WHAT IS SUSTAINABLE ASSET
   MANAGEMENT?

Manage asset in sustainable way means reuse, recycle, maintain,
fixing, avoid waste, upgrade so that maintenance can be optimize
while minimizing their impact on environment.

In short, the paradigm of “cradle to the grave”

Among the purpose:
   a. to reduce maintenance cost and improve service
   b. minimize impact on environment

Asset refers:
   a. Aset Alih
   b. Aset Tak Alih
   c. Aset Hidup
   d. Harta Intelek
The
 government
hope via TAM                                        PERANCANGAN



                                                         PERANCANGAN



TAM model for                               PELUPUSAN                  REKA BENTUK




                                                                                              PEWUJUDAN ASET
infrastructure/                PEMULIHAN
                                    &
building assets   PENGURUSAN
                               NAIK TARAF                                        PEROLEHAN


                    PRESTASI                             FAEDAH
                                                        ASET YANG
                                                         OPTIMUM
                                 PENILAIAN                                        PEMBINAAN




                                             OPERASI
                                                &
                                                                         PENTAULIAHAN
                                            SENGGARA
                                                         PENERIMAAN




                                                        PENGURUSAN
                                                        NILAI & RISIKO
BUSSINESS
       HUMAN
                                            PROCESS



                         HOW?



                          SYSTEM
                     (IT MECHANISM)



                        Asset life cycle
Architectural   Engineering       Construction    Operation



                Building Performance Evaluation
Effectiveness
                                        review

                Market/need
                 analysis                                Program
                              Planning     Programm
                                              ing         review
   Feed
forward into                         Building
                        Recycle    Performance Design
next building
                                     Criteria
   cycle
                  Post -        Post
                occupancy    occupancy                   Design
                                          construction
                evaluation   evaluation                  review



                                  Commissioning

                                                             Building Performance
                                                                   Evaluation
BUSSINESS
HUMAN                     PROCESS



           HOW




            SYSTEM
        (IT MECHANISM)
                                            CONSTRUCTION
                                               OPERATIONS
                                     BUILDING INFORMATION
                                        EXCHANGE (COBIE)
                                          : a FOUNDATION for
                                                  sustainable
                                                     facilities
Problem                                    HUMAN
                                                                    BUSSINESS
                                                                     PROCESS

Building Documentation Is Fragmented
                                                      HOW
Construction Operations & Maintenance
submittals in unorganized, usable format               SYSTEM
                                                   (IT MECHANISM)




Results
1. Data quickly lost
2. Poor preventive maintenance
3. More costly repairs
4. Warranties not maintained or lost

Adverse impact on mission of
the building occupant
COBIE/ BIM FOR LIFE LIFE- CYCLE   HUMAN
                                                           BUSSINESS
                                                            PROCESS


INFORMATION MANAGEMENT                       HOW




                                              SYSTEM
                                          (IT MECHANISM)
CRITICAL DATA LOST IN                         HUMAN
                                                                       BUSSINESS
                                                                        PROCESS



BUILDING PROCESS                                         HOW




1. Decisions made as ideas & parts are                    SYSTEM
                                                      (IT MECHANISM)


   transformed into designs & buildings are
   not captured
1. Translation of information for
   downstream use looses much of what is
   known during the previous phase
COBIE GOALS                                      HUMAN
                                                                          BUSSINESS
                                                                           PROCESS



                                                            HOW




1.   capture product, equipment, system,                     SYSTEM

     and warranty data as created during                 (IT MECHANISM)



     construction
2.   transfer to maintainer’s, operator’s, and
     asset manager’s systems.
3.   produce format and specification
4.   demonstrate software for captured
     during construction and exchange with
     commercial software
WHAT COBIE DOES . . .                    HUMAN
                                                                    BUSSINESS
                                                                     PROCESS



                                                      HOW


1. gather information during
   construction submittal                              SYSTEM
                                                   (IT MECHANISM)



2. define min. required information
   submittals to verify performance
3. direct import to CMMS’s
4. integration with building space model       Transfer
                                             information
                                             not e-paper
                             existing
                             contract
                            exchange
                              points
MEASURING COBIE RESULTS . . .                 HUMAN
                                                                       BUSSINESS
                                                                        PROCESS




• costs less to create & manage than
                                                         HOW




  current paper/e- paper methods                          SYSTEM
                                                      (IT MECHANISM)

• easy & authorized access to capture, use,
  and review information
• information captured as work is being
  accomplished
• acceptable to all tiers of contractors,
  suppliers, subs, etc..
• requirements are clearly identified in
  specifications
• use existing legal framework (i.e.
  deliverables/contracts)
• demonstrate framework for
  exchange/retrieval
• import of data included in commercial
  systems
• import users all data provided
PREVAILING BUSINESS CASE
    – The Nature of The Business Space
    Every Business Begins With An Investment in Assets or Infrastructure.
    Example as Follows :

#   Nature Of Business           Infrastructure                         Primary Returns                  Secondary Returns


1   Healthcare                   Hospitals                              Medical Fees and other fees      The Value of the Healthcare
                                                                        related to Healthcare            company

2   Education                    Schools, Universities                  Student fees , Boarding Fees     The Value of the Company,
                                                                        etc..                            appreciated value of the assets


3   Properties                   Accommodations, Office space           Rental and Service Fees          Appreciated value over time,
                                 and surrounding support                                                 out-right sales of the properties
                                 infrastructures

4   Government Infrastructures   Al types of government offices,        Services rendered to citizens    Via extended useful life of the
                                 living quarters, parks and utilities   from taxes, quit rents,          assets
                                                                        assessments etc..

5   Manufacturing                Plants and machineries                 Goods produced from plants       The Value of the assets based
                                                                        and machineries                  on the efficient use of the plants
                                                                                                         and machineries

6   Other Types Of               General Assets, specialized            Services rendered to customers   Extended value of the company
    Businesses. Eg               equipments and mobile                                                   based on ability to sustain
    Telecommunications,          infrastructures / assets                                                services rendered
    Utilities and others

7   Passive Property             Properties                             Rental Yield                     Incremental Value
    Investment
PREVAILING BUSINESS CASE
  – The Keyword is Building Infrastructures
  All development starts with development and construction involving
  an investor and builders. Other parties, mainly be, supporting
  professionals and authorities.


                    Planning
                           Approval                                 CAPITAL
Investment




                                 Construction                   EXPENDITURE
   Value




                                             Equipments
                                                    Non Mechanical
                                                    Assets


                                  M&E
Development




              Architects         Engineers                             The Property(s)
  Stages




                             Civil
                           Engineers          Suppliers
                                              and Installers
                 Authorities       Contractors
                           Authorities
                                                                 COMPLETION
PREVAILING BUSINESS CASE
                 – Investment Ready for Stream Of Returns
                 Once construction completes, revenue stream will start , but with it
                 also operational cost which is divided into two main categories, fixed
                 and variable. Where variable is total cost to maintain the developed
                 properties
Return Stream




                         Revenue Generated From
                         The Assets
                                                                              REVENUE


                                                                                     Net Revenue
                                                                                           Fixed Cost
Operation Cost




                  Minor Repairs                                                 (COST)
                             Usage Issue
                                    Vandalism
                                       Equipment Faults
                  Cost Incurred To Operate        Breakdowns
                  The Assets                                                              Variable Cost
PREVAILING BUSINESS CASE
– Combining Investment Development
and Stream Of Returns
When both stages combined the issues became noticeable.

       Investment Cost                    Investment Returns


 Monitor Investment                      Ensuring Sustainable
 Expenditure                             Return




                                                     Cost
                                                     Related To
 Monitor Project Cost                                Upkeep Of The
                                                     Property(s)

                                               The issue:
                                          Cost Of Maintenance
BUSSINESS
HUMAN                     PROCESS



           HOW




            SYSTEM
        (IT MECHANISM)
BUSSINESS
HUMAN                     PROCESS



           HOW




            SYSTEM
        (IT MECHANISM)
BUSSINESS
         HUMAN                     PROCESS



                    HOW




                     SYSTEM
                 (IT MECHANISM)




Example Of
Maintenance
Management
Failure…
The Star 28th
April 2009
BUSSINESS
         HUMAN                     PROCESS



                    HOW




                     SYSTEM
                 (IT MECHANISM)




Example Of
Maintenance
Management
Failure…
The Star 28th
April 2009
BUSSINESS
         HUMAN                     PROCESS



                    HOW




                     SYSTEM
                 (IT MECHANISM)




Example Of
Maintenance
Management
Failure…
The Star 28th
April 2009
BUSSINESS
                                                  HUMAN                     PROCESS



                                                             HOW




                                                              SYSTEM
                                                          (IT MECHANISM)




It wasn’t hit by the massive earthquake. In true fashion of the
        Ripley Legacy, it was built to reflect the odd 1812
   earthquake that measured 8.0 on the rick. The building has
    now become one of the most photographed in the world.
PREVAILING BUSINESS CASE                                        HUMAN
                                                                                                BUSSINESS
                                                                                                 PROCESS



                                                                                  HOW




                                                                                   SYSTEM
                                                                               (IT MECHANISM)
Return Stream




                               THE BEST WAY TO HANDLE THIS ISSUE IS TO PLAN
                                 MAINTENANCE MANAGEMENT EARLY BY WAY OF
                                THE RIGHT STRATEGY USING CMMS AS THE TOOL.

                                                           WHICH IS WHAT WE DO ….
                                                                    COMPUTERIZED
                 Simple Repair                                       MAINTENANCE
Operation Cost




                         Major Failure
                                Major Replacement          MANAGEMENT SOLUTION
                                                                           (CMMS)
                                       Equipment Failure
                                               Other types of damages
PREVAILING BUSINESS CASE                                HUMAN
                                                                                                  BUSSINESS
                                                                                                   PROCESS


                 – The result in having a good CMMS would simply be
                                                                                    HOW
                 managed cost, keeping customer satisfaction level
                 high hence sustainable revenue with extended life                   SYSTEM

                 cycle of asset…This is something investor willing to            (IT MECHANISM)


                 pay for.
Return Stream




                                                            THE BENEFIT
                        Customer Satisfaction            1. Translate to reduce and
                             level high                     manageable maintenance
                                                            cost
                                                         2. Better profit margin
                                                         3. Sustained to incremental
                                                            asset value

                          HOW                             Better cost control through
                       1. Deployment of appropriate          good CMMS solution
Operation Cost




                          corrective maintenance
                       2. Well planned preventive
                          maintenance
                       3. Accurate predictive maintenance
BUSSINESS
                                                       HUMAN                     PROCESS

Human aspect in implementing the
                                                                  HOW

   idea (with reflect to malaysian
       construction industry)                                      SYSTEM
                                                               (IT MECHANISM)




      Core business/services   Professional service provider (based from
                                programme outcome outlined by MQA)
a. Building design                ARCHITECT
b.   Engineering/Structure/Infra. ENGINEER
c.   Cost and contract admin.     QUANTITY SURVEYOR
d.   Valuation and estate agent   VALUATION SURVEYOR
e.   Town and regional planning   TOWN PLANNER
f.   Lanscape                     LANDSCAPE ARCHITECT
g.   Land survey                  LAND SURVEYOR
h.   Interior design              INTERIOR ARCHITECTURE
i.   Building control/performance BUILDING SURVEYOR


      One man show....does it really work??
BUSSINESS
                                                       HUMAN                     PROCESS


       Sustainable asset                                          HOW



     management...who’s who                                        SYSTEM
                                                               (IT MECHANISM)




      Core business/services   Professional service provider (based from
                                programme outcome outlined by MQA)
a. Building design                ARCHITECT
b.   Engineering/Structure/Infra. ENGINEER
c.   Cost and contract admin.     QUANTITY SURVEYOR
d.   Valuation and estate agent   VALUATION SURVEYOR
e.   Town and regional planning   TOWN PLANNER
f.   Lanscape                     LANDSCAPE ARCHITECT
g.   Land survey                  LAND SURVEYOR
h.   Interior design              INTERIOR ARCHITECTURE
i.   Building control/performance BUILDING SURVEYOR


                          - ALL OF US -
CASE STUDY: UKM SOLUTION                              HUMAN
                                                                               BUSSINESS
                                                                                PROCESS



Maintenance Approach of UKM                                      HOW




                                                                  SYSTEM
                                                              (IT MECHANISM)


       Reactive Maintenance
       “Run it until it breaks”

                                  Preventive Maintenance
                                  “Scheduled or planned
                                  maintenance”



                                       Predictive
                                       Maintenance
                                       “Strives to detect
                                       failures before they
                                       occur with testing”
                          Reliability Centered
                          Maintenance
                           “Based on assessment of
                          condition and serviced in context
                          to operating requirements”
CASE STUDY: UKM SOLUTION
Maintenance Approach of UKM
To strive maintenance management towards
excellence through Best Practices




                               The move in practice can
                               only be realized with a very
                               experience embedded
                               system (in this case we are
                               using WebTMA)
CASE STUDY: UKM SOLUTION
Maintenance Approach of UKM
Some Key Benefits And Advantages Are As Follows :

Extend the Useful Life of Assets.
    • Reduced assets/facilities/equipment down time through
      improved scheduling.
    • Improved reliability through better tracking and repair of
      failures.
    • Allows staff to be proactive through automatically
      generated preventive maintenance.

Efficiency in Inventory.
     • Reduce inventories needs 15% to 20%.
     • Reduced inventory costs through better tracking and
       restocking process.
     • Control of material ordering reduces stock costs.
CASE STUDY: UKM SOLUTION
Maintenance Approach of UKM
Some Key Benefits And Advantages Are As Follows :

Preventive Maintenance.
   • Extend the useful life of equipment.
   • Keep maintenance jobs to a minimum number.
   • Increase reliability of equipment and systems.
   • Provide adequate justification to regulatory agencies.

Benchmarking / KPI / KRA
   • Increase management feasibility through benchmarking
     and KPI (Key Performance Index).
   • Better understanding though KRA (Key Area Analysis)
     and pin-point of areas need for improvement.
   • Preparation of budgeting and cost projection for yearly
     actual budgeting projection.
CASE STUDY: UKM SOLUTION
    Maintenance Approach of UKM
    Prevailing Elements From Keywords Translated To
    Ideas In Generating Value Proposition
    KEYWORDS                        ELEMENTS                                         IDEAS
                       Facility management practice in Malaysia is       Knowledge database of experience
                       still in developing stage if not infant.          in managing facilities based on
HELP AND FACILITATE    Facilitating best practices are very much         business best practices based on
                       needed to ensure a proper practices in place.     others’ experiences.




                       To ensure a progressive and systematic            Provide consultancy services on
    AWARENESS          facilitation, awareness creation must be put in   facility management
                       place in full and categorically.



                      Years of practicing traditional method in
                      managing assets still prevails until unexpected    Provide option on ways to counter
CHALLENGES AND        incidences occurred. Forging ahead in              issues to manage and contain
 SUSTAINABILITY       countering challenges and sustain stability will   challenges and to sustain them
                      require a mind-set change backed by best           thereafter.
                      practices



  STANDARD AND         Standard and performance will facilitate          Assured Solution to maintain
  PERFORMANCE          sustainability of best practices.                 standard and performance
CASE STUDY: UKM SOLUTION
     Maintenance Approach of UKM
    Painting The Picture Clearer – Typical Current Practice
   Assuming Facility Manager Request For Maintenance or Services
   From Maintenance and Services Contractor(s)
 Buy Side
                                                        The Request requires the maintenance
Facility Manager                 Maintenance            contractor to procure parts and labour with
                                                        certain level of expertise Of which they do not
                                  Contractor            have

                                                          • The Contractor will need to procure
                                                            parts and material
                   Demand and Time = Money                • The contractor need to engage a
                                                            specific labour



         Delivery Of Work – May Necessary On Time at The Most Optimal Cost          Why ?
                                                                                    • The Maintenance Contractor
                                                                                     may just go for one parts
Parts Supplier      Special Labour    Performance      Completion Of                 supplier – Issue on the best
Supply              Engaged           Of Work          Work And                      price
                                                       Delivery
                                                                                    • Labour will hike the price as
                                                                                     due to speciality requirement

  Urgent             Specialty         Time                                         • Time is of essence – urgency
 Demand               Based           Factor                                         will naturally hike the price

Based Price            Fees
CASE STUDY: UKM SOLUTION
    Maintenance Approach of UKM
    Painting The Picture Clearer – Portal Based Idea

    Assuming Facility Manager Request For Maintenance or Services
    From Maintenance and Services Contractor(s)             Register as user by
                                                                      subscribing to the portal
                                                                       and access via system
Maintenance                             Select the Best Maintenance          download
                    Register their
Contractors         Value Services
                                        Contractor For The Job
                                        From The Portal                  Department of
                    in the Portal and
                    access the                                            Development
                                                 Knowledge
Parts Suppliers     portal via                                          Management (JPP)
                    system                      Best Practice
                    download

Assets Supplier
                    Provide Price               Facility
                    List ,
                                              Management                                UKM
Vendors             Task Listing ,              Portal
                    Capabilities,
                                              Business Process
Education Outfit    Locations
                                            System and Solution
                    Certifications

Technician and      Etc..
Engineers                                                               System Download
CASE STUDY: UKM SOLUTION
  Maintenance Approach of UKM
  Future Prospect Roadmap
Awareness                     Utilize                             Capitalize
                                                                  Practices based on
                                                                  actual Data
                              Shall Begin to
                              realize the full
• Promotion                   benefit                          Ability to fully practice FM best
• Members Recruitment                                           practices and perhaps able to
•Trial Stage                                                   market services out of the UKM
• Put Action To Test
• Online Articles    Begin to execute transactions.
                         Members actively participate in the
                                   value chain



    Set-up FM Portal filled with
  Knowledge Enrichment and Best
   Practice. Get stakeholders to
             participate

                                                                         …and to leapfrog

                                    UKM is now here
Thank you very much
 adiirfan@gmail.com

Mais conteúdo relacionado

Mais procurados

Bim Presentation
Bim PresentationBim Presentation
Bim Presentationrsalbin
 
Role of bim in modular construction converted
 Role of bim in modular construction converted Role of bim in modular construction converted
Role of bim in modular construction convertedTesla Outsourcing
 
Green Building Index
Green Building IndexGreen Building Index
Green Building IndexEraz
 
Lean construction & BIM
Lean construction & BIMLean construction & BIM
Lean construction & BIMStephen Au
 
Risk and uncertainty in construction projects
Risk and uncertainty in construction projectsRisk and uncertainty in construction projects
Risk and uncertainty in construction projectsSameer Nawab
 
Advanced technologies 2
Advanced technologies 2Advanced technologies 2
Advanced technologies 2hlksd
 
Construction Technology I Presentation Slides
Construction Technology I Presentation SlidesConstruction Technology I Presentation Slides
Construction Technology I Presentation SlidesJiaYu36
 
Value management presentation
Value management presentationValue management presentation
Value management presentationKoh Chiun Liang
 
Building as a system
Building as a systemBuilding as a system
Building as a systemAyesha Sattar
 
Lecture 1 Introduction to Procurement and contract Management Management - Co...
Lecture 1 Introduction to Procurement and contract Management Management - Co...Lecture 1 Introduction to Procurement and contract Management Management - Co...
Lecture 1 Introduction to Procurement and contract Management Management - Co...axmedbaasaay
 
SSL, FFL, SFL Abbreviations
SSL, FFL, SFL AbbreviationsSSL, FFL, SFL Abbreviations
SSL, FFL, SFL AbbreviationsEhlelt Mancha
 
Construction Safety Management
Construction Safety ManagementConstruction Safety Management
Construction Safety ManagementGAURAV. H .TANDON
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - BriefKai Yun Pang
 
Construction phases
Construction phasesConstruction phases
Construction phasesMeesum Zaidi
 

Mais procurados (20)

Bim Presentation
Bim PresentationBim Presentation
Bim Presentation
 
Role of bim in modular construction converted
 Role of bim in modular construction converted Role of bim in modular construction converted
Role of bim in modular construction converted
 
Refurbishment
RefurbishmentRefurbishment
Refurbishment
 
Green Building Index
Green Building IndexGreen Building Index
Green Building Index
 
Lean construction & BIM
Lean construction & BIMLean construction & BIM
Lean construction & BIM
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Risk and uncertainty in construction projects
Risk and uncertainty in construction projectsRisk and uncertainty in construction projects
Risk and uncertainty in construction projects
 
Advanced technologies 2
Advanced technologies 2Advanced technologies 2
Advanced technologies 2
 
Construction Technology I Presentation Slides
Construction Technology I Presentation SlidesConstruction Technology I Presentation Slides
Construction Technology I Presentation Slides
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
 
Value management presentation
Value management presentationValue management presentation
Value management presentation
 
Construction Management - New Trends
Construction Management - New TrendsConstruction Management - New Trends
Construction Management - New Trends
 
klcc
klccklcc
klcc
 
Building as a system
Building as a systemBuilding as a system
Building as a system
 
Lecture 1 Introduction to Procurement and contract Management Management - Co...
Lecture 1 Introduction to Procurement and contract Management Management - Co...Lecture 1 Introduction to Procurement and contract Management Management - Co...
Lecture 1 Introduction to Procurement and contract Management Management - Co...
 
SSL, FFL, SFL Abbreviations
SSL, FFL, SFL AbbreviationsSSL, FFL, SFL Abbreviations
SSL, FFL, SFL Abbreviations
 
Construction Safety Management
Construction Safety ManagementConstruction Safety Management
Construction Safety Management
 
Bim service presentation
Bim service presentationBim service presentation
Bim service presentation
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
Construction phases
Construction phasesConstruction phases
Construction phases
 

Destaque

Defective Construction Work
Defective Construction WorkDefective Construction Work
Defective Construction WorkAdiirfan Che-ani
 
Building condition survey whats more
Building condition survey whats moreBuilding condition survey whats more
Building condition survey whats moreAdiirfan Che-ani
 
Journal Writing: Lets Start
Journal Writing: Lets StartJournal Writing: Lets Start
Journal Writing: Lets StartAdiirfan Che-ani
 
Thesis the impact of total preventive maintenance on kanban system to buss...
Thesis   the impact  of total preventive maintenance on kanban system to buss...Thesis   the impact  of total preventive maintenance on kanban system to buss...
Thesis the impact of total preventive maintenance on kanban system to buss...Su darjo
 
Bussiness continuity
Bussiness continuityBussiness continuity
Bussiness continuityatharabbas
 
Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)Manu Alias
 
leed certified buildings examplsPresentation team work
leed certified buildings examplsPresentation team workleed certified buildings examplsPresentation team work
leed certified buildings examplsPresentation team workgatti Teja
 
45084928 bussiness-plan
45084928 bussiness-plan45084928 bussiness-plan
45084928 bussiness-planPratik Agal
 

Destaque (20)

Fm getting online
Fm getting onlineFm getting online
Fm getting online
 
Mpam 3 basic steps
Mpam 3 basic stepsMpam 3 basic steps
Mpam 3 basic steps
 
Defective Construction Work
Defective Construction WorkDefective Construction Work
Defective Construction Work
 
Building condition survey whats more
Building condition survey whats moreBuilding condition survey whats more
Building condition survey whats more
 
BS M'sia
BS M'siaBS M'sia
BS M'sia
 
Taklimat ifolio pelajar
Taklimat ifolio pelajarTaklimat ifolio pelajar
Taklimat ifolio pelajar
 
bs:copbs101
bs:copbs101bs:copbs101
bs:copbs101
 
GBI: Role of BS
GBI: Role of BSGBI: Role of BS
GBI: Role of BS
 
BS course bldg diagnostic
BS course bldg diagnosticBS course bldg diagnostic
BS course bldg diagnostic
 
Journal Writing: Lets Start
Journal Writing: Lets StartJournal Writing: Lets Start
Journal Writing: Lets Start
 
twintech wshop2-main ppt
twintech wshop2-main ppttwintech wshop2-main ppt
twintech wshop2-main ppt
 
Building Analysis-1
Building Analysis-1Building Analysis-1
Building Analysis-1
 
twintech wshop1-main ppt
twintech wshop1-main ppttwintech wshop1-main ppt
twintech wshop1-main ppt
 
Thesis the impact of total preventive maintenance on kanban system to buss...
Thesis   the impact  of total preventive maintenance on kanban system to buss...Thesis   the impact  of total preventive maintenance on kanban system to buss...
Thesis the impact of total preventive maintenance on kanban system to buss...
 
Cesmed presentation [22]
Cesmed presentation [22]Cesmed presentation [22]
Cesmed presentation [22]
 
Bussiness continuity
Bussiness continuityBussiness continuity
Bussiness continuity
 
Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)
 
leed certified buildings examplsPresentation team work
leed certified buildings examplsPresentation team workleed certified buildings examplsPresentation team work
leed certified buildings examplsPresentation team work
 
BS Role
BS RoleBS Role
BS Role
 
45084928 bussiness-plan
45084928 bussiness-plan45084928 bussiness-plan
45084928 bussiness-plan
 

Semelhante a Sustainable in asset management

Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationArul Nambi
 
Architecture solution architecture method
Architecture solution architecture methodArchitecture solution architecture method
Architecture solution architecture methodChris Eaton
 
Systems engineering for project managers - what you need to know
Systems engineering for project managers - what you need to knowSystems engineering for project managers - what you need to know
Systems engineering for project managers - what you need to knowAssociation for Project Management
 
Obeo thales@md day2011
Obeo thales@md day2011Obeo thales@md day2011
Obeo thales@md day2011MDDAY11
 
Auto DCR building plan approval-nov2012
Auto DCR building plan approval-nov2012Auto DCR building plan approval-nov2012
Auto DCR building plan approval-nov2012SoftTech Engineers
 
101206 intelligent buildings
101206 intelligent buildings101206 intelligent buildings
101206 intelligent buildingsMartijn Moerbeek
 
IFS Company Overview
IFS Company OverviewIFS Company Overview
IFS Company Overviewdaeager
 
IFS Marget Segment Overview
IFS Marget Segment OverviewIFS Marget Segment Overview
IFS Marget Segment Overviewdaeager
 
Bryan.moser
Bryan.moserBryan.moser
Bryan.moserNASAPMC
 
Bryan.moser
Bryan.moserBryan.moser
Bryan.moserNASAPMC
 
Making New Product Launches Successful: ERP and Supply Chain Strategies
Making New Product Launches Successful: ERP and Supply Chain StrategiesMaking New Product Launches Successful: ERP and Supply Chain Strategies
Making New Product Launches Successful: ERP and Supply Chain StrategiesLouis Columbus
 
Holly Carreras Resume Pic
Holly Carreras Resume PicHolly Carreras Resume Pic
Holly Carreras Resume Pichollynamed
 
Overcoming Cost Intransparency of Cloud Computing
Overcoming Cost Intransparency of Cloud ComputingOvercoming Cost Intransparency of Cloud Computing
Overcoming Cost Intransparency of Cloud ComputingNane Kratzke
 
Gilb project management driven by the top ten critical improvements quantifie...
Gilb project management driven by the top ten critical improvements quantifie...Gilb project management driven by the top ten critical improvements quantifie...
Gilb project management driven by the top ten critical improvements quantifie...tom gilb
 
BimStorm Intro
BimStorm Intro BimStorm Intro
BimStorm Intro KimonOnuma
 

Semelhante a Sustainable in asset management (20)

Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Architecture solution architecture method
Architecture solution architecture methodArchitecture solution architecture method
Architecture solution architecture method
 
Systems engineering for project managers - what you need to know
Systems engineering for project managers - what you need to knowSystems engineering for project managers - what you need to know
Systems engineering for project managers - what you need to know
 
Obeo thales@md day2011
Obeo thales@md day2011Obeo thales@md day2011
Obeo thales@md day2011
 
Auto DCR building plan approval-nov2012
Auto DCR building plan approval-nov2012Auto DCR building plan approval-nov2012
Auto DCR building plan approval-nov2012
 
2 effra roadmap-decubber
2 effra roadmap-decubber2 effra roadmap-decubber
2 effra roadmap-decubber
 
101206 intelligent buildings
101206 intelligent buildings101206 intelligent buildings
101206 intelligent buildings
 
IFS Company Overview
IFS Company OverviewIFS Company Overview
IFS Company Overview
 
IFS Marget Segment Overview
IFS Marget Segment OverviewIFS Marget Segment Overview
IFS Marget Segment Overview
 
Bryan.moser
Bryan.moserBryan.moser
Bryan.moser
 
Bryan.moser
Bryan.moserBryan.moser
Bryan.moser
 
12 action plant-and_fines-decubber
12 action plant-and_fines-decubber12 action plant-and_fines-decubber
12 action plant-and_fines-decubber
 
Spm2
Spm2Spm2
Spm2
 
Bim And Consulting 120720
Bim And Consulting 120720Bim And Consulting 120720
Bim And Consulting 120720
 
Military Critical Infrastructure: GeoReadiness
Military Critical Infrastructure: GeoReadinessMilitary Critical Infrastructure: GeoReadiness
Military Critical Infrastructure: GeoReadiness
 
Making New Product Launches Successful: ERP and Supply Chain Strategies
Making New Product Launches Successful: ERP and Supply Chain StrategiesMaking New Product Launches Successful: ERP and Supply Chain Strategies
Making New Product Launches Successful: ERP and Supply Chain Strategies
 
Holly Carreras Resume Pic
Holly Carreras Resume PicHolly Carreras Resume Pic
Holly Carreras Resume Pic
 
Overcoming Cost Intransparency of Cloud Computing
Overcoming Cost Intransparency of Cloud ComputingOvercoming Cost Intransparency of Cloud Computing
Overcoming Cost Intransparency of Cloud Computing
 
Gilb project management driven by the top ten critical improvements quantifie...
Gilb project management driven by the top ten critical improvements quantifie...Gilb project management driven by the top ten critical improvements quantifie...
Gilb project management driven by the top ten critical improvements quantifie...
 
BimStorm Intro
BimStorm Intro BimStorm Intro
BimStorm Intro
 

Último

Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...
Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...
Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...asmaqueen5
 
call girls in lajapat nagar 9811711561/..
call girls in lajapat nagar 9811711561/..call girls in lajapat nagar 9811711561/..
call girls in lajapat nagar 9811711561/..vikas rana
 
:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...
:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...
:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...lizamodels9
 
Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️soniya singh
 
Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...delhimodel235
 
Call Girls in laxmi Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts Se...
Call Girls in laxmi Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts Se...Call Girls in laxmi Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts Se...
Call Girls in laxmi Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts Se...delhimodel235
 
Premium Villa Projects in Sarjapur Road Bengaluru
Premium Villa Projects in Sarjapur Road BengaluruPremium Villa Projects in Sarjapur Road Bengaluru
Premium Villa Projects in Sarjapur Road BengaluruShivaSeo3
 
Call Girls in Noida Sector 77 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 77 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...Call Girls in Noida Sector 77 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 77 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...delhimodel235
 
2k Shot Call girls Karol Bagh Delhi 9205541914
2k Shot Call girls Karol Bagh Delhi 92055419142k Shot Call girls Karol Bagh Delhi 9205541914
2k Shot Call girls Karol Bagh Delhi 9205541914Delhi Call girls
 
Aparna Greenscapes Kompally Hyderabad E - Brochure.pdf
Aparna Greenscapes Kompally Hyderabad E - Brochure.pdfAparna Greenscapes Kompally Hyderabad E - Brochure.pdf
Aparna Greenscapes Kompally Hyderabad E - Brochure.pdffaheemali990101
 
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhi
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In DelhiCall Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhi
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhiasmaqueen5
 
Pooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired Fantasies
Pooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired FantasiesPooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired Fantasies
Pooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired FantasiesPooja Nehwal
 
Rustomjee Cleon Bandra East, Mumbai - Brochure.pdf
Rustomjee Cleon Bandra East, Mumbai - Brochure.pdfRustomjee Cleon Bandra East, Mumbai - Brochure.pdf
Rustomjee Cleon Bandra East, Mumbai - Brochure.pdfmonikasharma630
 
Nanke Area Estate commercial ( Dir. Kat Kuo)
Nanke Area Estate commercial ( Dir. Kat Kuo)Nanke Area Estate commercial ( Dir. Kat Kuo)
Nanke Area Estate commercial ( Dir. Kat Kuo)jessica288382
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | GurgaonFULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaonsoniya singh
 
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCR
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCRGirls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCR
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCRasmaqueen5
 
How to Build Multifamily and Laneway Suites in Toronto!! (feat. Expert Archi...
How to Build Multifamily and Laneway Suites  in Toronto!! (feat. Expert Archi...How to Build Multifamily and Laneway Suites  in Toronto!! (feat. Expert Archi...
How to Build Multifamily and Laneway Suites in Toronto!! (feat. Expert Archi...Volition Properties
 
Sankla East World Hadapsar Pune E-Brochure.pdf
Sankla East World Hadapsar Pune  E-Brochure.pdfSankla East World Hadapsar Pune  E-Brochure.pdf
Sankla East World Hadapsar Pune E-Brochure.pdfManishSaxena95
 

Último (20)

VIP Escorts in Delhi:🔝9953056974🔝 Hot Qutub Minar Delhi Escorts Service
VIP Escorts in Delhi:🔝9953056974🔝 Hot Qutub Minar Delhi Escorts ServiceVIP Escorts in Delhi:🔝9953056974🔝 Hot Qutub Minar Delhi Escorts Service
VIP Escorts in Delhi:🔝9953056974🔝 Hot Qutub Minar Delhi Escorts Service
 
Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...
Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...
Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...
 
call girls in lajapat nagar 9811711561/..
call girls in lajapat nagar 9811711561/..call girls in lajapat nagar 9811711561/..
call girls in lajapat nagar 9811711561/..
 
:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...
:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...
:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...
 
Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝
 
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
 
Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
 
Call Girls in laxmi Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts Se...
Call Girls in laxmi Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts Se...Call Girls in laxmi Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts Se...
Call Girls in laxmi Nagar Delhi 💯Call Us 🔝 9582086666🔝 South Delhi Escorts Se...
 
Premium Villa Projects in Sarjapur Road Bengaluru
Premium Villa Projects in Sarjapur Road BengaluruPremium Villa Projects in Sarjapur Road Bengaluru
Premium Villa Projects in Sarjapur Road Bengaluru
 
Call Girls in Noida Sector 77 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 77 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...Call Girls in Noida Sector 77 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 77 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
 
2k Shot Call girls Karol Bagh Delhi 9205541914
2k Shot Call girls Karol Bagh Delhi 92055419142k Shot Call girls Karol Bagh Delhi 9205541914
2k Shot Call girls Karol Bagh Delhi 9205541914
 
Aparna Greenscapes Kompally Hyderabad E - Brochure.pdf
Aparna Greenscapes Kompally Hyderabad E - Brochure.pdfAparna Greenscapes Kompally Hyderabad E - Brochure.pdf
Aparna Greenscapes Kompally Hyderabad E - Brochure.pdf
 
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhi
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In DelhiCall Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhi
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhi
 
Pooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired Fantasies
Pooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired FantasiesPooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired Fantasies
Pooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired Fantasies
 
Rustomjee Cleon Bandra East, Mumbai - Brochure.pdf
Rustomjee Cleon Bandra East, Mumbai - Brochure.pdfRustomjee Cleon Bandra East, Mumbai - Brochure.pdf
Rustomjee Cleon Bandra East, Mumbai - Brochure.pdf
 
Nanke Area Estate commercial ( Dir. Kat Kuo)
Nanke Area Estate commercial ( Dir. Kat Kuo)Nanke Area Estate commercial ( Dir. Kat Kuo)
Nanke Area Estate commercial ( Dir. Kat Kuo)
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | GurgaonFULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
 
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCR
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCRGirls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCR
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCR
 
How to Build Multifamily and Laneway Suites in Toronto!! (feat. Expert Archi...
How to Build Multifamily and Laneway Suites  in Toronto!! (feat. Expert Archi...How to Build Multifamily and Laneway Suites  in Toronto!! (feat. Expert Archi...
How to Build Multifamily and Laneway Suites in Toronto!! (feat. Expert Archi...
 
Sankla East World Hadapsar Pune E-Brochure.pdf
Sankla East World Hadapsar Pune  E-Brochure.pdfSankla East World Hadapsar Pune  E-Brochure.pdf
Sankla East World Hadapsar Pune E-Brochure.pdf
 

Sustainable in asset management

  • 1.
  • 2. SUSTAINABILITY IN ASSET MANAGEMENT: The Practical Approach Presenter: A.I.Che-Ani Team : W.H.W.Badaruzzaman T.Z.T.Mahmood M.S.I.Syahrial UKM Perunding Kejuruteraan dan Arkitek Sdn. Bhd.
  • 3. WHAT IS SUSTAINABLE ASSET MANAGEMENT? Manage asset in sustainable way means reuse, recycle, maintain, fixing, avoid waste, upgrade so that maintenance can be optimize while minimizing their impact on environment. In short, the paradigm of “cradle to the grave” Among the purpose: a. to reduce maintenance cost and improve service b. minimize impact on environment Asset refers: a. Aset Alih b. Aset Tak Alih c. Aset Hidup d. Harta Intelek
  • 4. The government hope via TAM PERANCANGAN PERANCANGAN TAM model for PELUPUSAN REKA BENTUK PEWUJUDAN ASET infrastructure/ PEMULIHAN & building assets PENGURUSAN NAIK TARAF PEROLEHAN PRESTASI FAEDAH ASET YANG OPTIMUM PENILAIAN PEMBINAAN OPERASI & PENTAULIAHAN SENGGARA PENERIMAAN PENGURUSAN NILAI & RISIKO
  • 5. BUSSINESS HUMAN PROCESS HOW? SYSTEM (IT MECHANISM) Asset life cycle Architectural Engineering Construction Operation Building Performance Evaluation
  • 6. Effectiveness review Market/need analysis Program Planning Programm ing review Feed forward into Building Recycle Performance Design next building Criteria cycle Post - Post occupancy occupancy Design construction evaluation evaluation review Commissioning Building Performance Evaluation
  • 7. BUSSINESS HUMAN PROCESS HOW SYSTEM (IT MECHANISM) CONSTRUCTION OPERATIONS BUILDING INFORMATION EXCHANGE (COBIE) : a FOUNDATION for sustainable facilities
  • 8. Problem HUMAN BUSSINESS PROCESS Building Documentation Is Fragmented HOW Construction Operations & Maintenance submittals in unorganized, usable format SYSTEM (IT MECHANISM) Results 1. Data quickly lost 2. Poor preventive maintenance 3. More costly repairs 4. Warranties not maintained or lost Adverse impact on mission of the building occupant
  • 9. COBIE/ BIM FOR LIFE LIFE- CYCLE HUMAN BUSSINESS PROCESS INFORMATION MANAGEMENT HOW SYSTEM (IT MECHANISM)
  • 10. CRITICAL DATA LOST IN HUMAN BUSSINESS PROCESS BUILDING PROCESS HOW 1. Decisions made as ideas & parts are SYSTEM (IT MECHANISM) transformed into designs & buildings are not captured 1. Translation of information for downstream use looses much of what is known during the previous phase
  • 11. COBIE GOALS HUMAN BUSSINESS PROCESS HOW 1. capture product, equipment, system, SYSTEM and warranty data as created during (IT MECHANISM) construction 2. transfer to maintainer’s, operator’s, and asset manager’s systems. 3. produce format and specification 4. demonstrate software for captured during construction and exchange with commercial software
  • 12. WHAT COBIE DOES . . . HUMAN BUSSINESS PROCESS HOW 1. gather information during construction submittal SYSTEM (IT MECHANISM) 2. define min. required information submittals to verify performance 3. direct import to CMMS’s 4. integration with building space model Transfer information not e-paper existing contract exchange points
  • 13. MEASURING COBIE RESULTS . . . HUMAN BUSSINESS PROCESS • costs less to create & manage than HOW current paper/e- paper methods SYSTEM (IT MECHANISM) • easy & authorized access to capture, use, and review information • information captured as work is being accomplished • acceptable to all tiers of contractors, suppliers, subs, etc.. • requirements are clearly identified in specifications • use existing legal framework (i.e. deliverables/contracts) • demonstrate framework for exchange/retrieval • import of data included in commercial systems • import users all data provided
  • 14. PREVAILING BUSINESS CASE – The Nature of The Business Space Every Business Begins With An Investment in Assets or Infrastructure. Example as Follows : # Nature Of Business Infrastructure Primary Returns Secondary Returns 1 Healthcare Hospitals Medical Fees and other fees The Value of the Healthcare related to Healthcare company 2 Education Schools, Universities Student fees , Boarding Fees The Value of the Company, etc.. appreciated value of the assets 3 Properties Accommodations, Office space Rental and Service Fees Appreciated value over time, and surrounding support out-right sales of the properties infrastructures 4 Government Infrastructures Al types of government offices, Services rendered to citizens Via extended useful life of the living quarters, parks and utilities from taxes, quit rents, assets assessments etc.. 5 Manufacturing Plants and machineries Goods produced from plants The Value of the assets based and machineries on the efficient use of the plants and machineries 6 Other Types Of General Assets, specialized Services rendered to customers Extended value of the company Businesses. Eg equipments and mobile based on ability to sustain Telecommunications, infrastructures / assets services rendered Utilities and others 7 Passive Property Properties Rental Yield Incremental Value Investment
  • 15. PREVAILING BUSINESS CASE – The Keyword is Building Infrastructures All development starts with development and construction involving an investor and builders. Other parties, mainly be, supporting professionals and authorities. Planning Approval CAPITAL Investment Construction EXPENDITURE Value Equipments Non Mechanical Assets M&E Development Architects Engineers The Property(s) Stages Civil Engineers Suppliers and Installers Authorities Contractors Authorities COMPLETION
  • 16. PREVAILING BUSINESS CASE – Investment Ready for Stream Of Returns Once construction completes, revenue stream will start , but with it also operational cost which is divided into two main categories, fixed and variable. Where variable is total cost to maintain the developed properties Return Stream Revenue Generated From The Assets REVENUE Net Revenue Fixed Cost Operation Cost Minor Repairs (COST) Usage Issue Vandalism Equipment Faults Cost Incurred To Operate Breakdowns The Assets Variable Cost
  • 17. PREVAILING BUSINESS CASE – Combining Investment Development and Stream Of Returns When both stages combined the issues became noticeable. Investment Cost Investment Returns Monitor Investment Ensuring Sustainable Expenditure Return Cost Related To Monitor Project Cost Upkeep Of The Property(s) The issue: Cost Of Maintenance
  • 18. BUSSINESS HUMAN PROCESS HOW SYSTEM (IT MECHANISM)
  • 19. BUSSINESS HUMAN PROCESS HOW SYSTEM (IT MECHANISM)
  • 20. BUSSINESS HUMAN PROCESS HOW SYSTEM (IT MECHANISM) Example Of Maintenance Management Failure… The Star 28th April 2009
  • 21. BUSSINESS HUMAN PROCESS HOW SYSTEM (IT MECHANISM) Example Of Maintenance Management Failure… The Star 28th April 2009
  • 22. BUSSINESS HUMAN PROCESS HOW SYSTEM (IT MECHANISM) Example Of Maintenance Management Failure… The Star 28th April 2009
  • 23. BUSSINESS HUMAN PROCESS HOW SYSTEM (IT MECHANISM) It wasn’t hit by the massive earthquake. In true fashion of the Ripley Legacy, it was built to reflect the odd 1812 earthquake that measured 8.0 on the rick. The building has now become one of the most photographed in the world.
  • 24. PREVAILING BUSINESS CASE HUMAN BUSSINESS PROCESS HOW SYSTEM (IT MECHANISM) Return Stream THE BEST WAY TO HANDLE THIS ISSUE IS TO PLAN MAINTENANCE MANAGEMENT EARLY BY WAY OF THE RIGHT STRATEGY USING CMMS AS THE TOOL. WHICH IS WHAT WE DO …. COMPUTERIZED Simple Repair MAINTENANCE Operation Cost Major Failure Major Replacement MANAGEMENT SOLUTION (CMMS) Equipment Failure Other types of damages
  • 25. PREVAILING BUSINESS CASE HUMAN BUSSINESS PROCESS – The result in having a good CMMS would simply be HOW managed cost, keeping customer satisfaction level high hence sustainable revenue with extended life SYSTEM cycle of asset…This is something investor willing to (IT MECHANISM) pay for. Return Stream THE BENEFIT Customer Satisfaction 1. Translate to reduce and level high manageable maintenance cost 2. Better profit margin 3. Sustained to incremental asset value HOW Better cost control through 1. Deployment of appropriate good CMMS solution Operation Cost corrective maintenance 2. Well planned preventive maintenance 3. Accurate predictive maintenance
  • 26. BUSSINESS HUMAN PROCESS Human aspect in implementing the HOW idea (with reflect to malaysian construction industry) SYSTEM (IT MECHANISM) Core business/services Professional service provider (based from programme outcome outlined by MQA) a. Building design ARCHITECT b. Engineering/Structure/Infra. ENGINEER c. Cost and contract admin. QUANTITY SURVEYOR d. Valuation and estate agent VALUATION SURVEYOR e. Town and regional planning TOWN PLANNER f. Lanscape LANDSCAPE ARCHITECT g. Land survey LAND SURVEYOR h. Interior design INTERIOR ARCHITECTURE i. Building control/performance BUILDING SURVEYOR One man show....does it really work??
  • 27. BUSSINESS HUMAN PROCESS Sustainable asset HOW management...who’s who SYSTEM (IT MECHANISM) Core business/services Professional service provider (based from programme outcome outlined by MQA) a. Building design ARCHITECT b. Engineering/Structure/Infra. ENGINEER c. Cost and contract admin. QUANTITY SURVEYOR d. Valuation and estate agent VALUATION SURVEYOR e. Town and regional planning TOWN PLANNER f. Lanscape LANDSCAPE ARCHITECT g. Land survey LAND SURVEYOR h. Interior design INTERIOR ARCHITECTURE i. Building control/performance BUILDING SURVEYOR - ALL OF US -
  • 28. CASE STUDY: UKM SOLUTION HUMAN BUSSINESS PROCESS Maintenance Approach of UKM HOW SYSTEM (IT MECHANISM) Reactive Maintenance “Run it until it breaks” Preventive Maintenance “Scheduled or planned maintenance” Predictive Maintenance “Strives to detect failures before they occur with testing” Reliability Centered Maintenance “Based on assessment of condition and serviced in context to operating requirements”
  • 29. CASE STUDY: UKM SOLUTION Maintenance Approach of UKM To strive maintenance management towards excellence through Best Practices The move in practice can only be realized with a very experience embedded system (in this case we are using WebTMA)
  • 30. CASE STUDY: UKM SOLUTION Maintenance Approach of UKM Some Key Benefits And Advantages Are As Follows : Extend the Useful Life of Assets. • Reduced assets/facilities/equipment down time through improved scheduling. • Improved reliability through better tracking and repair of failures. • Allows staff to be proactive through automatically generated preventive maintenance. Efficiency in Inventory. • Reduce inventories needs 15% to 20%. • Reduced inventory costs through better tracking and restocking process. • Control of material ordering reduces stock costs.
  • 31. CASE STUDY: UKM SOLUTION Maintenance Approach of UKM Some Key Benefits And Advantages Are As Follows : Preventive Maintenance. • Extend the useful life of equipment. • Keep maintenance jobs to a minimum number. • Increase reliability of equipment and systems. • Provide adequate justification to regulatory agencies. Benchmarking / KPI / KRA • Increase management feasibility through benchmarking and KPI (Key Performance Index). • Better understanding though KRA (Key Area Analysis) and pin-point of areas need for improvement. • Preparation of budgeting and cost projection for yearly actual budgeting projection.
  • 32. CASE STUDY: UKM SOLUTION Maintenance Approach of UKM Prevailing Elements From Keywords Translated To Ideas In Generating Value Proposition KEYWORDS ELEMENTS IDEAS Facility management practice in Malaysia is Knowledge database of experience still in developing stage if not infant. in managing facilities based on HELP AND FACILITATE Facilitating best practices are very much business best practices based on needed to ensure a proper practices in place. others’ experiences. To ensure a progressive and systematic Provide consultancy services on AWARENESS facilitation, awareness creation must be put in facility management place in full and categorically. Years of practicing traditional method in managing assets still prevails until unexpected Provide option on ways to counter CHALLENGES AND incidences occurred. Forging ahead in issues to manage and contain SUSTAINABILITY countering challenges and sustain stability will challenges and to sustain them require a mind-set change backed by best thereafter. practices STANDARD AND Standard and performance will facilitate Assured Solution to maintain PERFORMANCE sustainability of best practices. standard and performance
  • 33. CASE STUDY: UKM SOLUTION Maintenance Approach of UKM Painting The Picture Clearer – Typical Current Practice Assuming Facility Manager Request For Maintenance or Services From Maintenance and Services Contractor(s) Buy Side The Request requires the maintenance Facility Manager Maintenance contractor to procure parts and labour with certain level of expertise Of which they do not Contractor have • The Contractor will need to procure parts and material Demand and Time = Money • The contractor need to engage a specific labour Delivery Of Work – May Necessary On Time at The Most Optimal Cost Why ? • The Maintenance Contractor may just go for one parts Parts Supplier Special Labour Performance Completion Of supplier – Issue on the best Supply Engaged Of Work Work And price Delivery • Labour will hike the price as due to speciality requirement Urgent Specialty Time • Time is of essence – urgency Demand Based Factor will naturally hike the price Based Price Fees
  • 34. CASE STUDY: UKM SOLUTION Maintenance Approach of UKM Painting The Picture Clearer – Portal Based Idea Assuming Facility Manager Request For Maintenance or Services From Maintenance and Services Contractor(s) Register as user by subscribing to the portal and access via system Maintenance Select the Best Maintenance download Register their Contractors Value Services Contractor For The Job From The Portal Department of in the Portal and access the Development Knowledge Parts Suppliers portal via Management (JPP) system Best Practice download Assets Supplier Provide Price Facility List , Management UKM Vendors Task Listing , Portal Capabilities, Business Process Education Outfit Locations System and Solution Certifications Technician and Etc.. Engineers System Download
  • 35. CASE STUDY: UKM SOLUTION Maintenance Approach of UKM Future Prospect Roadmap Awareness Utilize Capitalize Practices based on actual Data Shall Begin to realize the full • Promotion benefit Ability to fully practice FM best • Members Recruitment practices and perhaps able to •Trial Stage market services out of the UKM • Put Action To Test • Online Articles Begin to execute transactions. Members actively participate in the value chain Set-up FM Portal filled with Knowledge Enrichment and Best Practice. Get stakeholders to participate …and to leapfrog UKM is now here
  • 36. Thank you very much adiirfan@gmail.com