1 Courtesy, in part, of Motorola SPS. Thank You! Welcome To Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
2 Courtesy, in part, of Motorola SPS. Thank You! About T.P.M. After World War ll. Japanese industries determined that to complete successfully in the world market they had to improve the quality of their products. to do so, they imported management and manufacturing techniques from United States and adapted them to their circumstances. Subsequently, their products became known throughout the world for their superior quality, focusing world attention on Japanese- style management techniques. TPM DEVELOPMENT PROGRAM Implementing Total Productive Maintenance Seiichi Nakajima. Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
3 Courtesy, in part, of Motorola SPS. Thank You! WHAT IS T.P.M. ?? Definition of T.P.M  : T.P.M. IS: A PRODUCTIVE MANUFACTURING SYSTEM with the TOTAL Participation of:  Managers, Supervisors,  Engineers, Technicians and Operators. T.P.M. Includes the Following Benefits: •  Maximize Overall Equipment Effectiveness •  Establishment a Complete System of Maintenance for the Machine Entire Life •  Create a Better Work Environment,  Promoting the Participation for All Employees Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
4 Courtesy, in part, of Motorola SPS. Thank You! T.P.M. = Medical Science of Equipment PRODUCTION Foton AUTOMATION B-820 VIDEO-AUTO DIE-BONDER MODEL 8030A POWER HEATER Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
5 Courtesy, in part, of Motorola SPS. Thank You! The Main objective of TPM is : Zero  Interruptions Zero  Defects Zero  Accidents Throughout total employees participation from Top Management to Operators, based in the following activities: Autonomous Maintenance •  Planned  Maintenance •  Individual Improvement •  Quality Maintenance •  Early Equipment Management •  Education/Training (People Development) •  Safety Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
6 Courtesy, in part, of Motorola SPS. Thank You! PILLARS  OF  TPM A U T O N O M O U S M A I N T E N A N C E Q U A L I T Y M A I N T E N A N C E P L A N N E D M A I N T E N A N C E I N D I V I D U A L I M P R O V E M E N T T R A I N I N G P E O P L E D E V E L O S A F E T Y E H S E A R L Y E Q U I P M A N A G E M E N T P 5S´s Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
7 Courtesy, in part, of Motorola SPS. Thank You! T.P.M. Total Productive Manufacturing People , Equipment and Product Improvement by Working Together. EXCELLENCE Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
8 Courtesy, in part, of Motorola SPS. Thank You! PLANT OVERVIEW PLANT OVERVIEW Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
9 Courtesy, in part, of Motorola SPS. Thank You! TPM Self Assessment PLANT OVERVIEW TPM Self Assessment Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
10 Courtesy, in part, of Motorola SPS. Thank You! TPM Self Assessment Background: ∆ 1991  First attempt to implement TPM. ∆ TPM consultant provides training to selected Managers, Supervisors and Engineers. ∆ One coordinator with experience in Process and Maintenance is assigned to lead TPM. ∆ Literature and materials, prepared and distributed.  Lack of support and involvement results on failing the implementation. Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
11 Courtesy, in part, of Motorola SPS. Thank You! TPM Self Assessment 1996 ∆ One Staff Mgr. is assigned to lead the TPM Implementation plant wide. ∆ A core team is formed on  2Q/96  with key people from different departments to coordinate the implementation. ∆ Model equipment is selected based on bottle neck operation. ∆ Equipment conditions analysis performed. ∆ Most of the teams cover the initial cleaning. ∆ Activities are focused on six big losses detected and 5 S´s implementation. Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
12 Courtesy, in part, of Motorola SPS. Thank You! Asia Benchmarking PLANT OVERVIEW TPM Self Assessment Asia Benchmarking Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
13 Courtesy, in part, of Motorola SPS. Thank You! TPM Benchmarking Asia Facilities Facility 1 April 1996 Facility 2 Facility 3 Committee: Objective: Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 May June 4 Chosen Folks Learn from Asia success experiences in TPM implementation and come up with directions for Plant implementation. TPM Awareness Information
14 Courtesy, in part, of Motorola SPS. Thank You! Benchmarking Conclusions  Total management involvement.  T.P.M. Manager (dedicated).  A well defined implementation process.  Provide people with time to work on it. ( 4- 6 Hr./wk ).  Each staff has their own T.P.M. Promoter full time.  Focused in Consultant X model.  Focused in just one product line per area.  Budget assigned for consulting and external training. Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
15 Courtesy, in part, of Motorola SPS. Thank You! TPM PLANT OVERVIEW TPM Self Assessment Asia Benchmarking TPM Implementation Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 Implementation TPM Awareness Information
16 Courtesy, in part, of Motorola SPS. Thank You! IMPLEMENTATION/CONSULTANT * Q3 1996,  Consultant X  is selected to be Consultant. * Training of Managers, Team leaders and Team members * Master Plan Defined * TPM. implementation initiated according to Consultant X recommendations Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
17 Courtesy, in part, of Motorola SPS. Thank You! T.P.M. POLICY #  ESTABLISH AN  INTEGRATED  STRUCTURE  TO  PROMOTE  T.P.M. AS A COMPANY CULTURE. #  MAXIMIZE OVERALL EQUIPMENT EFFECTIVENESS #  TOTAL EMPLOYEE  INVOLVEMENT. #  CULTIVATE  EQUIPMENT & PROCESS  RELATED EXPERTISE  THROUGHOUT SHOP FLOOR. ( Autonomous Maintenance, Planned Maintenance etc..) #  ESTABLISH A  RELIABILITY AND MAINTAINABILITY SYSTEM TO MAXIMIZE EQUIPMENT LIFE TIME. (Planned  Maintenance  Autonomous Maintenance, Individual Improvement, Early Equipment Management.) #  ALL EMPLOYEES  MUST  PARTICIPATE  IN T.P.M TRAINING PROGRAM. #  ALL AREAS  MUST FOLLOW T.P.M. ESTABLISHED GUIDE LINES. #  DEPARTMENT HEAD  IS  RESPONSIBLE  TO ACCOMPLISH AND SUPPORT T.P.M. GOALS. Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
18 Courtesy, in part, of Motorola SPS. Thank You! T.P.M. PLANT WIDE STRUCTURE TPM T.P.M. Office Responsible Plant Manager 5 ´s Autonomous Maintenance Planned Maintenance Individual Improvement Quality Maintenance Early Equipment Management Safety Training People Development Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
19 Courtesy, in part, of Motorola SPS. Thank You! PROMOTION STRUCTURE (OVERLAPPING SMALL GROUPS) PLANT MANAGER STAFF MANAGERS OPERATIONS TPM PILLARS & PROMOTION OFFICE TPM PROMOTERS Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information DEPARTMENT MANAGERS DEPARTMENT SUPERVISORS TPM TEAM
20 Courtesy, in part, of Motorola SPS. Thank You! VISION STATEMENT: TPM PLANT WIDE IMPLEMENTATION Q1 2000 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
21 Courtesy, in part, of Motorola SPS. Thank You! T.P.M. IMPLEMENTATION ACTIVITIES MANAGER TEAMS Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
22 Courtesy, in part, of Motorola SPS. Thank You! PREPARATION / PLANNING STAGE # DEFINE PILOT LINES # AMOUNT OF MACHINES INCLUDED PER LINE # DEFINE CORE TEAM MEMBERS OF EACH LINE # SELECT TEAM MEMBERS PER MACHINE # START ACTIVITIES IN PILOT MACHINES (bottle neck.) Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
B-820 B-609 V-701 23 Courtesy, in part, of Motorola SPS. Thank You! Line and Machine Selection B-820 Machine 1 Machine 2 N-661 POWER HEATER Machine 3 Machine 4 B-609 V-701 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
S T A R T T A TPM Implementation Plan ACTIVITIES DEFINE STRATEGIES 1996  1997  1998  1999  2000 Q3  Q4  Q1  Q2  Q3  Q4  Q1  Q2  Q3  Q4  Q1  Q2  Q3  Q4  Q1  Q2 PREPARATION STAGE MASTER PLAN ORGANIZATION INTRODUCTION TRAINING PUBLICITY 1 T P M 2 3 I M P L E M E N T A MODEL MACHINES Machine 1 Machine 2 Machine 3 Machine 4 EXTEND IMPLEMENTATION SIMILAR PRODUCTION LINES K I C K O F F AUTONOMOUS MAINTENANCE & REDUCE 6 BIG LOSSES EXTEND SIMILAR MACHINES 30% to 50% T I O N R G E T COMPLETE IMPLEMENTATION DEFINED AREAS 100%
TPM 90 Days Explosion Plan October November December ww40  ww41  ww42  ww43  ww44  ww45  ww46  ww47  ww48  ww49  ww50  ww51  ww52 Machine 1 PILOT TEAM Step 3 Planned maintenance 6 big losses Individual Improvement Start Start Start Start 10 Extension teams 19 Extension teams step 1-2 Start step 1 4 mc 7 mc 3 mc 6 mc 3 mc 6 mc Machine 2 PILOT TEAM Step 2-3 Planned maintenance Start Start 6 big losses Individual Improvement Step 1 Step 2 Step 1 11 Extension teams step 1-2 B-613 3 mc 2 mc  2 mc B-601 L-604 Machine 3 PILOT TEAM Step 2-3 Planned maintenance 6 big losses Individual Improvement Start Start Start Start 6 Extension teams 2 Extension teams Machine 4 PILOT TEAM step 1-2 Start step 1 Step 1-2 Start Start 2 mc 4 mc Planned maintenance 6 big losses Individual Improvement Start Start Start 4 extension teams Start step 1 a-820  a-821  J-701  J-601 PILLARS IMPLEMENTATION MODEL GANTT TPM Activity Board  Extension Teams Server Data collection M1 M2 M3 M4 GM Audit Team presentations TPM Office Audit Consultant visit TPM Meeting Local BOOT CAMP TPM MCOE MEETING, JAPAN Pillars meeting
M C O D E N I A L M M E N T T I R E S I S T A N C E E X P L O R A T I O N 26 Courtesy, in part, of Motorola SPS. Thank You! T.P.M. TRANSITION CURVE POLICIES DEVELOPMENT T.P.M. PROMOTION OFFICE START MANAGEMENT MACHINES FOCUS IN FEW EQUIPMENT T.P.M. PROMOTION DELEGATION INCLUDE T.P.M. IN PERFORMANCE MANAGEMENT PLAN. INCLUDE T.P.M. IN JOB KICK OFF FOCUS TRAINING SUCCESS STORIES 5 S´s CONSULTANT IN DESCRIPTION. ACCELERATED DEPLOYMENT. CONSULTANT OUT DEVELOP DATA COLLECTION SYSTEM ATTENTION TO FOCUS TEAMS TRAINING DEPLOYMENT IMPLEMENTATION PLAN RESOURCE IMPLEMENTATION GOALS SETTING FOR ALL ORGANIZATION. LOOK FOR ADDITIONAL WAYS TO DEPLOY T.P.M. FINISH CONFLICT WITH THE CULTURE ORGANIZATION ALIGNMENT REWARD SYSTEM CONTROL CHAOS Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
2X 27 Courtesy, in part, of Motorola SPS. Thank You! KEY GOALS 1.- TOTAL EQUIPMENT EFFECTIVENESS A) Equipment Breakdown B) M.T.B.A. C) M.T.B.F. 2.- REJECT CAUSED BY LINE EQUIPMENT 3.- LINE REJECT RATE 4.- CYCLE TIME 5.- FATAL ERROR AT CUSTOMER 6.- ON TIME DELIVERED 7.- MANUFACTURING COST % HOURS/MONTH MINUTES HOURS PPM % DAYS # OF % USD 85 1/10 1x10x 1x2x 1/5 1/5 0.8X 0 98 20% LESS 8.- LABOR PRODUCTIVITY Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 K.UNITS /# OF D/L TPM Awareness Information
28 Courtesy, in part, of Motorola SPS. Thank You! AUTONOMOUS MAINTENANCE. MANUFACTURING  SPECIALIST Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
29 Courtesy, in part, of Motorola SPS. Thank You! AUTONOMOUS MAINTENANCE IS: Maintenance performed by equipment operators. THE FIRST 3 STEPS OF AUTONOMOUS MAINTENANCE. STEP # 1  INITIAL CLEANING. STEP # 2  COUNTERMEASURES FOR THE CAUSES OF FORCED DETERIORATION AND IMPROVING HARD-TO-ACCESS AREAS . STEP # 3 MAKING A TENTATIVE CLEANING/ LUBRICATION STANDARD. Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
3 7 2 30 Courtesy, in part, of Motorola SPS. Thank You! AUTONOMOUS MAINTENANCE 5 4 Selection Formats: Daily Cleaning & Initial Inspection Hot Spots, CAP-DO 5W´s  Develop One Major Problems  Point lesson 6 Put F Tags Step # 1 Initial Cleaning Standardization Cleaning / Lubrication Initial Cleaning (Inspection) Training in One Point Lesson Photos Before Photos After 1 8 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
3 7 31 Courtesy, in part, of Motorola SPS. AUTONOMOUS MAINTENANCE 5 Thank You! 4 Put “F” Tags Failures Analysis Why´s Analysis Actions in Sources of Contamination & Hard access areas Step # 2 6 Find & List Areas of Hard Access Sources of Contamination & Hard Access Areas Modify Covers For Easy Visualization & Quick Disassemble Find & List Sources of Contamination Remove “F” Tags Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 2 Initial Inspection Final Inspection (Audit) 1 TPM Awareness Information 8
4 6 3 7 3 32 Courtesy, in part, of Motorola SPS. AUTONOMOUS MAINTENANCE 5 Thank You! Verify actual time Improve time of execution Detail activities Vs estimated Put “F” Tags (Establish time & frequency) Step # 3 Tentative Standards Remove “ F” Tags Cleaning / Lubrication implementation Apply  activities to similar machines 2 2 Develop tentative standards 8 1 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
44 34 27 1 2 33 Courtesy, in part, of Motorola SPS. Thank You! TPM Teams Status October 1997 • Number of Hot Spots detected: • Number of Hot Spots solved: • One Point Lesson developed: • One Point Lesson Taught: • Number of teams on TPM: • Teams on step 3: • Teams on step 2: • Teams on step 1: 284 126 24 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
34 Courtesy, in part, of Motorola SPS. Thank You! PLANT OVERVIEW TPM Self Assessment Asia Benchmarking TPM Implementation Expansion Plan Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 Expansion Plan TPM Awareness Information
1 9 9 8 35 Courtesy, in part, of Motorola SPS. Thank You! T.P.M. DEPLOYMENT L I N E F L O W CURRENT EQUIPMENT IN T.P.M. SAME KIND OF EQUIPMENT 1999/2000 EXPANSION 1997 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
Line 36 Courtesy, in part, of Motorola SPS. Thank You! PROJECTED PROGRESS IN TEAMS Q-1’ 98 A.M. STEP # 1 A.M. STEP # 2 A.M. STEP # 3 Wafer Process Line 1 Line 2 Line 3 Line 4 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 11 03 03 04 TPM Awareness Information 16 11 08 01 03 01 01 01
37 Courtesy, in part, of Motorola SPS. Thank You! T.P.M. FOLLOW-UP TEAMS PRESENTATION TEAMS AUDITS TEAMS MEETING Consultant X  MANAGERS VISITS  PRESENTATION 6 TEAMS PER MONTH 6 TEAMS PER MONTH WEEKLY TWO DAY EVERY TWO MONTHLY MEETING MONTHS Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
38 Courtesy, in part, of Motorola SPS. Thank You! PLANT OVERVIEW TPM Self Assessment Asia Benchmarking TPM Implementation Expansion Plan Pilot Team Case Study Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 Pilot Team Case Study TPM Awareness Information
39 Courtesy, in part, of Motorola SPS. Thank You! PILOT MACHINE N-62361 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
40 Courtesy, in part, of Motorola SPS. Thank You! Defectives 30 25 20 23 20 25 22 18 20 21 17 19 23 15 10 5 5 7 8 6 5 9 6 3 4 3 3 2 4 6 8 6 5 4 7 6 0 N-662361 N-61162 N-634766 JAN 96 JUN FEB JUL MAR AUG APR SEP MAY OCT 96 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
%T.C. ENE./96 MAR MAY JUL OCT./96 ABR %T.C. ABR AGO ENE./96 AGO MAR MAY SEP FEB JUN JUL SEP FEB JUN OCT./96 %T.C. FEB JUN AGO MAR OCT./96 ENE./96 MAY ABR JUL SEP 41 Courtesy, in part, of Motorola SPS. Thank You! DOWN TIME 25% 23% 23% 20% 20% 20% N-662361 15% 10% 17% 18% 12% 15% 18% 18% 5% 0% 25% 20% N-663242 15% 10% 5% 12% 11% 10% 11% 8% 9% 7% 6% 8% 10% 0% 25,00% 20,00% 15,00% N-649666 10,00% 5,00% 7,50% 8% 4% 7% 9% 5% 3% 5% 6% 8% 0,00% Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
42 Courtesy, in part, of Motorola SPS. Thank You! CLEANING IS INSPECTION.... 5’S AUTONOMOUS MAINTENANCE Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
43 Courtesy, in part, of Motorola SPS. Thank You! INSPECTION IS DETECTION. CRASH Broken Part Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
44 Courtesy, in part, of Motorola SPS. Thank You! PRESSURE CORRECT INCORRECT TO MUCH PRESSURE CORRECT GAUGE ALIGNMENT INCORRECT NO Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
45 Courtesy, in part, of Motorola SPS. Thank You! CORRECT CENTERING INCORRECT Dummy Part CORRECT SYMMETRY Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information INCORRECT BENT
46 Courtesy, in part, of Motorola SPS. Thank You! CONTACT CORRECT INCORRECT Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
47 Courtesy, in part, of Motorola SPS. Thank You! TO STANDARDIZE AND PREVENT RECURRENCE One Point Lesson Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
48 Courtesy, in part, of Motorola SPS. Thank You! MACHINE PERFORMANCE Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
Abr May Oct-96 Sep-96 Dec-96 Jan-97 Ago Mar Feb Jun Jul %D.T. Nov-96 Apr May Dec-96 Jan-97 Feb Oct-96 Mar Aug Sep Jun Jul Sep 49 Courtesy, in part, of Motorola SPS. Thank You! Defectives 25 20 15 23 18 “ ZERO” 10 10 6 Defectives 5 3 1 2 0 0 0 0 0 0 25% 20% 18% DOWN TIME 20% P.C. BOARD DAMAGED 15% 15% 12% 10% 5% 9% 8% 7% 5% 6% 4% 3% 3% 0% Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
3 50 Courtesy, in part, of Motorola SPS. Thank You! WHAT IS NEXT? 6 Big LINK Losses 4 4 Autonomous Maintenance Planned Maintenance Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
51 Courtesy, in part, of Motorola SPS. Thank You! Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information

Mais conteúdo relacionado

Mais procurados

Dfmea for engine systems
Dfmea for engine systemsDfmea for engine systems
Dfmea for engine systems
Kamal Vora
 
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Flevy.com Best Practices
 

Mais procurados (20)

Rcm
RcmRcm
Rcm
 
FMEA Basic
FMEA BasicFMEA Basic
FMEA Basic
 
Introduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceIntroduction to Reliability Centered Maintenance
Introduction to Reliability Centered Maintenance
 
Is Reliability Centered Maintenance (RCM) right for you?
Is Reliability Centered Maintenance (RCM) right for you?Is Reliability Centered Maintenance (RCM) right for you?
Is Reliability Centered Maintenance (RCM) right for you?
 
Dfmea for engine systems
Dfmea for engine systemsDfmea for engine systems
Dfmea for engine systems
 
Design fmea
Design fmeaDesign fmea
Design fmea
 
Reliability Centered Maintenance Made Simple
Reliability Centered Maintenance Made SimpleReliability Centered Maintenance Made Simple
Reliability Centered Maintenance Made Simple
 
How to implement an effective fmea process
How to implement an effective fmea processHow to implement an effective fmea process
How to implement an effective fmea process
 
Rcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsRcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teams
 
Failure Mode and Effects Analysis WithAdrian™ FMEA 2013 Adrian Beale
Failure Mode and Effects Analysis WithAdrian™ FMEA 2013 Adrian BealeFailure Mode and Effects Analysis WithAdrian™ FMEA 2013 Adrian Beale
Failure Mode and Effects Analysis WithAdrian™ FMEA 2013 Adrian Beale
 
Automated FMECA Technology for Tomorrow
Automated FMECA Technology for TomorrowAutomated FMECA Technology for Tomorrow
Automated FMECA Technology for Tomorrow
 
The Antidote to Implementation Failure in the World of Asset Management
The Antidote to Implementation Failure in the World of Asset ManagementThe Antidote to Implementation Failure in the World of Asset Management
The Antidote to Implementation Failure in the World of Asset Management
 
RCM
RCMRCM
RCM
 
Demystifying the Common Misconceptions about Reliability Centered Maintenance...
Demystifying the Common Misconceptions about Reliability Centered Maintenance...Demystifying the Common Misconceptions about Reliability Centered Maintenance...
Demystifying the Common Misconceptions about Reliability Centered Maintenance...
 
F.M.E.C.A pdf
F.M.E.C.A pdfF.M.E.C.A pdf
F.M.E.C.A pdf
 
Rcm terminology and concepts
Rcm terminology and conceptsRcm terminology and concepts
Rcm terminology and concepts
 
The Basics Of Failures
The Basics Of FailuresThe Basics Of Failures
The Basics Of Failures
 
Uptime Magazine - Failure Reporting Article
Uptime Magazine - Failure Reporting ArticleUptime Magazine - Failure Reporting Article
Uptime Magazine - Failure Reporting Article
 
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
 
Why RCM Doesn\'t Work
Why RCM Doesn\'t WorkWhy RCM Doesn\'t Work
Why RCM Doesn\'t Work
 

Semelhante a 1.tpm awareness information en

TPM Training HON Torrance
TPM Training HON TorranceTPM Training HON Torrance
TPM Training HON Torrance
Wayne Miller
 
Ams total productive maintenance
Ams total productive maintenanceAms total productive maintenance
Ams total productive maintenance
vivekmsmech
 
TPM_Basic Concept with the applictaion.ppt
TPM_Basic Concept with the applictaion.pptTPM_Basic Concept with the applictaion.ppt
TPM_Basic Concept with the applictaion.ppt
khurshedlakho
 

Semelhante a 1.tpm awareness information en (20)

Tpm how it_can_work
Tpm how it_can_workTpm how it_can_work
Tpm how it_can_work
 
Total Productivity Management (TPM)
Total Productivity Management (TPM)Total Productivity Management (TPM)
Total Productivity Management (TPM)
 
Srj tpm
Srj tpmSrj tpm
Srj tpm
 
tpm tracking for machine shope--by ganesh kadam
tpm tracking for machine shope--by ganesh kadamtpm tracking for machine shope--by ganesh kadam
tpm tracking for machine shope--by ganesh kadam
 
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
Total Productive Maintenance (TPM) for EVERTS  20Aug2018Total Productive Maintenance (TPM) for EVERTS  20Aug2018
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
 
PQT - Total Productive Maintenance
PQT - Total Productive MaintenancePQT - Total Productive Maintenance
PQT - Total Productive Maintenance
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
 
OEE - One Metric to Rule them All
OEE - One Metric to Rule them AllOEE - One Metric to Rule them All
OEE - One Metric to Rule them All
 
Total Productive Mantainence
Total Productive MantainenceTotal Productive Mantainence
Total Productive Mantainence
 
Cpm 200 C technical performance measures ipm2016
Cpm 200 C technical performance measures ipm2016Cpm 200 C technical performance measures ipm2016
Cpm 200 C technical performance measures ipm2016
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
TPM Training HON Torrance
TPM Training HON TorranceTPM Training HON Torrance
TPM Training HON Torrance
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
Tpm
Tpm Tpm
Tpm
 
Tpm
Tpm Tpm
Tpm
 
TPM
TPMTPM
TPM
 
John Deere 444k Specs Service Repair Manuals.pdf
John Deere 444k Specs Service Repair Manuals.pdfJohn Deere 444k Specs Service Repair Manuals.pdf
John Deere 444k Specs Service Repair Manuals.pdf
 
Ams total productive maintenance
Ams total productive maintenanceAms total productive maintenance
Ams total productive maintenance
 
TPM_Basic Concept with the applictaion.ppt
TPM_Basic Concept with the applictaion.pptTPM_Basic Concept with the applictaion.ppt
TPM_Basic Concept with the applictaion.ppt
 
John Deere 644h 644h Mh Service Repair Manual.pdf
John Deere 644h 644h Mh Service Repair Manual.pdfJohn Deere 644h 644h Mh Service Repair Manual.pdf
John Deere 644h 644h Mh Service Repair Manual.pdf
 

Mais de 營松 林

Observation report 20070720
Observation report 20070720Observation report 20070720
Observation report 20070720
營松 林
 
現場改善與管理寶典
現場改善與管理寶典現場改善與管理寶典
現場改善與管理寶典
營松 林
 
5.全面交期管理
5.全面交期管理5.全面交期管理
5.全面交期管理
營松 林
 
2.ie培訓教材
2.ie培訓教材2.ie培訓教材
2.ie培訓教材
營松 林
 
全面品質管理 東吳王超弘
全面品質管理  東吳王超弘全面品質管理  東吳王超弘
全面品質管理 東吳王超弘
營松 林
 
02 spc訓練教材
02 spc訓練教材02 spc訓練教材
02 spc訓練教材
營松 林
 
04 ppap training material
04 ppap training material04 ppap training material
04 ppap training material
營松 林
 
02training material for msa
02training material for msa02training material for msa
02training material for msa
營松 林
 
03 fmea表格使用說明
03 fmea表格使用說明03 fmea表格使用說明
03 fmea表格使用說明
營松 林
 
02 fmea training
02 fmea training02 fmea training
02 fmea training
營松 林
 
先期產品品質規劃 華宇
先期產品品質規劃  華宇先期產品品質規劃  華宇
先期產品品質規劃 華宇
營松 林
 
Manufacturing excellence
Manufacturing excellenceManufacturing excellence
Manufacturing excellence
營松 林
 
Zhiii skincare fe&r12(for media) 20110906
Zhiii skincare fe&r12(for media) 20110906Zhiii skincare fe&r12(for media) 20110906
Zhiii skincare fe&r12(for media) 20110906
營松 林
 

Mais de 營松 林 (17)

Observation report 20070720
Observation report 20070720Observation report 20070720
Observation report 20070720
 
現場改善與管理寶典
現場改善與管理寶典現場改善與管理寶典
現場改善與管理寶典
 
5.全面交期管理
5.全面交期管理5.全面交期管理
5.全面交期管理
 
5 s book
5 s book5 s book
5 s book
 
2.ie培訓教材
2.ie培訓教材2.ie培訓教材
2.ie培訓教材
 
全面品質管理 東吳王超弘
全面品質管理  東吳王超弘全面品質管理  東吳王超弘
全面品質管理 東吳王超弘
 
02 spc訓練教材
02 spc訓練教材02 spc訓練教材
02 spc訓練教材
 
04 ppap training material
04 ppap training material04 ppap training material
04 ppap training material
 
02training material for msa
02training material for msa02training material for msa
02training material for msa
 
03 fmea表格使用說明
03 fmea表格使用說明03 fmea表格使用說明
03 fmea表格使用說明
 
02 fmea training
02 fmea training02 fmea training
02 fmea training
 
01 fmea
01 fmea01 fmea
01 fmea
 
先期產品品質規劃 華宇
先期產品品質規劃  華宇先期產品品質規劃  華宇
先期產品品質規劃 華宇
 
Apqp-en
Apqp-enApqp-en
Apqp-en
 
O&E
O&EO&E
O&E
 
Manufacturing excellence
Manufacturing excellenceManufacturing excellence
Manufacturing excellence
 
Zhiii skincare fe&r12(for media) 20110906
Zhiii skincare fe&r12(for media) 20110906Zhiii skincare fe&r12(for media) 20110906
Zhiii skincare fe&r12(for media) 20110906
 

Último

Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
yulianti213969
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 

Último (20)

PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
KALYANI 💋 Call Girl 9827461493 Call Girls in Escort service book now
KALYANI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowKALYANI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
KALYANI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableNanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 

1.tpm awareness information en

  • 1. 1 Courtesy, in part, of Motorola SPS. Thank You! Welcome To Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 2. 2 Courtesy, in part, of Motorola SPS. Thank You! About T.P.M. After World War ll. Japanese industries determined that to complete successfully in the world market they had to improve the quality of their products. to do so, they imported management and manufacturing techniques from United States and adapted them to their circumstances. Subsequently, their products became known throughout the world for their superior quality, focusing world attention on Japanese- style management techniques. TPM DEVELOPMENT PROGRAM Implementing Total Productive Maintenance Seiichi Nakajima. Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 3. 3 Courtesy, in part, of Motorola SPS. Thank You! WHAT IS T.P.M. ?? Definition of T.P.M : T.P.M. IS: A PRODUCTIVE MANUFACTURING SYSTEM with the TOTAL Participation of: Managers, Supervisors, Engineers, Technicians and Operators. T.P.M. Includes the Following Benefits: • Maximize Overall Equipment Effectiveness • Establishment a Complete System of Maintenance for the Machine Entire Life • Create a Better Work Environment, Promoting the Participation for All Employees Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 4. 4 Courtesy, in part, of Motorola SPS. Thank You! T.P.M. = Medical Science of Equipment PRODUCTION Foton AUTOMATION B-820 VIDEO-AUTO DIE-BONDER MODEL 8030A POWER HEATER Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 5. 5 Courtesy, in part, of Motorola SPS. Thank You! The Main objective of TPM is : Zero Interruptions Zero Defects Zero Accidents Throughout total employees participation from Top Management to Operators, based in the following activities: Autonomous Maintenance • Planned Maintenance • Individual Improvement • Quality Maintenance • Early Equipment Management • Education/Training (People Development) • Safety Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 6. 6 Courtesy, in part, of Motorola SPS. Thank You! PILLARS OF TPM A U T O N O M O U S M A I N T E N A N C E Q U A L I T Y M A I N T E N A N C E P L A N N E D M A I N T E N A N C E I N D I V I D U A L I M P R O V E M E N T T R A I N I N G P E O P L E D E V E L O S A F E T Y E H S E A R L Y E Q U I P M A N A G E M E N T P 5S´s Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 7. 7 Courtesy, in part, of Motorola SPS. Thank You! T.P.M. Total Productive Manufacturing People , Equipment and Product Improvement by Working Together. EXCELLENCE Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 8. 8 Courtesy, in part, of Motorola SPS. Thank You! PLANT OVERVIEW PLANT OVERVIEW Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 9. 9 Courtesy, in part, of Motorola SPS. Thank You! TPM Self Assessment PLANT OVERVIEW TPM Self Assessment Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 10. 10 Courtesy, in part, of Motorola SPS. Thank You! TPM Self Assessment Background: ∆ 1991 First attempt to implement TPM. ∆ TPM consultant provides training to selected Managers, Supervisors and Engineers. ∆ One coordinator with experience in Process and Maintenance is assigned to lead TPM. ∆ Literature and materials, prepared and distributed.  Lack of support and involvement results on failing the implementation. Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 11. 11 Courtesy, in part, of Motorola SPS. Thank You! TPM Self Assessment 1996 ∆ One Staff Mgr. is assigned to lead the TPM Implementation plant wide. ∆ A core team is formed on 2Q/96 with key people from different departments to coordinate the implementation. ∆ Model equipment is selected based on bottle neck operation. ∆ Equipment conditions analysis performed. ∆ Most of the teams cover the initial cleaning. ∆ Activities are focused on six big losses detected and 5 S´s implementation. Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 12. 12 Courtesy, in part, of Motorola SPS. Thank You! Asia Benchmarking PLANT OVERVIEW TPM Self Assessment Asia Benchmarking Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 13. 13 Courtesy, in part, of Motorola SPS. Thank You! TPM Benchmarking Asia Facilities Facility 1 April 1996 Facility 2 Facility 3 Committee: Objective: Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 May June 4 Chosen Folks Learn from Asia success experiences in TPM implementation and come up with directions for Plant implementation. TPM Awareness Information
  • 14. 14 Courtesy, in part, of Motorola SPS. Thank You! Benchmarking Conclusions  Total management involvement.  T.P.M. Manager (dedicated).  A well defined implementation process.  Provide people with time to work on it. ( 4- 6 Hr./wk ).  Each staff has their own T.P.M. Promoter full time.  Focused in Consultant X model.  Focused in just one product line per area.  Budget assigned for consulting and external training. Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 15. 15 Courtesy, in part, of Motorola SPS. Thank You! TPM PLANT OVERVIEW TPM Self Assessment Asia Benchmarking TPM Implementation Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 Implementation TPM Awareness Information
  • 16. 16 Courtesy, in part, of Motorola SPS. Thank You! IMPLEMENTATION/CONSULTANT * Q3 1996, Consultant X is selected to be Consultant. * Training of Managers, Team leaders and Team members * Master Plan Defined * TPM. implementation initiated according to Consultant X recommendations Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 17. 17 Courtesy, in part, of Motorola SPS. Thank You! T.P.M. POLICY # ESTABLISH AN INTEGRATED STRUCTURE TO PROMOTE T.P.M. AS A COMPANY CULTURE. # MAXIMIZE OVERALL EQUIPMENT EFFECTIVENESS # TOTAL EMPLOYEE INVOLVEMENT. # CULTIVATE EQUIPMENT & PROCESS RELATED EXPERTISE THROUGHOUT SHOP FLOOR. ( Autonomous Maintenance, Planned Maintenance etc..) # ESTABLISH A RELIABILITY AND MAINTAINABILITY SYSTEM TO MAXIMIZE EQUIPMENT LIFE TIME. (Planned Maintenance Autonomous Maintenance, Individual Improvement, Early Equipment Management.) # ALL EMPLOYEES MUST PARTICIPATE IN T.P.M TRAINING PROGRAM. # ALL AREAS MUST FOLLOW T.P.M. ESTABLISHED GUIDE LINES. # DEPARTMENT HEAD IS RESPONSIBLE TO ACCOMPLISH AND SUPPORT T.P.M. GOALS. Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 18. 18 Courtesy, in part, of Motorola SPS. Thank You! T.P.M. PLANT WIDE STRUCTURE TPM T.P.M. Office Responsible Plant Manager 5 ´s Autonomous Maintenance Planned Maintenance Individual Improvement Quality Maintenance Early Equipment Management Safety Training People Development Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 19. 19 Courtesy, in part, of Motorola SPS. Thank You! PROMOTION STRUCTURE (OVERLAPPING SMALL GROUPS) PLANT MANAGER STAFF MANAGERS OPERATIONS TPM PILLARS & PROMOTION OFFICE TPM PROMOTERS Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information DEPARTMENT MANAGERS DEPARTMENT SUPERVISORS TPM TEAM
  • 20. 20 Courtesy, in part, of Motorola SPS. Thank You! VISION STATEMENT: TPM PLANT WIDE IMPLEMENTATION Q1 2000 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 21. 21 Courtesy, in part, of Motorola SPS. Thank You! T.P.M. IMPLEMENTATION ACTIVITIES MANAGER TEAMS Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 22. 22 Courtesy, in part, of Motorola SPS. Thank You! PREPARATION / PLANNING STAGE # DEFINE PILOT LINES # AMOUNT OF MACHINES INCLUDED PER LINE # DEFINE CORE TEAM MEMBERS OF EACH LINE # SELECT TEAM MEMBERS PER MACHINE # START ACTIVITIES IN PILOT MACHINES (bottle neck.) Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 23. B-820 B-609 V-701 23 Courtesy, in part, of Motorola SPS. Thank You! Line and Machine Selection B-820 Machine 1 Machine 2 N-661 POWER HEATER Machine 3 Machine 4 B-609 V-701 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 24. S T A R T T A TPM Implementation Plan ACTIVITIES DEFINE STRATEGIES 1996 1997 1998 1999 2000 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 PREPARATION STAGE MASTER PLAN ORGANIZATION INTRODUCTION TRAINING PUBLICITY 1 T P M 2 3 I M P L E M E N T A MODEL MACHINES Machine 1 Machine 2 Machine 3 Machine 4 EXTEND IMPLEMENTATION SIMILAR PRODUCTION LINES K I C K O F F AUTONOMOUS MAINTENANCE & REDUCE 6 BIG LOSSES EXTEND SIMILAR MACHINES 30% to 50% T I O N R G E T COMPLETE IMPLEMENTATION DEFINED AREAS 100%
  • 25. TPM 90 Days Explosion Plan October November December ww40 ww41 ww42 ww43 ww44 ww45 ww46 ww47 ww48 ww49 ww50 ww51 ww52 Machine 1 PILOT TEAM Step 3 Planned maintenance 6 big losses Individual Improvement Start Start Start Start 10 Extension teams 19 Extension teams step 1-2 Start step 1 4 mc 7 mc 3 mc 6 mc 3 mc 6 mc Machine 2 PILOT TEAM Step 2-3 Planned maintenance Start Start 6 big losses Individual Improvement Step 1 Step 2 Step 1 11 Extension teams step 1-2 B-613 3 mc 2 mc 2 mc B-601 L-604 Machine 3 PILOT TEAM Step 2-3 Planned maintenance 6 big losses Individual Improvement Start Start Start Start 6 Extension teams 2 Extension teams Machine 4 PILOT TEAM step 1-2 Start step 1 Step 1-2 Start Start 2 mc 4 mc Planned maintenance 6 big losses Individual Improvement Start Start Start 4 extension teams Start step 1 a-820 a-821 J-701 J-601 PILLARS IMPLEMENTATION MODEL GANTT TPM Activity Board Extension Teams Server Data collection M1 M2 M3 M4 GM Audit Team presentations TPM Office Audit Consultant visit TPM Meeting Local BOOT CAMP TPM MCOE MEETING, JAPAN Pillars meeting
  • 26. M C O D E N I A L M M E N T T I R E S I S T A N C E E X P L O R A T I O N 26 Courtesy, in part, of Motorola SPS. Thank You! T.P.M. TRANSITION CURVE POLICIES DEVELOPMENT T.P.M. PROMOTION OFFICE START MANAGEMENT MACHINES FOCUS IN FEW EQUIPMENT T.P.M. PROMOTION DELEGATION INCLUDE T.P.M. IN PERFORMANCE MANAGEMENT PLAN. INCLUDE T.P.M. IN JOB KICK OFF FOCUS TRAINING SUCCESS STORIES 5 S´s CONSULTANT IN DESCRIPTION. ACCELERATED DEPLOYMENT. CONSULTANT OUT DEVELOP DATA COLLECTION SYSTEM ATTENTION TO FOCUS TEAMS TRAINING DEPLOYMENT IMPLEMENTATION PLAN RESOURCE IMPLEMENTATION GOALS SETTING FOR ALL ORGANIZATION. LOOK FOR ADDITIONAL WAYS TO DEPLOY T.P.M. FINISH CONFLICT WITH THE CULTURE ORGANIZATION ALIGNMENT REWARD SYSTEM CONTROL CHAOS Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 27. 2X 27 Courtesy, in part, of Motorola SPS. Thank You! KEY GOALS 1.- TOTAL EQUIPMENT EFFECTIVENESS A) Equipment Breakdown B) M.T.B.A. C) M.T.B.F. 2.- REJECT CAUSED BY LINE EQUIPMENT 3.- LINE REJECT RATE 4.- CYCLE TIME 5.- FATAL ERROR AT CUSTOMER 6.- ON TIME DELIVERED 7.- MANUFACTURING COST % HOURS/MONTH MINUTES HOURS PPM % DAYS # OF % USD 85 1/10 1x10x 1x2x 1/5 1/5 0.8X 0 98 20% LESS 8.- LABOR PRODUCTIVITY Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 K.UNITS /# OF D/L TPM Awareness Information
  • 28. 28 Courtesy, in part, of Motorola SPS. Thank You! AUTONOMOUS MAINTENANCE. MANUFACTURING SPECIALIST Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 29. 29 Courtesy, in part, of Motorola SPS. Thank You! AUTONOMOUS MAINTENANCE IS: Maintenance performed by equipment operators. THE FIRST 3 STEPS OF AUTONOMOUS MAINTENANCE. STEP # 1 INITIAL CLEANING. STEP # 2 COUNTERMEASURES FOR THE CAUSES OF FORCED DETERIORATION AND IMPROVING HARD-TO-ACCESS AREAS . STEP # 3 MAKING A TENTATIVE CLEANING/ LUBRICATION STANDARD. Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 30. 3 7 2 30 Courtesy, in part, of Motorola SPS. Thank You! AUTONOMOUS MAINTENANCE 5 4 Selection Formats: Daily Cleaning & Initial Inspection Hot Spots, CAP-DO 5W´s Develop One Major Problems Point lesson 6 Put F Tags Step # 1 Initial Cleaning Standardization Cleaning / Lubrication Initial Cleaning (Inspection) Training in One Point Lesson Photos Before Photos After 1 8 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 31. 3 7 31 Courtesy, in part, of Motorola SPS. AUTONOMOUS MAINTENANCE 5 Thank You! 4 Put “F” Tags Failures Analysis Why´s Analysis Actions in Sources of Contamination & Hard access areas Step # 2 6 Find & List Areas of Hard Access Sources of Contamination & Hard Access Areas Modify Covers For Easy Visualization & Quick Disassemble Find & List Sources of Contamination Remove “F” Tags Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 2 Initial Inspection Final Inspection (Audit) 1 TPM Awareness Information 8
  • 32. 4 6 3 7 3 32 Courtesy, in part, of Motorola SPS. AUTONOMOUS MAINTENANCE 5 Thank You! Verify actual time Improve time of execution Detail activities Vs estimated Put “F” Tags (Establish time & frequency) Step # 3 Tentative Standards Remove “ F” Tags Cleaning / Lubrication implementation Apply activities to similar machines 2 2 Develop tentative standards 8 1 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 33. 44 34 27 1 2 33 Courtesy, in part, of Motorola SPS. Thank You! TPM Teams Status October 1997 • Number of Hot Spots detected: • Number of Hot Spots solved: • One Point Lesson developed: • One Point Lesson Taught: • Number of teams on TPM: • Teams on step 3: • Teams on step 2: • Teams on step 1: 284 126 24 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 34. 34 Courtesy, in part, of Motorola SPS. Thank You! PLANT OVERVIEW TPM Self Assessment Asia Benchmarking TPM Implementation Expansion Plan Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 Expansion Plan TPM Awareness Information
  • 35. 1 9 9 8 35 Courtesy, in part, of Motorola SPS. Thank You! T.P.M. DEPLOYMENT L I N E F L O W CURRENT EQUIPMENT IN T.P.M. SAME KIND OF EQUIPMENT 1999/2000 EXPANSION 1997 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 36. Line 36 Courtesy, in part, of Motorola SPS. Thank You! PROJECTED PROGRESS IN TEAMS Q-1’ 98 A.M. STEP # 1 A.M. STEP # 2 A.M. STEP # 3 Wafer Process Line 1 Line 2 Line 3 Line 4 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 11 03 03 04 TPM Awareness Information 16 11 08 01 03 01 01 01
  • 37. 37 Courtesy, in part, of Motorola SPS. Thank You! T.P.M. FOLLOW-UP TEAMS PRESENTATION TEAMS AUDITS TEAMS MEETING Consultant X MANAGERS VISITS PRESENTATION 6 TEAMS PER MONTH 6 TEAMS PER MONTH WEEKLY TWO DAY EVERY TWO MONTHLY MEETING MONTHS Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 38. 38 Courtesy, in part, of Motorola SPS. Thank You! PLANT OVERVIEW TPM Self Assessment Asia Benchmarking TPM Implementation Expansion Plan Pilot Team Case Study Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 Pilot Team Case Study TPM Awareness Information
  • 39. 39 Courtesy, in part, of Motorola SPS. Thank You! PILOT MACHINE N-62361 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 40. 40 Courtesy, in part, of Motorola SPS. Thank You! Defectives 30 25 20 23 20 25 22 18 20 21 17 19 23 15 10 5 5 7 8 6 5 9 6 3 4 3 3 2 4 6 8 6 5 4 7 6 0 N-662361 N-61162 N-634766 JAN 96 JUN FEB JUL MAR AUG APR SEP MAY OCT 96 Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 41. %T.C. ENE./96 MAR MAY JUL OCT./96 ABR %T.C. ABR AGO ENE./96 AGO MAR MAY SEP FEB JUN JUL SEP FEB JUN OCT./96 %T.C. FEB JUN AGO MAR OCT./96 ENE./96 MAY ABR JUL SEP 41 Courtesy, in part, of Motorola SPS. Thank You! DOWN TIME 25% 23% 23% 20% 20% 20% N-662361 15% 10% 17% 18% 12% 15% 18% 18% 5% 0% 25% 20% N-663242 15% 10% 5% 12% 11% 10% 11% 8% 9% 7% 6% 8% 10% 0% 25,00% 20,00% 15,00% N-649666 10,00% 5,00% 7,50% 8% 4% 7% 9% 5% 3% 5% 6% 8% 0,00% Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 42. 42 Courtesy, in part, of Motorola SPS. Thank You! CLEANING IS INSPECTION.... 5’S AUTONOMOUS MAINTENANCE Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 43. 43 Courtesy, in part, of Motorola SPS. Thank You! INSPECTION IS DETECTION. CRASH Broken Part Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 44. 44 Courtesy, in part, of Motorola SPS. Thank You! PRESSURE CORRECT INCORRECT TO MUCH PRESSURE CORRECT GAUGE ALIGNMENT INCORRECT NO Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 45. 45 Courtesy, in part, of Motorola SPS. Thank You! CORRECT CENTERING INCORRECT Dummy Part CORRECT SYMMETRY Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information INCORRECT BENT
  • 46. 46 Courtesy, in part, of Motorola SPS. Thank You! CONTACT CORRECT INCORRECT Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 47. 47 Courtesy, in part, of Motorola SPS. Thank You! TO STANDARDIZE AND PREVENT RECURRENCE One Point Lesson Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 48. 48 Courtesy, in part, of Motorola SPS. Thank You! MACHINE PERFORMANCE Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 49. Abr May Oct-96 Sep-96 Dec-96 Jan-97 Ago Mar Feb Jun Jul %D.T. Nov-96 Apr May Dec-96 Jan-97 Feb Oct-96 Mar Aug Sep Jun Jul Sep 49 Courtesy, in part, of Motorola SPS. Thank You! Defectives 25 20 15 23 18 “ ZERO” 10 10 6 Defectives 5 3 1 2 0 0 0 0 0 0 25% 20% 18% DOWN TIME 20% P.C. BOARD DAMAGED 15% 15% 12% 10% 5% 9% 8% 7% 5% 6% 4% 3% 3% 0% Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 50. 3 50 Courtesy, in part, of Motorola SPS. Thank You! WHAT IS NEXT? 6 Big LINK Losses 4 4 Autonomous Maintenance Planned Maintenance Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information
  • 51. 51 Courtesy, in part, of Motorola SPS. Thank You! Cayman Systems USA 513 777-3394 ©1998 Revision A 980810 TPM Awareness Information