SlideShare uma empresa Scribd logo
1 de 7
ADOC japan
HAIL Field Development Infrastructures Early Production Facilities Works
Project
RESUME
Objectives:
Professional organizational skills; work effectively under pressure and stress, prioritize workload and multi-task.
Conscious of deadlines; possess a good sense of urgency. Work efficiently and effectively as self-starter in
Busy Environment handling many tasks simultaneously. Initiate action and follow through to conclusion of any
Commitment, capably learn new skills. Combine sound time- and resource-management skills to implement
Strategic, Administrative, Operational initiatives to enhance productivity, quality, client service overall Quality
Management on site and the respective local works to be followed, and for implementing and maintaining the site quality
Plan in accordance to the overall Project Quality Plan, Ensure that contracted resources with the required QA/QC skill set
Capability exists within the Operations and projects group. For the incumbent inspector to function effectively in this position
Having in-depth knowledge and skills in Quality of work as per acceptance of testing activities within the petrochemical
Industry (both onshore and offshore environment)
Summary of Professional Experience:
With Seventeen (17) years plus of professional experience in Oil &Gas sector, Civil Engineering & Quality Control field for
working in Multinational EPC Contractors, I have skills as professional Engineer Civil in infrastructure Construction & Pre-
Cast / Pre – Stress Concrete structures manufacturer Companies throughout the Central Asia & GCC Countries region;
Working as Creative problem-solver, responsibilities include but are not limited to Reviewing project specifications, drawings
and Quality Control plans and procedures. Ensure, whenever necessary, the update of site quality control plans / control
procedures. Preparation of the Inspection Test Plan for the scope of work and have it approved by the client. Supervise and
witness inspections, check reports and documentation and collect and file the required Quality Records. Ensure that all sites
activities are carried out according to reference documentation for parts of the plant within his area of responsibility,
authorizing their acceptance at quality control completion. Cooperate and implementation of relative corrective actions,
NCRs, FCNs etc. Systematically records the nonconformity or event reports issued and identify appropriate corrective
actions. Manage collaboration of measurement instruments and related certifications. Inform the Site Manager of any
deviation regarding the contract. Check the completeness and conformity to specified applicable requirements, standards
and/or directives. Ensure that the tests, controls and inspections are carried out and that personnel have access to all
required project documentation. Road works- Inspection of embankment construction, gravel and asphalt placement.
Underground utilities- inspection and reporting on underground storm, water, sewer and electrical works, Concrete works-
pre-pour inspections of formwork, reinforcing steel and concrete placement Conducting field inspections and producing
inspection reports for various construction activities. Progressively built and compile the project turnover packages
throughout the construction schedule and maintain the up to date of the quality control records compile the final project
turnovers and submission to client approval any other project QA/QC duties as advised from time to time.
• Ready Mix Abu Dhabi Pre Cast
• Pioneer Precast Concrete LLC Abu Dhabi
• AL FARA’A Precast Company Abu Dhabi
• Qatar Ready-mix Concrete J.V. of Lafarge International & Qatar Precast Co., LLC.
• KITTCO CRUSHER, SIMSIMAH, AL KHOR, Qatar
• ALRASHID-ABETONG Precast Company LTD (RIYADH-KSA)
• Eastern Precast Concrete Company (DAMMAM-KSA)
Professional Key Qualifications:
Performs Quality Walk About at site locations and QC Surveillance at Subcontractors premises, ensures that
Contract specifications, procedures and Subcontractor’s documents are available in Site office with the
Appropriate revision, Supervision of discipline QC Inspectors and evaluates their inspection and activities
Performance, arranges all Subcontractors / Vendors documents review ensures such documents meet Contract
Specifications, QMS and legal requirements, reviews and arranges final QC dossier for handing over to the
Client. Maintain proper filling system (as per Organization procedure) with full traceability for retrieving the
Documents, strives to have a proactive approach in problem solving, develops and ensures Implementation and
Compliance with Project Quality Plan (PQP), Project Quality related procedures for document Control, change
Control, material Control/inspection/testing, material inspection & test plan. Manages the non-conformance
Issues to their resolution in liaison with responsible party (Subcontractor / Vendor), reviews all inspection
Reports & maintains them in a manner, which allows all personnel concerned access to results, establishes all
Formats of records and documents required for implementing Quality control, reviews & received comments
Page 1 of 6
ADOC japan
HAIL Field Development Infrastructures Early Production Facilities Works
Project
From Client for QC documentation such as ITP, QC procedures etc. and ensure that comments are addressed
In the revised Quality formats or checklists & documents accordingly.
DEGREES/COURSES/TRAININGS:
Bachelor of Civil Engineering Preston institute of Management Science & Technology, Pakistan
D.A.E (Diploma of Engineer Civil) Punjab Board of Technical Education, Pakistan
• Construction work Safety from ADOC (Abu Dhabi Oil Company) JAPAN
• Construction work Safety from ADCO (Abu Dhabi Company for Onshore Oil Operations)
• Construction work Safety from ADMA – OPCO (Abu Dhabi Marine Operating Company)
• Construction work Safety from ALSTOM GRID (BAB-2,400/220/33 kV Grid Station at HABSHAN)
• H2S OPITO Certified from E.T.S.D.C(Emirates Technical & Safety Development Centre)
• T-BOSIET(Tropical-Basic Offshore Safety induction & Emergency Training) from E.T.S.D.C
• Helicopter Escape ,Sea Survival, Fire Fighting & First Aider Training from E.T.S.D.C
• Construction work Site Safety from JGC (JAPAN GAS COMPANY) in Qatar Barzun Onshore Oil & Gas
• Training program on Water Resources Management from SDCP Pakistan
• AutoCAD Certified ,PIMCS Pakistan
• Conflict of Interest and Your Responsibilities from CDM University USA
• Ethics: Core Values in Action from CDM University from CDM University USA
• Preventing Harassment for Managers from CDM University USA
• IACET Authorized Provider No. 592 FL PE Board CEP #0003609
• Basic Training of Lead Auditor ISO 9001 – 2008 by Al Hassan Engineering Company U.A.E
• Approved QA-QC Engineer by ADCO, ADMA OPCO, TRANSCO, U.A.E, RAS GAS QATAR, SWCC KSA.
PROJECT DETAILS:
Position Project Period
Civil Engineer - Construction
Hail Field Development Infrastructure
Early Production Facilities Works ,
UAE
Jun’16 to Present
Senior Civil Engineer - Construction
Al Dabbi’ya Phase III, Field
Development Infrastructure /
Residential Buildings Works, UAE
Nov’14 to Jun’16
Senior Civil Engineer - Construction &
QA-QC
MIRFA, 400/220/33kV Sub Station
(IWPP) at MIRFA Project
BAB-2, 400/220/33kV Sub Station
(IWPP) at BAB HABSHAN Project
Central Control Building, Laboratory
Building, Security/gate House,
Workshop ,Warehouse Building, Jetty
Harbor Master, Building and Sea
Water Intake Building at Zirku
Island, Satah Al Razboot (SARB)
Field Development Project
(PKG. III, IV & VI- EPC) Works at
SARB North, SARB South & Zirku
Island, UAE
DEC’12 – to Nov’14
Civil Engineer - Construction & QA-QC
Barzan Infrastructure Onshore GAS
Plant Project, QATAR
OCT‘11– to NOV‘12
Page 2 of 6
ADOC japan
HAIL Field Development Infrastructures Early Production Facilities Works
Project
Civil QA-QC & Construction Engineer
Blinding Stations & Water Quality
Monitoring Buildings, Phase II
(Eastern Province) Project (133 km
Pipeline) from Jubail to Dammam
Kingdom of Saudi Arabia (KSA)
Mar ‘09 – to Nov ’10
Civil QA-QC & Construction Engineer
Infrastructure, buildings, Roads and
Sewage works Almaty Financial Plaza
Kazakhstan (Central Asia)
Nov ‘07– to Oct ‘08
Professional experience:
Employer Name: Mott Macdonald Abu Dhabi L.L.C. (AUG’16 – to Present)
Project: Hail Field Development Infrastructure Early Production Facilities Works
Client: Abu Dhabi Company Oil (ADOC) JAPAN LTD
Consultant: Mott Macdonald Abu Dhabi L.L.C.
Position: Civil Engineer - Construction
Employer Name: BAM International Abu Dhabi L.L.C. (NOV’14 – to JUN’16)
Project: Al Dabbi’ya Phase III, Field Development Infrastructure / Residential Buildings Works
Client: Abu Dhabi Company for Onshore Oil Operations (ADCO)
Consultant: Halcrow Intl’ a CH2M HILL company
Position: Senior Civil Engineer - Construction
Employer Name: Al Hassan Engineering Abu Dhabi L.L.C. (DEC’12 – to Nov’14)
Projects: MIRFA, 400/220/33kV Sub Station (IWPP) at MIRFA Project
BAB-2, 400/220/33kV Sub Station (IWPP) at BAB HABSHAN Project
Central Control Building, Laboratory Building, Security/gate House, Workshop
Warehouse Building, Jetty Harbour Master, Building and Sea Water Intake
Building at Zirku Island, Satah Al Razboot (SARB) Field Development Project
(PKG. III, IV & VI- EPC) Works at SARB North, SARB South & Zirku Island
Client: TRANSCO, Abu Dhabi Transmission and Dispatch Company, ADMA OPCO, Abu Dhabi
Consultants: GERMAN LLOYED (GL) Lahmeyer International GmbH, eDF, Electricite De France
Contractor: Petrofac International Limited, SIEMENS U.A.E & ALSTOM GRID International
Position: Senior Construction Engineer Civil Projects
Employer Name: DESCON Engineering Qatar L.L.C. (OCT‘11– to NOV‘12)
Project: Barzan Infrastructure Onshore GAS Plant Project
Client: Ras Gas Company Limited
Consultant: JGC JAPAN GAS CORPORATION Construction International
Position: Civil Engineer - Construction & QA-QC
Employer Name: CDM Smith International Construction Company (PMC) Pakistan (Feb‘11– to Sep’11)
Project: Pakistan Earthquake Reconstruction& Rehabilitation Project of Educational
Buildings & Hospital in District Bagh Azad Kashmir Funded by USAID
Client: (USAID) United States Agency for International Development.
Position: Civil Engineer - Construction & QC
Employer Name: YUKSEL INSAAT SAUDI Co. Ltd. (Mar ‘09 – to Nov ’10)
EPWTS-II Project: Blinding Stations & Water Quality Monitoring Buildings, Phase II
(Eastern Province) Project (133 km Pipeline) from Jubail to Dammam KSA
Consultant: ILF (Consulting Engineers) Germany
Client: Saline Water Conversion Corporation (S.W.C.C.), Saudi ARAMCO, KSA
Position: QA-QC & Construction Civil Engineer
Employer Name: YUKSEL TURKUAZ YDA (Kazakhstan) (Nov ‘07– to Oct ‘08)
(International Construction Company)
Project: Infrastructure, buildings, Roads and Sewage works Almaty Financial Plaza
Consultant: Bureau VERITAS
Client: Govt. Republic of Kazakhstan (Central Asia)
Position: Civil Engineer
Page 3 of 6
ADOC japan
HAIL Field Development Infrastructures Early Production Facilities Works
Project
Employer Name: National Engineering Services Pakistan (PMC) (Jan‘06 – to Oct ‘07)
Project: Mega Irrigation Projects, Punjab, Irrigation offices Buildings Rehabilitation
Client: Ministry of Water & Power, Govt. of Pakistan, Irrigation & Power Department
Position: Civil Engineer
Employer Name: M/S Kamran Construction Company (Jun ‘05 – to Dec ‘05)
Project: International Islamic University Islamabad
Consultant: National Engineering Services Pakistan PMC (NESPAK)
Client: Govt. of Pakistan Public Works Department
Position: Civil Engineer
Employer Name: M/S National Associate Construction Company. (Apr ‘03 – to Mar ‘05)
Project: Medical College at Gujranwala
Client: Communication & Works Deptt. Govt. of the Punjab
Consultant: National Engineering Services Pakistan PMC (NESPAK)
Position: Civil Engineer
Employer Name: M/S Nazir & Company Pvt Limited (Jan ‘01 – to Feb ‘03)
Project: 500 kV Jamshoro-Lahore and Tarbela-Lahore Transmission Lines (1422 km)
Client: Water and Power Development Authority (Government of Pakistan)
Consultant: National Engineering Services Pakistan PMC (NESPAK)
Position: Civil Engineer / Inspector Civil
Main Duties and Responsibilities:
Key Responsibilities and Duties:
• Reviews the engineering deliverables and coordinates with other disciplines engineers
• Participate in and advise on all civil and structural construction activities and initiatives
• Responsible for the civil and structural scope to ensure the Contractor and sub-contractors perform the work to agreed
scope of work, specifications and schedules all to an acceptable standard
• Supervise the contractor and sub-contractor personnel to ensure contractor performs all work to agreed standards for
safety, health and environment and to attaining high levels of HSE performance
• Ensure assigned scope of work is carried out without any significant HSE incidents
• Ensure the work is carried out in time and in accordance with scope of work, specification and quality requirement
• Promote HSE awareness and ensure that all HD EPS( Hail Field Development Early Production Scheme) Project HSE
requirements are implemented and adhered to
• Responsible for construction civil and structural activities through the contractors supervision in respect of HSE,
method, working practices, quality and timely execution of the works
• Advise civil and structural HD EPS( Hail Field Development Early Production Scheme) Project staff on best practices
• Responsible for the civil and structural HD EPS( Hail Field Development Early Production Scheme) Project staff
aspect of Risk Management to ensure all risks / opportunities are identified and appropriate controls/mitigations
developed and implemented
• Responsible for civil and structural coordination with regard to SIMOPS
• Ensure that construction hazards and risks are fully considered by designers and contractors and that appropriate
mitigation actions are implemented and appropriate action taken
• To be fully familiar with the contractors methods of construction, schedule and procedure
• Initiate and manage the civil and structural project element of the continuous improvement processes
• Monitor site activities for potential contractual / claims problems
• Maintain records of site activities and check Contractor records for accuracy
• Carry out inspection, surveillance witnessing of contractor activities, ensuring records are maintained, including as-
built data
• Endorse daily progress report and time sheets
• Detailing the work progress, number of contractor personnel and equipment available on site and other related items
identified in the scope of work
• Coordinates with third party engineering services if the project requires critical design review.
• Evaluates contractors’ planning package to identify critical/long-lead procurement items to facilitate tracking and on-
time delivery within the project schedule.
• Evaluates and ensures the mobilization plan and resources of contractors to be aligned with project commencement
date and execution schedule.
Page 4 of 6
ADOC japan
HAIL Field Development Infrastructures Early Production Facilities Works
Project
• Examines and coordinates the necessary documentations required for project execution like equipment list, material
requisitions and purchase requisitions.
• Conducts site survey jointly with contractor and provides clarification to outstanding project execution concerns.
• Responds to clarifications on design and specifications sought by contractors based on site specific conditions in
coordination with Engineering Development team. Assures submission of HSE reports and safety in the execution.
• Coordinates issuance of critical work permits for mobilization of site activities.
• Ensures the contractors’ mechanical work procedures, rigging plans, construction methodology, piping/static
equipment installation, demolition procedures and Task Risk Assessments are properly executed.
• Verifies that project QA/QC procedures are adhered in collaboration with company third party inspection.
• Checks and coordinates the application and use of heavy lifts and rigging requirements, as applicable.
• Monitors contractors’ execution of project work to check strict compliance with planned execution schedule and makes
necessary controls to avoid project delays through regular weekly and monthly meetings and updates concerns to Sr.
Construction Engineer and Section Head.
• Updates the Project Execution Section’s weekly and monthly reports based on contractors’ reports.
• Provides the necessary technical field engineering support to contractors brought forth by site conditions.
• Liaises with other disciplines to support contractors’ requirements like lay-down facilities, road closure, security issues,
water requests and easement area activities. Verifies on a daily basis the availability of contractors’ resources and
progress at site. Reviews the project specifications deviations, if any, and takes appropriate approvals.
• Coordinates and oversees the third party inspection agency services for the project.
• Certifies contractor’s invoices in line with project BOQ and progress.
• Ensures the project SPIR requirements are fulfilled by the contractor and reviews with the end users.
• Coordinates with Operations team during the commissioning of the project by contractor.
• Ensures the project’s As-Built documentation and the associated handover procedures are fulfilled by the contractor.
• Prepares project close out reports and asset registers. Arranges operational training for operators on the newly
installed project, as required. Performs the project audit on contractor performance evaluation.
• Coordinates the preparation of Spare Parts Interchangeability Record (SPIR) documents.
• Ensures the submission of Final Dossier documents of the completed project by the contractor.
• Knowledge and skills with colleagues pertaining to mechanical project planning and execution concerns.
• Identifies development and learning opportunities for self and discusses requirement/benefits with supervisor.
• Identifies technological advances in mechanical engineering discipline and opportunities for work enhancement.
• Review of structural specifications and drawings for jackets, decks, bridges, and other structures and confirm
compliance with standards Prepare response to structural technical queries for engineering, and fabrication.
• Review Contractor offshore transportation and lifting analysis &.Review safety studies including boat impact
assessment studies and pile capacity to confirm structural integrity
• Coordinate and participate in model, safety, and constructability Reviews
• Monitor closely fabrication activities in the shop and ensure compliance to project drawings and specifications
• Coordinate with and close with the inspectors quality findings & Ensure that fabrication and installation activities are
executed safely & Provide prompt responses to field change requests and obtain required approval
• Review Contractor activities and ensure compliance with schedule
• Interfaces with Client, Engineering Companies, and EPC Contractors.
• Participate and coordinate Discipline Interfaces Conduct site surveys as required for existing platforms
• Construction support for offshore Installation of jackets, decks, bridges and other structures
• Support pre-commissioning, hook-up and commissioning activities including Punch list items closure.
Quality Assurance & Quality Control Skills:
Evaluating and interpreting with job related activities by visually or by Quality Control & Quality assurance
Methods under BS (British Standards) Codes, ASTM, API, ACI & ISO 9001-2008 & Working under ISO
Standards for Environmental management 14001 & ISO 26000 for Social Responsibility at Project / work site
Cary out inspection and checking for all quality related procedures in the site and ensures activity at site are
As per approved method statement and inspection test plan, Coordinate with the consultant’s representative
And Site in-charge for inspection and meeting about quality problems including closure of Non-Compliance
Report and responsible in the quality and workmanship of every activities, thorough knowledge of all phases of
Engineering construction relating to Civil, Architectural and Structural discipline interfacing the multidisciplinary
Operations.
Computer Knowledge:
Page 5 of 6
ADOC japan
HAIL Field Development Infrastructures Early Production Facilities Works
Project
Microsoft Office Programming, Excel, outlook, Auto cad, Power Point
Personal Strengths:
Highly adaptive and able to work in fast environment and can handle multiple tasks, when required. Ready to
Work in any shift provided after hour support. Fast learner, Team player and has ability to take direction
& follow up.
Personal Details:
Present Address : Al Gaith Towers, Flat No. 706,707 Hamdan Street, P.O. Box 47094, Abu Dhabi
Permanent Address : Sargodha Road, Nabi Pura Sultan Colony, Sheikhupura, Pakistan
Age & Date of Birth : 35 years, 26/08/1981
Gender : Male
Nationality : Pakistani
Marital Status : Married
Languages Known:
English, German, Turkish : Speak, Read & write
Urdu & Punjabi, Arabic
References: Will be pleased to provide upon request
Page 6 of 6
ADOC japan
HAIL Field Development Infrastructures Early Production Facilities Works
Project
Microsoft Office Programming, Excel, outlook, Auto cad, Power Point
Personal Strengths:
Highly adaptive and able to work in fast environment and can handle multiple tasks, when required. Ready to
Work in any shift provided after hour support. Fast learner, Team player and has ability to take direction
& follow up.
Personal Details:
Present Address : Al Gaith Towers, Flat No. 706,707 Hamdan Street, P.O. Box 47094, Abu Dhabi
Permanent Address : Sargodha Road, Nabi Pura Sultan Colony, Sheikhupura, Pakistan
Age & Date of Birth : 35 years, 26/08/1981
Gender : Male
Nationality : Pakistani
Marital Status : Married
Languages Known:
English, German, Turkish : Speak, Read & write
Urdu & Punjabi, Arabic
References: Will be pleased to provide upon request
Page 6 of 6

Mais conteúdo relacionado

Mais procurados

Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)
Efren Molina
 
Resume_Bupathy Vidyapathy_15-Sep-2016
Resume_Bupathy Vidyapathy_15-Sep-2016Resume_Bupathy Vidyapathy_15-Sep-2016
Resume_Bupathy Vidyapathy_15-Sep-2016
Bupathy Vidyapathy
 
Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)
Huzoor Ahmed
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
muhammad jamil
 
Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)
Huzoor Ahmed
 
INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTOR
Regu Mkc
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
Gowrijayashankar S V
 

Mais procurados (20)

Anup.CV
Anup.CVAnup.CV
Anup.CV
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
 
MIDEL C resume013[1]
MIDEL C resume013[1]MIDEL C resume013[1]
MIDEL C resume013[1]
 
Shakir CV
Shakir CV Shakir CV
Shakir CV
 
Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)
 
CV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-CivilCV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-Civil
 
Glenn updated cv
Glenn updated cvGlenn updated cv
Glenn updated cv
 
P7512-EXT-SQ-0030
P7512-EXT-SQ-0030P7512-EXT-SQ-0030
P7512-EXT-SQ-0030
 
QC
QCQC
QC
 
NY_ CV
NY_ CVNY_ CV
NY_ CV
 
Project _TQR_Manager
Project _TQR_ManagerProject _TQR_Manager
Project _TQR_Manager
 
CV Updated
CV UpdatedCV Updated
CV Updated
 
Resume_Bupathy Vidyapathy_15-Sep-2016
Resume_Bupathy Vidyapathy_15-Sep-2016Resume_Bupathy Vidyapathy_15-Sep-2016
Resume_Bupathy Vidyapathy_15-Sep-2016
 
Resume bambang
Resume bambangResume bambang
Resume bambang
 
Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
 
Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)
 
INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTOR
 
CV-Balamurugan.
CV-Balamurugan.CV-Balamurugan.
CV-Balamurugan.
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
 

Destaque

CV - Florin Tuluc 2
CV - Florin Tuluc 2CV - Florin Tuluc 2
CV - Florin Tuluc 2
FLORIN TULUC
 
Top 8 infrastructure engineer resume samples
Top 8 infrastructure engineer resume samplesTop 8 infrastructure engineer resume samples
Top 8 infrastructure engineer resume samples
gurimen12
 
Consumer Behaviour - Reccomendations Report
Consumer Behaviour - Reccomendations ReportConsumer Behaviour - Reccomendations Report
Consumer Behaviour - Reccomendations Report
Rebecca Holland
 
Batiste Power Point Presentation for First Steps
Batiste Power Point Presentation for First StepsBatiste Power Point Presentation for First Steps
Batiste Power Point Presentation for First Steps
Rebecca Holland
 
Datasheet-bmss05
Datasheet-bmss05Datasheet-bmss05
Datasheet-bmss05
Martin Pec
 

Destaque (20)

CV - Florin Tuluc 2
CV - Florin Tuluc 2CV - Florin Tuluc 2
CV - Florin Tuluc 2
 
Top 8 infrastructure engineer resume samples
Top 8 infrastructure engineer resume samplesTop 8 infrastructure engineer resume samples
Top 8 infrastructure engineer resume samples
 
Infrastructure engineer. CV
Infrastructure engineer. CVInfrastructure engineer. CV
Infrastructure engineer. CV
 
Lecliclocal
Lecliclocal Lecliclocal
Lecliclocal
 
Presentation for the Burstiness satellite at CCS'16 Amsterdam
Presentation for the Burstiness satellite at CCS'16 AmsterdamPresentation for the Burstiness satellite at CCS'16 Amsterdam
Presentation for the Burstiness satellite at CCS'16 Amsterdam
 
Présentation valBiom
Présentation valBiomPrésentation valBiom
Présentation valBiom
 
Consumer Behaviour - Reccomendations Report
Consumer Behaviour - Reccomendations ReportConsumer Behaviour - Reccomendations Report
Consumer Behaviour - Reccomendations Report
 
Robert van den Ham VI
Robert van den Ham VIRobert van den Ham VI
Robert van den Ham VI
 
Batiste Power Point Presentation for First Steps
Batiste Power Point Presentation for First StepsBatiste Power Point Presentation for First Steps
Batiste Power Point Presentation for First Steps
 
Dünya yazarları derlemesi
Dünya yazarları derlemesiDünya yazarları derlemesi
Dünya yazarları derlemesi
 
Datasheet-bmss05
Datasheet-bmss05Datasheet-bmss05
Datasheet-bmss05
 
Colter's Creek Winery Campaign
Colter's Creek Winery CampaignColter's Creek Winery Campaign
Colter's Creek Winery Campaign
 
PE1215_David Dosa
PE1215_David DosaPE1215_David Dosa
PE1215_David Dosa
 
Insite Software and Geriatric Medical at IRCE 2016: Does eCommerce Self-Servi...
Insite Software and Geriatric Medical at IRCE 2016: Does eCommerce Self-Servi...Insite Software and Geriatric Medical at IRCE 2016: Does eCommerce Self-Servi...
Insite Software and Geriatric Medical at IRCE 2016: Does eCommerce Self-Servi...
 
Instalación de Software
Instalación de SoftwareInstalación de Software
Instalación de Software
 
Les actions de la province de liège
Les actions de la province de liègeLes actions de la province de liège
Les actions de la province de liège
 
Task 2
Task 2Task 2
Task 2
 
Top Engineering College in Chandigarh
Top Engineering College in ChandigarhTop Engineering College in Chandigarh
Top Engineering College in Chandigarh
 
Social media _mc_cain, ayssa presentation
Social media  _mc_cain, ayssa presentationSocial media  _mc_cain, ayssa presentation
Social media _mc_cain, ayssa presentation
 
Question 3
Question 3Question 3
Question 3
 

Semelhante a Farrukh ali hassan civil engineer cv

jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
jafar hussain
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
jafar hussain
 
Resume 08--Earl Victor -
Resume 08--Earl Victor -Resume 08--Earl Victor -
Resume 08--Earl Victor -
Earlvic Torcino
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
Adnan Rehmat
 
Social Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanSocial Media Profile_Shabin Shajahan
Social Media Profile_Shabin Shajahan
Shabin Shajahan
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
Neeladri varma
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
Murugan murugan
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
Sajjad Ali
 

Semelhante a Farrukh ali hassan civil engineer cv (20)

RESUME=
RESUME=RESUME=
RESUME=
 
balaji cv
balaji cvbalaji cv
balaji cv
 
Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Resume 08--Earl Victor -
Resume 08--Earl Victor -Resume 08--Earl Victor -
Resume 08--Earl Victor -
 
CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA Manager
 
Aftab CV.
Aftab CV.Aftab CV.
Aftab CV.
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
 
Social Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanSocial Media Profile_Shabin Shajahan
Social Media Profile_Shabin Shajahan
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
 
UPDATED RESUME 2016
UPDATED RESUME 2016UPDATED RESUME 2016
UPDATED RESUME 2016
 
Antony cv - 2
Antony cv - 2Antony cv - 2
Antony cv - 2
 
Mohammed Yousuf cv
Mohammed Yousuf cvMohammed Yousuf cv
Mohammed Yousuf cv
 
Hamza qadeer cv
Hamza qadeer cvHamza qadeer cv
Hamza qadeer cv
 
Abdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C VAbdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C V
 
CV@JOMY NEW
CV@JOMY NEWCV@JOMY NEW
CV@JOMY NEW
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 

Último

Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 

Último (20)

Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 

Farrukh ali hassan civil engineer cv

  • 1. ADOC japan HAIL Field Development Infrastructures Early Production Facilities Works Project RESUME Objectives: Professional organizational skills; work effectively under pressure and stress, prioritize workload and multi-task. Conscious of deadlines; possess a good sense of urgency. Work efficiently and effectively as self-starter in Busy Environment handling many tasks simultaneously. Initiate action and follow through to conclusion of any Commitment, capably learn new skills. Combine sound time- and resource-management skills to implement Strategic, Administrative, Operational initiatives to enhance productivity, quality, client service overall Quality Management on site and the respective local works to be followed, and for implementing and maintaining the site quality Plan in accordance to the overall Project Quality Plan, Ensure that contracted resources with the required QA/QC skill set Capability exists within the Operations and projects group. For the incumbent inspector to function effectively in this position Having in-depth knowledge and skills in Quality of work as per acceptance of testing activities within the petrochemical Industry (both onshore and offshore environment) Summary of Professional Experience: With Seventeen (17) years plus of professional experience in Oil &Gas sector, Civil Engineering & Quality Control field for working in Multinational EPC Contractors, I have skills as professional Engineer Civil in infrastructure Construction & Pre- Cast / Pre – Stress Concrete structures manufacturer Companies throughout the Central Asia & GCC Countries region; Working as Creative problem-solver, responsibilities include but are not limited to Reviewing project specifications, drawings and Quality Control plans and procedures. Ensure, whenever necessary, the update of site quality control plans / control procedures. Preparation of the Inspection Test Plan for the scope of work and have it approved by the client. Supervise and witness inspections, check reports and documentation and collect and file the required Quality Records. Ensure that all sites activities are carried out according to reference documentation for parts of the plant within his area of responsibility, authorizing their acceptance at quality control completion. Cooperate and implementation of relative corrective actions, NCRs, FCNs etc. Systematically records the nonconformity or event reports issued and identify appropriate corrective actions. Manage collaboration of measurement instruments and related certifications. Inform the Site Manager of any deviation regarding the contract. Check the completeness and conformity to specified applicable requirements, standards and/or directives. Ensure that the tests, controls and inspections are carried out and that personnel have access to all required project documentation. Road works- Inspection of embankment construction, gravel and asphalt placement. Underground utilities- inspection and reporting on underground storm, water, sewer and electrical works, Concrete works- pre-pour inspections of formwork, reinforcing steel and concrete placement Conducting field inspections and producing inspection reports for various construction activities. Progressively built and compile the project turnover packages throughout the construction schedule and maintain the up to date of the quality control records compile the final project turnovers and submission to client approval any other project QA/QC duties as advised from time to time. • Ready Mix Abu Dhabi Pre Cast • Pioneer Precast Concrete LLC Abu Dhabi • AL FARA’A Precast Company Abu Dhabi • Qatar Ready-mix Concrete J.V. of Lafarge International & Qatar Precast Co., LLC. • KITTCO CRUSHER, SIMSIMAH, AL KHOR, Qatar • ALRASHID-ABETONG Precast Company LTD (RIYADH-KSA) • Eastern Precast Concrete Company (DAMMAM-KSA) Professional Key Qualifications: Performs Quality Walk About at site locations and QC Surveillance at Subcontractors premises, ensures that Contract specifications, procedures and Subcontractor’s documents are available in Site office with the Appropriate revision, Supervision of discipline QC Inspectors and evaluates their inspection and activities Performance, arranges all Subcontractors / Vendors documents review ensures such documents meet Contract Specifications, QMS and legal requirements, reviews and arranges final QC dossier for handing over to the Client. Maintain proper filling system (as per Organization procedure) with full traceability for retrieving the Documents, strives to have a proactive approach in problem solving, develops and ensures Implementation and Compliance with Project Quality Plan (PQP), Project Quality related procedures for document Control, change Control, material Control/inspection/testing, material inspection & test plan. Manages the non-conformance Issues to their resolution in liaison with responsible party (Subcontractor / Vendor), reviews all inspection Reports & maintains them in a manner, which allows all personnel concerned access to results, establishes all Formats of records and documents required for implementing Quality control, reviews & received comments Page 1 of 6
  • 2. ADOC japan HAIL Field Development Infrastructures Early Production Facilities Works Project From Client for QC documentation such as ITP, QC procedures etc. and ensure that comments are addressed In the revised Quality formats or checklists & documents accordingly. DEGREES/COURSES/TRAININGS: Bachelor of Civil Engineering Preston institute of Management Science & Technology, Pakistan D.A.E (Diploma of Engineer Civil) Punjab Board of Technical Education, Pakistan • Construction work Safety from ADOC (Abu Dhabi Oil Company) JAPAN • Construction work Safety from ADCO (Abu Dhabi Company for Onshore Oil Operations) • Construction work Safety from ADMA – OPCO (Abu Dhabi Marine Operating Company) • Construction work Safety from ALSTOM GRID (BAB-2,400/220/33 kV Grid Station at HABSHAN) • H2S OPITO Certified from E.T.S.D.C(Emirates Technical & Safety Development Centre) • T-BOSIET(Tropical-Basic Offshore Safety induction & Emergency Training) from E.T.S.D.C • Helicopter Escape ,Sea Survival, Fire Fighting & First Aider Training from E.T.S.D.C • Construction work Site Safety from JGC (JAPAN GAS COMPANY) in Qatar Barzun Onshore Oil & Gas • Training program on Water Resources Management from SDCP Pakistan • AutoCAD Certified ,PIMCS Pakistan • Conflict of Interest and Your Responsibilities from CDM University USA • Ethics: Core Values in Action from CDM University from CDM University USA • Preventing Harassment for Managers from CDM University USA • IACET Authorized Provider No. 592 FL PE Board CEP #0003609 • Basic Training of Lead Auditor ISO 9001 – 2008 by Al Hassan Engineering Company U.A.E • Approved QA-QC Engineer by ADCO, ADMA OPCO, TRANSCO, U.A.E, RAS GAS QATAR, SWCC KSA. PROJECT DETAILS: Position Project Period Civil Engineer - Construction Hail Field Development Infrastructure Early Production Facilities Works , UAE Jun’16 to Present Senior Civil Engineer - Construction Al Dabbi’ya Phase III, Field Development Infrastructure / Residential Buildings Works, UAE Nov’14 to Jun’16 Senior Civil Engineer - Construction & QA-QC MIRFA, 400/220/33kV Sub Station (IWPP) at MIRFA Project BAB-2, 400/220/33kV Sub Station (IWPP) at BAB HABSHAN Project Central Control Building, Laboratory Building, Security/gate House, Workshop ,Warehouse Building, Jetty Harbor Master, Building and Sea Water Intake Building at Zirku Island, Satah Al Razboot (SARB) Field Development Project (PKG. III, IV & VI- EPC) Works at SARB North, SARB South & Zirku Island, UAE DEC’12 – to Nov’14 Civil Engineer - Construction & QA-QC Barzan Infrastructure Onshore GAS Plant Project, QATAR OCT‘11– to NOV‘12 Page 2 of 6
  • 3. ADOC japan HAIL Field Development Infrastructures Early Production Facilities Works Project Civil QA-QC & Construction Engineer Blinding Stations & Water Quality Monitoring Buildings, Phase II (Eastern Province) Project (133 km Pipeline) from Jubail to Dammam Kingdom of Saudi Arabia (KSA) Mar ‘09 – to Nov ’10 Civil QA-QC & Construction Engineer Infrastructure, buildings, Roads and Sewage works Almaty Financial Plaza Kazakhstan (Central Asia) Nov ‘07– to Oct ‘08 Professional experience: Employer Name: Mott Macdonald Abu Dhabi L.L.C. (AUG’16 – to Present) Project: Hail Field Development Infrastructure Early Production Facilities Works Client: Abu Dhabi Company Oil (ADOC) JAPAN LTD Consultant: Mott Macdonald Abu Dhabi L.L.C. Position: Civil Engineer - Construction Employer Name: BAM International Abu Dhabi L.L.C. (NOV’14 – to JUN’16) Project: Al Dabbi’ya Phase III, Field Development Infrastructure / Residential Buildings Works Client: Abu Dhabi Company for Onshore Oil Operations (ADCO) Consultant: Halcrow Intl’ a CH2M HILL company Position: Senior Civil Engineer - Construction Employer Name: Al Hassan Engineering Abu Dhabi L.L.C. (DEC’12 – to Nov’14) Projects: MIRFA, 400/220/33kV Sub Station (IWPP) at MIRFA Project BAB-2, 400/220/33kV Sub Station (IWPP) at BAB HABSHAN Project Central Control Building, Laboratory Building, Security/gate House, Workshop Warehouse Building, Jetty Harbour Master, Building and Sea Water Intake Building at Zirku Island, Satah Al Razboot (SARB) Field Development Project (PKG. III, IV & VI- EPC) Works at SARB North, SARB South & Zirku Island Client: TRANSCO, Abu Dhabi Transmission and Dispatch Company, ADMA OPCO, Abu Dhabi Consultants: GERMAN LLOYED (GL) Lahmeyer International GmbH, eDF, Electricite De France Contractor: Petrofac International Limited, SIEMENS U.A.E & ALSTOM GRID International Position: Senior Construction Engineer Civil Projects Employer Name: DESCON Engineering Qatar L.L.C. (OCT‘11– to NOV‘12) Project: Barzan Infrastructure Onshore GAS Plant Project Client: Ras Gas Company Limited Consultant: JGC JAPAN GAS CORPORATION Construction International Position: Civil Engineer - Construction & QA-QC Employer Name: CDM Smith International Construction Company (PMC) Pakistan (Feb‘11– to Sep’11) Project: Pakistan Earthquake Reconstruction& Rehabilitation Project of Educational Buildings & Hospital in District Bagh Azad Kashmir Funded by USAID Client: (USAID) United States Agency for International Development. Position: Civil Engineer - Construction & QC Employer Name: YUKSEL INSAAT SAUDI Co. Ltd. (Mar ‘09 – to Nov ’10) EPWTS-II Project: Blinding Stations & Water Quality Monitoring Buildings, Phase II (Eastern Province) Project (133 km Pipeline) from Jubail to Dammam KSA Consultant: ILF (Consulting Engineers) Germany Client: Saline Water Conversion Corporation (S.W.C.C.), Saudi ARAMCO, KSA Position: QA-QC & Construction Civil Engineer Employer Name: YUKSEL TURKUAZ YDA (Kazakhstan) (Nov ‘07– to Oct ‘08) (International Construction Company) Project: Infrastructure, buildings, Roads and Sewage works Almaty Financial Plaza Consultant: Bureau VERITAS Client: Govt. Republic of Kazakhstan (Central Asia) Position: Civil Engineer Page 3 of 6
  • 4. ADOC japan HAIL Field Development Infrastructures Early Production Facilities Works Project Employer Name: National Engineering Services Pakistan (PMC) (Jan‘06 – to Oct ‘07) Project: Mega Irrigation Projects, Punjab, Irrigation offices Buildings Rehabilitation Client: Ministry of Water & Power, Govt. of Pakistan, Irrigation & Power Department Position: Civil Engineer Employer Name: M/S Kamran Construction Company (Jun ‘05 – to Dec ‘05) Project: International Islamic University Islamabad Consultant: National Engineering Services Pakistan PMC (NESPAK) Client: Govt. of Pakistan Public Works Department Position: Civil Engineer Employer Name: M/S National Associate Construction Company. (Apr ‘03 – to Mar ‘05) Project: Medical College at Gujranwala Client: Communication & Works Deptt. Govt. of the Punjab Consultant: National Engineering Services Pakistan PMC (NESPAK) Position: Civil Engineer Employer Name: M/S Nazir & Company Pvt Limited (Jan ‘01 – to Feb ‘03) Project: 500 kV Jamshoro-Lahore and Tarbela-Lahore Transmission Lines (1422 km) Client: Water and Power Development Authority (Government of Pakistan) Consultant: National Engineering Services Pakistan PMC (NESPAK) Position: Civil Engineer / Inspector Civil Main Duties and Responsibilities: Key Responsibilities and Duties: • Reviews the engineering deliverables and coordinates with other disciplines engineers • Participate in and advise on all civil and structural construction activities and initiatives • Responsible for the civil and structural scope to ensure the Contractor and sub-contractors perform the work to agreed scope of work, specifications and schedules all to an acceptable standard • Supervise the contractor and sub-contractor personnel to ensure contractor performs all work to agreed standards for safety, health and environment and to attaining high levels of HSE performance • Ensure assigned scope of work is carried out without any significant HSE incidents • Ensure the work is carried out in time and in accordance with scope of work, specification and quality requirement • Promote HSE awareness and ensure that all HD EPS( Hail Field Development Early Production Scheme) Project HSE requirements are implemented and adhered to • Responsible for construction civil and structural activities through the contractors supervision in respect of HSE, method, working practices, quality and timely execution of the works • Advise civil and structural HD EPS( Hail Field Development Early Production Scheme) Project staff on best practices • Responsible for the civil and structural HD EPS( Hail Field Development Early Production Scheme) Project staff aspect of Risk Management to ensure all risks / opportunities are identified and appropriate controls/mitigations developed and implemented • Responsible for civil and structural coordination with regard to SIMOPS • Ensure that construction hazards and risks are fully considered by designers and contractors and that appropriate mitigation actions are implemented and appropriate action taken • To be fully familiar with the contractors methods of construction, schedule and procedure • Initiate and manage the civil and structural project element of the continuous improvement processes • Monitor site activities for potential contractual / claims problems • Maintain records of site activities and check Contractor records for accuracy • Carry out inspection, surveillance witnessing of contractor activities, ensuring records are maintained, including as- built data • Endorse daily progress report and time sheets • Detailing the work progress, number of contractor personnel and equipment available on site and other related items identified in the scope of work • Coordinates with third party engineering services if the project requires critical design review. • Evaluates contractors’ planning package to identify critical/long-lead procurement items to facilitate tracking and on- time delivery within the project schedule. • Evaluates and ensures the mobilization plan and resources of contractors to be aligned with project commencement date and execution schedule. Page 4 of 6
  • 5. ADOC japan HAIL Field Development Infrastructures Early Production Facilities Works Project • Examines and coordinates the necessary documentations required for project execution like equipment list, material requisitions and purchase requisitions. • Conducts site survey jointly with contractor and provides clarification to outstanding project execution concerns. • Responds to clarifications on design and specifications sought by contractors based on site specific conditions in coordination with Engineering Development team. Assures submission of HSE reports and safety in the execution. • Coordinates issuance of critical work permits for mobilization of site activities. • Ensures the contractors’ mechanical work procedures, rigging plans, construction methodology, piping/static equipment installation, demolition procedures and Task Risk Assessments are properly executed. • Verifies that project QA/QC procedures are adhered in collaboration with company third party inspection. • Checks and coordinates the application and use of heavy lifts and rigging requirements, as applicable. • Monitors contractors’ execution of project work to check strict compliance with planned execution schedule and makes necessary controls to avoid project delays through regular weekly and monthly meetings and updates concerns to Sr. Construction Engineer and Section Head. • Updates the Project Execution Section’s weekly and monthly reports based on contractors’ reports. • Provides the necessary technical field engineering support to contractors brought forth by site conditions. • Liaises with other disciplines to support contractors’ requirements like lay-down facilities, road closure, security issues, water requests and easement area activities. Verifies on a daily basis the availability of contractors’ resources and progress at site. Reviews the project specifications deviations, if any, and takes appropriate approvals. • Coordinates and oversees the third party inspection agency services for the project. • Certifies contractor’s invoices in line with project BOQ and progress. • Ensures the project SPIR requirements are fulfilled by the contractor and reviews with the end users. • Coordinates with Operations team during the commissioning of the project by contractor. • Ensures the project’s As-Built documentation and the associated handover procedures are fulfilled by the contractor. • Prepares project close out reports and asset registers. Arranges operational training for operators on the newly installed project, as required. Performs the project audit on contractor performance evaluation. • Coordinates the preparation of Spare Parts Interchangeability Record (SPIR) documents. • Ensures the submission of Final Dossier documents of the completed project by the contractor. • Knowledge and skills with colleagues pertaining to mechanical project planning and execution concerns. • Identifies development and learning opportunities for self and discusses requirement/benefits with supervisor. • Identifies technological advances in mechanical engineering discipline and opportunities for work enhancement. • Review of structural specifications and drawings for jackets, decks, bridges, and other structures and confirm compliance with standards Prepare response to structural technical queries for engineering, and fabrication. • Review Contractor offshore transportation and lifting analysis &.Review safety studies including boat impact assessment studies and pile capacity to confirm structural integrity • Coordinate and participate in model, safety, and constructability Reviews • Monitor closely fabrication activities in the shop and ensure compliance to project drawings and specifications • Coordinate with and close with the inspectors quality findings & Ensure that fabrication and installation activities are executed safely & Provide prompt responses to field change requests and obtain required approval • Review Contractor activities and ensure compliance with schedule • Interfaces with Client, Engineering Companies, and EPC Contractors. • Participate and coordinate Discipline Interfaces Conduct site surveys as required for existing platforms • Construction support for offshore Installation of jackets, decks, bridges and other structures • Support pre-commissioning, hook-up and commissioning activities including Punch list items closure. Quality Assurance & Quality Control Skills: Evaluating and interpreting with job related activities by visually or by Quality Control & Quality assurance Methods under BS (British Standards) Codes, ASTM, API, ACI & ISO 9001-2008 & Working under ISO Standards for Environmental management 14001 & ISO 26000 for Social Responsibility at Project / work site Cary out inspection and checking for all quality related procedures in the site and ensures activity at site are As per approved method statement and inspection test plan, Coordinate with the consultant’s representative And Site in-charge for inspection and meeting about quality problems including closure of Non-Compliance Report and responsible in the quality and workmanship of every activities, thorough knowledge of all phases of Engineering construction relating to Civil, Architectural and Structural discipline interfacing the multidisciplinary Operations. Computer Knowledge: Page 5 of 6
  • 6. ADOC japan HAIL Field Development Infrastructures Early Production Facilities Works Project Microsoft Office Programming, Excel, outlook, Auto cad, Power Point Personal Strengths: Highly adaptive and able to work in fast environment and can handle multiple tasks, when required. Ready to Work in any shift provided after hour support. Fast learner, Team player and has ability to take direction & follow up. Personal Details: Present Address : Al Gaith Towers, Flat No. 706,707 Hamdan Street, P.O. Box 47094, Abu Dhabi Permanent Address : Sargodha Road, Nabi Pura Sultan Colony, Sheikhupura, Pakistan Age & Date of Birth : 35 years, 26/08/1981 Gender : Male Nationality : Pakistani Marital Status : Married Languages Known: English, German, Turkish : Speak, Read & write Urdu & Punjabi, Arabic References: Will be pleased to provide upon request Page 6 of 6
  • 7. ADOC japan HAIL Field Development Infrastructures Early Production Facilities Works Project Microsoft Office Programming, Excel, outlook, Auto cad, Power Point Personal Strengths: Highly adaptive and able to work in fast environment and can handle multiple tasks, when required. Ready to Work in any shift provided after hour support. Fast learner, Team player and has ability to take direction & follow up. Personal Details: Present Address : Al Gaith Towers, Flat No. 706,707 Hamdan Street, P.O. Box 47094, Abu Dhabi Permanent Address : Sargodha Road, Nabi Pura Sultan Colony, Sheikhupura, Pakistan Age & Date of Birth : 35 years, 26/08/1981 Gender : Male Nationality : Pakistani Marital Status : Married Languages Known: English, German, Turkish : Speak, Read & write Urdu & Punjabi, Arabic References: Will be pleased to provide upon request Page 6 of 6