)
 
Live800の導入【招待ウィンドウ編】
Live800の導入【招待ウィンドウ編】Live800の導入【招待ウィンドウ編】
Live800の導入【招待ウィンドウ編】
 
Ur-Energy January 2016 Corporate Presentation
Ur-Energy January 2016 Corporate PresentationUr-Energy January 2016 Corporate Presentation
Ur-Energy January 2016 Corporate Presentation
 
How to install setup-use the aq performance monitor package dbms aq-monitor [...
How to install setup-use the aq performance monitor package dbms aq-monitor [...How to install setup-use the aq performance monitor package dbms aq-monitor [...
How to install setup-use the aq performance monitor package dbms aq-monitor [...
 
Orden Arquitectonico Q3
Orden Arquitectonico Q3Orden Arquitectonico Q3
Orden Arquitectonico Q3
 
May 2012 Ur-Energy Corporate Presentation
May 2012 Ur-Energy Corporate PresentationMay 2012 Ur-Energy Corporate Presentation
May 2012 Ur-Energy Corporate Presentation
 
August 2012 Ur-Energy Corporate Presentation
August 2012 Ur-Energy Corporate PresentationAugust 2012 Ur-Energy Corporate Presentation
August 2012 Ur-Energy Corporate Presentation
 
Life Insurance Lesson
Life Insurance LessonLife Insurance Lesson
Life Insurance Lesson
 
Master Networking List 7 4 12
Master Networking List 7 4 12Master Networking List 7 4 12
Master Networking List 7 4 12
 
Pemberton Holmes - June 1
Pemberton Holmes - June 1Pemberton Holmes - June 1
Pemberton Holmes - June 1
 
20110427 ure 2011 agm presentation (april 2011)
20110427 ure 2011 agm presentation (april 2011)20110427 ure 2011 agm presentation (april 2011)
20110427 ure 2011 agm presentation (april 2011)
 
Class 3 3
Class 3 3Class 3 3
Class 3 3
 
It Governance at UJI
It Governance at UJIIt Governance at UJI
It Governance at UJI
 

Semelhante a Brackets

38720563 vintage-go-kart-mini-bike-plans-1950s
38720563 vintage-go-kart-mini-bike-plans-1950s38720563 vintage-go-kart-mini-bike-plans-1950s
38720563 vintage-go-kart-mini-bike-plans-1950s
zebratwo
 
System accessories
System accessoriesSystem accessories
System accessories
Hai Pham
 

Semelhante a Brackets (20)

2010 Traxx
2010 Traxx2010 Traxx
2010 Traxx
 
Traxx Checklist (word)
Traxx Checklist (word)Traxx Checklist (word)
Traxx Checklist (word)
 
Xsite Checklist
Xsite ChecklistXsite Checklist
Xsite Checklist
 
2010 Contemporary Casegoods Specification
2010 Contemporary Casegoods Specification2010 Contemporary Casegoods Specification
2010 Contemporary Casegoods Specification
 
Xsite Checklist
Xsite ChecklistXsite Checklist
Xsite Checklist
 
Basic ShoreMaster Kit Dock Instruction
Basic ShoreMaster Kit Dock InstructionBasic ShoreMaster Kit Dock Instruction
Basic ShoreMaster Kit Dock Instruction
 
2010 Xsite Checklist (.doc)
2010 Xsite Checklist (.doc)2010 Xsite Checklist (.doc)
2010 Xsite Checklist (.doc)
 
Chassis catalog
Chassis catalogChassis catalog
Chassis catalog
 
Chapter 2 notes
Chapter   2 notesChapter   2 notes
Chapter 2 notes
 
UWR Weapon Racks Installation Instructions
UWR Weapon Racks Installation InstructionsUWR Weapon Racks Installation Instructions
UWR Weapon Racks Installation Instructions
 
Loads and mass new
Loads and mass newLoads and mass new
Loads and mass new
 
Coates Hire Engineering Solutions - Structural Propping Systems
Coates Hire Engineering Solutions - Structural Propping Systems Coates Hire Engineering Solutions - Structural Propping Systems
Coates Hire Engineering Solutions - Structural Propping Systems
 
38720563 vintage-go-kart-mini-bike-plans-1950s
38720563 vintage-go-kart-mini-bike-plans-1950s38720563 vintage-go-kart-mini-bike-plans-1950s
38720563 vintage-go-kart-mini-bike-plans-1950s
 
12772469 3wheel2
12772469 3wheel212772469 3wheel2
12772469 3wheel2
 
Model 301 instr_inst_maint_manual_103_0007_rev06_10
Model 301 instr_inst_maint_manual_103_0007_rev06_10Model 301 instr_inst_maint_manual_103_0007_rev06_10
Model 301 instr_inst_maint_manual_103_0007_rev06_10
 
System accessories
System accessoriesSystem accessories
System accessories
 
Assembly_Manual_0.1 (2).pdf
Assembly_Manual_0.1 (2).pdfAssembly_Manual_0.1 (2).pdf
Assembly_Manual_0.1 (2).pdf
 
Chain conveyor | Ultimation Industries
Chain conveyor | Ultimation IndustriesChain conveyor | Ultimation Industries
Chain conveyor | Ultimation Industries
 
ProClip Forklift Mount Kits
ProClip Forklift Mount KitsProClip Forklift Mount Kits
ProClip Forklift Mount Kits
 
V panel data-sheet
V panel data-sheetV panel data-sheet
V panel data-sheet
 

Mais de Alibia de Vente

Mais de Alibia de Vente (17)

2016 Traxx Checklist
2016 Traxx Checklist2016 Traxx Checklist
2016 Traxx Checklist
 
2016 Traxx Presentation
2016 Traxx Presentation2016 Traxx Presentation
2016 Traxx Presentation
 
Neo con e tool overview
Neo con e tool overviewNeo con e tool overview
Neo con e tool overview
 
2012 Traxx Specification Presentation
2012 Traxx Specification Presentation2012 Traxx Specification Presentation
2012 Traxx Specification Presentation
 
2012 Hum Specification Presentation
2012 Hum Specification Presentation2012 Hum Specification Presentation
2012 Hum Specification Presentation
 
Electrical and Panel Systems
Electrical and Panel SystemsElectrical and Panel Systems
Electrical and Panel Systems
 
Lateral Filing
Lateral FilingLateral Filing
Lateral Filing
 
2010 Hum
2010 Hum2010 Hum
2010 Hum
 
2010 Traditional Casegoods Specification
2010 Traditional Casegoods Specification2010 Traditional Casegoods Specification
2010 Traditional Casegoods Specification
 
2010 Transitional Casegoods Specification
2010 Transitional Casegoods Specification2010 Transitional Casegoods Specification
2010 Transitional Casegoods Specification
 
2010 Xsite Checklist
2010 Xsite Checklist2010 Xsite Checklist
2010 Xsite Checklist
 
2010 Xsite
2010 Xsite2010 Xsite
2010 Xsite
 
2010 Xsite Checklist
2010 Xsite Checklist2010 Xsite Checklist
2010 Xsite Checklist
 
2007 Electrical Regions
2007 Electrical Regions2007 Electrical Regions
2007 Electrical Regions
 
2008 Electrical & Data
2008 Electrical & Data2008 Electrical & Data
2008 Electrical & Data
 
2010 Interworks EQ
2010 Interworks EQ2010 Interworks EQ
2010 Interworks EQ
 
2010 Cetra
2010 Cetra2010 Cetra
2010 Cetra
 

Último

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 

Último (20)

How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 

Brackets

  • 1.
  • 2.
  • 4. TraxxWorksurface Brackets Page 316 Important: Brackets must be specified separately and sold individually. 1 3/16” needs support every 48”. 1 9/16” needs support every 60”. Brackets have an anti-kick-out design that provides secure attachment. A variety of additional supports such as angel brackets and support panels are used from Footprint. Images taken from pricelist and installation instructions. .
  • 5. Storage spacing with Traxx Brackets can easily be spaced any place along the traxx rails. Spacing is located behind the pedestal to accommodate the worksurface brackets.
  • 6. Traxx Overhead Mounting Brackets & Overhead Ganging Brackets Overhead Brackets Page 316 & 521 (Footprint) Ganging Brackets Page 523 (Footprint)
  • 7. Traxx Square, Radius, and Curved Profile Overhead Brackets Page 521 & 523 (Footprint) Images taken from pricelist and installation instructions.
  • 8. Traxx Flat and Bevel Profile Overhead Brackets Page 521 & 523 (Footprint) Images taken from the pricelist and installation instructions. .
  • 9. Traxx Lunar Profile Overhead Brackets Page 288 & 499 (Footprint) Images taken from pricelist and installation instructions. .
  • 10. Traxx Storage Cubby Brackets Page 521 (Footprint) Two are recommended to be ganged. Images taken from pricelist and installation instructions. .
  • 11. Traxx Overhead Mounting Brackets & Overhead Ganging Brackets Spacer Page 522 (Footprint) Images taken from pricelist and installation instructions.
  • 13. CetraWorksurface Brackets Important: Brackets must be specified separately and sold individually. 1 3/16” needs support every 48”. 1 9/16” needs support every 60”.
  • 14. Cetra Application and Support Page 328 & 329 (Footprint)
  • 15. Cetra Edge Support Brackets Page 449 (Footprint) Edge brackets are handed depending on where you are standing, facing the panel. Edge brackets at corner locations are not specific to hand of bracket. Images taken from installation instructions.
  • 16. Cetra Cantilever Page 450 (Footprint) Cantilevers are handed. Flat brackets are sold individually however must be used in pairs with a cantilever when located at the seam of two surfaces. Images taken from installation instructions.
  • 17. Cetra Overhead Mounting Brackets & Overhead Ganging Brackets Overhead Brackets Page 519 (Footprint) Ganging Brackets Page 523 (Footprint)
  • 18. Cetra Square, Radius, and Curved Profile Overhead Brackets Page 519 & 523 (Footprint) Images taken from pricelist and installation instructions.
  • 19. Cetra Flat and Bevel Profile Overhead Brackets Page 519 & 523 (Footprint) Images taken from the pricelist and installation instructions. .
  • 20. Cetra Lunar Profile Overhead Brackets Page 519 & 523 (Footprint) Images taken from pricelist and installation instructions. .
  • 21. Cetra Flat Shelf Bracket Page 519 (Footprint) Images taken from the pricelist and installation instructions. .
  • 23. Interworks EQ Worksurface Brackets Important: Brackets must be specified separately. 1 3/16” surfaces need support every 48” 1 9/16” surfaces need support every 60” Cantilevers are handed. Flat brackets are sold individually however must be used in pairs with a cantilever when located at the seam of two surfaces. Edge brackets at corner locations are not specific to hand of bracket.
  • 24. Interworks EQ Application and Support Page 332 & 333 (Footprint)
  • 25. Interworks EQ Cantilever Page 450 (Footprint) Important: Brackets must be specified separately. Cantilevers are handed. Flat brackets are sold individually however must be used in pairs with a cantilever when located at the seam of two surfaces. Consider placing pedestal fillers behind pedestals to fill gap.
  • 26. Interworks EQ Edge Support Brackets Page 449 (Footprint) Important: Brackets must be specified separately. Edge brackets at corner locations are not specific to hand of bracket. It is not recommended to place edge brackets in the center of runs this image simply conveys all possible locations.
  • 27. Interworks EQ Overhead Brackets Overview Wood/ Laminate overheads cannot be hung on Interworks EQ. Bevel profile overheads have a back bracket. Overhead Brackets Page 520 (Footprint) Ganging Brackets Page 523 (Footprint) .
  • 28. Interworks EQ Flat and Bevel Profile Overhead Brackets Page 524 (Footprint) You will not find a bracket for this overhead is apart of the construction. Ganging brackets are sold in a quantity of 4. .
  • 29. Interworks EQ Lunar Profile Overhead Brackets Page 524 & 526 (Footprint) A set of overhead brackets is need for each overhead regardless of width. Ganging brackets are sold individually .
  • 31. Xsite Worksurface Support Page 446 All brackets are specified separately. Edge support brackets have the ability to adjust in ¼” increments up to ¾”. Top caps should be cut around transaction counter brackets. Mid-adjustable support can not be used as sole support at the end of the run. INTERWORKS
  • 32. Xsite Page 330 Brackets are placed every 48” for 1 3/16” and 60” for 1 9/16”. INTERWORKS
  • 33. XsiteOverhead Mounting Brackets & Overhead Ganging Brackets Overhead Brackets Page 518 (Footprint) Ganging Brackets Page 523 (Footprint)
  • 34. XsiteSquare, Radius, and Curved Profile Overhead Brackets Page 518 & 523 (Footprint) Images taken from pricelist and installation instructions.
  • 35. XsiteFlat and Bevel Profile Overhead Brackets Page 521 & 523 (Footprint) Images taken from the pricelist and installation instructions. .
  • 36. XsiteLunar Profile Overhead Brackets Page 288 & 499 (Footprint) Images taken from pricelist and installation instructions. .
  • 37. Xsite Storage Cubby Brackets Page 518 (Footprint) Two are recommended to be ganged. Images taken from pricelist and installation instructions. .
  • 38. Kimball Office Resources Dealer Sales Manager Sales Specialist Customer Care/ By Design 800.482.1818 Product Technical Support 800.481.6696 Product Specifier Alibia de Vente Market Education 770.265.4006 or Alibia.devente@kimball.com

Notas do Editor

  1. Go over the items used in the example at the bottom and what it would look like specified on the computer.Surface support panels in wood, laminate or metal should be set 1” from the wll for molding or wires.