Pacific Industrial Company is a Western Australian steel fabrication and construction company founded in 1969. It has a majority shareholding in Como Engineers, allowing it to offer engineering, procurement, construction contracts. Some of PIC's major projects include the Tropicana Gold Mine, Karara Iron Ore, Sino Iron Project, and various projects for BHP Billiton Iron Ore and Rio Tinto. PIC has experience across the resources, oil and gas, industrial and infrastructure sectors.
2. Company Profile
INDEX
1. Corporate Directory
2. Introduction & Mission Statement
3. Vision and Corporate Values
4. Accreditation Credentials
4. Summary of Major Projects
CORPORATE DIRECTORY
Corporate Office & Works
42 Hope Valley Road
Naval Base
Western Australia 6165
Workshop 2
51 Hope Valley Road
Naval Base
Western Australia 6165
Postal Address
PO Box 263, Kwinana
Western Australia 6966
ABN
35 813 081 087
ACN
008 895 154
Website
www.pacind.com.au
E-Mail
mail@pacind.com.au
Telephone
+61 8 9410 2566
Directors
Erasmo Mosole
Marco Mosole
Bankers
Commonwealth Bank of Australia
3. Introduction
Pacific Industrial Company, Founded in 1969 by Erasmo Mosole and later
joined by his sons, Marco and Sandro , is now established as one of
Western Australia’s leading fabrication and construction organisations,
presently combining main office and fabrication facilities at Naval Base,
Western Australia.
Pacific Industrial Company is involved in all aspects of steel fabrication and
construction from shop fabricated items through to major construction
projects including: engineering, procurement, fabrication, installation,
commissioning and related electrical, instrumentation and civil works.
Although the company’s main clientele are involved in the oil and gas,
mining, resource and industrial sector, Pacific Industrial Company is actively
involved in all forms of fabrication and construction for a broad customer
base.
4. Vision & Values
“Our vision is to develop a sustainable business by
being the best at what we do through the investment in
our people, technology and innovation”
PERSISTENCE
TEAMWORK
SAFETY
INTEGRITY
RESPECT
5. Accreditation Credentials
Quality Management System
ISO 9001:2008
Certificate No: QEC0291
Occupational Health & Safety Management System
AS / NZS 4801:2001
Certificate No: HSM40062
Occupational Health & Safety Management System
OHSAS 18001:2007
Certificate No: HSM40062
Environmental Management System
ISO 140001:2004
Certificate No: EMS40134
6. Pacific Industrial Company has a majority shareholding in Como Engineers. Through
this agreement PIC is able to offer its mineral resource clients a more cost and time
efficient execution model through an EPC contracting arrangement.
Como Engineers Pty Ltd was established in 1986. The core focus is to provide
engineering services and specialist products to the Mining and Resource sector
with a strong focus on process metallurgy, mechanical engineering and materials
handling both in Australia and abroad.
Como Engineers employs a team of experienced metallurgists, engineers,
construction supervisors and drafts-people which enables us to offer a complete
process and engineering service. Como Engineers are able to supply services from
metallurgical testing through to scoping and definitive feasibility studies as well as
detailed engineering design to project construction and commissioning.
Como Engineers specialises in fit for purpose solutions utilising modular and
transportable equipment in our plant designs. Where possible, Como Engineers
likes to offer design and construct projects at a fixed duration, lump-sum price,
thereby removing a large portion of the project risk from the client.
Como Engineers works closely with our Clients to understand and deliver the
product and service that is required for each individual project.
Como Engineers operate worldwide offering localised support with offices in Perth,
Melbourne and Jakarta.
Services include:
• Studies
• Design and Construction
• Plant and Infrastructure
• Relocations and Upgrades
• Maintenance and Refurbishments
• Modular Gold Stripping Plants
• Certified Dangerous Goods Assessments
7.
8. Tropicana Gold Mine
Client: AngloGold Ashanti
Completion: 2013
Value: $120 MILLION
Works involved the total onsite construction of the Tankage, Structural, Mechanical
and Piping works for the 5.5 million tonnes per annum gold process plant located
330klms North of Kalgoorlie W.A.
10. Karara Iron Ore
Client: Karara Mining Limited
Completion: 2012
Value: $40 Million
Works involved the design, fabrication, Installation and surface treatment of the
project tankage for the magnetite iron ore concentrator.
12. Sino Iron Project
Client: CITIC Pacific Mining
Completion: 2012
Value: $32 Million
Works involved the Installation of approx. 5000 tonnes of steelwork and mechanical
items for the stockpile cover, conveying and recovery system for the Magnetite Iron
Ore Concentrator. PIC subsidiary business COMO Engineers was also engaged under
separate contracts for installation works for the Ball Mill and AG Mill equipment and
other mechanical works.
14. BHPBIO-Bucket Wheel Reclaimers
Client: Thyssen Krupp
Completion: 2012
Value: $30 Million
Works involved the supply, fabrication and assembly of 3 x 15000 tonnes per hour
capacity Bucket Wheel Reclaimers for BHP Billiton Iron Ore. One machine located at
the Jimblebar Mine and 2 machines at the Port Hedland port facilities.
16. City Square – Brookfield Place
Client: Brookfield Multiplex
Completion: 2012
Value: $52 Million
Works involved the supply, fabrication and delivery of 11,000 tonnes of steelwork,
decking and column reinforcing for the 51 floor level steel frame building located in
the Perth CBD.
18. DIN Project
Client: Rio Tinto Iron Ore
Completion: 2012
Value: $15 Million
Works involved the supply, fabrication, surface treatment and load out and shipping to
site of the 2 Surge Bins and associated steelwork for the Dampier Incremental
Expansion Project located at Rio Tinto Iron Ore port facility at Parker Point W.A.
20. Gorgon LNG Subsea BIS
Client: ALLSEAS
Completion: 2011
Value: $15 Million
Works involved the fabrication, testing and load out of 11 Buckle Initiator Structures
weighing in excess of 120 tonnes each for the subsea gas pipelines delivering LNG to
the Grogon LNG facility.
22. BHBIO – RGP 5Rail Bridges
Client: BHP Billiton Iron Ore
Completion: 2010
Value: $40 Million
Works involved the fabrication, assembly, transportation and Installation of 125 Bridge
Truss assemblies totalling 6500 tonnes for 11 river crossings for the Rail Bridge
Duplication works between Newman and Port Hedland.
24. FMG-Cloud Break Mine
Client: FLSmisth - RAHCO
Completion: 2010
Value: $12 Million
Works involved the supply, fabrication, surface treatment and assembly of 2 mobile
overburden removal systems for Fortescue Metal Group Cloud Break Mine
26. Pluto LNG Emission Chimneys
Client: Woodside Petroleum
Completion: 2010
Value: $9 million
Works involved the fabrication, surface treatment, refractory lining and load out of the
3 Gas Turbine emission chimneys. Sections completed where up to 7 meters in
diameter and weighing in excess of 200 tonnes each.
28. Bluewaters Power Station
Client: ALSTOM
Completion: 2009
Value: $22 Million
Works involved the installation of steelwork, piping and the turbine and generating
systems for both Units 1 and 2 for the Blue Waters Power Station.
30. Rio Tinto – Ship Loader
Client: Sandvik- Voest Alpine
Completion: 2009
Value: $20 million
Works involved the supply, fabrication, surface treatment and assembly and load out
of 4 x 10,000 tonnes per hour capacity Ship Loaders for various Rio Tinto port
operations.
32. Pluto LNG Subsea BIS
Client: ALLSEAS
Completion: 2009
Value: $14 Million
Works involved the fabrication, testing and load out of 21 Buckle Initiator Structures
for the subsea gas pipeline delivering LNG to the Pluto LNG facility.
34. NewGen Power Station
Client: ALSTOM
Completion: 2008
Value: $12 Million
Works involved the installation of the Heat Recovery Steam Generator Boiler (HRSG)
for the combined cycle 280MW gas turbine power station located in Kwinana W.A.
36. Burrup LNG Train 4 & 5
Client: Woodside Petroleum
Completion: 2008
Value: $11 Million
Works involved the fabrication, surface treatment, refractory lining and load out of the
7 Gas Turbine emission chimneys and Thermal Combustion Unit. Sections completed
where up to 7 metres in diameter and weighing in excess of 200 tonnes each.
38. Ravensthorpe Nickel Mine
Client: Outotec
Completion: 2007
Value: $35 Million
Works involved the supply, fabrication and installation of the 15 Thickeners – 6 x CCD
thickeners, 4 x Precipitation thickeners, 5 x PAL, SAP and LIM deep cone thickeners and
associated tanks totalling approx. 5000 tonnes of steelwork.
40. Telfer Gold Mine
Client: Newcrest Mining
Completion: 2005
Value: $11 million
Works involved the fabrication and structural, mechanical and piping installation of the
crushing, conveying, stockpiling and reclaim circuits for the gold – copper treatment
plant located 400 klms south east of Port Hedland WA.
42. Hlsmelt Project
Client: Rio Tinto Iron Ore
Completion: 2004
Value: $20 million
Works involved the fabrication and structural, mechanical and piping installation of the
coal drying and preparation facility. In addition PIC fabricated the massive Smelt
Reduction Vessel and two Hot Blast Stoves for the HIsmelt plant located at Kwinana
WA.
44. BHPBIO- Yandicoogina Rail Bridge
Client: BHP Billiton Iron Ore
Completion: 2003
Value: $3.5 million
Works involved the fabrication, assembly and transportation of the 7 rail truss
assemblies for the Yandicoogina Creek bridge located 150 kms north east of Newman
WA. Individual girders fabricated where 3.2 metres deep and 45 meters long weighing
50 tonnes each and assembled into truss arrangements weighing 150 tonnes each for
transportation and incremental launching.
46. AMC – Assembly Hall
Client: Brookfield Multiplex
Completion: 20003
Value: $5.0 million
Works involved the fabrication and assembly of the mobile assembly hall located at
the Australian Marine Complex in Henderson WA. The building dimension was 45
metres high, 90 meters long and spanned 90 meters. Included was also the fabrication
and assembly of the 200 tonne capacity portal crane.
48. Cockburn Power Station
Client: ALSTOM
Completion: 2003
Value: $6.0 million
Works involved the structural, mechanical, piping installation, hydrostatic testing and
certification to ASME standard of the Heat Recovery Steam Generation (HRSG) unit for
the 240MW combined cycle gas fired power station at Kwinana WA. Additional works
included the fabrication and installation of the 60 meter high emission chimney.
50. Redbank Power Station
Client: ALSTOM
Completion: 2001
Value: $12 million
Works involved the EPC contract for the materials handling plant for the 151MW coal
fired power station located at Singleton NSW. Scope included the design, civil,
structural, mechanical, piping, electrical, instrumentation and performance testing
requirements using both coal and beneficiated dewatered tailings as fuels.
52. Globex Grain Terminal
Client: GrainCorp
Completion: 2000
Value: $10 million
Works involved the EPC contract for the grain silo construction at the Globex Grain
Export Terminal located in Melbourne Victoria. Scope included the design and
construction of 4 x 750 tonne, 14 x 1500 tonne capacity elevated silos and 2 x 12000
tonne capacity flat bottom steel silos for grain storage.
54. Merlin Diamond Mine
Client: Rio Tinto
Completion: 2000
Value: $11 million
Works involved the total construction including the earthworks, civil works, structural,
mechanical, piping, electrical and instrumentation requirements for the Merlin
Diamond Mine located 800 klms south east of Darwin NT.