SlideShare uma empresa Scribd logo
1 de 124
SURVEYING
Introduction
Introduction to Surveying
►Definition:
Surveying is the science and art of
determining the relative positions of points
above, on, or beneath the earth’s surface
and locating the points in the field.
The work of the surveyor
consists of 5 phases:
1. Decision Making – selecting method, equipment and
final point locations.
2. Fieldwork & Data Collection – making measurements
and recording data in the field.
3. Computing & Data Processing – preparing
calculations based upon the recorded data to
determine locations in a useable form.
4. Mapping or Data Representation – plotting data to
produce a map, plot, or chart in the proper form.
5. Stakeout – locating and establishing monuments or
stakes in the proper locations in the field.
Object of Surveying
►The primary object of survey is the
preparation of plan of estate or buildings
roads, railways, pipelines, canals, etc. Or to
measure area of field, state, nation.
►Object of geodetic surveying is to determine
precise positions on the surface of the earth
of widely distant points.
Uses of Surveying
►To prepare a topographical map this shows
the hills, valley, rivers, villages, town, etc, of
a country.
►To prepare a cadastral map showing the
boundaries of fields houses, and other
properties.
►To prepare an engineering map to show
details like roads, railways, canals, etc.
Uses of Surveying
►To prepare military map showing roads and
railways, communication with different parts
of country.
►To prepare contour map and to determine
capacity of a reservoirs and ton find the
best possible route for roads, railways etc.
►To prepare archeological map including
places where ancient relics exist.
Types of Surveying
Classification
A. Primary Classification or
Primary Division :
1. Plane surveying
2. Geodetic surveying
1. Plane Surveying
 The shape of the earth is spherical. Thus
the surface is obviously curved. But in plane
surveying the curvature of earth is not
taken into account. This is because plane
surveying is carried out over a small area,
so the surface of the earth is considered as
a plane. The degree of accuracy required in
this type of surveying is completely low.
Plane surveying is done on an area of less
than 250 sq.km.
2. Geodetic surveying
 In geodetic surveying the curvature of the
earth is taken into consideration. It is
extended over a large area greater than 250
sq.km. The line joining any two points
considered as a curved line. Very refined
methods and instruments are used in this
type of surveying. In this method very high
precision or accuracy is required.
B. Secondary Classification
►Survey can be classified on different bases:
1. Based on instrument:
►Chain Survey
►Compass survey
►Plane Table survey
►Theodolite survey
►Tacheometric Survey
►Photographic survey
2. Based on methods:
►Triangulation Survey
►Traverse Survey
3. Based on Objects:
►Geological survey
►Mine survey
►Archeological Survey
►Military survey
4. Based on nature of field
►Land Survey
►Marine survey
►Astronomical survey
Other Types of Surveys:
1. Photogrammetry – mapping utilizing data obtained
by camera or other sensors carried in airplanes or
satellites.
2. Boundary Surveying – establishing property corners,
boundaries, and areas of land parcels.
3. Control Surveying – establish a network of horizontal
and vertical monuments that serve as a reference
framework for other survey projects.
4. Engineering Surveying – providing points and
elevations for the building Civil Engineering projects.
Other Types of Surveys:
5. Topographic Surveying – collecting data and
preparing maps showing the locations of natural
man-made features and elevations of points of the
ground for multiple uses.
6. Route Surveys – topographic and other surveys for
long – narrow projects associated with Civil
Engineering projects.
 Highways, railroads, pipelines, and transmission lines.
7. Hydrographic Surveying – mapping of shorelines and
the bottom of bodies of water.
 Also known as bathymetric surveying.
Brief History of Surveying:
1. Surveying had it’s beginning in Egypt about 1400 BC
 Land along the Nile River was divided for taxation.
Divisions were washed away by annual floods.
 “ROPE-STRETCHERS” Egyptian surveyors were created to
relocate the land divisions (measurements were made with
ropes having knots at unit distances).
 Extensive use of surveying in building of Egyptian
monuments
2. Greeks: expanded Egyptian work and developed
Geometry.
 Developed one of the earliest surveying instruments
– Diopter (a form of level).
Brief History of Surveying:
3. Romans: developed surveying into a science to
create the Roman roads, aqueducts, and land
division systems.
 Surveyors held great power, had schools and a
professional organization
 Developed several instruments:
• Groma – cross instrument used to determine lines and right angles
• Libella – “A” frame with a plumb bob used for leveling
• Chorobates – 20’ straight edge with oil in notch for leveling
4. Middle Ages: Land division of Romans continued in
Europe.
 Quadrans – square brass frame capable of turning angles
up to 90° and has a graduated scale developed by an
Italian named Von Piso.
Brief History of Surveying:
5. 18th & 19th Century in the New World: the need for
mapping and marking land claims caused extensive
surveying, especially by the English.
 1785: United Stated began extensive surveys of public
lands into one mile square sections
• 30 states surveyed under the U.S. Public Land System
(also called the Rectangular System)
 1807: United States Geological Survey founded to
establish an accurate control network and mapping
 Famous American Surveyors: George Washington, Thomas
Jefferson, George Rogers Clark, Abe Lincoln and many
more.
Brief History of Surveying:
6. 20th Century and Beyond: As technology advanced,
population increased, and land value caused
development of licensure for surveyors in all states.
 Educational requirements for licensure began in the early
1990’s
 Capable of electronic distance measurement, positioning
using global positioning systems, construction machine
control, and lidar (scanning) mapping
 Involvement in rebuilding of the infrastructure and
geographic information systems (GIS)
 Shortage of licensed professionals is projected well into
the 21st century
Measurement of Distance
► Linear measurement is the basis of all surveying and
even though angles may be read precisely, the length
of at least one line in a tract must be measured to
supplement the angles in locating points.
► Old surveys were often measured using a Surveyors
Chain. These were literally chains made up of 100
links. Each Chain was 66 feet long. Each link was
0.666 of a foot.
Units of Measurement
►Acre - The (English) acre is a unit of area
equal to 43560 square feet, or 10 square
chains. A square mile is 640 acres. The
Scottish acre is 1.27 English acres.
►Chain - Unit of length usually understood to
be Gunter's chain, from the heavy metal chain
of 100 links that was used by surveyors to
measure property bounds.
Units of Measurement
►Hectare - Metric unit of area equal to
10,000 square meters, or 2.471 acres.
►Link - Unit of length equal to 1/100 chain
(7.92 inches).
►Rood - Unit of area usually equal to 1/4
acre.
►Engineer's Chain - A 100 foot chain
containing 100 links of one foot a piece.
Units of Measurement
►Furlong - Unit of length equal to 40 poles
(220 yards).
Methods of Measuring Distance
►Direct Method of Measuring Distance:
1. Pacing: Where approximate result is required,
distance may be determined by pacing. This method
is used for reconnaissance survey, for preparation of
military plans. Also used for approximate checking
distance. The method consists of walking over a line
and counting the number of paces (80cm) the
required distance may be obtained by multiplying
the number of paces by the average length of pace.
Methods of Measuring Distance
 The length of pace varies with the:
►Individual, age, height and physical
condition
►The nature of the ground (uphill and down
hill)
►The slope of the country and
►The speed of pacing
Methods of Measuring Distance
2. Passometer:
It is a pocket instrument. It automatically
records the number of paces. It should be
carried vertically, in waistcoat pocket or
suspended from a button. The mechanism
being operated by motion and strain of the
body.
Methods of Measuring Distance
►3. Pedometer:
► It is similar to passometer. But it registers the
distance walked by the persons carrying it. The
distance is read by means of an indicator. It is
fitted with a stud or knob, which when pressed
release indicator to zero, it may be carried in the
same way as the passometer.
Methods of Measuring Distance
4. Odometer:
It measures the distance approximately. It
can be attached to the wheel of any vehicle,
such as carriage, cart bicycle, etc. It registers
the number of revolution of the wheel.
Knowing the circumference of the wheel, the
distance traversed may be obtained by
multiplying the number of revolutions. By the
circumference of the wheel
Methods of Measuring Distance
5. Speedometer: The Speedometer of an
automobile may be used to measure distances
approximately. It gives better results than
pacing, provided the route is smooth.
Methods of Measuring Distance
6. Perambulator: It can measure distance
rapidly. It consist a single wheel provided with
forks and a handle. It is wheeled along the line,
the length of which is desired. The distance
traversed is automatically registered on the dial.
The reading approximates on rough ground.
Methods of Measuring Distance
7. Judging distance:
This is very rough method of determining
distance. It is used reconnaissance survey.
8. Time Measurement:
Distance is roughly determined by time intervals
of travel. Knowing the average time per km for a
person at walk or a horse, the distance traversed
may be easily obtained.
Methods of Measuring Distance
9. Chaining: Measuring distance with chain or
rope is the most accurate and common method,
called as chaining. For work of ordinary precision
a chain is used. Where great accuracy is
required, a steel tape is used.
Measurement of Distance
► Taping: applying the known length of a graduated
tape directly to a line a number of times.
2 Problems exist in Taping:
1. Measuring the distance between two existing points
2. Laying out a known distance with only the starting
point in place
Measurement of Distance
6 Steps of Taping
1. Lining in – shortest distance between two points is a
straight line.
2. Applying tension – rear chain is anchor and head
chain applies required tension.
3. Plumbing – horizontal distance requires tape to be
horizontal.
4. Marking tape lengths – each application of the tape
requires marking using chaining pins to obtain total
length.
5. Reading the tape – the graduated tape must be read
correctly.
6. Recording the distance – the total length must be
reported and recorded correctly.
Types of Chains and Tapes
► Before the ability to make steel rods and bands, sticks
were cut into lengths of 16.5’ (Rod) and they were
laid end to end to measure.
► Gunter’s Chain
 66’ long with 100 link w/each link being 7.92 inches or 0.66
feet long.
 Developed by Edmund Gunter in 1600’s in England and
made with individual wires with a loop at each end
connected
 Chain had between 600-800 wearing surfaces which with
hard use would wear and cause chain to elongate
 Measurements were recorded in chains and links
 7ch 94.5lk = 7.945 ch = 7.945 X 66’/ch = 524.37’
 1 chain = 4 rods; 80 chains = 1 mile
Types of Chains and Tapes
► Engineer’s Chain
 Same construction as Gunter’s Chain, but each link is 1.0’
long and was used for engineering projects
► Surveyor’s and Engineer’s Tapes
 Made of ¼” to 3/8” wide steel tapes in 100’; 200’; 300’
lengths
Types of Chains and Tapes
► Invar Tapes
 Made of special nickel steel to reduce length variations due
to temperature changes
 The tapes are extremely brittle and expensive
 Used most of the time for standard comparison of tapes
► Cloth, Fiberglass, and PVC Tapes:
 Lower accuracy and stored on reels. Used for measurement
of 0.1’ accuracy requirements
Accessories
1. Chaining Pins – set of 11, used to mark the tape lengths
2. Hand Level – used to determine required plumbing height
3. Plumb Bob – used to transfer the mark from the tape to ground
4. Tension Handle – used to maintain correct tension on tape
Taping (Field Process)
1. The line to be taped should be marked at both ends
 Keeps measurement on line
 Rear chain person should keep the head chain person on
line
 1’ of line error/100’ = 0.01’ error in length
2. Applying Tension
 Rear chainman is anchor and should hold 100’ mark over
point
► Tension is applied by head chain person – normally 12 to 30 pounds
of pull
► Tapes are standardized at 12 lbs., but greater is utilized to
compensate for sag
Taping (Field Process)
3. Plumbing
 One end of tape is raised to maintain a horizontal
measuring plane. ONLY one end is elevated
► This allows measurements to be made on uneven ground
► If a high spot exists in center, “break” tape by measuring to the
top and then move forward to complete the distance
Slope Measurements:
► Generally, measurements are made horizontally, but
on even, often man-made slopes the distance can be
measured directly on the slope, but the vertical or
zenith angle must be obtained.
 Horizontal Distance = sin Zenith Angle X Slope Distance
 Horizontal Distance = cos Vertical Angle X Slope Distance
Taping Error:
1. Instrumental Error – a tape may have different length due to
defect in manufacture or repair or as the result of kinks
2. Natural Error – length of tape varies from normal due to
temperature, wind and weight of tape (sag)
3. Personal Error – tape person may be careless in setting pins,
reading the tape, or manipulating the equipment
►Instrumental and natural error can be corrected mathematically, but
personal error can only be corrected by remeasure.
►When a tape is obtained, it should either be standardized or checked
against a standard.
► Tapes standardized at National Bureau of Standards in Maryland
►Standardized at 68 degrees F and 12 lbs. tension fully supported.
Tape Error Correction:
1) Measuring between two existing points:
1) If a tape is long, the distance will be short, thus any
correction must be added
2) If tape is short, the distance will be long, thus any
correction must be subtracted
3) If you are setting or establishing a point, the above rule is
reversed.
Generally can correct for tape length,
temperature, tension, and sag, but tension and
sag are negated by increasing tension to
approximately 25 – 30 lbs.
Error in Taping:
► Tape Length: Correction per foot = Error in 100’/100’
 If tape was assumed to be 100.00’ but when standardized
was found to be 100.02’ after distance measured at 565.75’
 then: Correction =(100.02-100.00)/100.00 = 0.0002’ error/ft
 565.75’ X .0002’/’ = 0.11’ correction and based upon rule,
must be added, thus true distance = 565.86’
 If tape had been 99.98’ then correction would be subtracted
and true distance would be 565.64’
Error in Taping:
► Temperature – Tapes in U.S. are standardized at
68F; the temperature difference above or below that
will change the length of the tape
 Tapes have a relatively constant coefficient of expansion of
0.0000065 per unit length per F
 CT = 0.0000065(Temp (F)-68) Length
 Example: Assume a distance was measured when
temperature was 30°F using a 100’ tape was 872.54’
(68 – 30) X 0.00000645 X 872.54’ = 0.21’ error
tape is short, thus distance is long, error must be subtracted
and thus 872.54’ – 0.21’ = 872.33’
(note: temperature difference is absolute difference)
Surveying Metric Conversion
► 1 Survey Foot = 1200 / 3937 meters
► 1 Meter = 3937 / 1200 Survey Feet
Transit
► Transit is the most universal of
surveying instruments – primary use is
for measurement or layout of horizontal
and vertical angles – also used to
determine vertical and horizontal
distance by stadia, prolonging straight
lines, and low-order leveling.
3 Components of the Transit
1. Alidade – Upper part
2. Horizontal limb – Middle part
3. Leveling-head assembly – Lower part
Transit
►Alidade (upper part)
 Circular cover plate w/2 level vials and is connected
to a solid conical shaft called the inner spindle.
 Contains the vernier for the horizontal circle
 Also contains frames that support the telescope
called STANDARDS
 Contains the vertical circle and its verniers, the
compass box, the telescope and its level vial
Transit
Transit
►Horizontal Limb (middle part)
 This is rigidly connected to a hollow conical shaft
called the outer spindle (which holds the inner
spindle)
 Also has the upper clamp, which allows the alidade
to be clamped tight
 Also contains the horizontal circle
Transit
► Leveling-Head Assembly (lower part)
1. 4 – leveling screws
2. Bottom plate that screws into tripod
3. Shifting device that allows transit to move ¼ to 3/8”
4. ½ ball that allows transit to tilt when being leveled
5. The SPIDER – 4-arm piece which holds the outer spindle
6. Lower clamp – allows rotation of outer spindle
►Telescope: Similar to that of dumpy level, but
shorter
 Parts – objective, internal focusing lens, focusing
wheel, X-hairs, & eyepiece
► Scales: horizontal plate or circle is usually graduated
into 30’ or 20’ spaces with graduations from 0 to 360
in both directions
 Circles are graduated automatically by machine and then
scanned to ensure accuracy
 They are correct to with in 2” of arc
Verniers
► Least count = Lowest # of reading possible –
determines accuracy
► Least Count = (Value of smallest division on scale)/(#
of divisions on vernier)
Scale Graduation Vernier Divisions Least Count
30’ 30 1’
20’ 40 30”
15’ 45 20”
10’ 60 10”
Verniers
► 3 Types of Verniers
1. Direct or single vernier – reads only in one direction &
must be set with graduations ahead of zero
2. Double vernier – can be read clockwise or
counterclockwise–only ½ is used at a time
3. Folded vernier – avoids a ling vernier plate
 ½ of the graduations are placed on each side of the index mark
 Use is not justified because it is likely to cause errors
Verniers
► The vernier is always read in the same direction from
zero as the numbering of the circle, i.e. the direction
of the increasing angles
► Typical mistakes in reading verniers result from
1.Not using magnifying glass
2.Reading in the wrong direction from zero, or on the wrong
side of a double vernier
3.Failing to determine the least count correctly
4.Omitting 10’, 15’, 20’, 30’ when the index is beyond those
marks
Properties of the Transit
1. Designed to have proper balance between:
 Magnification and resolution of the telescope
 Least count of the vernier and sensitivity of the plate and telescope
bubbles
2. Average length of sight of 300’ assumed in design
3. Specifications of typical 1’ gun:
 Magnification – 18 to 28X
 Field of view - 1 to 130’
 Minimum focus – 5’ to 7’
 X-hairs usually are + with stadia lines above and below
 The transit is a repeating instrument because angles are measured by
repetition and the total is added on the plate
► Advantages of this:
1. Better accuracy obtained through averaging
2. Disclosure of errors by comparing values of the single and multiple readings
Handling the Transit
► Hints on handling and setting-up the transit
 Pick up transit by leveling head and standards
 When carrying the transit, have telescope locked in position
perpendicular to the leveling head with objective lens down
 When setting-up, keep tripod head level and bring plumb
bob to within ¼” of point to be set over, then loosen
leveling screws enough to enable you to move transit on
plate, then move transit until it is over the point
C
A
B
Operation of Transit
► 9 Steps
1. Set up over point B and level it. Loosen both motions
2. Set up the plates to read 0 and tighten the upper clamp.
(Upper and lower plates are locked together)
3. Bring Vernier to exactly 0 using upper tangent screw and
magnifying glass.
4. Sight on point A and set vertical X-hair in center of point,
by rotating transit
5. Tighten the lower clamp and entire transit is locked in
6. Set X-hair exactly on BS point A using the lower tangent
screws. At this point the vernier is on 000’ and the X-
hairs are on BS
Operation of Transit
7. Loosen the upper clamp, turn instrument to right until you
are near pt. C. Tighten the upper clamp
8. Set vertical X-hair exactly on pt. C using the upper tangent
screw.
9. Read  on vernier
► If repeating , loosen lower motion and again BS on A (using only
lower motion), and then loosen upper motion to allow  to
accumulate.
► If an instrument is in adjustment, leveled, exactly centered,
and operated by an experienced observer under suitable
conditions, there are only 2 sources for error.
1. Pointing the telescope
2. Reading the plates
C
A
B
Transit Field Notes
1d Mean 
0-90 (4d)4
90-180 (4d + 360)  4
180-270 (4d + 720)  4
270-360 (4d + 1080)  4
Use longest side for backsite
TOTAL STATIONS
TOTAL STATION SET UP
► WHEN TOTAL STATION IS MOVED OR
TRANSPORTED, IT MUST BE IN THE CASE!!!!!!!!
1. ESTABLISH TRIPOD OVER THE POINT.
2. OPEN THE CASE AND REMOVE TOTAL STATION, PLACING IT ON THE HEAD
OF THE TRIPOD AND ATTACH SECURELY WITH CENTER SCREW.
3. CLOSE THE CASE.
4. GRASP TWO TRIPOD LEGS AND LOOK THROUGH THE OPTICAL PLUMB,
ADJUST THE LEGS SO THAT BULLSEYE IS OVER THE POINT (KEEP THE
TRIPOD HEAD AS LEVEL AS POSSIBLE).
5. UTILIZING THE TRIPOD LEG ADJUSTMENTS, LEVEL THE TOTAL STATION
USING THE FISH-EYE BUBBLE.
6. LOOSEN THE CENTER SCREW TO ADJUST THE TOTAL STATION EXACTLY
OVER THE POINT IF NEEDED.
7. COMPLETE LEVELING THE TOTAL STATION USING THE LEVEL VIAL.
8. CHECK TO MAKE SURE YOU ARE STILL ON THE POINT.
TURNING ANGLES WITH TOTAL STATION
1. SIGHT ON THE BACKSIGHT UTILIZING THE HORIZONTAL ADJUSTMENT
SCREW.
2. ZERO SET THE INSTRUMENT (THIS PROVIDES AN INNITIAL READING OF
0 SECONDS.
3. LOOSEN TANGENT SCREW AND ROTATE INSTRUMENT TO FORESIGHT.
4. TIGHTEN TANGENT SCREW AND BRING CROSS HAIR EXACT ON TARGET
WITH ADJUSTMENT SCREW.
5. READ AND RECORD ANGLE AS DISPLAYED.
TO CLOSE THE HORIZON:
1. SIGHT ON FORESIGHT POINT FROM ABOVE AND ZERO SET INSTRUMENT.
2. ROTATE TO FORMER BACKSIGHT AND ADJUST INSTRUMENT TO EXACT.
3. READ AND RECORD ANGLE AS DISPLAYED.
ANGLE FROM DIRECT AND INDIRECT SHOULD EQUAL 360 DEGREES.
TOTAL STATION DISTANCE MEASUREMENT
1. POINT THE INSTRUMENT AT A PRISM (WHICH IS VERTICAL OVER
THE POINT.
2. PUSH THE MEASURE BUTTON AND RECORD THE DISTANCE.
YOU CAN MEASURE THE HORIZONTAL DISTANCE OR THE SLOPE
DISTANCE, IT IS IMPORTANT THAT YOU NOTE WHICH IS BEING
COLLECTED.
1. IF YOU ARE MEASURING THE SLOPE DISTANCE, THE ZENITH
ANGLE MUST BE RECORDED TO ALLOW THE HORIZONTAL
DISTANCE TO BE COMPUTED.
2. IF YOU ARE COLLECTING TOPOGRAPHIC DATA WITH ELEVATIONS,
IT IS IMPORTANT THAT THE HEIGHT OF THE INSTRUMENT AND
THE HEIGHT OF THE PRISM BE COLLECTED AND RECORDED.
THIS CAN ALSO BE SOLVED BY SETTING THE PRISM HEIGHT THE SAME AS
THE INSTRUMENT HEIGHT.
TOTAL STATION RULES
1. NEVER POINT THE INSTRUMENT AT THE SUN, THIS CAN DAMAGE
THE COMPONENTS OF THE INSTRUMENT AS WELL AS CAUSE
IMMEDIATE BLINDNESS.
2. NEVER MOVE OR TRANSPORT THE TOTAL STATION UNLESS IT IS
IN THE CASE PROVIDED.
3. DO NOT ATTEMPT TO ROTATE THE INSTRUMENT UNLESS THE
TANGENT SCREW IS LOOSE.
4. AVOID GETTING THE INSTRUMENT WET, IF IT DOES GET WET,
WIPE IT DOWN AND ALLOW TO DRY IN A SAFE AREA BEFORE
STORAGE.
5. BATTERIES OF THE TOTAL STATION ARE NICAD AND THUS MUST
BE CHARGED REGULARLY. AT LEAST ONCE PER MONTH, THE
BATTERY SHOULD BE CYCLED.
6. CARE SHOULD BE TAKEN AT ALL TIMES, THESE UNITS ARE
EXPENSIVE ($8,000 - $45,000)
Angles and Determination of
Direction
► Angle – difference in direction of 2 lines
 Another way of explaining is the amount of rotation about a central point
 3 kinds of Horizontal angles: Exterior ( to right); Interior; Deflection
 To turn an angle you need
► A reference line
► Direction of turning
► Angular distance
 Angular Units
► Degrees, minutes, seconds (sexagesimal system)
 Circle divided into 360 degrees
 Each degree divided by 60 minutes
 Each minute divided into 60 seconds
► Radians
 1 radian = 1/2 of a circle = 0.1592*360 = 5717’44. 8”
► Grads (Centesimal System) – now called Gon
 1/400 of a circle or 054’00” (100 gon = 90)
Angles and Determination of
Direction
► Angles turned in field must be accurate: 3X least count is
max. error
► Check #1 – Close horizon when turning
► If traverse closes: sum of the interior angles should equal the
sum of
 (N-2)X180, N = Number of sides
► 3 angles = (3-2) 180 = 180
► 4 angles = (4-2) 180 = 360
► 8 angles = (8-2) 180 = 1080
► 25 angles = (25-2) 180 = 4140
 If an exterior angle exists, subtract it from 360 to obtain the interior 
 Angular closure should be checked before leaving the field
Angles and Determination of
Direction
► If angular adjustment does not divide out equally:
1. Do not go to decimal unless instrument reads to decimal
2. Observe field notes for angles with poor closure or where problems
turning angles existed. Apply excess to these angles evenly.
3. If unable to view field notes or no apparent source, generally apply
excess to angles with shortest sides
► Bearings/Azimuths
 Bearing of a line is the acute horizontal angle between a reference
meridian (North and South) and a line
 Azimuth of a line is the horizontal angle measured from the North
meridian clockwise to the line
Example
L
M
N
P
Q
Angles and Determination of
Direction
4 Point Comparison
Bearing Azimuth
1. Numeric Value 0-90 0-360
2. Method of Expressing 2 letters & number Number only
3. Direction Clockwise & counterclockwise Clockwise
4. Position of 0 point North and South North
It is always very important to have your field
sketch properly oriented
Angles and Determination of
Direction
Rectangular Coordinates
► Totally based on computation of right triangle
North – South Movement = Latitude = D X cos A
East – West Movement = Departure = D X sin A
► Latitude running North are +, South are –
► Departure running East are +, West are –
Angles and Determination of
Direction
► Basic Procedure
1. Determine Latitude and Departure
2. Sum Lat. and Departure to calc. closure
3. Obtain balanced Lat. and Dept. (Compass Rule)
4. Determine coordinates
5. Once rectangular coordinates are known on point, their
exact location is known with respect to all other points in
the network
Example
F
A
B
C
D
E
Angles and Determination of
Direction
► Balancing Methods
1. Compass Rule: (Bowditch) Used when accuracy of  and length
measurement is equal
► (Error Lat./Perimeter length) X Distance = Latitude Correction
► (Error Dept./Perimeter length) X Distance = Departure Correction
2. Transit Rule: Used if angles are more accurate than distances (more
accurate direction)
► Correction Latitude (Side) = (Lat. Side/Sum all Lat.) X Lat. error
► Correction Departure (Side) = (Dept. Side/Sum all Dept.) X Dept. error
3. Crandall Method: Used when larger random error exists in linear
measurements that angular. Directional adjustments from balancing
are held fixed and distances are balanced by a weighted least squares
procedure
4. Least Squares: Based on the theory of probability. Angular and linear
adjustments are made simultaneously. Hand methods are long and
complex not often done. Computer adjustment through existing
software make it feasible, which is why it is often used today
Area, Inverse, Intersection
► Once rectangular coordinates are established on all
points, the relationship to all other points is known.
You can:
1. Determine area of all or any portion
2. Determine length and direction between any 2 points
3. Locate new points by intersection
Area, Inverse, Intersection
► Area: Method is area by cross multiplication
Using example from traverse lecture:
NA X EB + NB X EC + NC X ED + ND X EE + NE X EF + NF X EA = Sum N
EA X NB + EB X NC + EC X ND + ED X NE + EE X NF + EF X NA = Sum E
Difference in Sums/2 = Square feet
Square feet/43560 = Acres
A 10000.0000 5000.0000
B 10326.7981 5356.3614
C 9938.7277 5298.7122
D 9448.9156 4560.3990
E 9854.7405 4760.8417
F 10070.8565 4583.9559
A 10000.0000 5000.0000
Sum N = 294,119,678.8
Sum E = 293,663,353.6
456,325.2 / 2 = 228,162.6 ft2 = 5.24 Ac
Area, Inverse, Intersection
Example: Determine Area of A, D, E, F, A
N = 186,116,759.8
E = 185,971,439.3
145,320.5 / 2 = 72,660.25 ft2 = 1.67 Ac 
A 10000.0000 5000.0000
D 9448.9156 4560.3990
E 9854.7405 4760.8417
F 10070.8565 4583.9559
A 10000.0000 5000.0000
Area, Inverse, Intersection
► Inverse: With known coordinates of any two points on a
system, you find the distance and direction between the two
C 9938.7277 5298.7122
D 9448.9156 4560.3990
489.8121 738.3132
► To find the Inverse between 2 Points
1. Find difference in N & E of coordinates
2. Plot
► Use point you are going from 1st
► Plot longest side 1st
3. Determine length using Pythagorean (a2 + b2 = c2)
4. Determine reference direction
5. Determine local  using tan A = a/b
6. Determine line direction
Area, Inverse, Intersection
► Example: Determine direction and distance D-A
D 9448.9156 4560.3990
A 10000.0000 5000.0000
551.0844 439.6010
Area, Inverse, Intersection
► Intersection: Determination of unknown point
location with directions from two points known
1. Determine difference in coordinates
2. Plot points and line projections
3. Set up dual formulas (as Latitude and Departure)
4. Solve for length
5. Compute coordinate as sideshot
C 9938.7277 5298.7122
D 9448.9156 4560.3990
489.8121 738.3132
Area, Inverse, Intersection
► Example: What are the coordinates of the point of
intersection of line C-F and D-A.
Azimuth D-A = 3834’46”.
Coordinates of D: N = 9448.9156, E = 4560.3990
C 9938.7277 5298.7122
F 10070.8565 4583.9559
132.1288 714.7563
Horizontal and Vertical Curves
► Horizontal curves are the basis for most Right of Ways:
 Go through formulas
 Angle at PC and PT are always 90
 Given any 2 elements T, L, C, R, D; the remainder can be completed
Example: Horizontal curve, PC STA 201+00
 D = 3615’00”
 R = 1200.00’
 T =
 L =
 C =
 Seg =
 PI STA =
 PT STA =
Horizontal and Vertical Curves
► Vertical Curves – Two major methods used to calculate
vertical curves: Tangent offset and Equation of Parabola
Information needed:
1. Grade or slope on each side of curve
2. Elevation and station of PVI
3. Curve length (Horizontal distance PVC – PVT)
Horizontal and Vertical Curves
Tangent Offset Method
► Procedure:
1. Compute the elevation of the PVC and PVT
2. Compute the elevation of Chord midpoint
3. Compute offset to curve at midpoint
4. Determine total number of stations covered
5. Determine tangent elevations at stations
6. Compute curve offset at stations
7. Combine data and determine vertical curve elevations
Horizontal and Vertical Curves
Equation of Parabola Method
► Equation: r = g2 - g1 / L
 g1 = initial grade
 r = change in grade/sta.
 g2 = final grade
 L = length of curve in stations
► Procedure:
1. Compute PVC and PVT elevations
2. Calculate total change in grade/station
3. Insert data to chart and compute final curve elevations
To find the elevation at the high point or low point,
find the station at which it fall and include that
station in the elevation computations
The equation gives the distance from the PVC in stations
1
pt
-g
x =
r
Leveling
► Leveling is the determination of the elevation of a point or
difference between points referenced to some datum
Terms:
1. Datum – any level surface to which elevations are referenced
2. Mean Sea Level (MSL) – the average height of the surface of the sea for
all stages of the tide over a 19 year period at 26 tide stations along
Pacific, Atlantic and Gulf
3. National Geodetic Vertical Datum – nationwide reference surface for
elevations throughout the U.S. – made available by National Geodetic
Survey (NGS), based on 1929 adjustment.
4. Benchmark – relatively permanent object bearing a marked point whose
elevation above or below an adopted datum.
Leveling
► Most often Mean Sea Level is used
 MSL varies along the coasts
 Pacific is almost 2’ higher than Atlantic and Gulf
► U.S. System: National Geodetic Vertical Datum of
1929
 Has been used as reference for extensive network of BM’s
 BM’s are periodically adjusted as to elevation
►Best to check with USGS or NGS for current elevation of a BM and
also best to check between two known BM’s to verify elevation
difference.
Leveling
► The level surface parallels the curvature of the earth a level
line is a curved line, normal () at all points to plumbline
 Line of sight is only normal at point of instrument
 A line with a sight distance of 1 mile using the earth’s radius as 3959
mile, curvature change is 0.667 feet.
 Refraction of line of sight of level is downward by a small amount
 The combined curvature & refraction amounts for short distances
(normal sight dist. for levels) are:
 100’ = 0.0002’
 200’ = 0.0008’
 300’ = 0.0019’
 500’ = 0.0052
Value is small  for most instances
can be neglected
Leveling
► Most common leveling instrument today is the Automatic or
Self-leveling level – has an internal compensator that
automatically provides a horizontal line of sight and
maintains this through gravity (prism hanging on pendulum)
► Differential Leveling: (Spirit Leveling) Most common type
today
 Determine the difference in elevation using a horizontal line of sight
and readings on graduated rod
 Circuit must be closed on BM of origin or on BM of equal accuracy
 Process:
1. Reading on point of known elevation (BS)
2. BS reading + BM elevation = HI
3. Reading on point of unknown elevation (FS)
4. HI – FS = elevation of new point
Leveling
► Systematic Error in Leveling
1. Inclination of line of sight due to curvature of earth and
refraction – generally very minimal due to short sights
2. Inclination due to maladjustment of instrument
 Both can be alleviated by equalizing length of BS and FS legs
3. Changes in scale of rod due to temperature
 Usually ignored except in very precise work
 Would use same process as tape correction
4. Rod not held plumb
 Minimized by carefully plumbing the rod or more commonly known as
“Rocking the Rod” and taking the lowest reading
Leveling
► Peg Test
1. Set 2 marks at 300’ apart, also mark center point in a relatively
flat area
2. Set level at midpoint and take readings at each end
3. Determine difference in readings (difference in elevation)
4. Move level to one end and setup so that level is just in front of
rod on point
5. Read rod by looking backward through scope (X-hair not
visible), hold pencil on rod to determine reading
6. Read rod at other end in normal manner
7. Difference in readings should equal #3
8. If values are not equal, there is error
 Most instruments have adjustment screws
 Adjust and repeat test as a check
Seven Basic Rules of
Differential Leveling
1. Balance length of BS and FS (300’ max)
2. Make sure gun is level and pendulum free
3. Turn through all BM’s
4. Give complete description of BM’s and TBM’s
5. Have rod rocked
6. Make sure turning points are solid
7. Close all circuits on BM of same degree of accuracy
Other Random Errors
1. Incorrect rod reading – most common viewing foot
number above and recording it
2. Parallax – having the X-hair not properly focused
3. Heat Waves – limit shot lengths
Field Notes
STA BS HI FS ELEV
►Sum BS – Sum FS = Difference of Elevation
Closure Error
► Difference in measured elevation and know elevation
► Correction factor = closure / # turns
Error = 0.09’
Turns = 12 Correction = 0.0075’ / turn
► If TBM’s set, break circuit into sections
► Figure correction factor the same
► Figure correction by taking CF X # turns in section
Precise Leveling
► Precise Leveling – Accuracy obtained by quality of instruments
and care taken in the field
► High quality automatic levels are utilized
► Level rods are equipped with rod level, rod shoe (to allow
better setting on BM’s); scale (on rod) is made of invar steel
(not affected by temp – generally called Invar Rod)
► Reading either taken by optical micrometer or a process called
3-wire leveling is used (all 3 wire are read and averaged)
 Optical micrometer: line of sight deflected by turning micrometer screw
to read subdivision on rod.
► Rod division is read as normal & then fractional reading taken from
micrometer screw, thus on normal rod readings to 0.0001’ are possible
Topographic Surveying
► Topographic surveying is the process of determining
the positions, on the earth’s surface, of the natural,
and artificial features of a given locality and of
determining the configuration of the terrain.
 Planimetry – location of features
 Topography – configuration of the ground
►Both produce a topographic map which shows the true distance
between objects & their elevations above a given datum
►Topos can be done by field methods, or by photogrammetric
methods. (Photo also requires some field work)
►Topo map is 1st step in a construction project
Topographic Surveying
► Scale and accuracy: Both depend on what used for
► Method of Representing:
 Most common is Contour Line – Imaginary line on surface of
the earth passing through points that have equal elevation
 Contour Interval – Vertical distance between lines
» Topo map with contour lines shows elevation of points on ground &
shapes of topographic features (hills, etc.)
►USGS Topo – 10’ or 20’ contour intercal
►Subdivision – 2’ or 4’
 Index Contour – every 5th contour drawn heavier on maps
 Slopes & X-sections can be obtained from contours
Topographic Surveying
 Interpolating – can find elevation of any point or find
contour line with known elevation of point
 Contour lines that close represent either a hill or depression
and can be represented as:
►Marks are called hatchures (used most in depressions)
Characteristics of Contours
1. Each contour must close upon itself with within a
map or outside its borders – a contour line cannot
end on a map except at the edge
2. Contours do not cross or meet except in caves, cliffs
& vertical walls where they can meet
3. Contour lines crossing streams form V’s pointing
upstream
4. Contour lines crossing a ridge form U’s pointing down
the ridge
5. Contour lines tend to parallel streams
Characteristics of Contours
6. Contour lines are uniformly spaced on uniform slopes
7. Horizontal spacing between contour lines indicated
steepness of slope on ground
8. Contours are generally perpendicular to direction of
maximum slope
9. Contours can never branch into 2 contours of the
same elevation
Field Methods of Topos
Factors That Influence Method
1. Scale of map
2. Contour interval
3. Type of terrain
4. Nature of project
5. Equipment available
6. Required accuracy
7. Existing control
8. Extent of area to be mapped
Field Methods of Topos
Methods:
1. Cross section – railroad of highway
2. Trace contour – drainage or impoundments
3. Grid – small areas
4. Controlling point – large area, plane table
5. Theodolite & EDM - radial
Field Methods of Topos
Cross Section Method (Plus Offset):
Equipment used: Transit, tape, and level
1. Establish horizontal control – traverse between
control points – stakes set at cross section intervals
2. Run profile of traverse line
3. Take cross section
4. Locate planimetric features from traverse line
Field Methods of Topos
Trace Contour:
1. Contour is by traverse
2. Establish elevation of each station
3. Contour elevation established and is then followed by
rodperson
4. Contour elevation is marked, then tied to traverse line
by plus-offset
 Most accurate and expensive work
 Elevation of reservoir water line
 2 transit use
Field Methods of Topos
Grid Method:
1. Establish baselines
2. Estimate grid of uniform size – smaller grid = more
accurate
3. Number grid
4. Shoot elevation at each point
5. Tie existing objects to grid points
Field Methods of Topos
Controlling Point Method: (old and sketched in field)
1. Determine position & elevation of pre-selected
control points
2. Depends greatly on experience & judgment of people
doing work
3. Required traverse of area (CP’s)
4. Locations are made & elevations obtained along
control points – then intermittent topo sketched in
Field Methods of Topos
Theodolite & EDM (Radial)
 Replaces tacheometry (stadia)
1. Establish control points (horizontal and elevation)
2. Shoot locations and turn vertical angles
3. Used for large areas
Field Methods of Topos
Common mistakes in topo surveys:
1. Improper selection of contour interval
2. Unsatisfactory equipment or field method for the
particular survey and terrain conditions
3. Insufficient horizontal and vertical control of suitable
precision
4. Omission of some topographic details
Mine Surveying
► Points are on roof of mine
Reasons needed
1. Location in respect to boundaries
2. Location in respect to other shafts
3. Accurate maps (above and below ground)
4. Quantities
Equipment and Terms
► Spad – Beams that you hold plumb bob from
► Bracket – Mounting instrument from timber supports
► Trivet – Tripod that’s about 1’ tall
► Gyroscope – Locate north
► Laser vertical collimator – located point at top of vertical shaft platform
► Plumb shaft – Using piano wire then wiggle in at bottom
Global Positioning Systems (GPS)
► Developed in early 1980’ s (Dept. of Defense)
► Made up of 26 satellites (24 functioning & 2 spares)
► Each satellite is 20,000 km high (off Earth’s surface)
► Each satellite is in a fixed position
► Minimum of 3 satellites needed, but 4-5 preferred
► Need satellites at least 15° above horizon
► Locate positions on Earth by distance-distance intersection
► Need 2-3 receivers ($80-$100K per system)
► Most accurate with double occupancy (no other checks)
► Differential GPS – one receiver on known point, other receiver
on unknowns
Global Positioning Systems (GPS)
Biggest advantage
► Distance and direction in-between 2 points without
being seen
Downfalls/Limitations of GPS
► Multipath – bouncing off of walls of buildings
► Blocked signals – clouds, trees, etc.
► Sunspot – defraction from atmosphere
► DOP (Delusion of Position) – bad satellite position
► Set up error – not set up exactly over point (human
error – most common)
Global Positioning Systems (GPS)
Methods
► Static – observation time is at least an hour
 Ideally set points in triangular fashion
 Accuracy – 1/10 million
► RTK (Real Time Kinematic) – stand for 30-60 seconds
minimum
 Base receivers transmission, does corrections, sends
corrections to receivers
 Limitations – limitation of transmitter signal
Geographic Information Systems
(GIS)
► GIS are computer programs that allow users to store,
retrieve, manipulate, analyze and display spatial data
► Spatial Data (Geographic data) – any data that
represents information about the Earth
GIS components
 Recent definitions of GIS suggest that is consists of:
1. Hardware (computer and operating system)
2. Software
3. Data
4. Human Operators and Institutional Infrastructure
Geographic/Spatial
Non-Geographic/Aspatial/Attribute
GIS Data Structures
► Vector – Made up of points, lines, and polygons
GIS Data Structures
► Raster (Grids) – Made up of pixels of computer screen
GIS Data Structures
► DEM (Digital Elevation Model) – Digital terrain
representation technique, where elevation values are
stored in raster cells
Future of Surveying
► Major advances in future
 Remote Sensing (Government and Military)
 Arial Photographs
► Design Professions
 Every 10 years, must justify to Legislature that need for our
license exists
 Surveyor have ULTIMATE liability
 Standards → Laws
 Continuing Education – Enough points every 2 years

Mais conteúdo relacionado

Mais procurados

1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & RangingRakesh Verma
 
traversing of survey
traversing of surveytraversing of survey
traversing of surveySelf-employed
 
Lec 1 introduction surveying by et bilal
Lec 1   introduction surveying  by et bilalLec 1   introduction surveying  by et bilal
Lec 1 introduction surveying by et bilalUET Peshawar
 
Surveying presentation and its objectives in detail including principles,hist...
Surveying presentation and its objectives in detail including principles,hist...Surveying presentation and its objectives in detail including principles,hist...
Surveying presentation and its objectives in detail including principles,hist...amansingh2914
 
LEVELING AND CONTOURING
LEVELING AND CONTOURINGLEVELING AND CONTOURING
LEVELING AND CONTOURINGANAND JIBHKATE
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levellingParimal Jha
 
Surveying
SurveyingSurveying
SurveyingJNTUK
 
Detailed analysis of plane table surveying
Detailed analysis of plane table surveyingDetailed analysis of plane table surveying
Detailed analysis of plane table surveyingsumitvikram
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2Muhammad Zubair
 
Surveying
SurveyingSurveying
Surveyingredaasd
 
Chain surveying
Chain surveyingChain surveying
Chain surveyingJNTUK
 
Electronic distance measurement (EDM)
Electronic distance measurement (EDM)Electronic distance measurement (EDM)
Electronic distance measurement (EDM)Bathla Tuition Centre
 

Mais procurados (20)

Control surveying
Control surveyingControl surveying
Control surveying
 
Surveying
Surveying Surveying
Surveying
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging
 
Levelling
LevellingLevelling
Levelling
 
traversing of survey
traversing of surveytraversing of survey
traversing of survey
 
Trigonometric levelling
Trigonometric levellingTrigonometric levelling
Trigonometric levelling
 
Lec 1 introduction surveying by et bilal
Lec 1   introduction surveying  by et bilalLec 1   introduction surveying  by et bilal
Lec 1 introduction surveying by et bilal
 
Application of surveying
Application of surveyingApplication of surveying
Application of surveying
 
Surveying presentation and its objectives in detail including principles,hist...
Surveying presentation and its objectives in detail including principles,hist...Surveying presentation and its objectives in detail including principles,hist...
Surveying presentation and its objectives in detail including principles,hist...
 
LEVELING AND CONTOURING
LEVELING AND CONTOURINGLEVELING AND CONTOURING
LEVELING AND CONTOURING
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
 
Surveying
SurveyingSurveying
Surveying
 
Unit 1
Unit 1Unit 1
Unit 1
 
Detailed analysis of plane table surveying
Detailed analysis of plane table surveyingDetailed analysis of plane table surveying
Detailed analysis of plane table surveying
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
 
Theodolite survey
Theodolite surveyTheodolite survey
Theodolite survey
 
Surveying
SurveyingSurveying
Surveying
 
Plane Table Surveying PPt
Plane Table Surveying PPtPlane Table Surveying PPt
Plane Table Surveying PPt
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
 
Electronic distance measurement (EDM)
Electronic distance measurement (EDM)Electronic distance measurement (EDM)
Electronic distance measurement (EDM)
 

Semelhante a Introduction to Surveying

Semelhante a Introduction to Surveying (20)

surveying.ppt
surveying.pptsurveying.ppt
surveying.ppt
 
Surveying (introduction)
Surveying (introduction)Surveying (introduction)
Surveying (introduction)
 
TYPES OF SURVEYING.docx
TYPES OF SURVEYING.docxTYPES OF SURVEYING.docx
TYPES OF SURVEYING.docx
 
Surveying
Surveying Surveying
Surveying
 
Presentation on Introduction of Surveying.
Presentation on Introduction of Surveying.Presentation on Introduction of Surveying.
Presentation on Introduction of Surveying.
 
site analysis and planning
site analysis and planningsite analysis and planning
site analysis and planning
 
Lecture#1.pptx
Lecture#1.pptxLecture#1.pptx
Lecture#1.pptx
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
Surveying.pptx
Surveying.pptxSurveying.pptx
Surveying.pptx
 
Surveying and Mapping inSoil Resources and Watershed Management
Surveying and Mapping inSoil Resources and Watershed ManagementSurveying and Mapping inSoil Resources and Watershed Management
Surveying and Mapping inSoil Resources and Watershed Management
 
Distance Measurement & Chain Surveying
Distance Measurement & Chain SurveyingDistance Measurement & Chain Surveying
Distance Measurement & Chain Surveying
 
Introduction to Surveying and its classification
Introduction to Surveying and its classificationIntroduction to Surveying and its classification
Introduction to Surveying and its classification
 
Lecture 1.pptx
Lecture  1.pptxLecture  1.pptx
Lecture 1.pptx
 
Introduction to survey
Introduction to surveyIntroduction to survey
Introduction to survey
 
Civil engineering land surveying basics pdf
Civil engineering land surveying basics pdfCivil engineering land surveying basics pdf
Civil engineering land surveying basics pdf
 
Introduction of Surveying
Introduction of Surveying Introduction of Surveying
Introduction of Surveying
 
CE121- Introduction.pptx
CE121- Introduction.pptxCE121- Introduction.pptx
CE121- Introduction.pptx
 
Surveying I
Surveying ISurveying I
Surveying I
 
Introduction to surveying
Introduction to surveyingIntroduction to surveying
Introduction to surveying
 

Último

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 

Último (20)

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 

Introduction to Surveying

  • 2. Introduction to Surveying ►Definition: Surveying is the science and art of determining the relative positions of points above, on, or beneath the earth’s surface and locating the points in the field.
  • 3. The work of the surveyor consists of 5 phases: 1. Decision Making – selecting method, equipment and final point locations. 2. Fieldwork & Data Collection – making measurements and recording data in the field. 3. Computing & Data Processing – preparing calculations based upon the recorded data to determine locations in a useable form. 4. Mapping or Data Representation – plotting data to produce a map, plot, or chart in the proper form. 5. Stakeout – locating and establishing monuments or stakes in the proper locations in the field.
  • 4. Object of Surveying ►The primary object of survey is the preparation of plan of estate or buildings roads, railways, pipelines, canals, etc. Or to measure area of field, state, nation. ►Object of geodetic surveying is to determine precise positions on the surface of the earth of widely distant points.
  • 5. Uses of Surveying ►To prepare a topographical map this shows the hills, valley, rivers, villages, town, etc, of a country. ►To prepare a cadastral map showing the boundaries of fields houses, and other properties. ►To prepare an engineering map to show details like roads, railways, canals, etc.
  • 6. Uses of Surveying ►To prepare military map showing roads and railways, communication with different parts of country. ►To prepare contour map and to determine capacity of a reservoirs and ton find the best possible route for roads, railways etc. ►To prepare archeological map including places where ancient relics exist.
  • 8. A. Primary Classification or Primary Division : 1. Plane surveying 2. Geodetic surveying
  • 9. 1. Plane Surveying  The shape of the earth is spherical. Thus the surface is obviously curved. But in plane surveying the curvature of earth is not taken into account. This is because plane surveying is carried out over a small area, so the surface of the earth is considered as a plane. The degree of accuracy required in this type of surveying is completely low. Plane surveying is done on an area of less than 250 sq.km.
  • 10. 2. Geodetic surveying  In geodetic surveying the curvature of the earth is taken into consideration. It is extended over a large area greater than 250 sq.km. The line joining any two points considered as a curved line. Very refined methods and instruments are used in this type of surveying. In this method very high precision or accuracy is required.
  • 11. B. Secondary Classification ►Survey can be classified on different bases: 1. Based on instrument: ►Chain Survey ►Compass survey ►Plane Table survey ►Theodolite survey ►Tacheometric Survey ►Photographic survey
  • 12. 2. Based on methods: ►Triangulation Survey ►Traverse Survey
  • 13. 3. Based on Objects: ►Geological survey ►Mine survey ►Archeological Survey ►Military survey
  • 14. 4. Based on nature of field ►Land Survey ►Marine survey ►Astronomical survey
  • 15. Other Types of Surveys: 1. Photogrammetry – mapping utilizing data obtained by camera or other sensors carried in airplanes or satellites. 2. Boundary Surveying – establishing property corners, boundaries, and areas of land parcels. 3. Control Surveying – establish a network of horizontal and vertical monuments that serve as a reference framework for other survey projects. 4. Engineering Surveying – providing points and elevations for the building Civil Engineering projects.
  • 16. Other Types of Surveys: 5. Topographic Surveying – collecting data and preparing maps showing the locations of natural man-made features and elevations of points of the ground for multiple uses. 6. Route Surveys – topographic and other surveys for long – narrow projects associated with Civil Engineering projects.  Highways, railroads, pipelines, and transmission lines. 7. Hydrographic Surveying – mapping of shorelines and the bottom of bodies of water.  Also known as bathymetric surveying.
  • 17. Brief History of Surveying: 1. Surveying had it’s beginning in Egypt about 1400 BC  Land along the Nile River was divided for taxation. Divisions were washed away by annual floods.  “ROPE-STRETCHERS” Egyptian surveyors were created to relocate the land divisions (measurements were made with ropes having knots at unit distances).  Extensive use of surveying in building of Egyptian monuments 2. Greeks: expanded Egyptian work and developed Geometry.  Developed one of the earliest surveying instruments – Diopter (a form of level).
  • 18. Brief History of Surveying: 3. Romans: developed surveying into a science to create the Roman roads, aqueducts, and land division systems.  Surveyors held great power, had schools and a professional organization  Developed several instruments: • Groma – cross instrument used to determine lines and right angles • Libella – “A” frame with a plumb bob used for leveling • Chorobates – 20’ straight edge with oil in notch for leveling 4. Middle Ages: Land division of Romans continued in Europe.  Quadrans – square brass frame capable of turning angles up to 90° and has a graduated scale developed by an Italian named Von Piso.
  • 19. Brief History of Surveying: 5. 18th & 19th Century in the New World: the need for mapping and marking land claims caused extensive surveying, especially by the English.  1785: United Stated began extensive surveys of public lands into one mile square sections • 30 states surveyed under the U.S. Public Land System (also called the Rectangular System)  1807: United States Geological Survey founded to establish an accurate control network and mapping  Famous American Surveyors: George Washington, Thomas Jefferson, George Rogers Clark, Abe Lincoln and many more.
  • 20. Brief History of Surveying: 6. 20th Century and Beyond: As technology advanced, population increased, and land value caused development of licensure for surveyors in all states.  Educational requirements for licensure began in the early 1990’s  Capable of electronic distance measurement, positioning using global positioning systems, construction machine control, and lidar (scanning) mapping  Involvement in rebuilding of the infrastructure and geographic information systems (GIS)  Shortage of licensed professionals is projected well into the 21st century
  • 21. Measurement of Distance ► Linear measurement is the basis of all surveying and even though angles may be read precisely, the length of at least one line in a tract must be measured to supplement the angles in locating points. ► Old surveys were often measured using a Surveyors Chain. These were literally chains made up of 100 links. Each Chain was 66 feet long. Each link was 0.666 of a foot.
  • 22. Units of Measurement ►Acre - The (English) acre is a unit of area equal to 43560 square feet, or 10 square chains. A square mile is 640 acres. The Scottish acre is 1.27 English acres. ►Chain - Unit of length usually understood to be Gunter's chain, from the heavy metal chain of 100 links that was used by surveyors to measure property bounds.
  • 23. Units of Measurement ►Hectare - Metric unit of area equal to 10,000 square meters, or 2.471 acres. ►Link - Unit of length equal to 1/100 chain (7.92 inches). ►Rood - Unit of area usually equal to 1/4 acre. ►Engineer's Chain - A 100 foot chain containing 100 links of one foot a piece.
  • 24. Units of Measurement ►Furlong - Unit of length equal to 40 poles (220 yards).
  • 25. Methods of Measuring Distance ►Direct Method of Measuring Distance: 1. Pacing: Where approximate result is required, distance may be determined by pacing. This method is used for reconnaissance survey, for preparation of military plans. Also used for approximate checking distance. The method consists of walking over a line and counting the number of paces (80cm) the required distance may be obtained by multiplying the number of paces by the average length of pace.
  • 26. Methods of Measuring Distance  The length of pace varies with the: ►Individual, age, height and physical condition ►The nature of the ground (uphill and down hill) ►The slope of the country and ►The speed of pacing
  • 27. Methods of Measuring Distance 2. Passometer: It is a pocket instrument. It automatically records the number of paces. It should be carried vertically, in waistcoat pocket or suspended from a button. The mechanism being operated by motion and strain of the body.
  • 28. Methods of Measuring Distance ►3. Pedometer: ► It is similar to passometer. But it registers the distance walked by the persons carrying it. The distance is read by means of an indicator. It is fitted with a stud or knob, which when pressed release indicator to zero, it may be carried in the same way as the passometer.
  • 29. Methods of Measuring Distance 4. Odometer: It measures the distance approximately. It can be attached to the wheel of any vehicle, such as carriage, cart bicycle, etc. It registers the number of revolution of the wheel. Knowing the circumference of the wheel, the distance traversed may be obtained by multiplying the number of revolutions. By the circumference of the wheel
  • 30. Methods of Measuring Distance 5. Speedometer: The Speedometer of an automobile may be used to measure distances approximately. It gives better results than pacing, provided the route is smooth.
  • 31. Methods of Measuring Distance 6. Perambulator: It can measure distance rapidly. It consist a single wheel provided with forks and a handle. It is wheeled along the line, the length of which is desired. The distance traversed is automatically registered on the dial. The reading approximates on rough ground.
  • 32. Methods of Measuring Distance 7. Judging distance: This is very rough method of determining distance. It is used reconnaissance survey. 8. Time Measurement: Distance is roughly determined by time intervals of travel. Knowing the average time per km for a person at walk or a horse, the distance traversed may be easily obtained.
  • 33. Methods of Measuring Distance 9. Chaining: Measuring distance with chain or rope is the most accurate and common method, called as chaining. For work of ordinary precision a chain is used. Where great accuracy is required, a steel tape is used.
  • 34. Measurement of Distance ► Taping: applying the known length of a graduated tape directly to a line a number of times. 2 Problems exist in Taping: 1. Measuring the distance between two existing points 2. Laying out a known distance with only the starting point in place
  • 35. Measurement of Distance 6 Steps of Taping 1. Lining in – shortest distance between two points is a straight line. 2. Applying tension – rear chain is anchor and head chain applies required tension. 3. Plumbing – horizontal distance requires tape to be horizontal. 4. Marking tape lengths – each application of the tape requires marking using chaining pins to obtain total length. 5. Reading the tape – the graduated tape must be read correctly. 6. Recording the distance – the total length must be reported and recorded correctly.
  • 36. Types of Chains and Tapes ► Before the ability to make steel rods and bands, sticks were cut into lengths of 16.5’ (Rod) and they were laid end to end to measure. ► Gunter’s Chain  66’ long with 100 link w/each link being 7.92 inches or 0.66 feet long.  Developed by Edmund Gunter in 1600’s in England and made with individual wires with a loop at each end connected  Chain had between 600-800 wearing surfaces which with hard use would wear and cause chain to elongate  Measurements were recorded in chains and links  7ch 94.5lk = 7.945 ch = 7.945 X 66’/ch = 524.37’  1 chain = 4 rods; 80 chains = 1 mile
  • 37. Types of Chains and Tapes ► Engineer’s Chain  Same construction as Gunter’s Chain, but each link is 1.0’ long and was used for engineering projects ► Surveyor’s and Engineer’s Tapes  Made of ¼” to 3/8” wide steel tapes in 100’; 200’; 300’ lengths
  • 38. Types of Chains and Tapes ► Invar Tapes  Made of special nickel steel to reduce length variations due to temperature changes  The tapes are extremely brittle and expensive  Used most of the time for standard comparison of tapes ► Cloth, Fiberglass, and PVC Tapes:  Lower accuracy and stored on reels. Used for measurement of 0.1’ accuracy requirements Accessories 1. Chaining Pins – set of 11, used to mark the tape lengths 2. Hand Level – used to determine required plumbing height 3. Plumb Bob – used to transfer the mark from the tape to ground 4. Tension Handle – used to maintain correct tension on tape
  • 39. Taping (Field Process) 1. The line to be taped should be marked at both ends  Keeps measurement on line  Rear chain person should keep the head chain person on line  1’ of line error/100’ = 0.01’ error in length 2. Applying Tension  Rear chainman is anchor and should hold 100’ mark over point ► Tension is applied by head chain person – normally 12 to 30 pounds of pull ► Tapes are standardized at 12 lbs., but greater is utilized to compensate for sag
  • 40. Taping (Field Process) 3. Plumbing  One end of tape is raised to maintain a horizontal measuring plane. ONLY one end is elevated ► This allows measurements to be made on uneven ground ► If a high spot exists in center, “break” tape by measuring to the top and then move forward to complete the distance
  • 41. Slope Measurements: ► Generally, measurements are made horizontally, but on even, often man-made slopes the distance can be measured directly on the slope, but the vertical or zenith angle must be obtained.  Horizontal Distance = sin Zenith Angle X Slope Distance  Horizontal Distance = cos Vertical Angle X Slope Distance
  • 42. Taping Error: 1. Instrumental Error – a tape may have different length due to defect in manufacture or repair or as the result of kinks 2. Natural Error – length of tape varies from normal due to temperature, wind and weight of tape (sag) 3. Personal Error – tape person may be careless in setting pins, reading the tape, or manipulating the equipment ►Instrumental and natural error can be corrected mathematically, but personal error can only be corrected by remeasure. ►When a tape is obtained, it should either be standardized or checked against a standard. ► Tapes standardized at National Bureau of Standards in Maryland ►Standardized at 68 degrees F and 12 lbs. tension fully supported.
  • 43. Tape Error Correction: 1) Measuring between two existing points: 1) If a tape is long, the distance will be short, thus any correction must be added 2) If tape is short, the distance will be long, thus any correction must be subtracted 3) If you are setting or establishing a point, the above rule is reversed. Generally can correct for tape length, temperature, tension, and sag, but tension and sag are negated by increasing tension to approximately 25 – 30 lbs.
  • 44. Error in Taping: ► Tape Length: Correction per foot = Error in 100’/100’  If tape was assumed to be 100.00’ but when standardized was found to be 100.02’ after distance measured at 565.75’  then: Correction =(100.02-100.00)/100.00 = 0.0002’ error/ft  565.75’ X .0002’/’ = 0.11’ correction and based upon rule, must be added, thus true distance = 565.86’  If tape had been 99.98’ then correction would be subtracted and true distance would be 565.64’
  • 45. Error in Taping: ► Temperature – Tapes in U.S. are standardized at 68F; the temperature difference above or below that will change the length of the tape  Tapes have a relatively constant coefficient of expansion of 0.0000065 per unit length per F  CT = 0.0000065(Temp (F)-68) Length  Example: Assume a distance was measured when temperature was 30°F using a 100’ tape was 872.54’ (68 – 30) X 0.00000645 X 872.54’ = 0.21’ error tape is short, thus distance is long, error must be subtracted and thus 872.54’ – 0.21’ = 872.33’ (note: temperature difference is absolute difference)
  • 46. Surveying Metric Conversion ► 1 Survey Foot = 1200 / 3937 meters ► 1 Meter = 3937 / 1200 Survey Feet
  • 47. Transit ► Transit is the most universal of surveying instruments – primary use is for measurement or layout of horizontal and vertical angles – also used to determine vertical and horizontal distance by stadia, prolonging straight lines, and low-order leveling. 3 Components of the Transit 1. Alidade – Upper part 2. Horizontal limb – Middle part 3. Leveling-head assembly – Lower part
  • 48. Transit ►Alidade (upper part)  Circular cover plate w/2 level vials and is connected to a solid conical shaft called the inner spindle.  Contains the vernier for the horizontal circle  Also contains frames that support the telescope called STANDARDS  Contains the vertical circle and its verniers, the compass box, the telescope and its level vial
  • 50.
  • 51.
  • 52. Transit ►Horizontal Limb (middle part)  This is rigidly connected to a hollow conical shaft called the outer spindle (which holds the inner spindle)  Also has the upper clamp, which allows the alidade to be clamped tight  Also contains the horizontal circle
  • 53.
  • 54. Transit ► Leveling-Head Assembly (lower part) 1. 4 – leveling screws 2. Bottom plate that screws into tripod 3. Shifting device that allows transit to move ¼ to 3/8” 4. ½ ball that allows transit to tilt when being leveled 5. The SPIDER – 4-arm piece which holds the outer spindle 6. Lower clamp – allows rotation of outer spindle
  • 55.
  • 56. ►Telescope: Similar to that of dumpy level, but shorter  Parts – objective, internal focusing lens, focusing wheel, X-hairs, & eyepiece ► Scales: horizontal plate or circle is usually graduated into 30’ or 20’ spaces with graduations from 0 to 360 in both directions  Circles are graduated automatically by machine and then scanned to ensure accuracy  They are correct to with in 2” of arc
  • 57. Verniers ► Least count = Lowest # of reading possible – determines accuracy ► Least Count = (Value of smallest division on scale)/(# of divisions on vernier) Scale Graduation Vernier Divisions Least Count 30’ 30 1’ 20’ 40 30” 15’ 45 20” 10’ 60 10”
  • 58.
  • 59. Verniers ► 3 Types of Verniers 1. Direct or single vernier – reads only in one direction & must be set with graduations ahead of zero 2. Double vernier – can be read clockwise or counterclockwise–only ½ is used at a time 3. Folded vernier – avoids a ling vernier plate  ½ of the graduations are placed on each side of the index mark  Use is not justified because it is likely to cause errors
  • 60. Verniers ► The vernier is always read in the same direction from zero as the numbering of the circle, i.e. the direction of the increasing angles ► Typical mistakes in reading verniers result from 1.Not using magnifying glass 2.Reading in the wrong direction from zero, or on the wrong side of a double vernier 3.Failing to determine the least count correctly 4.Omitting 10’, 15’, 20’, 30’ when the index is beyond those marks
  • 61.
  • 62. Properties of the Transit 1. Designed to have proper balance between:  Magnification and resolution of the telescope  Least count of the vernier and sensitivity of the plate and telescope bubbles 2. Average length of sight of 300’ assumed in design 3. Specifications of typical 1’ gun:  Magnification – 18 to 28X  Field of view - 1 to 130’  Minimum focus – 5’ to 7’  X-hairs usually are + with stadia lines above and below  The transit is a repeating instrument because angles are measured by repetition and the total is added on the plate ► Advantages of this: 1. Better accuracy obtained through averaging 2. Disclosure of errors by comparing values of the single and multiple readings
  • 63. Handling the Transit ► Hints on handling and setting-up the transit  Pick up transit by leveling head and standards  When carrying the transit, have telescope locked in position perpendicular to the leveling head with objective lens down  When setting-up, keep tripod head level and bring plumb bob to within ¼” of point to be set over, then loosen leveling screws enough to enable you to move transit on plate, then move transit until it is over the point
  • 64. C A B Operation of Transit ► 9 Steps 1. Set up over point B and level it. Loosen both motions 2. Set up the plates to read 0 and tighten the upper clamp. (Upper and lower plates are locked together) 3. Bring Vernier to exactly 0 using upper tangent screw and magnifying glass. 4. Sight on point A and set vertical X-hair in center of point, by rotating transit 5. Tighten the lower clamp and entire transit is locked in 6. Set X-hair exactly on BS point A using the lower tangent screws. At this point the vernier is on 000’ and the X- hairs are on BS
  • 65. Operation of Transit 7. Loosen the upper clamp, turn instrument to right until you are near pt. C. Tighten the upper clamp 8. Set vertical X-hair exactly on pt. C using the upper tangent screw. 9. Read  on vernier ► If repeating , loosen lower motion and again BS on A (using only lower motion), and then loosen upper motion to allow  to accumulate. ► If an instrument is in adjustment, leveled, exactly centered, and operated by an experienced observer under suitable conditions, there are only 2 sources for error. 1. Pointing the telescope 2. Reading the plates C A B
  • 66. Transit Field Notes 1d Mean  0-90 (4d)4 90-180 (4d + 360)  4 180-270 (4d + 720)  4 270-360 (4d + 1080)  4 Use longest side for backsite
  • 68. TOTAL STATION SET UP ► WHEN TOTAL STATION IS MOVED OR TRANSPORTED, IT MUST BE IN THE CASE!!!!!!!! 1. ESTABLISH TRIPOD OVER THE POINT. 2. OPEN THE CASE AND REMOVE TOTAL STATION, PLACING IT ON THE HEAD OF THE TRIPOD AND ATTACH SECURELY WITH CENTER SCREW. 3. CLOSE THE CASE. 4. GRASP TWO TRIPOD LEGS AND LOOK THROUGH THE OPTICAL PLUMB, ADJUST THE LEGS SO THAT BULLSEYE IS OVER THE POINT (KEEP THE TRIPOD HEAD AS LEVEL AS POSSIBLE). 5. UTILIZING THE TRIPOD LEG ADJUSTMENTS, LEVEL THE TOTAL STATION USING THE FISH-EYE BUBBLE. 6. LOOSEN THE CENTER SCREW TO ADJUST THE TOTAL STATION EXACTLY OVER THE POINT IF NEEDED. 7. COMPLETE LEVELING THE TOTAL STATION USING THE LEVEL VIAL. 8. CHECK TO MAKE SURE YOU ARE STILL ON THE POINT.
  • 69. TURNING ANGLES WITH TOTAL STATION 1. SIGHT ON THE BACKSIGHT UTILIZING THE HORIZONTAL ADJUSTMENT SCREW. 2. ZERO SET THE INSTRUMENT (THIS PROVIDES AN INNITIAL READING OF 0 SECONDS. 3. LOOSEN TANGENT SCREW AND ROTATE INSTRUMENT TO FORESIGHT. 4. TIGHTEN TANGENT SCREW AND BRING CROSS HAIR EXACT ON TARGET WITH ADJUSTMENT SCREW. 5. READ AND RECORD ANGLE AS DISPLAYED. TO CLOSE THE HORIZON: 1. SIGHT ON FORESIGHT POINT FROM ABOVE AND ZERO SET INSTRUMENT. 2. ROTATE TO FORMER BACKSIGHT AND ADJUST INSTRUMENT TO EXACT. 3. READ AND RECORD ANGLE AS DISPLAYED. ANGLE FROM DIRECT AND INDIRECT SHOULD EQUAL 360 DEGREES.
  • 70. TOTAL STATION DISTANCE MEASUREMENT 1. POINT THE INSTRUMENT AT A PRISM (WHICH IS VERTICAL OVER THE POINT. 2. PUSH THE MEASURE BUTTON AND RECORD THE DISTANCE. YOU CAN MEASURE THE HORIZONTAL DISTANCE OR THE SLOPE DISTANCE, IT IS IMPORTANT THAT YOU NOTE WHICH IS BEING COLLECTED. 1. IF YOU ARE MEASURING THE SLOPE DISTANCE, THE ZENITH ANGLE MUST BE RECORDED TO ALLOW THE HORIZONTAL DISTANCE TO BE COMPUTED. 2. IF YOU ARE COLLECTING TOPOGRAPHIC DATA WITH ELEVATIONS, IT IS IMPORTANT THAT THE HEIGHT OF THE INSTRUMENT AND THE HEIGHT OF THE PRISM BE COLLECTED AND RECORDED. THIS CAN ALSO BE SOLVED BY SETTING THE PRISM HEIGHT THE SAME AS THE INSTRUMENT HEIGHT.
  • 71. TOTAL STATION RULES 1. NEVER POINT THE INSTRUMENT AT THE SUN, THIS CAN DAMAGE THE COMPONENTS OF THE INSTRUMENT AS WELL AS CAUSE IMMEDIATE BLINDNESS. 2. NEVER MOVE OR TRANSPORT THE TOTAL STATION UNLESS IT IS IN THE CASE PROVIDED. 3. DO NOT ATTEMPT TO ROTATE THE INSTRUMENT UNLESS THE TANGENT SCREW IS LOOSE. 4. AVOID GETTING THE INSTRUMENT WET, IF IT DOES GET WET, WIPE IT DOWN AND ALLOW TO DRY IN A SAFE AREA BEFORE STORAGE. 5. BATTERIES OF THE TOTAL STATION ARE NICAD AND THUS MUST BE CHARGED REGULARLY. AT LEAST ONCE PER MONTH, THE BATTERY SHOULD BE CYCLED. 6. CARE SHOULD BE TAKEN AT ALL TIMES, THESE UNITS ARE EXPENSIVE ($8,000 - $45,000)
  • 72. Angles and Determination of Direction ► Angle – difference in direction of 2 lines  Another way of explaining is the amount of rotation about a central point  3 kinds of Horizontal angles: Exterior ( to right); Interior; Deflection  To turn an angle you need ► A reference line ► Direction of turning ► Angular distance  Angular Units ► Degrees, minutes, seconds (sexagesimal system)  Circle divided into 360 degrees  Each degree divided by 60 minutes  Each minute divided into 60 seconds ► Radians  1 radian = 1/2 of a circle = 0.1592*360 = 5717’44. 8” ► Grads (Centesimal System) – now called Gon  1/400 of a circle or 054’00” (100 gon = 90)
  • 73. Angles and Determination of Direction ► Angles turned in field must be accurate: 3X least count is max. error ► Check #1 – Close horizon when turning ► If traverse closes: sum of the interior angles should equal the sum of  (N-2)X180, N = Number of sides ► 3 angles = (3-2) 180 = 180 ► 4 angles = (4-2) 180 = 360 ► 8 angles = (8-2) 180 = 1080 ► 25 angles = (25-2) 180 = 4140  If an exterior angle exists, subtract it from 360 to obtain the interior   Angular closure should be checked before leaving the field
  • 74. Angles and Determination of Direction ► If angular adjustment does not divide out equally: 1. Do not go to decimal unless instrument reads to decimal 2. Observe field notes for angles with poor closure or where problems turning angles existed. Apply excess to these angles evenly. 3. If unable to view field notes or no apparent source, generally apply excess to angles with shortest sides ► Bearings/Azimuths  Bearing of a line is the acute horizontal angle between a reference meridian (North and South) and a line  Azimuth of a line is the horizontal angle measured from the North meridian clockwise to the line
  • 76. Angles and Determination of Direction 4 Point Comparison Bearing Azimuth 1. Numeric Value 0-90 0-360 2. Method of Expressing 2 letters & number Number only 3. Direction Clockwise & counterclockwise Clockwise 4. Position of 0 point North and South North It is always very important to have your field sketch properly oriented
  • 77. Angles and Determination of Direction Rectangular Coordinates ► Totally based on computation of right triangle North – South Movement = Latitude = D X cos A East – West Movement = Departure = D X sin A ► Latitude running North are +, South are – ► Departure running East are +, West are –
  • 78. Angles and Determination of Direction ► Basic Procedure 1. Determine Latitude and Departure 2. Sum Lat. and Departure to calc. closure 3. Obtain balanced Lat. and Dept. (Compass Rule) 4. Determine coordinates 5. Once rectangular coordinates are known on point, their exact location is known with respect to all other points in the network
  • 80. Angles and Determination of Direction ► Balancing Methods 1. Compass Rule: (Bowditch) Used when accuracy of  and length measurement is equal ► (Error Lat./Perimeter length) X Distance = Latitude Correction ► (Error Dept./Perimeter length) X Distance = Departure Correction 2. Transit Rule: Used if angles are more accurate than distances (more accurate direction) ► Correction Latitude (Side) = (Lat. Side/Sum all Lat.) X Lat. error ► Correction Departure (Side) = (Dept. Side/Sum all Dept.) X Dept. error 3. Crandall Method: Used when larger random error exists in linear measurements that angular. Directional adjustments from balancing are held fixed and distances are balanced by a weighted least squares procedure 4. Least Squares: Based on the theory of probability. Angular and linear adjustments are made simultaneously. Hand methods are long and complex not often done. Computer adjustment through existing software make it feasible, which is why it is often used today
  • 81. Area, Inverse, Intersection ► Once rectangular coordinates are established on all points, the relationship to all other points is known. You can: 1. Determine area of all or any portion 2. Determine length and direction between any 2 points 3. Locate new points by intersection
  • 82. Area, Inverse, Intersection ► Area: Method is area by cross multiplication Using example from traverse lecture: NA X EB + NB X EC + NC X ED + ND X EE + NE X EF + NF X EA = Sum N EA X NB + EB X NC + EC X ND + ED X NE + EE X NF + EF X NA = Sum E Difference in Sums/2 = Square feet Square feet/43560 = Acres A 10000.0000 5000.0000 B 10326.7981 5356.3614 C 9938.7277 5298.7122 D 9448.9156 4560.3990 E 9854.7405 4760.8417 F 10070.8565 4583.9559 A 10000.0000 5000.0000 Sum N = 294,119,678.8 Sum E = 293,663,353.6 456,325.2 / 2 = 228,162.6 ft2 = 5.24 Ac
  • 83. Area, Inverse, Intersection Example: Determine Area of A, D, E, F, A N = 186,116,759.8 E = 185,971,439.3 145,320.5 / 2 = 72,660.25 ft2 = 1.67 Ac  A 10000.0000 5000.0000 D 9448.9156 4560.3990 E 9854.7405 4760.8417 F 10070.8565 4583.9559 A 10000.0000 5000.0000
  • 84. Area, Inverse, Intersection ► Inverse: With known coordinates of any two points on a system, you find the distance and direction between the two C 9938.7277 5298.7122 D 9448.9156 4560.3990 489.8121 738.3132 ► To find the Inverse between 2 Points 1. Find difference in N & E of coordinates 2. Plot ► Use point you are going from 1st ► Plot longest side 1st 3. Determine length using Pythagorean (a2 + b2 = c2) 4. Determine reference direction 5. Determine local  using tan A = a/b 6. Determine line direction
  • 85. Area, Inverse, Intersection ► Example: Determine direction and distance D-A D 9448.9156 4560.3990 A 10000.0000 5000.0000 551.0844 439.6010
  • 86. Area, Inverse, Intersection ► Intersection: Determination of unknown point location with directions from two points known 1. Determine difference in coordinates 2. Plot points and line projections 3. Set up dual formulas (as Latitude and Departure) 4. Solve for length 5. Compute coordinate as sideshot C 9938.7277 5298.7122 D 9448.9156 4560.3990 489.8121 738.3132
  • 87. Area, Inverse, Intersection ► Example: What are the coordinates of the point of intersection of line C-F and D-A. Azimuth D-A = 3834’46”. Coordinates of D: N = 9448.9156, E = 4560.3990 C 9938.7277 5298.7122 F 10070.8565 4583.9559 132.1288 714.7563
  • 88. Horizontal and Vertical Curves ► Horizontal curves are the basis for most Right of Ways:  Go through formulas  Angle at PC and PT are always 90  Given any 2 elements T, L, C, R, D; the remainder can be completed Example: Horizontal curve, PC STA 201+00  D = 3615’00”  R = 1200.00’  T =  L =  C =  Seg =  PI STA =  PT STA =
  • 89. Horizontal and Vertical Curves ► Vertical Curves – Two major methods used to calculate vertical curves: Tangent offset and Equation of Parabola Information needed: 1. Grade or slope on each side of curve 2. Elevation and station of PVI 3. Curve length (Horizontal distance PVC – PVT)
  • 90. Horizontal and Vertical Curves Tangent Offset Method ► Procedure: 1. Compute the elevation of the PVC and PVT 2. Compute the elevation of Chord midpoint 3. Compute offset to curve at midpoint 4. Determine total number of stations covered 5. Determine tangent elevations at stations 6. Compute curve offset at stations 7. Combine data and determine vertical curve elevations
  • 91. Horizontal and Vertical Curves Equation of Parabola Method ► Equation: r = g2 - g1 / L  g1 = initial grade  r = change in grade/sta.  g2 = final grade  L = length of curve in stations ► Procedure: 1. Compute PVC and PVT elevations 2. Calculate total change in grade/station 3. Insert data to chart and compute final curve elevations To find the elevation at the high point or low point, find the station at which it fall and include that station in the elevation computations The equation gives the distance from the PVC in stations 1 pt -g x = r
  • 92. Leveling ► Leveling is the determination of the elevation of a point or difference between points referenced to some datum Terms: 1. Datum – any level surface to which elevations are referenced 2. Mean Sea Level (MSL) – the average height of the surface of the sea for all stages of the tide over a 19 year period at 26 tide stations along Pacific, Atlantic and Gulf 3. National Geodetic Vertical Datum – nationwide reference surface for elevations throughout the U.S. – made available by National Geodetic Survey (NGS), based on 1929 adjustment. 4. Benchmark – relatively permanent object bearing a marked point whose elevation above or below an adopted datum.
  • 93. Leveling ► Most often Mean Sea Level is used  MSL varies along the coasts  Pacific is almost 2’ higher than Atlantic and Gulf ► U.S. System: National Geodetic Vertical Datum of 1929  Has been used as reference for extensive network of BM’s  BM’s are periodically adjusted as to elevation ►Best to check with USGS or NGS for current elevation of a BM and also best to check between two known BM’s to verify elevation difference.
  • 94. Leveling ► The level surface parallels the curvature of the earth a level line is a curved line, normal () at all points to plumbline  Line of sight is only normal at point of instrument  A line with a sight distance of 1 mile using the earth’s radius as 3959 mile, curvature change is 0.667 feet.  Refraction of line of sight of level is downward by a small amount  The combined curvature & refraction amounts for short distances (normal sight dist. for levels) are:  100’ = 0.0002’  200’ = 0.0008’  300’ = 0.0019’  500’ = 0.0052 Value is small  for most instances can be neglected
  • 95. Leveling ► Most common leveling instrument today is the Automatic or Self-leveling level – has an internal compensator that automatically provides a horizontal line of sight and maintains this through gravity (prism hanging on pendulum) ► Differential Leveling: (Spirit Leveling) Most common type today  Determine the difference in elevation using a horizontal line of sight and readings on graduated rod  Circuit must be closed on BM of origin or on BM of equal accuracy  Process: 1. Reading on point of known elevation (BS) 2. BS reading + BM elevation = HI 3. Reading on point of unknown elevation (FS) 4. HI – FS = elevation of new point
  • 96. Leveling ► Systematic Error in Leveling 1. Inclination of line of sight due to curvature of earth and refraction – generally very minimal due to short sights 2. Inclination due to maladjustment of instrument  Both can be alleviated by equalizing length of BS and FS legs 3. Changes in scale of rod due to temperature  Usually ignored except in very precise work  Would use same process as tape correction 4. Rod not held plumb  Minimized by carefully plumbing the rod or more commonly known as “Rocking the Rod” and taking the lowest reading
  • 97. Leveling ► Peg Test 1. Set 2 marks at 300’ apart, also mark center point in a relatively flat area 2. Set level at midpoint and take readings at each end 3. Determine difference in readings (difference in elevation) 4. Move level to one end and setup so that level is just in front of rod on point 5. Read rod by looking backward through scope (X-hair not visible), hold pencil on rod to determine reading 6. Read rod at other end in normal manner 7. Difference in readings should equal #3 8. If values are not equal, there is error  Most instruments have adjustment screws  Adjust and repeat test as a check
  • 98. Seven Basic Rules of Differential Leveling 1. Balance length of BS and FS (300’ max) 2. Make sure gun is level and pendulum free 3. Turn through all BM’s 4. Give complete description of BM’s and TBM’s 5. Have rod rocked 6. Make sure turning points are solid 7. Close all circuits on BM of same degree of accuracy
  • 99. Other Random Errors 1. Incorrect rod reading – most common viewing foot number above and recording it 2. Parallax – having the X-hair not properly focused 3. Heat Waves – limit shot lengths
  • 100. Field Notes STA BS HI FS ELEV ►Sum BS – Sum FS = Difference of Elevation
  • 101. Closure Error ► Difference in measured elevation and know elevation ► Correction factor = closure / # turns Error = 0.09’ Turns = 12 Correction = 0.0075’ / turn ► If TBM’s set, break circuit into sections ► Figure correction factor the same ► Figure correction by taking CF X # turns in section
  • 102. Precise Leveling ► Precise Leveling – Accuracy obtained by quality of instruments and care taken in the field ► High quality automatic levels are utilized ► Level rods are equipped with rod level, rod shoe (to allow better setting on BM’s); scale (on rod) is made of invar steel (not affected by temp – generally called Invar Rod) ► Reading either taken by optical micrometer or a process called 3-wire leveling is used (all 3 wire are read and averaged)  Optical micrometer: line of sight deflected by turning micrometer screw to read subdivision on rod. ► Rod division is read as normal & then fractional reading taken from micrometer screw, thus on normal rod readings to 0.0001’ are possible
  • 103. Topographic Surveying ► Topographic surveying is the process of determining the positions, on the earth’s surface, of the natural, and artificial features of a given locality and of determining the configuration of the terrain.  Planimetry – location of features  Topography – configuration of the ground ►Both produce a topographic map which shows the true distance between objects & their elevations above a given datum ►Topos can be done by field methods, or by photogrammetric methods. (Photo also requires some field work) ►Topo map is 1st step in a construction project
  • 104. Topographic Surveying ► Scale and accuracy: Both depend on what used for ► Method of Representing:  Most common is Contour Line – Imaginary line on surface of the earth passing through points that have equal elevation  Contour Interval – Vertical distance between lines » Topo map with contour lines shows elevation of points on ground & shapes of topographic features (hills, etc.) ►USGS Topo – 10’ or 20’ contour intercal ►Subdivision – 2’ or 4’  Index Contour – every 5th contour drawn heavier on maps  Slopes & X-sections can be obtained from contours
  • 105. Topographic Surveying  Interpolating – can find elevation of any point or find contour line with known elevation of point  Contour lines that close represent either a hill or depression and can be represented as: ►Marks are called hatchures (used most in depressions)
  • 106. Characteristics of Contours 1. Each contour must close upon itself with within a map or outside its borders – a contour line cannot end on a map except at the edge 2. Contours do not cross or meet except in caves, cliffs & vertical walls where they can meet 3. Contour lines crossing streams form V’s pointing upstream 4. Contour lines crossing a ridge form U’s pointing down the ridge 5. Contour lines tend to parallel streams
  • 107. Characteristics of Contours 6. Contour lines are uniformly spaced on uniform slopes 7. Horizontal spacing between contour lines indicated steepness of slope on ground 8. Contours are generally perpendicular to direction of maximum slope 9. Contours can never branch into 2 contours of the same elevation
  • 108. Field Methods of Topos Factors That Influence Method 1. Scale of map 2. Contour interval 3. Type of terrain 4. Nature of project 5. Equipment available 6. Required accuracy 7. Existing control 8. Extent of area to be mapped
  • 109. Field Methods of Topos Methods: 1. Cross section – railroad of highway 2. Trace contour – drainage or impoundments 3. Grid – small areas 4. Controlling point – large area, plane table 5. Theodolite & EDM - radial
  • 110. Field Methods of Topos Cross Section Method (Plus Offset): Equipment used: Transit, tape, and level 1. Establish horizontal control – traverse between control points – stakes set at cross section intervals 2. Run profile of traverse line 3. Take cross section 4. Locate planimetric features from traverse line
  • 111. Field Methods of Topos Trace Contour: 1. Contour is by traverse 2. Establish elevation of each station 3. Contour elevation established and is then followed by rodperson 4. Contour elevation is marked, then tied to traverse line by plus-offset  Most accurate and expensive work  Elevation of reservoir water line  2 transit use
  • 112. Field Methods of Topos Grid Method: 1. Establish baselines 2. Estimate grid of uniform size – smaller grid = more accurate 3. Number grid 4. Shoot elevation at each point 5. Tie existing objects to grid points
  • 113. Field Methods of Topos Controlling Point Method: (old and sketched in field) 1. Determine position & elevation of pre-selected control points 2. Depends greatly on experience & judgment of people doing work 3. Required traverse of area (CP’s) 4. Locations are made & elevations obtained along control points – then intermittent topo sketched in
  • 114. Field Methods of Topos Theodolite & EDM (Radial)  Replaces tacheometry (stadia) 1. Establish control points (horizontal and elevation) 2. Shoot locations and turn vertical angles 3. Used for large areas
  • 115. Field Methods of Topos Common mistakes in topo surveys: 1. Improper selection of contour interval 2. Unsatisfactory equipment or field method for the particular survey and terrain conditions 3. Insufficient horizontal and vertical control of suitable precision 4. Omission of some topographic details
  • 116. Mine Surveying ► Points are on roof of mine Reasons needed 1. Location in respect to boundaries 2. Location in respect to other shafts 3. Accurate maps (above and below ground) 4. Quantities Equipment and Terms ► Spad – Beams that you hold plumb bob from ► Bracket – Mounting instrument from timber supports ► Trivet – Tripod that’s about 1’ tall ► Gyroscope – Locate north ► Laser vertical collimator – located point at top of vertical shaft platform ► Plumb shaft – Using piano wire then wiggle in at bottom
  • 117. Global Positioning Systems (GPS) ► Developed in early 1980’ s (Dept. of Defense) ► Made up of 26 satellites (24 functioning & 2 spares) ► Each satellite is 20,000 km high (off Earth’s surface) ► Each satellite is in a fixed position ► Minimum of 3 satellites needed, but 4-5 preferred ► Need satellites at least 15° above horizon ► Locate positions on Earth by distance-distance intersection ► Need 2-3 receivers ($80-$100K per system) ► Most accurate with double occupancy (no other checks) ► Differential GPS – one receiver on known point, other receiver on unknowns
  • 118. Global Positioning Systems (GPS) Biggest advantage ► Distance and direction in-between 2 points without being seen Downfalls/Limitations of GPS ► Multipath – bouncing off of walls of buildings ► Blocked signals – clouds, trees, etc. ► Sunspot – defraction from atmosphere ► DOP (Delusion of Position) – bad satellite position ► Set up error – not set up exactly over point (human error – most common)
  • 119. Global Positioning Systems (GPS) Methods ► Static – observation time is at least an hour  Ideally set points in triangular fashion  Accuracy – 1/10 million ► RTK (Real Time Kinematic) – stand for 30-60 seconds minimum  Base receivers transmission, does corrections, sends corrections to receivers  Limitations – limitation of transmitter signal
  • 120. Geographic Information Systems (GIS) ► GIS are computer programs that allow users to store, retrieve, manipulate, analyze and display spatial data ► Spatial Data (Geographic data) – any data that represents information about the Earth GIS components  Recent definitions of GIS suggest that is consists of: 1. Hardware (computer and operating system) 2. Software 3. Data 4. Human Operators and Institutional Infrastructure Geographic/Spatial Non-Geographic/Aspatial/Attribute
  • 121. GIS Data Structures ► Vector – Made up of points, lines, and polygons
  • 122. GIS Data Structures ► Raster (Grids) – Made up of pixels of computer screen
  • 123. GIS Data Structures ► DEM (Digital Elevation Model) – Digital terrain representation technique, where elevation values are stored in raster cells
  • 124. Future of Surveying ► Major advances in future  Remote Sensing (Government and Military)  Arial Photographs ► Design Professions  Every 10 years, must justify to Legislature that need for our license exists  Surveyor have ULTIMATE liability  Standards → Laws  Continuing Education – Enough points every 2 years