CORPORATE DIRECTORY
Corporate Office & Works
42 Hope Valley Road
Naval Base
Western Australia 6165
Workshop 2
51 Hope Valley Road
Naval Base
Western Australia 6165

INDEX
1. Corporate Directory
2. Introduction & Mission Statement
3. Vision and Corporate Values
4. Accreditation Credentials
4. Summary of Major Projects

Postal Address
PO Box 263, Kwinana
Western Australia 6966
ABN
35 813 081 087
ACN
008 895 154
Website
www.pacind.com.au
E-Mail
mail@pacind.com.au
Telephone
+61 8 9410 2566
Directors
Erasmo Mosole
Marco Mosole
Bankers
Commonwealth Bank of
Australia
Introduction
Pacific Industrial Company, Founded in 1969 by Erasmo Mosole and
later joined by his sons, Marco and Sandro , is now established as
one of Western Australia’s leading fabrication and construction
organisations, presently combining main office and fabrication
facilities at Naval Base, Western Australia.
Pacific Industrial Company is involved in all aspects of steel
fabrication and construction from shop fabricated items through to
major construction projects including: engineering, procurement,
fabrication, installation, commissioning and related electrical,
instrumentation and civil works.
Although the company’s main clientele are involved in the oil and

gas, mining, resource and industrial sector, Pacific Industrial
Company is actively involved in all forms of fabrication and
construction for a broad customer base.
Vision
“Our vision is to develop a sustainable
business by being the best at what we do
through the investment in our people,
technology and innovation”

Company Values
PERSISTENCE

TEAMWORK

SAFETY

INTEGRITY

RESPECT
Accreditation Credentials
Quality Management System
ISO 9001:2008
Certificate No: QEC0291

Occupational Health & Safety Management System
AS / NZS 4801:2001
Certificate No: HSM40062

Occupational Health & Safety Management System
OHSAS 18001:2007
Certificate No: HSM40062

Environmental Management System
ISO 140001:2004
Certificate No: EMS40134
Pacific Industrial Company has a majority shareholding in Como
Engineers. Through this agreement PIC is able to offer its mineral
resource clients a more cost and time efficient execution model through
an EPC contracting arrangement.
Como Engineers Pty Ltd was established in 1986. The core focus is to
provide engineering services and specialist products to the Mining and
Resource sector with a strong focus on process metallurgy, mechanical
engineering and materials handling both in Australia and abroad.
Como Engineers employs a team of experienced metallurgists,
engineers, construction supervisors and drafts-people which enables us
to offer a complete process and engineering service. Como Engineers
are able to supply services from metallurgical testing through to scoping
and definitive feasibility studies as well as detailed engineering design to
project construction and commissioning.
Como Engineers specialises in fit for purpose solutions utilising modular
and transportable equipment in our plant designs. Where possible,
Como Engineers likes to offer design and construct projects at a fixed
duration, lump-sum price, thereby removing a large portion of the
project risk from the client.
Como Engineers works closely with our Clients to understand and deliver
the product and service that is required for each individual project.
Como Engineers operate worldwide offering localised support with
offices in Perth, Melbourne and Jakarta.
Services include:
• Studies
• Design and Construction
• Plant and Infrastructure
• Relocations and Upgrades
• Maintenance and Refurbishments
• Modular Gold Stripping Plants
• Certified Dangerous Goods Assessments
Tropicana Gold Mine
Client: AngloGold Ashanti
Completion: 2013
Value: $120 MILLION

Works involved the total onsite construction of the Tankage, Structural,
Mechanical and Piping works for the 5.5 million tonnes per annum gold
process plant located 330klms North of Kalgoorlie W.A.
Fiona Stanley Hospital
Client: Brookfield Multiplex
Completion: 2012
Value: $5.0 Million
Karara Iron Ore
Client: Karara Mining Limited
Completion: 2012
Value: $40 Million

Works involved the design, fabrication, Installation and surface treatment of
the project tankage for the magnetite iron ore concentrator.
Sino Iron Project
Client: CITIC Pacific Mining
Completion: 2012
Value: $32 Million

Works involved the Installation of approx. 5000 tonnes of steelwork and
mechanical items for the stockpile cover, conveying and recovery system for
the Magnetite Iron Ore Concentrator. PIC subsidiary business COMO
Engineers was also engaged under separate contracts for installation works
for the Ball Mill and AG Mill equipment and other mechanical works.
BHPBIO-Bucket Wheel Reclaimers
Client: Thyssen Krupp
Completion: 2012
Value: $30 Million

Works involved the supply, fabrication and assembly of 3 x 15000 tonnes per
hour capacity Bucket Wheel Reclaimers for BHP Billiton Iron Ore. One
machine located at the Jimblebar Mine and 2 machines at the Port Hedland
port facilities.
City Square – Brookfield Place
Client: Brookfield Multiplex
Completion: 2012
Value: $52 Million

Works involved the supply, fabrication and delivery of 11,000 tonnes of
steelwork, decking and column reinforcing for the 51 floor level steel frame
building located in the Perth CBD.
DIN Project
Client: Rio Tinto Iron Ore
Completion: 2012
Value: $15 Million

Works involved the supply, fabrication, surface treatment and load out and
shipping to site of the 2 Surge Bins and associated steelwork for the Dampier
Incremental Expansion Project located at Rio Tinto Iron Ore port facility at
Parker Point W.A.
Gorgon LNG Subsea BIS
Client: ALLSEAS
Completion: 2011
Value: $15 Million

Works involved the fabrication, testing and load out of 11 Buckle Initiator
Structures weighing in excess of 120 tonnes each for the subsea gas pipelines
delivering LNG to the Grogon LNG facility.
BHBIO – RGP 5Rail Bridges
Client: BHP Billiton Iron Ore
Completion: 2010
Value: $40 Million

Works involved the fabrication, assembly, transportation and Installation of
125 Bridge Truss assemblies totalling 6500 tonnes for 11 river crossings for
the Rail Bridge Duplication works between Newman and Port Hedland.
FMG-Cloud Break Mine
Client: FLSmisth - RAHCO
Completion: 2010
Value: $12 Million

Works involved the supply, fabrication, surface treatment and assembly of 2
mobile overburden removal systems for Fortescue Metal Group Cloud Break
Mine
Pluto LNG Emission Chimneys
Client: Woodside Petroleum
Completion: 2010
Value: $9 million

Works involved the fabrication, surface treatment, refractory lining and load
out of the 3 Gas Turbine emission chimneys. Sections completed where up to
7 meters in diameter and weighing in excess of 200 tonnes each.
Bluewaters Power Station
Client: ALSTOM
Completion: 2009
Value: $22 Million

Works involved the installation of steelwork, piping and the turbine and
generating systems for both Units 1 and 2 for the Blue Waters Power Station.
Rio Tinto – Ship Loader
Client: Sandvik- Voest Alpine
Completion: 2009
Value: $20 million

Works involved the supply, fabrication, surface treatment and assembly and
load out of 4 x 10,000 tonnes per hour capacity Ship Loaders for various Rio
Tinto port operations.
Pluto LNG Subsea BIS
Client: ALLSEAS
Completion: 2009
Value: $14 Million

Works involved the fabrication, testing and load out of 21 Buckle Initiator
Structures for the subsea gas pipeline delivering LNG to the Pluto LNG
facility.
NewGen Power Station
Client: ALSTOM
Completion: 2008
Value: $12 Million

Works involved the installation of the Heat Recovery Steam Generator Boiler
(HRSG) for the combined cycle 280MW gas turbine power station located in
Kwinana W.A.
Burrup LNG Train 4 & 5
Client: Woodside Petroleum
Completion: 2008
Value: $11 Million

Works involved the fabrication, surface treatment, refractory lining and load
out of the 7 Gas Turbine emission chimneys and Thermal Combustion Unit.
Sections completed where up to 7 metres in diameter and weighing in excess
of 200 tonnes each.
Ravensthorpe Nickel Mine
Client: Outotec
Completion: 2007
Value: $35 Million

Works involved the supply, fabrication and installation of the 15 Thickeners –
6 x CCD thickeners, 4 x Precipitation thickeners, 5 x PAL, SAP and LIM deep
cone thickeners and associated tanks totalling approx. 5000 tonnes of
steelwork.
Telfer Gold Mine
Client: Newcrest Mining
Completion: 2005
Value: $11 million

Works involved the fabrication and structural, mechanical and piping
installation of the crushing, conveying, stockpiling and reclaim circuits for the
gold – copper treatment plant located 400 klms south east of Port Hedland
WA.
Hlsmelt Project
Client: Rio Tinto Iron Ore
Completion: 2004
Value: $20 million

Works involved the fabrication and structural, mechanical and piping
installation of the coal drying and preparation facility. In addition PIC
fabricated the massive Smelt Reduction Vessel and two Hot Blast Stoves for
the HIsmelt plant located at Kwinana WA.
BHPBIO- Yandicoogina Rail Bridge
Client: BHP Billiton Iron Ore
Completion: 2003
Value: $3.5 million

Works involved the fabrication, assembly and transportation of the 7 rail
truss assemblies for the Yandicoogina Creek bridge located 150 kms north
east of Newman WA. Individual girders fabricated where 3.2 metres deep
and 45 meters long weighing 50 tonnes each and assembled into truss
arrangements weighing 150 tonnes each for transportation and incremental
launching.
AMC – Assembly Hall
Client: Brookfield Multiplex
Completion: 20003
Value: $5.0 million

Works involved the fabrication and assembly of the mobile assembly hall
located at the Australian Marine Complex in Henderson WA. The building
dimension was 45 metres high, 90 meters long and spanned 90 meters.
Included was also the fabrication and assembly of the 200 tonne capacity
portal crane.
Cockburn Power Station
Client: ALSTOM
Completion: 2003
Value: $6.0 million

Works involved the structural, mechanical, piping installation, hydrostatic
testing and certification to ASME standard of the Heat Recovery Steam
Generation (HRSG) unit for the 240MW combined cycle gas fired power
station at Kwinana WA. Additional works included the fabrication and
installation of the 60 meter high emission chimney.
Redbank Power Station
Client: ALSTOM
Completion: 2001
Value: $12 million

Works involved the EPC contract for the materials handling plant for the
151MW coal fired power station located at Singleton NSW. Scope included
the design, civil, structural, mechanical, piping, electrical, instrumentation
and performance testing requirements using both coal and beneficiated
dewatered tailings as fuels.
Globex Grain Terminal
Client: GrainCorp
Completion: 2000
Value: $10 million

Works involved the EPC contract for the grain silo construction at the Globex
Grain Export Terminal located in Melbourne Victoria. Scope included the
design and construction of 4 x 750 tonne, 14 x 1500 tonne capacity elevated
silos and 2 x 12000 tonne capacity flat bottom steel silos for grain storage.
Merlin Diamond Mine
Client: Rio Tinto
Completion: 2000
Value: $11 million

Works involved the total construction including the earthworks, civil works,
structural, mechanical, piping, electrical and instrumentation requirements
for the Merlin Diamond Mine located 800 klms south east of Darwin NT.
Aac booklet

Mais conteúdo relacionado

Mais procurados

number 1. pro cv
number 1. pro cvnumber 1. pro cv
number 1. pro cv
Dave Chase
 
profix portfolio 2016
profix portfolio 2016profix portfolio 2016
profix portfolio 2016
Phil Syers
 
Mopani Tankouse Upgrade 2014
Mopani Tankouse Upgrade 2014Mopani Tankouse Upgrade 2014
Mopani Tankouse Upgrade 2014
Rudolf Kruger
 
Gagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightGagnon Patrice new CV3 light
Gagnon Patrice new CV3 light
Patrice Gagnon
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
Alaa Ammar
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
Hassan Halhoul
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
Hesham Fathy, PMP
 
CV NAEEM QURESHI 2014
CV NAEEM QURESHI 2014CV NAEEM QURESHI 2014
CV NAEEM QURESHI 2014
Naeem Qureshi
 

Mais procurados (20)

Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
 
Phillips Howard
Phillips HowardPhillips Howard
Phillips Howard
 
KENRICK RAMOS 2017
KENRICK RAMOS 2017KENRICK RAMOS 2017
KENRICK RAMOS 2017
 
number 1. pro cv
number 1. pro cvnumber 1. pro cv
number 1. pro cv
 
Resume (apr16)
Resume (apr16)Resume (apr16)
Resume (apr16)
 
profix portfolio 2016
profix portfolio 2016profix portfolio 2016
profix portfolio 2016
 
New Jersey Projects
New Jersey ProjectsNew Jersey Projects
New Jersey Projects
 
Clough Corporate Brochure
Clough Corporate BrochureClough Corporate Brochure
Clough Corporate Brochure
 
Mopani Tankouse Upgrade 2014
Mopani Tankouse Upgrade 2014Mopani Tankouse Upgrade 2014
Mopani Tankouse Upgrade 2014
 
Gagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightGagnon Patrice new CV3 light
Gagnon Patrice new CV3 light
 
Cv Presentation
Cv PresentationCv Presentation
Cv Presentation
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
M&R Company profile
M&R Company profileM&R Company profile
M&R Company profile
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
 
Psn resume
Psn   resume Psn   resume
Psn resume
 
NEMER- CV - 16
NEMER- CV - 16NEMER- CV - 16
NEMER- CV - 16
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
CV NAEEM QURESHI 2014
CV NAEEM QURESHI 2014CV NAEEM QURESHI 2014
CV NAEEM QURESHI 2014
 
Degima industrial, naval, civil and energy - 2010
Degima   industrial, naval, civil and energy - 2010Degima   industrial, naval, civil and energy - 2010
Degima industrial, naval, civil and energy - 2010
 

Destaque

Social networking
Social networkingSocial networking
Social networking
pogikana000
 

Destaque (12)

Phan loai bai nao
Phan loai bai naoPhan loai bai nao
Phan loai bai nao
 
Social networking
Social networkingSocial networking
Social networking
 
3D Construction Methodology for High-rise buildings
3D Construction Methodology for High-rise buildings3D Construction Methodology for High-rise buildings
3D Construction Methodology for High-rise buildings
 
Sample Contract Close-out Report
Sample Contract Close-out ReportSample Contract Close-out Report
Sample Contract Close-out Report
 
Web design company miami
Web design  company miamiWeb design  company miami
Web design company miami
 
Logo Design Company Miami
Logo Design Company MiamiLogo Design Company Miami
Logo Design Company Miami
 
Graphic Design Poster
Graphic Design PosterGraphic Design Poster
Graphic Design Poster
 
Graphic Design Miami
Graphic Design MiamiGraphic Design Miami
Graphic Design Miami
 
Graphic Design Company Miami
Graphic Design  Company MiamiGraphic Design  Company Miami
Graphic Design Company Miami
 
Web Design Miami
Web Design MiamiWeb Design Miami
Web Design Miami
 
Corporate Design
Corporate DesignCorporate Design
Corporate Design
 
Corporate Logo
Corporate  LogoCorporate  Logo
Corporate Logo
 

Semelhante a Aac booklet

Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy
 
J Ray Firsts
J Ray FirstsJ Ray Firsts
J Ray Firsts
MyLast1
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
Edward Byrne
 
MCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdfMCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdf
KAWMAW
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
Ahmad Hassan
 
POOLEY RESUME short
POOLEY RESUME shortPOOLEY RESUME short
POOLEY RESUME short
Duane Pooley
 
Final Report BSp
Final Report BSpFinal Report BSp
Final Report BSp
Arpit Dubey
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
Richard Turnbull
 
GRAHAMS RESUME docx GC 3 19 2016
GRAHAMS RESUME docx GC 3 19 2016GRAHAMS RESUME docx GC 3 19 2016
GRAHAMS RESUME docx GC 3 19 2016
Graham Chaffey
 
Smith, Simon- Resume - Master
Smith, Simon- Resume - MasterSmith, Simon- Resume - Master
Smith, Simon- Resume - Master
simon smith
 

Semelhante a Aac booklet (20)

Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017
 
projects
projectsprojects
projects
 
Linkedin
LinkedinLinkedin
Linkedin
 
J Ray Firsts
J Ray FirstsJ Ray Firsts
J Ray Firsts
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
 
Muhammad_Aslam_CV
Muhammad_Aslam_CVMuhammad_Aslam_CV
Muhammad_Aslam_CV
 
MCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdfMCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdf
 
Discovery prsnt 260x200_4+4_eng_create2021_compressed
Discovery prsnt 260x200_4+4_eng_create2021_compressedDiscovery prsnt 260x200_4+4_eng_create2021_compressed
Discovery prsnt 260x200_4+4_eng_create2021_compressed
 
Discovery prsnt 260x200_4+4_eng_create2021
Discovery prsnt 260x200_4+4_eng_create2021Discovery prsnt 260x200_4+4_eng_create2021
Discovery prsnt 260x200_4+4_eng_create2021
 
CV_Oscar_Bandeira
CV_Oscar_BandeiraCV_Oscar_Bandeira
CV_Oscar_Bandeira
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1
 
POOLEY RESUME short
POOLEY RESUME shortPOOLEY RESUME short
POOLEY RESUME short
 
Final Report BSp
Final Report BSpFinal Report BSp
Final Report BSp
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
 
GRAHAMS RESUME docx GC 3 19 2016
GRAHAMS RESUME docx GC 3 19 2016GRAHAMS RESUME docx GC 3 19 2016
GRAHAMS RESUME docx GC 3 19 2016
 
E profiil references
E profiil referencesE profiil references
E profiil references
 
DEGIMA INGENIERIA CIVIL Y NAVAL ESPAÑA - ENERGIAS MARINAS Y OFFSHORE RENOVABLES
DEGIMA INGENIERIA CIVIL Y NAVAL ESPAÑA - ENERGIAS MARINAS Y OFFSHORE RENOVABLESDEGIMA INGENIERIA CIVIL Y NAVAL ESPAÑA - ENERGIAS MARINAS Y OFFSHORE RENOVABLES
DEGIMA INGENIERIA CIVIL Y NAVAL ESPAÑA - ENERGIAS MARINAS Y OFFSHORE RENOVABLES
 
Smith, Simon- Resume - Master
Smith, Simon- Resume - MasterSmith, Simon- Resume - Master
Smith, Simon- Resume - Master
 
Creative Engineers, Inc. Alkali Metal Experience
Creative Engineers, Inc. Alkali Metal ExperienceCreative Engineers, Inc. Alkali Metal Experience
Creative Engineers, Inc. Alkali Metal Experience
 

Aac booklet

  • 1. Company Profile CORPORATE DIRECTORY Corporate Office & Works 42 Hope Valley Road Naval Base Western Australia 6165 Workshop 2 51 Hope Valley Road Naval Base Western Australia 6165 INDEX 1. Corporate Directory 2. Introduction & Mission Statement 3. Vision and Corporate Values 4. Accreditation Credentials 4. Summary of Major Projects Postal Address PO Box 263, Kwinana Western Australia 6966 ABN 35 813 081 087 ACN 008 895 154 Website www.pacind.com.au E-Mail mail@pacind.com.au Telephone +61 8 9410 2566 Directors Erasmo Mosole Marco Mosole Bankers Commonwealth Bank of Australia
  • 2. Introduction Pacific Industrial Company, Founded in 1969 by Erasmo Mosole and later joined by his sons, Marco and Sandro , is now established as one of Western Australia’s leading fabrication and construction organisations, presently combining main office and fabrication facilities at Naval Base, Western Australia. Pacific Industrial Company is involved in all aspects of steel fabrication and construction from shop fabricated items through to major construction projects including: engineering, procurement, fabrication, installation, commissioning and related electrical, instrumentation and civil works. Although the company’s main clientele are involved in the oil and gas, mining, resource and industrial sector, Pacific Industrial Company is actively involved in all forms of fabrication and construction for a broad customer base.
  • 3. Vision “Our vision is to develop a sustainable business by being the best at what we do through the investment in our people, technology and innovation” Company Values PERSISTENCE TEAMWORK SAFETY INTEGRITY RESPECT
  • 4. Accreditation Credentials Quality Management System ISO 9001:2008 Certificate No: QEC0291 Occupational Health & Safety Management System AS / NZS 4801:2001 Certificate No: HSM40062 Occupational Health & Safety Management System OHSAS 18001:2007 Certificate No: HSM40062 Environmental Management System ISO 140001:2004 Certificate No: EMS40134
  • 5. Pacific Industrial Company has a majority shareholding in Como Engineers. Through this agreement PIC is able to offer its mineral resource clients a more cost and time efficient execution model through an EPC contracting arrangement. Como Engineers Pty Ltd was established in 1986. The core focus is to provide engineering services and specialist products to the Mining and Resource sector with a strong focus on process metallurgy, mechanical engineering and materials handling both in Australia and abroad. Como Engineers employs a team of experienced metallurgists, engineers, construction supervisors and drafts-people which enables us to offer a complete process and engineering service. Como Engineers are able to supply services from metallurgical testing through to scoping and definitive feasibility studies as well as detailed engineering design to project construction and commissioning. Como Engineers specialises in fit for purpose solutions utilising modular and transportable equipment in our plant designs. Where possible, Como Engineers likes to offer design and construct projects at a fixed duration, lump-sum price, thereby removing a large portion of the project risk from the client. Como Engineers works closely with our Clients to understand and deliver the product and service that is required for each individual project. Como Engineers operate worldwide offering localised support with offices in Perth, Melbourne and Jakarta. Services include: • Studies • Design and Construction • Plant and Infrastructure • Relocations and Upgrades • Maintenance and Refurbishments • Modular Gold Stripping Plants • Certified Dangerous Goods Assessments
  • 6.
  • 7. Tropicana Gold Mine Client: AngloGold Ashanti Completion: 2013 Value: $120 MILLION Works involved the total onsite construction of the Tankage, Structural, Mechanical and Piping works for the 5.5 million tonnes per annum gold process plant located 330klms North of Kalgoorlie W.A.
  • 8.
  • 9. Fiona Stanley Hospital Client: Brookfield Multiplex Completion: 2012 Value: $5.0 Million
  • 10.
  • 11. Karara Iron Ore Client: Karara Mining Limited Completion: 2012 Value: $40 Million Works involved the design, fabrication, Installation and surface treatment of the project tankage for the magnetite iron ore concentrator.
  • 12.
  • 13. Sino Iron Project Client: CITIC Pacific Mining Completion: 2012 Value: $32 Million Works involved the Installation of approx. 5000 tonnes of steelwork and mechanical items for the stockpile cover, conveying and recovery system for the Magnetite Iron Ore Concentrator. PIC subsidiary business COMO Engineers was also engaged under separate contracts for installation works for the Ball Mill and AG Mill equipment and other mechanical works.
  • 14.
  • 15. BHPBIO-Bucket Wheel Reclaimers Client: Thyssen Krupp Completion: 2012 Value: $30 Million Works involved the supply, fabrication and assembly of 3 x 15000 tonnes per hour capacity Bucket Wheel Reclaimers for BHP Billiton Iron Ore. One machine located at the Jimblebar Mine and 2 machines at the Port Hedland port facilities.
  • 16.
  • 17. City Square – Brookfield Place Client: Brookfield Multiplex Completion: 2012 Value: $52 Million Works involved the supply, fabrication and delivery of 11,000 tonnes of steelwork, decking and column reinforcing for the 51 floor level steel frame building located in the Perth CBD.
  • 18.
  • 19. DIN Project Client: Rio Tinto Iron Ore Completion: 2012 Value: $15 Million Works involved the supply, fabrication, surface treatment and load out and shipping to site of the 2 Surge Bins and associated steelwork for the Dampier Incremental Expansion Project located at Rio Tinto Iron Ore port facility at Parker Point W.A.
  • 20.
  • 21. Gorgon LNG Subsea BIS Client: ALLSEAS Completion: 2011 Value: $15 Million Works involved the fabrication, testing and load out of 11 Buckle Initiator Structures weighing in excess of 120 tonnes each for the subsea gas pipelines delivering LNG to the Grogon LNG facility.
  • 22.
  • 23. BHBIO – RGP 5Rail Bridges Client: BHP Billiton Iron Ore Completion: 2010 Value: $40 Million Works involved the fabrication, assembly, transportation and Installation of 125 Bridge Truss assemblies totalling 6500 tonnes for 11 river crossings for the Rail Bridge Duplication works between Newman and Port Hedland.
  • 24.
  • 25. FMG-Cloud Break Mine Client: FLSmisth - RAHCO Completion: 2010 Value: $12 Million Works involved the supply, fabrication, surface treatment and assembly of 2 mobile overburden removal systems for Fortescue Metal Group Cloud Break Mine
  • 26.
  • 27. Pluto LNG Emission Chimneys Client: Woodside Petroleum Completion: 2010 Value: $9 million Works involved the fabrication, surface treatment, refractory lining and load out of the 3 Gas Turbine emission chimneys. Sections completed where up to 7 meters in diameter and weighing in excess of 200 tonnes each.
  • 28.
  • 29. Bluewaters Power Station Client: ALSTOM Completion: 2009 Value: $22 Million Works involved the installation of steelwork, piping and the turbine and generating systems for both Units 1 and 2 for the Blue Waters Power Station.
  • 30.
  • 31. Rio Tinto – Ship Loader Client: Sandvik- Voest Alpine Completion: 2009 Value: $20 million Works involved the supply, fabrication, surface treatment and assembly and load out of 4 x 10,000 tonnes per hour capacity Ship Loaders for various Rio Tinto port operations.
  • 32.
  • 33. Pluto LNG Subsea BIS Client: ALLSEAS Completion: 2009 Value: $14 Million Works involved the fabrication, testing and load out of 21 Buckle Initiator Structures for the subsea gas pipeline delivering LNG to the Pluto LNG facility.
  • 34.
  • 35. NewGen Power Station Client: ALSTOM Completion: 2008 Value: $12 Million Works involved the installation of the Heat Recovery Steam Generator Boiler (HRSG) for the combined cycle 280MW gas turbine power station located in Kwinana W.A.
  • 36.
  • 37. Burrup LNG Train 4 & 5 Client: Woodside Petroleum Completion: 2008 Value: $11 Million Works involved the fabrication, surface treatment, refractory lining and load out of the 7 Gas Turbine emission chimneys and Thermal Combustion Unit. Sections completed where up to 7 metres in diameter and weighing in excess of 200 tonnes each.
  • 38.
  • 39. Ravensthorpe Nickel Mine Client: Outotec Completion: 2007 Value: $35 Million Works involved the supply, fabrication and installation of the 15 Thickeners – 6 x CCD thickeners, 4 x Precipitation thickeners, 5 x PAL, SAP and LIM deep cone thickeners and associated tanks totalling approx. 5000 tonnes of steelwork.
  • 40.
  • 41. Telfer Gold Mine Client: Newcrest Mining Completion: 2005 Value: $11 million Works involved the fabrication and structural, mechanical and piping installation of the crushing, conveying, stockpiling and reclaim circuits for the gold – copper treatment plant located 400 klms south east of Port Hedland WA.
  • 42.
  • 43. Hlsmelt Project Client: Rio Tinto Iron Ore Completion: 2004 Value: $20 million Works involved the fabrication and structural, mechanical and piping installation of the coal drying and preparation facility. In addition PIC fabricated the massive Smelt Reduction Vessel and two Hot Blast Stoves for the HIsmelt plant located at Kwinana WA.
  • 44.
  • 45. BHPBIO- Yandicoogina Rail Bridge Client: BHP Billiton Iron Ore Completion: 2003 Value: $3.5 million Works involved the fabrication, assembly and transportation of the 7 rail truss assemblies for the Yandicoogina Creek bridge located 150 kms north east of Newman WA. Individual girders fabricated where 3.2 metres deep and 45 meters long weighing 50 tonnes each and assembled into truss arrangements weighing 150 tonnes each for transportation and incremental launching.
  • 46.
  • 47. AMC – Assembly Hall Client: Brookfield Multiplex Completion: 20003 Value: $5.0 million Works involved the fabrication and assembly of the mobile assembly hall located at the Australian Marine Complex in Henderson WA. The building dimension was 45 metres high, 90 meters long and spanned 90 meters. Included was also the fabrication and assembly of the 200 tonne capacity portal crane.
  • 48.
  • 49. Cockburn Power Station Client: ALSTOM Completion: 2003 Value: $6.0 million Works involved the structural, mechanical, piping installation, hydrostatic testing and certification to ASME standard of the Heat Recovery Steam Generation (HRSG) unit for the 240MW combined cycle gas fired power station at Kwinana WA. Additional works included the fabrication and installation of the 60 meter high emission chimney.
  • 50.
  • 51. Redbank Power Station Client: ALSTOM Completion: 2001 Value: $12 million Works involved the EPC contract for the materials handling plant for the 151MW coal fired power station located at Singleton NSW. Scope included the design, civil, structural, mechanical, piping, electrical, instrumentation and performance testing requirements using both coal and beneficiated dewatered tailings as fuels.
  • 52.
  • 53. Globex Grain Terminal Client: GrainCorp Completion: 2000 Value: $10 million Works involved the EPC contract for the grain silo construction at the Globex Grain Export Terminal located in Melbourne Victoria. Scope included the design and construction of 4 x 750 tonne, 14 x 1500 tonne capacity elevated silos and 2 x 12000 tonne capacity flat bottom steel silos for grain storage.
  • 54.
  • 55. Merlin Diamond Mine Client: Rio Tinto Completion: 2000 Value: $11 million Works involved the total construction including the earthworks, civil works, structural, mechanical, piping, electrical and instrumentation requirements for the Merlin Diamond Mine located 800 klms south east of Darwin NT.