Drilling Engineering 2 Course (1st Ed.)
1.
2.
3.
4.
5.
6.

Laminar Flow in Pipes and Annuli
Turbulent Flow in Pipes and Annuli
Pressure Drop Across Surface Connections
Pressure Drop Across Bit
Optimization of Bit Hydraulics
Particle Slip Velocity
Casing functions
Casing costs compromise
one of the largest cost items of the drilling project.
Therefore proper planning of
casing setting depths and casing selection is vital
to realize a cost effective and safe well.

The casings themselves fulfill multiple functions
that can be summarized as:

Isolate porous formations with different fluid-pressure
regimes from contaminating the pay zone,
Prevent near surface fresh water zones
from contamination with drilling mud,
Protect the hole from caving in,
Provide a connection and support of the wellhead equipment,
Provide exact dimensions for running
testing, completion and production subsurface equipment.

Fall 13 H. AlamiNia

Drilling Engineering 2 Course (1st Ed.)

3
Casing Types
According to the different
functions,
the total casing program
consists of
different casings strings.
Conductor Casing
Surface Casing
Intermediate Casing
Production Casing
Liners

Fall 13 H. AlamiNia

Drilling Engineering 2 Course (1st Ed.)

4
Conductor Casing
The function of the conductor is
to enable circulation of the drilling fluid to
the shale shakers without eroding
the surface sediments directly below the rig foundation.
The conductor prevents the subsequent casings from
corrosion and may partly support the wellhead weight.

Commonly a diverter is installed on top of the
conductor casing to divert an unexpected inflow
of formation fluids into the wellbore
away from the rig-site and the personal.
Conductor setting depths are
in the range of 150 to 600 [ft] (46-183 m),
their seizes range from 36 to 20 [in] (0.91-0.5 m).
Fall 13 H. AlamiNia

Drilling Engineering 2 Course (1st Ed.)

5
Surface Casing
The function of the surface casing is
 to prevent cave in of unconsolidated, weak near-surface formations
as well as protect the shallow, freshwater sands
from contamination with drilling mud.
 As the conductors,
surface casing protects the subsequent casings from corrosion.

Before the surface casing is set,
 no blow out preventers (BOP) are installed.
 After setting the surface casing and installing the wellhead, a BOP is
available to handle kicks when drilling the intermediate hole section.

Surface casing setting depths are in the range
from 300 to 5,000 [ft] (91-1524 m),
their diameters range from 24 to 17-1/2 [in].
 the surface casing setting depth is often determined by government
or company policy and not selected due to technical reasoning.
Fall 13 H. AlamiNia

Drilling Engineering 2 Course (1st Ed.)

6
Intermediate Casing
The intermediate casing string
is a purely technical casing.

One or more may be necessary to handle abnormal
formation pressures, unstable shale formations, lost
circulation or cave-in zones.
An intermediate casing may also be necessary to realize
the planned mud weight profile.
When for example an abnormally pressured formation is
encountered, it may have to be protected by an intermediate
casing so when formation pressure of the formations below is
normal, a lower mud weight can be applied.

Intermediate casing diameters
range from 17-1/2 to 9- 5/8 [in].
Fall 13 H. AlamiNia

Drilling Engineering 2 Course (1st Ed.)

7
Production Casing
The production casing is set through the
prospective production zone(s).
This casing string protects the environment
in case of production tubing failure and
permits the tubing string to be maintained or
replaced during the production life.
Commonly production casing and production liners
have gas-tight connections,
their diameters range from 9-5/8 to 5 [in].
A production casing diameter of 7 [in] is encountered often.

Fall 13 H. AlamiNia

Drilling Engineering 2 Course (1st Ed.)

8
Liners
To save cost, the casing installed
sometimes doesn’t reach until the
surface but finishes within the
previous string.
Such a casing configuration is called
liner.
A liner is mounted on a so called
“liner hanger” to the previous casing
string.
Commonly the liner head is several
hundred feet into the previous
casing to enable a good cement seal.
Liner
Fall 13 H. AlamiNia

Drilling Engineering 2 Course (1st Ed.)

9
Various typical casing programs

Fall 13 H. AlamiNia

Drilling Engineering 2 Course (1st Ed.)

10
develop a casing program
To develop a casing program, first the various
casing setting depths have to be determined.
Since the primary reason to drill a well is
to produce hydrocarbons out of a reservoir,
the final casing inside diameters
have to be large enough to allow
for the forecasted completion and production schemes.
Factors like completion type
(open hole, cased hole, monobore production, etc.),
expected amount of production (production tubing seize),
expected production forecast (e.g. need of gas-lift, etc.) and
seize of evaluation tools to be run have to be considered.
In general, for production purposes
the well diameters shall be as large as possible.
Fall 13 H. AlamiNia

Drilling Engineering 2 Course (1st Ed.)

11
Advantages of small hole sizes
On the other hand, as small as possible hole seizes
reduces the total cost of the well since:

drilling times are faster,
less mud has to be used (purchase and disposal of
mud),
smaller mud equipment can be used (cleaning, pumps, etc.),
smaller casings can be used (cheaper, higher strength at same
grade),
smaller rig can be applied (lighter casings, smaller mud
volume),
rig site can be smaller (especially important offshore and
platform types like TLP where weights are limited).

Out of this reason a technology called slim-hole drilling
was developed.
Fall 13 H. AlamiNia

Drilling Engineering 2 Course (1st Ed.)

12
Q921 de2 lec6 uc v1

Mais conteúdo relacionado

Mais procurados

Q922+de1+l07 v1
Q922+de1+l07 v1Q922+de1+l07 v1
Q922+de1+l07 v1
AFATous
 
Q922+de2+l07 v1
Q922+de2+l07 v1Q922+de2+l07 v1
Q922+de2+l07 v1
AFATous
 
Q922+de2+l04 v1
Q922+de2+l04 v1Q922+de2+l04 v1
Q922+de2+l04 v1
AFATous
 
Q921 de1 lec 7 v1
Q921 de1 lec 7 v1Q921 de1 lec 7 v1
Q921 de1 lec 7 v1
AFATous
 
PPEJ.090.2010 rev2
PPEJ.090.2010 rev2PPEJ.090.2010 rev2
PPEJ.090.2010 rev2
Rahmat Riski
 
SUMMARY 2016 - Copy (1)
SUMMARY 2016 - Copy (1)SUMMARY 2016 - Copy (1)
SUMMARY 2016 - Copy (1)
Student
 
4. Borehole Stresses
4. Borehole Stresses4. Borehole Stresses
4. Borehole Stresses
James Craig
 

Mais procurados (20)

Q922+de1+l07 v1
Q922+de1+l07 v1Q922+de1+l07 v1
Q922+de1+l07 v1
 
Q922+de2+l07 v1
Q922+de2+l07 v1Q922+de2+l07 v1
Q922+de2+l07 v1
 
Casing design
Casing designCasing design
Casing design
 
Q922+de2+l04 v1
Q922+de2+l04 v1Q922+de2+l04 v1
Q922+de2+l04 v1
 
Weirs on Permeable Foundations
Weirs on Permeable FoundationsWeirs on Permeable Foundations
Weirs on Permeable Foundations
 
Q921 de1 lec 7 v1
Q921 de1 lec 7 v1Q921 de1 lec 7 v1
Q921 de1 lec 7 v1
 
Watertank
WatertankWatertank
Watertank
 
PPEJ.090.2010 rev2
PPEJ.090.2010 rev2PPEJ.090.2010 rev2
PPEJ.090.2010 rev2
 
SUMMARY 2016 - Copy (1)
SUMMARY 2016 - Copy (1)SUMMARY 2016 - Copy (1)
SUMMARY 2016 - Copy (1)
 
over veiw on desighn of offshore pipelines
over veiw on desighn of offshore pipelinesover veiw on desighn of offshore pipelines
over veiw on desighn of offshore pipelines
 
Introduction & under ground water tank problem
Introduction & under ground water tank problemIntroduction & under ground water tank problem
Introduction & under ground water tank problem
 
Intze ppt
Intze pptIntze ppt
Intze ppt
 
suresh_011
suresh_011suresh_011
suresh_011
 
Kick t1
Kick t1Kick t1
Kick t1
 
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-AghaBasics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
 
Complete design of r.c.c over head tank & boq estimate
Complete design of r.c.c over head tank & boq estimateComplete design of r.c.c over head tank & boq estimate
Complete design of r.c.c over head tank & boq estimate
 
subsea
subseasubsea
subsea
 
Water retaining structures quick guide
Water retaining structures quick guideWater retaining structures quick guide
Water retaining structures quick guide
 
Lyapichev. Analysis, design & behavior of CFRDs
Lyapichev. Analysis, design & behavior of CFRDsLyapichev. Analysis, design & behavior of CFRDs
Lyapichev. Analysis, design & behavior of CFRDs
 
4. Borehole Stresses
4. Borehole Stresses4. Borehole Stresses
4. Borehole Stresses
 

Destaque

Q922+de2+l02 v1
Q922+de2+l02 v1Q922+de2+l02 v1
Q922+de2+l02 v1
AFATous
 
Q921 de2 lec5 v1
Q921 de2 lec5 v1Q921 de2 lec5 v1
Q921 de2 lec5 v1
AFATous
 
Q922+de2+l10 v1
Q922+de2+l10 v1Q922+de2+l10 v1
Q922+de2+l10 v1
AFATous
 
Q922+de2+l08 v1
Q922+de2+l08 v1Q922+de2+l08 v1
Q922+de2+l08 v1
AFATous
 
Q922+de1+l03 v1
Q922+de1+l03 v1Q922+de1+l03 v1
Q922+de1+l03 v1
AFATous
 
Meet the Social Leaders
Meet the Social LeadersMeet the Social Leaders
Meet the Social Leaders
Blog Atlantic
 
Q921 rfp lec8 v1
Q921 rfp lec8 v1Q921 rfp lec8 v1
Q921 rfp lec8 v1
AFATous
 
Magazine advertisement questionnaire advert two analysis
Magazine advertisement questionnaire   advert two analysisMagazine advertisement questionnaire   advert two analysis
Magazine advertisement questionnaire advert two analysis
ChrisAshwell
 
Q921 rfp lec10 v1
Q921 rfp lec10 v1Q921 rfp lec10 v1
Q921 rfp lec10 v1
AFATous
 
Q921 re1 lec8 v1
Q921 re1 lec8 v1Q921 re1 lec8 v1
Q921 re1 lec8 v1
AFATous
 
Q922+de1+l06 v1
Q922+de1+l06 v1Q922+de1+l06 v1
Q922+de1+l06 v1
AFATous
 
Waterline Tech Catalog X
Waterline Tech Catalog XWaterline Tech Catalog X
Waterline Tech Catalog X
Waterline
 
FAFEN-Election-Observation-Sindh-Local-Government-Elections-–-Phase-1-Prelimi...
FAFEN-Election-Observation-Sindh-Local-Government-Elections-–-Phase-1-Prelimi...FAFEN-Election-Observation-Sindh-Local-Government-Elections-–-Phase-1-Prelimi...
FAFEN-Election-Observation-Sindh-Local-Government-Elections-–-Phase-1-Prelimi...
mohsinshayan
 

Destaque (19)

Q922+de2+l02 v1
Q922+de2+l02 v1Q922+de2+l02 v1
Q922+de2+l02 v1
 
Q921 de2 lec5 v1
Q921 de2 lec5 v1Q921 de2 lec5 v1
Q921 de2 lec5 v1
 
Q922+de2+l10 v1
Q922+de2+l10 v1Q922+de2+l10 v1
Q922+de2+l10 v1
 
Q922+de2+l08 v1
Q922+de2+l08 v1Q922+de2+l08 v1
Q922+de2+l08 v1
 
Q922+de1+l03 v1
Q922+de1+l03 v1Q922+de1+l03 v1
Q922+de1+l03 v1
 
Meet the Social Leaders
Meet the Social LeadersMeet the Social Leaders
Meet the Social Leaders
 
Q921 rfp lec8 v1
Q921 rfp lec8 v1Q921 rfp lec8 v1
Q921 rfp lec8 v1
 
جزوه کمک درسی مهندسی حفاری دو
جزوه کمک درسی مهندسی حفاری دوجزوه کمک درسی مهندسی حفاری دو
جزوه کمک درسی مهندسی حفاری دو
 
Magazine advertisement questionnaire advert two analysis
Magazine advertisement questionnaire   advert two analysisMagazine advertisement questionnaire   advert two analysis
Magazine advertisement questionnaire advert two analysis
 
Q921 rfp lec10 v1
Q921 rfp lec10 v1Q921 rfp lec10 v1
Q921 rfp lec10 v1
 
Q932+sgo reference fa lec 4x1
Q932+sgo reference fa lec 4x1Q932+sgo reference fa lec 4x1
Q932+sgo reference fa lec 4x1
 
Wwwwwwwwwwwwwwwwwwwwwwwwwwwwwww
WwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwWwwwwwwwwwwwwwwwwwwwwwwwwwwwwww
Wwwwwwwwwwwwwwwwwwwwwwwwwwwwwww
 
Föredrag om Ubuntu för Stadsbiblioteket Göteborg 2011 02-19
Föredrag om Ubuntu för Stadsbiblioteket Göteborg 2011 02-19Föredrag om Ubuntu för Stadsbiblioteket Göteborg 2011 02-19
Föredrag om Ubuntu för Stadsbiblioteket Göteborg 2011 02-19
 
Q921 re1 lec8 v1
Q921 re1 lec8 v1Q921 re1 lec8 v1
Q921 re1 lec8 v1
 
Q922+de1+l06 v1
Q922+de1+l06 v1Q922+de1+l06 v1
Q922+de1+l06 v1
 
Q933+de2 reference fa lec
Q933+de2 reference fa lecQ933+de2 reference fa lec
Q933+de2 reference fa lec
 
جزوه کمک درسی مهندسی مخازن دو
جزوه کمک درسی مهندسی مخازن دوجزوه کمک درسی مهندسی مخازن دو
جزوه کمک درسی مهندسی مخازن دو
 
Waterline Tech Catalog X
Waterline Tech Catalog XWaterline Tech Catalog X
Waterline Tech Catalog X
 
FAFEN-Election-Observation-Sindh-Local-Government-Elections-–-Phase-1-Prelimi...
FAFEN-Election-Observation-Sindh-Local-Government-Elections-–-Phase-1-Prelimi...FAFEN-Election-Observation-Sindh-Local-Government-Elections-–-Phase-1-Prelimi...
FAFEN-Election-Observation-Sindh-Local-Government-Elections-–-Phase-1-Prelimi...
 

Semelhante a Q921 de2 lec6 uc v1

Q922+de2+l06 v1
Q922+de2+l06 v1Q922+de2+l06 v1
Q922+de2+l06 v1
AFATous
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
Leo Youngman
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas Wells
Mohamed Elnagar
 
EP- August 2015.PDF
EP- August 2015.PDFEP- August 2015.PDF
EP- August 2015.PDF
Moises Nava
 
Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)
Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)
Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)
Paul Brett
 

Semelhante a Q921 de2 lec6 uc v1 (20)

Q922+de2+l06 v1
Q922+de2+l06 v1Q922+de2+l06 v1
Q922+de2+l06 v1
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
 
Defining Well completion
Defining Well completionDefining Well completion
Defining Well completion
 
Casing_Design(1).ppt
Casing_Design(1).pptCasing_Design(1).ppt
Casing_Design(1).ppt
 
Casing Seat depth and Basic casing design lecture 4.pdf
Casing Seat depth and Basic casing design  lecture 4.pdfCasing Seat depth and Basic casing design  lecture 4.pdf
Casing Seat depth and Basic casing design lecture 4.pdf
 
Drilling Engineering - Casing Design
Drilling Engineering - Casing DesignDrilling Engineering - Casing Design
Drilling Engineering - Casing Design
 
Deep basement excavation
Deep basement excavation Deep basement excavation
Deep basement excavation
 
Construction dewatering technology data sheet
Construction dewatering technology data sheetConstruction dewatering technology data sheet
Construction dewatering technology data sheet
 
Unit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringUnit 37: Advanced Civil Engineering
Unit 37: Advanced Civil Engineering
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas Wells
 
Anmol bhargava casing basics
Anmol bhargava   casing basicsAnmol bhargava   casing basics
Anmol bhargava casing basics
 
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing EffectDesign , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
 
EP- August 2015.PDF
EP- August 2015.PDFEP- August 2015.PDF
EP- August 2015.PDF
 
Field Failure Analysis of DTH Hammer Bit
Field Failure Analysis of DTH Hammer BitField Failure Analysis of DTH Hammer Bit
Field Failure Analysis of DTH Hammer Bit
 
Cut and cover
Cut and coverCut and cover
Cut and cover
 
Well_Completions.pdf
Well_Completions.pdfWell_Completions.pdf
Well_Completions.pdf
 
Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)
Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)
Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)
 
Dam engineering i 5
Dam engineering i 5Dam engineering i 5
Dam engineering i 5
 
Drilling imp
Drilling impDrilling imp
Drilling imp
 
underwater-construction-55849d4caf8cd.pptx
underwater-construction-55849d4caf8cd.pptxunderwater-construction-55849d4caf8cd.pptx
underwater-construction-55849d4caf8cd.pptx
 

Mais de AFATous

Q932+rrl reference fa lec 4x1
Q932+rrl reference fa lec 4x1Q932+rrl reference fa lec 4x1
Q932+rrl reference fa lec 4x1
AFATous
 

Mais de AFATous (20)

جزوه درس نمودارگیری از چاه، ویرایش ششم
جزوه درس نمودارگیری از چاه، ویرایش ششم جزوه درس نمودارگیری از چاه، ویرایش ششم
جزوه درس نمودارگیری از چاه، ویرایش ششم
 
جزوه درس مهندسی حفاری دو، ویرایش ششم
جزوه درس مهندسی حفاری دو، ویرایش ششم جزوه درس مهندسی حفاری دو، ویرایش ششم
جزوه درس مهندسی حفاری دو، ویرایش ششم
 
جزوه درس مهندسی بهره برداری دو، ویرایش دوم
جزوه درس مهندسی بهره برداری دو، ویرایش دومجزوه درس مهندسی بهره برداری دو، ویرایش دوم
جزوه درس مهندسی بهره برداری دو، ویرایش دوم
 
جزوه درس مهندسی حفاری یک،ویرایش ششم
جزوه درس مهندسی حفاری یک،ویرایش ششمجزوه درس مهندسی حفاری یک،ویرایش ششم
جزوه درس مهندسی حفاری یک،ویرایش ششم
 
جزوه درس انگیزش چاه (اسیدکاری)، ویرایش دوم
جزوه درس انگیزش چاه (اسیدکاری)، ویرایش دومجزوه درس انگیزش چاه (اسیدکاری)، ویرایش دوم
جزوه درس انگیزش چاه (اسیدکاری)، ویرایش دوم
 
Q933+log reference fa lec
Q933+log reference fa lecQ933+log reference fa lec
Q933+log reference fa lec
 
Q933+log reference fa lec 4x1
Q933+log reference fa lec 4x1Q933+log reference fa lec 4x1
Q933+log reference fa lec 4x1
 
Q933+po2 reference fa lec
Q933+po2 reference fa lecQ933+po2 reference fa lec
Q933+po2 reference fa lec
 
Q933+po2 reference fa lec 4x1
Q933+po2 reference fa lec 4x1Q933+po2 reference fa lec 4x1
Q933+po2 reference fa lec 4x1
 
Q933+de2 reference fa lec 4x1
Q933+de2 reference fa lec 4x1Q933+de2 reference fa lec 4x1
Q933+de2 reference fa lec 4x1
 
Q933+de1 reference fa lec 4x1
Q933+de1 reference fa lec 4x1Q933+de1 reference fa lec 4x1
Q933+de1 reference fa lec 4x1
 
Q933+de1 reference fa lec
Q933+de1 reference fa lecQ933+de1 reference fa lec
Q933+de1 reference fa lec
 
Q932+log reference fa lec 4 x1
Q932+log reference fa lec 4 x1Q932+log reference fa lec 4 x1
Q932+log reference fa lec 4 x1
 
Q932+stm reference fa lec 4x1
Q932+stm reference fa lec 4x1Q932+stm reference fa lec 4x1
Q932+stm reference fa lec 4x1
 
Q932+rrl reference fa lec
Q932+rrl reference fa lecQ932+rrl reference fa lec
Q932+rrl reference fa lec
 
Q932+stm reference fa lec
Q932+stm reference fa lecQ932+stm reference fa lec
Q932+stm reference fa lec
 
Q932+rrl reference fa lec 4x1
Q932+rrl reference fa lec 4x1Q932+rrl reference fa lec 4x1
Q932+rrl reference fa lec 4x1
 
Q932+sgo reference fa lec
Q932+sgo reference fa lecQ932+sgo reference fa lec
Q932+sgo reference fa lec
 
Q932+de1 reference fa lec
Q932+de1 reference fa lecQ932+de1 reference fa lec
Q932+de1 reference fa lec
 
Q932+log reference fa lec
Q932+log reference fa lecQ932+log reference fa lec
Q932+log reference fa lec
 

Último

Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 

Último (20)

WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 

Q921 de2 lec6 uc v1

  • 1. Drilling Engineering 2 Course (1st Ed.)
  • 2. 1. 2. 3. 4. 5. 6. Laminar Flow in Pipes and Annuli Turbulent Flow in Pipes and Annuli Pressure Drop Across Surface Connections Pressure Drop Across Bit Optimization of Bit Hydraulics Particle Slip Velocity
  • 3. Casing functions Casing costs compromise one of the largest cost items of the drilling project. Therefore proper planning of casing setting depths and casing selection is vital to realize a cost effective and safe well. The casings themselves fulfill multiple functions that can be summarized as: Isolate porous formations with different fluid-pressure regimes from contaminating the pay zone, Prevent near surface fresh water zones from contamination with drilling mud, Protect the hole from caving in, Provide a connection and support of the wellhead equipment, Provide exact dimensions for running testing, completion and production subsurface equipment. Fall 13 H. AlamiNia Drilling Engineering 2 Course (1st Ed.) 3
  • 4. Casing Types According to the different functions, the total casing program consists of different casings strings. Conductor Casing Surface Casing Intermediate Casing Production Casing Liners Fall 13 H. AlamiNia Drilling Engineering 2 Course (1st Ed.) 4
  • 5. Conductor Casing The function of the conductor is to enable circulation of the drilling fluid to the shale shakers without eroding the surface sediments directly below the rig foundation. The conductor prevents the subsequent casings from corrosion and may partly support the wellhead weight. Commonly a diverter is installed on top of the conductor casing to divert an unexpected inflow of formation fluids into the wellbore away from the rig-site and the personal. Conductor setting depths are in the range of 150 to 600 [ft] (46-183 m), their seizes range from 36 to 20 [in] (0.91-0.5 m). Fall 13 H. AlamiNia Drilling Engineering 2 Course (1st Ed.) 5
  • 6. Surface Casing The function of the surface casing is  to prevent cave in of unconsolidated, weak near-surface formations as well as protect the shallow, freshwater sands from contamination with drilling mud.  As the conductors, surface casing protects the subsequent casings from corrosion. Before the surface casing is set,  no blow out preventers (BOP) are installed.  After setting the surface casing and installing the wellhead, a BOP is available to handle kicks when drilling the intermediate hole section. Surface casing setting depths are in the range from 300 to 5,000 [ft] (91-1524 m), their diameters range from 24 to 17-1/2 [in].  the surface casing setting depth is often determined by government or company policy and not selected due to technical reasoning. Fall 13 H. AlamiNia Drilling Engineering 2 Course (1st Ed.) 6
  • 7. Intermediate Casing The intermediate casing string is a purely technical casing. One or more may be necessary to handle abnormal formation pressures, unstable shale formations, lost circulation or cave-in zones. An intermediate casing may also be necessary to realize the planned mud weight profile. When for example an abnormally pressured formation is encountered, it may have to be protected by an intermediate casing so when formation pressure of the formations below is normal, a lower mud weight can be applied. Intermediate casing diameters range from 17-1/2 to 9- 5/8 [in]. Fall 13 H. AlamiNia Drilling Engineering 2 Course (1st Ed.) 7
  • 8. Production Casing The production casing is set through the prospective production zone(s). This casing string protects the environment in case of production tubing failure and permits the tubing string to be maintained or replaced during the production life. Commonly production casing and production liners have gas-tight connections, their diameters range from 9-5/8 to 5 [in]. A production casing diameter of 7 [in] is encountered often. Fall 13 H. AlamiNia Drilling Engineering 2 Course (1st Ed.) 8
  • 9. Liners To save cost, the casing installed sometimes doesn’t reach until the surface but finishes within the previous string. Such a casing configuration is called liner. A liner is mounted on a so called “liner hanger” to the previous casing string. Commonly the liner head is several hundred feet into the previous casing to enable a good cement seal. Liner Fall 13 H. AlamiNia Drilling Engineering 2 Course (1st Ed.) 9
  • 10. Various typical casing programs Fall 13 H. AlamiNia Drilling Engineering 2 Course (1st Ed.) 10
  • 11. develop a casing program To develop a casing program, first the various casing setting depths have to be determined. Since the primary reason to drill a well is to produce hydrocarbons out of a reservoir, the final casing inside diameters have to be large enough to allow for the forecasted completion and production schemes. Factors like completion type (open hole, cased hole, monobore production, etc.), expected amount of production (production tubing seize), expected production forecast (e.g. need of gas-lift, etc.) and seize of evaluation tools to be run have to be considered. In general, for production purposes the well diameters shall be as large as possible. Fall 13 H. AlamiNia Drilling Engineering 2 Course (1st Ed.) 11
  • 12. Advantages of small hole sizes On the other hand, as small as possible hole seizes reduces the total cost of the well since: drilling times are faster, less mud has to be used (purchase and disposal of mud), smaller mud equipment can be used (cleaning, pumps, etc.), smaller casings can be used (cheaper, higher strength at same grade), smaller rig can be applied (lighter casings, smaller mud volume), rig site can be smaller (especially important offshore and platform types like TLP where weights are limited). Out of this reason a technology called slim-hole drilling was developed. Fall 13 H. AlamiNia Drilling Engineering 2 Course (1st Ed.) 12