Consider a SDLC Waterfall environment
with multiple projects
Requirements
3 wks
Design
3 wks
Build
6 wks
Test
4 wks
Deploy
4 wks
Requirements
3 wks
Design
3 wks
Build
6 wks
Test
4 wks
Deploy
4 wks
Requirements
3 wks
Design
3 wks
Build
6 wks
Test
4 wks
Deploy
4 wks
Which Logic should
be used to stagger
and prioritize these
projects and tasks?
1. Stagger projects based on the
constraint. Launch projects As Late As
Possible*.
Requirements
3 wks
Design
3 wks
Build
6 wks
Test
4 wks
Deploy
4 wks
Requirements
3 wks
Design
3 wks
Build
6 wks
Test
4 wks
Requirements
3 wks
Design
3 wks
Buil
6 wk
* Subordinating everything to the constraint. No Reason to begin project #2 sooner –
that will only increase the WIP and may lead to multi-tasking and incorrect
prioritization of tasks by developers and team leaders.
2. Use Shared Buffers, move safeties to
the end using CCPM methodology
Test
2 wks
Deploy
2 wks
Reqs
1.5 wk
Desgn
1.5 wk
Build
3 wks
Project Buffer
5 wks
Requirements
3 wks
Design
3 wks
Build
6 wks
Test
4 wks
Deploy
4 wks
3. Use Buffer Consumption and Project
Completion to determine prioritization
between tasks.
Test
2 wks
Deploy
2 wks
Reqs
1.5 wk
Desgn
1.5 wk
Build
3 wks
Project Buffer
5 wks
Test
2 wks
Deploy
2 wks
Desgn
2 wks
Build
2 wks
Project Buffer
4 wks
Project A – Project Completed 60%, Buffer Consumption 50%.
Project B – Project Completed 50%, Buffer Consumption 50%.
Therefore Test Resources will be working on Project B before Project A due
to higher priority based on the Buffer Index (Project Completion/Buffer
Consumption)
What is the Program
Manager role in an IT
multi-projects
environment?
1. Maintain low Work In Progress (WIP).
Only Constraints need to be fully
occupied.
2. Ensure quick issues resolution and
tasks priorities discipline enforced by
PMs.
3. Make sure projects and tasks have all
resources and other dependencies
ready before beginning
For more information please
contact Yossi Bonomo
mail@yossibonomo.com
913-230-2230
LinkedIn/in/yossibonomo

Mais conteúdo relacionado

Mais procurados

Masie slides Agile_Scrum
Masie slides Agile_ScrumMasie slides Agile_Scrum
Masie slides Agile_Scrum
daveberz
 

Mais procurados (20)

Software Testing, Everyone's responsibility
Software Testing, Everyone's responsibilitySoftware Testing, Everyone's responsibility
Software Testing, Everyone's responsibility
 
Team wide testing
Team wide testingTeam wide testing
Team wide testing
 
Software architecture in a DevOps world
Software architecture in a DevOps worldSoftware architecture in a DevOps world
Software architecture in a DevOps world
 
A culture of Automation - Joe Smith - DevOpsDays Tel Aviv 2017
A culture of Automation - Joe Smith - DevOpsDays Tel Aviv 2017A culture of Automation - Joe Smith - DevOpsDays Tel Aviv 2017
A culture of Automation - Joe Smith - DevOpsDays Tel Aviv 2017
 
Devops syllabus
Devops syllabusDevops syllabus
Devops syllabus
 
Debugging distributed systems
Debugging distributed systemsDebugging distributed systems
Debugging distributed systems
 
JavaLand 2022 - Debugging distributed systems
JavaLand 2022 - Debugging distributed systemsJavaLand 2022 - Debugging distributed systems
JavaLand 2022 - Debugging distributed systems
 
DevQAOps - Surviving in a DevOps World
DevQAOps - Surviving in a DevOps WorldDevQAOps - Surviving in a DevOps World
DevQAOps - Surviving in a DevOps World
 
Skills Matter DevSecOps eXchange Forum 2022 - Software architecture in a DevO...
Skills Matter DevSecOps eXchange Forum 2022 - Software architecture in a DevO...Skills Matter DevSecOps eXchange Forum 2022 - Software architecture in a DevO...
Skills Matter DevSecOps eXchange Forum 2022 - Software architecture in a DevO...
 
JavaLand 2022 - Software architecture in a DevOps world
JavaLand 2022 - Software architecture in a DevOps worldJavaLand 2022 - Software architecture in a DevOps world
JavaLand 2022 - Software architecture in a DevOps world
 
Debugging distributed systems
Debugging distributed systemsDebugging distributed systems
Debugging distributed systems
 
Continuous integration
Continuous integrationContinuous integration
Continuous integration
 
Adopting continuous delivery in video games - Pipeline Conference 2018
Adopting continuous delivery in video games - Pipeline Conference 2018Adopting continuous delivery in video games - Pipeline Conference 2018
Adopting continuous delivery in video games - Pipeline Conference 2018
 
DevOps(1) : What's DevOps - (MOSG)
DevOps(1) : What's DevOps - (MOSG)DevOps(1) : What's DevOps - (MOSG)
DevOps(1) : What's DevOps - (MOSG)
 
JUG CH September 2021 - Debugging distributed systems
JUG CH September 2021 - Debugging distributed systemsJUG CH September 2021 - Debugging distributed systems
JUG CH September 2021 - Debugging distributed systems
 
TDC 2021 - Better software, faster: Principles of Continuous Delivery and DevOps
TDC 2021 - Better software, faster: Principles of Continuous Delivery and DevOpsTDC 2021 - Better software, faster: Principles of Continuous Delivery and DevOps
TDC 2021 - Better software, faster: Principles of Continuous Delivery and DevOps
 
Improving Agility (Learning from Maersk Line's Journey) | Özlem Yüce | Agile ...
Improving Agility (Learning from Maersk Line's Journey) | Özlem Yüce | Agile ...Improving Agility (Learning from Maersk Line's Journey) | Özlem Yüce | Agile ...
Improving Agility (Learning from Maersk Line's Journey) | Özlem Yüce | Agile ...
 
Security Implications for a DevOps Transformation
Security Implications for a DevOps TransformationSecurity Implications for a DevOps Transformation
Security Implications for a DevOps Transformation
 
Sandstorm or Significant? The evolving role of situational context in inciden...
Sandstorm or Significant? The evolving role of situational context in inciden...Sandstorm or Significant? The evolving role of situational context in inciden...
Sandstorm or Significant? The evolving role of situational context in inciden...
 
Masie slides Agile_Scrum
Masie slides Agile_ScrumMasie slides Agile_Scrum
Masie slides Agile_Scrum
 

Semelhante a Advanced CCPM concepts for IT Program Management

Project mangement chp 1 12
Project mangement chp 1 12Project mangement chp 1 12
Project mangement chp 1 12
Dreams Design
 
HOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEM
HOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEMHOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEM
HOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEM
RebekahSamuel2
 
Agility : a Velvet Glove in an Iron FIst
Agility : a Velvet Glove in an Iron FIstAgility : a Velvet Glove in an Iron FIst
Agility : a Velvet Glove in an Iron FIst
HSBC Private Bank
 

Semelhante a Advanced CCPM concepts for IT Program Management (20)

[DPE Summit] How Improving the Testing Experience Goes Beyond Quality: A Deve...
[DPE Summit] How Improving the Testing Experience Goes Beyond Quality: A Deve...[DPE Summit] How Improving the Testing Experience Goes Beyond Quality: A Deve...
[DPE Summit] How Improving the Testing Experience Goes Beyond Quality: A Deve...
 
Project mangement chp 1 12
Project mangement chp 1 12Project mangement chp 1 12
Project mangement chp 1 12
 
24-scrum.ppt
24-scrum.ppt24-scrum.ppt
24-scrum.ppt
 
Scrum and Agile Software Development
Scrum and Agile Software DevelopmentScrum and Agile Software Development
Scrum and Agile Software Development
 
24 scrum
24 scrum24 scrum
24 scrum
 
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
 
Agile Adoption - What's the Payoff?
Agile Adoption - What's the Payoff? Agile Adoption - What's the Payoff?
Agile Adoption - What's the Payoff?
 
The Waterfall Model
The Waterfall ModelThe Waterfall Model
The Waterfall Model
 
Scrum in a nutshell
Scrum in a nutshellScrum in a nutshell
Scrum in a nutshell
 
ANI | Flow Based Development- A Venture of the 5G Development Team | Ravindra...
ANI | Flow Based Development- A Venture of the 5G Development Team | Ravindra...ANI | Flow Based Development- A Venture of the 5G Development Team | Ravindra...
ANI | Flow Based Development- A Venture of the 5G Development Team | Ravindra...
 
Unit2 scheduling wbs_network
Unit2 scheduling wbs_networkUnit2 scheduling wbs_network
Unit2 scheduling wbs_network
 
Unit2 scheduling wbs_network Management
Unit2 scheduling wbs_network Management Unit2 scheduling wbs_network Management
Unit2 scheduling wbs_network Management
 
Critical Chain Project Management
Critical Chain Project ManagementCritical Chain Project Management
Critical Chain Project Management
 
Chapter 2 Time boxing & agile models
Chapter 2   Time boxing & agile modelsChapter 2   Time boxing & agile models
Chapter 2 Time boxing & agile models
 
224 - Factors Impacting Rapid Releases: An Industrial Case Study
224 - Factors Impacting Rapid Releases: An Industrial Case Study224 - Factors Impacting Rapid Releases: An Industrial Case Study
224 - Factors Impacting Rapid Releases: An Industrial Case Study
 
Sage Project Management
Sage Project Management Sage Project Management
Sage Project Management
 
FTSProc: a Process to Alleviate the Challenges of Projects that Use the Follo...
FTSProc: a Process to Alleviate the Challenges of Projects that Use the Follo...FTSProc: a Process to Alleviate the Challenges of Projects that Use the Follo...
FTSProc: a Process to Alleviate the Challenges of Projects that Use the Follo...
 
MGT 402 EXceptional Education/snaptutorial.COM
MGT 402 EXceptional Education/snaptutorial.COMMGT 402 EXceptional Education/snaptutorial.COM
MGT 402 EXceptional Education/snaptutorial.COM
 
HOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEM
HOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEMHOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEM
HOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEM
 
Agility : a Velvet Glove in an Iron FIst
Agility : a Velvet Glove in an Iron FIstAgility : a Velvet Glove in an Iron FIst
Agility : a Velvet Glove in an Iron FIst
 

Último

Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 

Último (20)

Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 

Advanced CCPM concepts for IT Program Management

  • 1. Advanced CCPM Concepts for IT Program Management Yossi Bonomo
  • 2. Consider a SDLC Waterfall environment with multiple projects Requirements 3 wks Design 3 wks Build 6 wks Test 4 wks Deploy 4 wks Requirements 3 wks Design 3 wks Build 6 wks Test 4 wks Deploy 4 wks Requirements 3 wks Design 3 wks Build 6 wks Test 4 wks Deploy 4 wks
  • 3. Which Logic should be used to stagger and prioritize these projects and tasks?
  • 4. 1. Stagger projects based on the constraint. Launch projects As Late As Possible*. Requirements 3 wks Design 3 wks Build 6 wks Test 4 wks Deploy 4 wks Requirements 3 wks Design 3 wks Build 6 wks Test 4 wks Requirements 3 wks Design 3 wks Buil 6 wk * Subordinating everything to the constraint. No Reason to begin project #2 sooner – that will only increase the WIP and may lead to multi-tasking and incorrect prioritization of tasks by developers and team leaders.
  • 5. 2. Use Shared Buffers, move safeties to the end using CCPM methodology Test 2 wks Deploy 2 wks Reqs 1.5 wk Desgn 1.5 wk Build 3 wks Project Buffer 5 wks Requirements 3 wks Design 3 wks Build 6 wks Test 4 wks Deploy 4 wks
  • 6. 3. Use Buffer Consumption and Project Completion to determine prioritization between tasks. Test 2 wks Deploy 2 wks Reqs 1.5 wk Desgn 1.5 wk Build 3 wks Project Buffer 5 wks Test 2 wks Deploy 2 wks Desgn 2 wks Build 2 wks Project Buffer 4 wks Project A – Project Completed 60%, Buffer Consumption 50%. Project B – Project Completed 50%, Buffer Consumption 50%. Therefore Test Resources will be working on Project B before Project A due to higher priority based on the Buffer Index (Project Completion/Buffer Consumption)
  • 7. What is the Program Manager role in an IT multi-projects environment?
  • 8. 1. Maintain low Work In Progress (WIP). Only Constraints need to be fully occupied. 2. Ensure quick issues resolution and tasks priorities discipline enforced by PMs. 3. Make sure projects and tasks have all resources and other dependencies ready before beginning
  • 9. For more information please contact Yossi Bonomo mail@yossibonomo.com 913-230-2230 LinkedIn/in/yossibonomo