2. www.xrosswater.com.
July 2012
Xrosswater Ltd
Xrosswater Ltd produce a unique industrial strength bulk shippable floating structure, designed for use in
mining and industrial water applications. Manufactured in USA & Europe under strict quality control, we offer a
pre-fabricated floating structure that is extremely versatile, immensely strong, light and made to last. All the
components are pre-formed, pre-drilled and packed in custom crates with all necessary fasteners and tools
included, facilitating rapid assembly and quick deployment in required locations.
View our website for video and PDF brochures in multiple languages. www.xrosswater.com
Xrosswater’s product uses material designed to withstand the harsh conditions prevalent in industrial
marine locations. The products ingenious patented design is multi-configurable, allowing the sections
to be assembled SIDE2SIDE, END2SIDE, END2END. So whether the requirement is a walkway, pipe
supports (up to 500kg p/m fully supported or greater if partially supported), pump platforms or work
platform, Xrosswater can offer a solution.
Xrosswater’s product has been designed from 20 years experience in the mining industry. The product
is primarily produced from aluminum, HDPE and laminated material, with a simple to follow pictorial
assembly guide. The product maintains a buoyancy of up to 1000 kg per 3m section. On-site assembly
set-up and training is offered.
Walkway Deck
A 12mm thick laminated marine deck, overlaid with a highly resistant NON-SLIP abrasion resistance
surface (Taber Test EN 438-2). Grey in color and similarly used as non-static ship decks, pedestrian
bridges, scaffolding and truck beds demonstrating the products strength, quality & weather resistance.
Aluminium or FRP Structure
The components are produced from RECYCLED aluminum. There are many optional fittings offering
pipeline support, cables tray, width expansion to make platforms etc. We offer as an option a 100%
FRP, Stainless steel and HDPE version now for low PH dams.
Handrail structure (optional)
The handrails structure is a TUBE FRP in bright safety yellow with black stanchions An option is a
10mm stainless steel cable with stainless steel turnbuckles coated in a thick bright safety yellow PVC.
Pipe support bracket for 300mm diameter (optional)
Pipe support bracket are available that easily attach to the outside edge of the walkway at deck level
and can support a pipeline up to 300mm in diameter.
Pipe support outrigger for 500mm diameter (optional)
larger pipelines can be suspended from extended crossmembers, thus lowering the center of gravity by
allowing the pipe weight to be supported by the water the walkway floats in itself.
Assembly
Once assembled, each section is 3m x 1.5m. Assembly is very fast and simple. 4-6 fitters can
assemble up to 70 meters per day
Helical Anchors.(optional)
New corrosion
proof system in
2012 for ACID
water tailings
3. www.xrosswater.com.
Helical anchors designed to be rotated into the ground by hand or with drive tools. Used as underwater
mooring anchors can be provided
Bulk Shippable
1 x 40ft (12m) container = 600 meters long x 1.5m wide
1 x 20ft (6m) container = 270 meters long x 1.5m
Xrosswater Warehouse & 8 drill CNC fabrication equipment
Since 1996 Xrosswater has pioneered the designing, producing and delivery of large floating
structures and floating walkways for mine and industrial requirement around-the-world. Clients
include: Debswana, Rio Tinto, Anglo Gold, Anglo Platinum, Exarro, Alberta Oil Sands, Plus Petrol
etc. To date over 7500 linear meters have been delivered across Asia, Africa, Americas with 500
meters carried into the Peruvian Amazon beneath a helicopter. The Xrosswater product is
manufactured in the USA & Europe by ISO certified manufactures.
Some of the recent projects completed;
Anglo Gold Ashanti, Namibia 42m
Koza Gold 320m, Turkey
Debswana 810m walkway and penstock platform
Plus Petrol, Peruvian Amazon 504m (Airlifted in by Chinook helicopter)
Water Reservoir, Algeria 417m with pipe line support and 6x6 pump platform
Downstream of Mine: Pollution monitor, Manitoba, Canada 21 m
Gold mine Zimbabwe 70m,
Oil Sand (Shell) Alberta Canada 90m with 2 specialised equipment platforms.
Debswana 270 m walkway with Grid inserts and penstock platform
4. www.xrosswater.com.
500 meter walkway in Peruvian Amazon Penstock platform on Mine Tailings Dam
504 Meter leaving for South America Units assembled ready for installation
Crates containing 21m x 1.5m of walkway Pipeline support brackets (300mm dia)
5. www.xrosswater.com.
Large Pipe suspended beneath outriggers.
Walkway Grate insert to reduce wind drag and optimize shipping capacity
Pipe & cable support for 300mm dia pipe
8. www.xrosswater.com.
Oil Sands Canada Operation 90 meters 11m hoisted into position (Oil Sands)
810 meters Diamond Mine in Africa
270m with 1m grid inserts for De Beers, Botswana