220 KV GRID SUB STATION IG NAGAR JAIPUR :-
SUBMITTED TO:- SUBMITTED BY:-
Miss. VICKY JAIN SURENDRA KUMAR MEENA
Lecturer
SINE INTERNATIONAL INSTITUTE OF TECHNOLOGY,
JAIPUR
RAJASTHAN TECHNICAL UNIVERSITY, KOTA
In India Electrecal power is Generated at a voltage
of 11kv to 33kv ,which is taken stepped up to the
transmission level in the range of 66kv to 400kv
member of transmission and switching have to be
created these are known as ”Substation”.
Substation is an assembly of apparatus ,which
transform the characteristics of electrical energy
from one form to another say from one voltage
level to another level. hence a substation is an
Intermedate link between the Genrating station
and consumer
Fig.1 – 220 KV GSS ,IG NAGAR JAIPUR
Substations have switching, protection and control equipment and one
or more transformers. In a large substation, circuit breaker are used to
interrupt any short-circuits or overload currents that may occur on the
network
220KV INDRA GANDHI NAGAR
GRID SUBSTATION
220kv IGN s/s is a convensional, hybrid substaion.
It is part of transmission system.
33kv substation is gas insulated substation which is
inside the control room.
 for communication purpose PLCC is used.
INCOMING FEEDER:
 220KV PURANA GHAT LINE-1.
 220KV PURANA GHAT LINE-2.
 220KV BASSI LINE.
 220KV HEERAPURA LINE.
OUTGOING FEEDER:
 132KV PURANAGHAT.
 132KV SITAPURA.
 132KV MNIT(UNDER CONSTRUTION).
33KV FEEDER:
 JAGATPURA.
 INDRA GANDHI NAGAR.
 BISALPUR.
 SIDDHARTH MARG.
 PRADHAN MARG.
CONTENTS:-
 LIGHTNING ARRESTOR.
 INSULATER.
 POWER TRANSFORMER.
 CURRENT TRANSFOMER.
 CIRCUIT BREAKER.
 BUSBARS.
 PROTECTIVE RELAY.
 CONTROL PANEL.
 POTENTIAL TRANSFORMER
 SINGLE LINE DIAGRAM
 WAVE TRAP.
 CONCLUSION
LIGHTNING ARRESTOR
 Lightning arrestor provide protection to all the
equipment against the HV.an electric discharge
between cloud and earth ,between cloud and
charge enters of some loud is known as lightning.
 It is provide to safety transmission &distribution
line.
INSULATER
An electrical insulator is
a material whose
internal electric charge
do not flow freely and
therefor make it very
hard to conduct an
electric current under
the influence of an
electric field.
POWER TRANSFORMER
•For stepping up or down the system voltage, power transformers are used in
the substations. At generating end, the voltage is only stepped up for
transmission of power while at all the subsequent substations the voltage is
gradually stepped down to reach finally to working voltage level
CURRENT TRANSFORMER
The current
transformer are used to
stepped down .
It is used to
measurement/control/
protection.
CIRCUIT BREAKER
 Circuit breaker are used for
switching and protection.
 Brake a circuit and
automatically under fault
condition.
 A circuit breaker consist of
fixed and moving contact
called electrode under
normal condition.
BUSBARS
 Bus bars are common
electrical component
through which a
large no. of feeders
operating at some
voltage have to
connected.
 It is used to connect
to transmission line
which go to
electricity.
 It is used to high
material conductor.
PROTECTIVE REALAY
 A Protective relay is a
device which detect
the fault.
 It is to detect after
their go to command
circuit breaker
 It is provide to safety
in electrical
equipments.
CONTROL PANEL
CONTROL PANEL
 Color coding:-
1. 33kv (Green)
2. 132kv (black)
3. 220kv (Broun)
4. 440kv (indigo)
5. 110kv (orange)
POTENTIAL TRANSFORMER
The potential transformer is used to one electrical
form to another form .
It is used to measurment of current &voltage.
WAVE TRAP:-
SINGLE LINE DIAGRAM:-
CONCLUSION
 An Engineer need to have not just theoretical but
practical as well as and so every student is supposed to
undergo a practical training .session after 3rd year
where I have impaired the knowledge about
transmission ,distribution .during the 45 days training
session. we have acquainted with the repairing of a
transformer and testing of transformer. At last is
would like to say that practical training taken at 220kv
gss ig nagar has broadened my knowledge and
widened my thinking as a professional.
ANY QUERY

Mais conteúdo relacionado

Mais procurados

Basis principles of hvdc
Basis principles of hvdcBasis principles of hvdc
Basis principles of hvdc
rakesh_rath
 
FAULT ANALISIS IN HVDC & HVAC TRANSMISSION LINE
FAULT ANALISIS IN HVDC & HVAC TRANSMISSION LINEFAULT ANALISIS IN HVDC & HVAC TRANSMISSION LINE
FAULT ANALISIS IN HVDC & HVAC TRANSMISSION LINE
Dr. Babasaheb Ambedkar Technological University
 

Mais procurados (20)

High Voltage Direct Current Transmission System
High Voltage Direct Current Transmission SystemHigh Voltage Direct Current Transmission System
High Voltage Direct Current Transmission System
 
315564438 hvdc-transmission-ppt
315564438 hvdc-transmission-ppt315564438 hvdc-transmission-ppt
315564438 hvdc-transmission-ppt
 
HVDC Transmission System Today's Upgrading Technology
HVDC Transmission System Today's Upgrading TechnologyHVDC Transmission System Today's Upgrading Technology
HVDC Transmission System Today's Upgrading Technology
 
HVDC
HVDCHVDC
HVDC
 
Hvdc transmission system
Hvdc transmission systemHvdc transmission system
Hvdc transmission system
 
Basis principles of hvdc
Basis principles of hvdcBasis principles of hvdc
Basis principles of hvdc
 
Applications of power electronics in HVDC
Applications of  power electronics in HVDCApplications of  power electronics in HVDC
Applications of power electronics in HVDC
 
HVDC benefits and types
HVDC benefits and typesHVDC benefits and types
HVDC benefits and types
 
HVDC presentation
HVDC presentationHVDC presentation
HVDC presentation
 
FAULT ANALISIS IN HVDC & HVAC TRANSMISSION LINE
FAULT ANALISIS IN HVDC & HVAC TRANSMISSION LINEFAULT ANALISIS IN HVDC & HVAC TRANSMISSION LINE
FAULT ANALISIS IN HVDC & HVAC TRANSMISSION LINE
 
Hvdc notes
Hvdc notesHvdc notes
Hvdc notes
 
High Voltage Direct Current(Hvdc) transmission
High Voltage Direct Current(Hvdc) transmissionHigh Voltage Direct Current(Hvdc) transmission
High Voltage Direct Current(Hvdc) transmission
 
Hvdc
HvdcHvdc
Hvdc
 
Conventional and emerging converter technologies in hvdc power transmission s...
Conventional and emerging converter technologies in hvdc power transmission s...Conventional and emerging converter technologies in hvdc power transmission s...
Conventional and emerging converter technologies in hvdc power transmission s...
 
FAULT ANALYSIS OF HVDC TRANSMISSION SYSTEMS
FAULT ANALYSIS OF HVDC TRANSMISSION SYSTEMSFAULT ANALYSIS OF HVDC TRANSMISSION SYSTEMS
FAULT ANALYSIS OF HVDC TRANSMISSION SYSTEMS
 
Edited hvdc2222upload
Edited hvdc2222uploadEdited hvdc2222upload
Edited hvdc2222upload
 
HVDC
HVDC HVDC
HVDC
 
1 hvdc systems_in_india
1 hvdc systems_in_india1 hvdc systems_in_india
1 hvdc systems_in_india
 
MUSTAFA MASS HVDC PPT
MUSTAFA MASS HVDC PPTMUSTAFA MASS HVDC PPT
MUSTAFA MASS HVDC PPT
 
Lightning Characteristics and Impulse Voltage.
Lightning Characteristics and Impulse Voltage.Lightning Characteristics and Impulse Voltage.
Lightning Characteristics and Impulse Voltage.
 

Semelhante a seminnnskjsk

Semelhante a seminnnskjsk (20)

Omprakash mahawar ppt
Omprakash mahawar pptOmprakash mahawar ppt
Omprakash mahawar ppt
 
My training
My trainingMy training
My training
 
33kv substation
33kv substation33kv substation
33kv substation
 
Shashikdoc
ShashikdocShashikdoc
Shashikdoc
 
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
 
Training report on 400 kV GSS
Training report on 400 kV GSSTraining report on 400 kV GSS
Training report on 400 kV GSS
 
220kv GSS, VKIA, jaipur
220kv GSS, VKIA, jaipur 220kv GSS, VKIA, jaipur
220kv GSS, VKIA, jaipur
 
New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660
 
PPT ON 220KV GSS
PPT ON 220KV GSSPPT ON 220KV GSS
PPT ON 220KV GSS
 
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish BairwaPPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
 
Switchyard design overview
Switchyard design overviewSwitchyard design overview
Switchyard design overview
 
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG  INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
 
sub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxsub subsation seminar ppt.pptx
sub subsation seminar ppt.pptx
 
220 kv gss sitapua ppt sk95
220 kv gss sitapua ppt sk95220 kv gss sitapua ppt sk95
220 kv gss sitapua ppt sk95
 
INVERTER BY PANKAJ CHAUDHARY
INVERTER BY PANKAJ CHAUDHARYINVERTER BY PANKAJ CHAUDHARY
INVERTER BY PANKAJ CHAUDHARY
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptx
TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptxTRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptx
TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptx
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 

Último

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 

Último (20)

Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 

seminnnskjsk

  • 1. 220 KV GRID SUB STATION IG NAGAR JAIPUR :- SUBMITTED TO:- SUBMITTED BY:- Miss. VICKY JAIN SURENDRA KUMAR MEENA Lecturer SINE INTERNATIONAL INSTITUTE OF TECHNOLOGY, JAIPUR RAJASTHAN TECHNICAL UNIVERSITY, KOTA
  • 2. In India Electrecal power is Generated at a voltage of 11kv to 33kv ,which is taken stepped up to the transmission level in the range of 66kv to 400kv member of transmission and switching have to be created these are known as ”Substation”. Substation is an assembly of apparatus ,which transform the characteristics of electrical energy from one form to another say from one voltage level to another level. hence a substation is an Intermedate link between the Genrating station and consumer
  • 3. Fig.1 – 220 KV GSS ,IG NAGAR JAIPUR Substations have switching, protection and control equipment and one or more transformers. In a large substation, circuit breaker are used to interrupt any short-circuits or overload currents that may occur on the network
  • 4. 220KV INDRA GANDHI NAGAR GRID SUBSTATION 220kv IGN s/s is a convensional, hybrid substaion. It is part of transmission system. 33kv substation is gas insulated substation which is inside the control room.  for communication purpose PLCC is used.
  • 5. INCOMING FEEDER:  220KV PURANA GHAT LINE-1.  220KV PURANA GHAT LINE-2.  220KV BASSI LINE.  220KV HEERAPURA LINE.
  • 6. OUTGOING FEEDER:  132KV PURANAGHAT.  132KV SITAPURA.  132KV MNIT(UNDER CONSTRUTION). 33KV FEEDER:  JAGATPURA.  INDRA GANDHI NAGAR.  BISALPUR.  SIDDHARTH MARG.  PRADHAN MARG.
  • 7. CONTENTS:-  LIGHTNING ARRESTOR.  INSULATER.  POWER TRANSFORMER.  CURRENT TRANSFOMER.  CIRCUIT BREAKER.  BUSBARS.  PROTECTIVE RELAY.  CONTROL PANEL.  POTENTIAL TRANSFORMER  SINGLE LINE DIAGRAM  WAVE TRAP.  CONCLUSION
  • 8. LIGHTNING ARRESTOR  Lightning arrestor provide protection to all the equipment against the HV.an electric discharge between cloud and earth ,between cloud and charge enters of some loud is known as lightning.  It is provide to safety transmission &distribution line.
  • 9. INSULATER An electrical insulator is a material whose internal electric charge do not flow freely and therefor make it very hard to conduct an electric current under the influence of an electric field.
  • 10. POWER TRANSFORMER •For stepping up or down the system voltage, power transformers are used in the substations. At generating end, the voltage is only stepped up for transmission of power while at all the subsequent substations the voltage is gradually stepped down to reach finally to working voltage level
  • 11. CURRENT TRANSFORMER The current transformer are used to stepped down . It is used to measurement/control/ protection.
  • 12. CIRCUIT BREAKER  Circuit breaker are used for switching and protection.  Brake a circuit and automatically under fault condition.  A circuit breaker consist of fixed and moving contact called electrode under normal condition.
  • 13. BUSBARS  Bus bars are common electrical component through which a large no. of feeders operating at some voltage have to connected.  It is used to connect to transmission line which go to electricity.  It is used to high material conductor.
  • 14. PROTECTIVE REALAY  A Protective relay is a device which detect the fault.  It is to detect after their go to command circuit breaker  It is provide to safety in electrical equipments.
  • 16. CONTROL PANEL  Color coding:- 1. 33kv (Green) 2. 132kv (black) 3. 220kv (Broun) 4. 440kv (indigo) 5. 110kv (orange)
  • 17. POTENTIAL TRANSFORMER The potential transformer is used to one electrical form to another form . It is used to measurment of current &voltage.
  • 20. CONCLUSION  An Engineer need to have not just theoretical but practical as well as and so every student is supposed to undergo a practical training .session after 3rd year where I have impaired the knowledge about transmission ,distribution .during the 45 days training session. we have acquainted with the repairing of a transformer and testing of transformer. At last is would like to say that practical training taken at 220kv gss ig nagar has broadened my knowledge and widened my thinking as a professional.
  • 21.