Personal Information
Organização/Local de trabalho
India India
Cargo
Having 2+ year good working Experience in Electrical maintenance & Planning.
Sobre
Key Responsibility :
• Managing overall activities pertaining to erection, testing, commissioning and maintenance of a wide range of Electrical equipments like Induction furnace, Transformers, Generators, Induction Motors, EOT Cranes, VFD & AC drives, Siemens S7-200 PLC Systems and process control & Instrumentation equipments.
• Operation and Maintenance of Electrical and Mechanical System, Utilities and Machineries.
• Utility Operations (start up, shut down, emergency, breakdown and Test mode) monitoring and Control the Facility of VCB (33KV, 3 phase, 50 Hz & 630A).Furnace Transformer (1200 KVA 33KV/2X570V) & Auxiliary Transformer (1000 KVA, 33KV/433V), APFC, MCC, PLC Base panel,...
Documentos
(1)Personal Information
Organização/Local de trabalho
India India
Cargo
Having 2+ year good working Experience in Electrical maintenance & Planning.
Sobre
Key Responsibility :
• Managing overall activities pertaining to erection, testing, commissioning and maintenance of a wide range of Electrical equipments like Induction furnace, Transformers, Generators, Induction Motors, EOT Cranes, VFD & AC drives, Siemens S7-200 PLC Systems and process control & Instrumentation equipments.
• Operation and Maintenance of Electrical and Mechanical System, Utilities and Machineries.
• Utility Operations (start up, shut down, emergency, breakdown and Test mode) monitoring and Control the Facility of VCB (33KV, 3 phase, 50 Hz & 630A).Furnace Transformer (1200 KVA 33KV/2X570V) & Auxiliary Transformer (1000 KVA, 33KV/433V), APFC, MCC, PLC Base panel,...